# BRIDGER PIPELINE LLC — Warning Letter

**Citation:** CPF 520165001W  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2016-02-09

CLOSED warning letter citing 195.54(b).

## Document text

Warning Letter involving BRIDGER PIPELINE LLC. PHMSA's enforcement data identifies the cited regulation as 195.54(b). The case was opened on 2016-02-09 and is reported as closed as of 2016-02-09. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520165001W_Warning Letter_02092016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520165001W/520165001W_Warning%20Letter_02092016.pdf

520165001W_Warning Letter_02092016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520165001W/520165001W_Warning%20Letter_02092016_text.pdf

520165001W_Warning Letter_02092016_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 9, 2016
Mr. Ken Dockweiler
Director-Land, Government and Compliance
Bridger Pipeline, LLC
PO Drawer 2360
Casper, WY 82602
CPF 5-2016-5001W
Dear Mr. Dockweiler:
On February 2, 2016, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, received a
supplemental accident report. The revised report included an accounting of property damage
caused by your January 17, 2015 crude oil release from your Yellowstone River pipeline
crossing near Glendive, Montana.
As a result of the inspection, it appears that you have committed a probable violation of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and
the probable violation is:
1. §195.54 Accident reports.
(b) Whenever an operator receives any changes in the information reported or
additions to the original report on DOT Form 7000-1, it shall file a supplemental
report within 30 days.



On February 13, 2015, Bridger submitted a written report for the crude oil release that
occurred on January 17, 2015. This initial report was preliminary due to the fact that there
was ice on the river and much of the information as to the apparent cause and costs associated
with the release was not available. On February 2, 2016, Bridger submitted a supplemental
report which included estimated costs to the operator totaling $7,367,683. PHMSA does not
consider a supplemental report one year after the original report to be timely.
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed
$200,000 per violation per day the violation persists up to a maximum of $2,000,000 for a
related series of violations. For violations occurring prior to January 4, 2012, the maximum
penalty may not exceed $100,000 per violation per day, with a maximum penalty not to
exceed $1,000,000 for a related series of violations. We have reviewed the circumstances and
supporting documents involved in this case, and have decided not to conduct additional
enforcement action or penalty assessment proceedings at this time. We advise you to correct
the cause of the late reporting identified in this letter. Future late reporting will result in
Bridger Pipeline, LLC being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF 5-2016-5001W. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any
portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b),
along with the complete original document you must provide a second copy of the document
with the portions you believe qualify for confidential treatment redacted and an explanation of
why you believe the redacted information qualifies for confidential treatment under 5 U.S.C.
552(b).
Sincerely,
For Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 P. Katchmar (#149545)

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520165001W>
- Source ID: `phmsa-enforcement`
- SHA-256: `ea61b43b222cd70eb26d6ea138491d5a2f9770a2cb95859d7fa88fb9abc8c812`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-25T02:50:30.188Z
- Document slug: `phmsa-enforcement-520165001w`

### Source metadata

```json
{
  "cpf": "520165001W",
  "operator": "BRIDGER PIPELINE LLC",
  "region": "Western",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.54(b)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "520165001W_Warning Letter_02092016.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520165001W/520165001W_Warning%20Letter_02092016.pdf",
      "bytes": 169656,
      "category": "agency_document"
    },
    {
      "name": "520165001W_Warning Letter_02092016_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520165001W/520165001W_Warning%20Letter_02092016_text.pdf",
      "bytes": 7396,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "BRIDGER PIPELINE LLC"
}
```