# CALNEV PIPELINE CO — Notice of Probable Violation

**Citation:** CPF 520175011  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2017-07-06

CLOSED notice of probable violation citing 195.402(a).

## Document text

Notice of Probable Violation involving CALNEV PIPELINE CO. PHMSA's enforcement data identifies the cited regulation as 195.402(a). The case was opened on 2017-07-06 and is reported as closed as of 2019-02-25. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520175011_Closure Letter_02252019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520175011/520175011_Closure%20Letter_02252019.pdf

520175011_Closure Letter_02252019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520175011/520175011_Closure%20Letter_02252019_text.pdf

520175011_Final Order_05012018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520175011/520175011_Final%20Order_05012018.pdf

520175011_Final Order_05012018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520175011/520175011_Final%20Order_05012018_text.pdf

520175011_NOPV PCO_07062017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520175011/520175011_NOPV%20PCO_07062017.pdf

520175011_NOPV PCO_07062017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520175011/520175011_NOPV%20PCO_07062017_text.pdf

520175011_Operator Response to Notice_08102017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520175011/520175011_Operator%20Response%20to%20Notice_08102017.pdf

520175011_Final Order_05012018_text.pdf

May 1, 2018
Mr. Steven J. Kean
President and Chief Executive Officer
Kinder Morgan, Inc.
1001 Louisiana Street, Suite 1000
Houston, Texas 77002
Re: CPF No. 5-2017-5011
Dear Mr. Kean:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation and specifies actions that need to be taken by Kinder Morgan’s subsidiary, CALNEV
Pipe Line, LLC, to comply with the pipeline safety regulations. When the terms of the
compliance order have been completed, as determined by the Director, Western Region, this
enforcement action will be closed. Service of the Final Order is effective as provided under
49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Director, Western Region, Office of Pipeline Safety, PHMSA
Mr. Wayne Simmons, Chief Operating Officer, Products Pipelines, Kinder Morgan
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
CALNEV Pipe Line, LLC, ) CPF No. 5-2017-5011
a subsidiary of Kinder Morgan, Inc., )
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On several occasions from September 7, 2016, through November 18, 2016, pursuant to
49 U.S.C. § 60117, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), Office of Pipeline Safety (OPS), conducted an on-site pipeline safety
inspection of the facilities and records of CALNEV Pipe Line, LLC’s (CALNEV or Respondent)
hazardous liquid pipeline running from Colton, California, to Las Vegas, Nevada. CALNEV, a
subsidiary of Kinder Morgan, Inc., (Kinder Morgan) operates this transmission pipeline, which is
approximately 550 miles long and transports jet fuel and refined products through parallel 14-
inch and 8-inch diameter pipelines that originate in Colton, California, and extend to terminals in
Barstow, California, and Las Vegas, Nevada.1 The pipeline system also serves Nellis Air Force
Base in Las Vegas, Nevada, McCarran International Airport in Las Vegas, Nevada, and Edwards
Air Force Base in the Mojave Desert in southeastern California.2
As a result of the inspection, the Director, Western Region, OPS (Director), issued to
Respondent, by letter dated July 6, 2017, a Notice of Probable Violation and Proposed
Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed
finding that CALNEV had committed two violations of 49 C.F.R. Part 195 and ordering
Respondent to take certain measures to correct the alleged violations.
CALNEV responded to the Notice by letter dated August 10, 2017 (Response). The company
contested the allegations, offered additional information in response to the Notice, and provided
information concerning the corrective actions it had taken. Respondent did not request a hearing
and therefore has waived its right to one.
1 Pipeline Safety Violation Report (Violation Report), (July 6, 2017) (on file with PHMSA), at 1; and Kinder
Morgan website, available at https://www.kindermorgan.com/pages/business/products_pipelines/calnev.aspx (last
accessed March 22, 2018).
2 Kinder Morgan website, available at
https://www.kindermorgan.com/pages/business/products_pipelines/calnev.aspx (last accessed March 22, 2018).



CPF No. 5-2017-5011
Page 2
FINDINGS OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 195, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.402(a), which states:
§ 195.402 Procedural manual for operations, maintenance, and
emergencies.
(a) General. Each operator shall prepare and follow for each pipeline
system a manual of written procedures for conducting normal operations
and maintenance activities and handling abnormal operations and
emergencies. This manual shall be reviewed at intervals not exceeding 15
months, but at least once each calendar year, and appropriate changes made
as necessary to insure that the manual is effective. This manual shall be
prepared before initial operations of a pipeline system commence, and
appropriate parts shall be kept at locations where operations and
maintenance activities are conducted.
The Notice alleged that Respondent violated 49 C.F.R. § 195.402(a) by failing to follow for each
pipeline system a manual of written procedures for conducting normal operations and
maintenance activities and handling abnormal operations and emergencies. Specifically, the
Notice alleged that CALNEV did not follow its written procedure, Atmospheric Breakout Tank
Inspections (L-O&M 2101) when it failed to adequately document the condition of three
breakout tanks (i.e., Tanks #120, #321, and #521) on monthly inspection reports. Kinder
Morgan’s L-O&M 2101, Section 3.1.1, states, in relevant part:
This in-service inspection shall include a visual inspection of the tank’s
exterior surfaces. Evidence of leaks; shell distortions; signs of settlement;
corrosion; and condition of the foundation, paint and coatings, insulation
systems, and appurtenances shall be documented on L-OM2100-02,
Monthly Breakout Tank Inspection Report and reported to the local
supervisor. 3
The Notice alleged that CALNEV did not properly document the atmospheric corrosion
conditions on the Monthly Breakout Tank Inspection reports for the following three tanks:
Tank #120
The Notice alleged that the annual inspections conducted by CALNEV’s contractor had
indicated paint failures and rust observed on Tank #120’s roof, shell and appurtenances for the
2015 and 2016 annual inspections. However, the 2015 and 2016 monthly inspections conducted
by CALNEV employees did not record the same information and only indicated the roof, shell
and its appurtenances were “Okay.” Additionally, the Notice alleged that during its own 2016
inspection, PHMSA observed atmospheric corrosion and coating degradations on the shell and
its appurtenances, which were not listed by CALNEV on its Monthly Breakout Tank Inspections
Reports.
3 Violation Report, Exhibit H (emphasis in original).



CPF No. 5-2017-5011
Page 3
In its Response, CALNEV acknowledged the failure of its employees to properly document
observations about the paint condition on Tank #120.4 However, CALNEV argued that Tank
#120 did not have atmospheric corrosion or coating degradations on the shell and its
appurtenances, as alleged in the Notice.5 CALNEV pointed to PHMSA’s website, which defines
the term “corrosion” as the deterioration of metal, resulting from a reaction with its
environment.6 CALNEV asserted that the PHMSA inspector only observed a “light, non-
injurious surface oxide involving no metal loss” because the atmospheric conditions in Colton,
California, were not “conducive to creating a corrosive environment.”7
Having reviewed the record, I find that while CALNEV is correct that corrosion can be defined
as “the deterioration of metal, resulting from a reaction with its environment,” it is important to
note that common rust is an example of metal corrosion. In fact, this is explained in the
definition of corrosion that Respondent cited.8 The photographs taken during the PHMSA
inspection clearly show rust on Tank #120, disproving Respondent’s claim that conditions are
not conducive to corrosion.9 Not only did the PHMSA inspector observe and photograph
corrosion on Tank #120, this condition was corroborated by the observations of the contractor
during the annual inspections, as noted in the annual inspection reports. This condition was not
properly documented in accordance with Kinder Morgan’s Atmospheric Breakout Tank
Inspections (L-O&M 2101) procedure and therefore, I find that CALNEV failed to follow its
own written procedure.
Tank #321 and Tank #521
The Notice alleged that the 2015 and 2016 annual inspections by CALNEV’s contractor and
monthly inspections by CALNEV personnel indicated paint failures/discolorations on the shells
and appurtenances of Tanks #321 and #521, but no atmospheric corrosion conditions. During its
own 2016 inspection, PHMSA observed, in addition to the coating deterioration, atmospheric
corrosion on the shells and appurtenances, which was not listed on the monthly inspection
reports.
In its Response, CALNEV asserted that its personnel followed L-O&M 2101 and properly
documented their observations. CALNEV again asserted that the PHMSA inspector was
mistaken and only observed a “light, non-injurious surface oxide involving no metal loss.”10
4 Response, at 1.
5 Id., at 1, 2.
6 Id., at 2.
7 Id.
8 PHMSA Pipeline Glossary, available at https://primis.phmsa.dot.gov/comm/glossary/#Corrosion (last accessed
February 21, 2018).
9 Violation Report, Exhibit K.
10 Response at 1, 2.



CPF No. 5-2017-5011
Page 4
As discussed above, rust is an example of metal corrosion. During its 2016 inspection, PHMSA
observed and photographed rust on Tank #321.11 This condition was not properly documented
by CALNEV in accordance with Kinder Morgan’s L-O&M 2101 and, therefore, I find that
CALNEV failed to follow its own written procedure.
In summary, after considering all of the evidence, I find that Respondent violated 49 C.F.R.
§ 195.402(a) by failing to follow for each pipeline system its own manual of written procedures
for conducting normal operations and maintenance activities and handling abnormal operations
and emergencies (specifically, Kinder Morgan’s L-O&M 2101) when it did not properly
document the corrosion conditions for Tank #120, Tank #321, and Tank #521.
Item 2: The Notice alleged that Respondent violated 49 C.F.R. § 195.402(a), as quoted above,
by failing to follow for each pipeline system a manual of written procedures for conducting
normal operations and maintenance activities and handling abnormal operations and
emergencies. Specifically, the Notice alleged that CALNEV failed to follow its own written
procedure, Inspecting for Atmospheric Corrosion (L-O&M 918) ,when it did not adequately
document atmospheric corrosion conditions at four locations. Kinder Morgan’s L-O&M 918,
Section 3.4, states, in relevant part:
Visually inspect all onshore, aboveground piping and structural components for
evidence of atmospheric corrosion at least once every 3 calendar years, but with
intervals not to exceed 39 months (L-O&M Procedure 1700, Inspection &
Maintenance, L-I&M I-1141.00). . .
During inspection, give particular attention to the following components:
a. Flange gaps and bolts
b. Soil-to-Air Interface
c. Splash zones
d. Air/building interface
e. Crevices
f. Pipe supports and wear pads
g. Pipe under insulation
h. Spans/bridges
i. Deck penetrations12
This procedure includes an attachment for evaluating and grading the conditions of above-
ground piping and associated structural components for signs of atmospheric corrosion. This
attachment contains sample pictures of atmospheric conditions of above-ground pipe and
instructions on how to grade or evaluate the conditions as being “Good,” “Fair,” or “Poor.”13
11 Violation Report, Exhibit N and Exhibit Q.
12 Id., Exhibit R (emphasis in original).
13 Id., Exhibit S.



CPF No. 5-2017-5011
Page 5
The Notice alleged that CALNEV’s 2014, 2015, and 2016 atmospheric-corrosion inspection
records, as well as the 2014 and 2016 Bridge/Span inspection reports, indicated all the
atmospheric-corrosion conditions on the above-ground pipes were evaluated as “Good.” At the
time of the inspection, however, PHMSA observed and photographed several above-ground
pipes and components with atmospheric corrosion that should have been evaluated as “Fair” or
“Poor,” according to L-O&M 918. The incorrect evaluations involved the following four
locations:
Colton North Terminal
The Notice alleged during its 2016 inspection, PHMSA observed signs of atmospheric corrosion
on the soil-to-air interface of the pipe at the Colton North Terminal, coating disbondment on the
pipe, corrosion and pitting on the pipe under the above-ground flange that had inadvertently been
buried, an above-ground valve body that was also inadvertently buried, and signs of corrosion
pitting and coating deterioration on pump equipment.
Valley Wells Pump Station
The Notice alleged that during its 2016 inspection, PHMSA observed that pump equipment at
the Valley Wells Pump Station had been inadvertently buried and showed signs of atmospheric
corrosion.
With respect to these two locations, CALNEV agreed that there may have been “some coating
deterioration,” but disagreed with the allegations regarding atmospheric corrosion.14 In addition,
CALNEV stated that its procedure L-O&M 918 applied to the inspection of above-ground
components for corrosion, not for inspecting coating. CALNEV further argued that components
below ground were subject to a different Kinder Morgan inspection procedure (L-O&M 903).
Finally, CALNEV argued there were no conditions at the above two locations involving metal
loss on the components and no condition that could affect the safe operation of the components
before the next inspection.15
I am unpersuaded by CALNEV’s arguments. Having reviewed the record, I note, as mentioned
above, that Kinder Morgan’s procedure directs employees to an attachment - L-O&M 918
Atmospheric Corrosion Inspection Guidelines - for guidelines on “grading coating condition.”
These guidelines specifically utilize levels of coating deterioration for grading atmospheric
corrosion. Additionally, while CALNEV asserted that observed conditions did not involve metal
loss or any effect on safe operations, L-O&M 918 and the attachment do not instruct conditions
to be graded as “Good” in the absence of metal loss or conditions affecting safe operations.
Rather the procedures require the evaluation and grading of levels of corrosion based on certain
criteria and illustrations related to the condition of the coating and topcoat, location of corrosion,
and the presence of any pitting or scale.
14 Response at 2.
15 Id.



CPF No. 5-2017-5011
Page 6
Further, the photographs clearly show the coating was not “intact” or “limited to ‘chalking’” and
that the atmospheric corrosion was beyond mere “minor surface corrosion,” and, therefore,
should not have been graded “Good,” according to Kinder Morgan’s own Atmospheric
Corrosion Inspection Guidelines.
16 The photographs also show that the components were
installed as above-ground components, but had become surrounded by mostly gravel. If the
components were meant to be buried, they would have had to meet different coating
requirements that would protect against external corrosion caused by the elements of the soil
environment, whereas, in this case, after digging less than 1/2 inch of gravel to expose the
components, the riser pipe connected to the flange showed severe external corrosion and no
coating.
Therefore, I find that CALNEV failed to follow its procedures when it did not properly grade
corrosion conditions at the above two locations.
Las Vegas Terminal
The Notice alleged that during its 2016 inspection, PHMSA observed a metallic contact between
an above-ground pipe and a metallic support. The inspector also observed that the surface area
within the vicinity of the metallic contact showed galvanic corrosion activity. Because of this
existing condition, the Notice alleged, the PHMSA inspector was unable to conduct an accurate
atmospheric-corrosion inspection on the contact surface.
In its Response, CALNEV stated that it had submitted to PHMSA the two most recent Facility
Risk Evaluations, which indicated “no substantial risk related to atmospheric corrosion.”
CALNEV also stated it had provided wall-thickness evaluations for the pipe in question,
demonstrating “no wall loss.”17 CALNEV also noted that the pipe was resting on a 3/4-inch
piece of hot roll steel that was “designed to wear due to pipe movement, and thus eliminate
degradation of the pipeline wall thickness.”18
PHMSA has since reviewed the information provided by CALNEV following the 2016 PHMSA
inspection, accepts this documentation, and therefore withdraws this alleged violation for Item 2.
Baldy Mesa Aqueduct Pipe Span
The Notice alleged during its 2016 inspection, PHMSA observed signs of atmospheric corrosion
on a span of 14-inch pipe at the California Aqueduct overhead crossing near Baldy Mesa Road.
In its Response, CALNEV asserted that it had recently discovered, after reviewing additional
records, that the PHMSA inspector was observing a casing and not a carrier pipe. At the time of
the inspection, a Kinder Morgan employee had incorrectly advised the PHMSA inspector that it
was a carrier pipe.
16 Violation Report, Exhibits S, V and W.
17 Response at 3.
18 Id.



CPF No. 5-2017-5011
Page 7
Having reviewed the evidence in the record, I find that by failing to correctly identify the
inspected component as a casing on its inspection forms, CALNEV did not accurately complete
the 2014-2016 Annual Bridge/Span Inspection Report form. Therefore, CALNEV failed to
follow its procedures when it did not properly document the inspection at the above location.
In summary, after considering all of the evidence, I find that Respondent violated 49 C.F.R.
§ 195.402(a) by failing to follow for each pipeline system a manual of written procedures for
conducting normal operations and maintenance activities and handling abnormal operations and
emergencies (specifically, Kinder Morgan’s L-O&M 918) when it did not properly document
conditions at three locations. The allegation related to the Las Vegas Terminal, however, is
withdrawn.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Items 1 and 2 in the Notice for
violations of 49 C.F.R. § 195.402(a). Under 49 U.S.C. § 60118(a), each person who engages in
the transportation of hazardous liquids or who owns or operates a pipeline facility is required to
comply with the applicable safety standards established under chapter 601.
With regard to the violations of § 195.402(a) (Items 1 and 2), Respondent argued that the
compliance terms should be withdrawn. While CALNEV agreed that it had failed to follow a
portion of its procedures in “one very narrow circumstance,” but that one instance had since been
corrected.19 CALNEV argued that the compliance terms were unnecessary,20 and that it had
been fully compliant with the regulations and its procedures.21 Since I have already determined
that Respondent violated § 195.402(a) as discussed above, the proposed compliance order is not
withdrawn in its entirety, but only that portion pertaining to the Las Vegas Terminal. The
compliance order is also modified based on CALNEV’s response to the allegation relating to the
Baldy Mesa Aqueduct Pipe Span for Item 2.
As for Item 1 and for all the facilities covered under Item 2 (except for the Las Vegas Terminal),
pursuant to the authority of 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is
ordered to take the following actions to ensure compliance with the pipeline safety regulations
applicable to its operations:
1. With respect to the violation of § 195.402(a) (Items 1 and 2), Respondent must
requalify all its personnel who conducted atmospheric corrosion inspections from
2014 to 2016, and provide adequate training in evaluating atmospheric corrosion
conditions of pipeline systems and in-service breakout tanks;
19 Id., at 1.
20 Id., at 4.
21 Id., at 1 and 4.



CPF No. 5-2017-5011
Page 8
2. With respect to the violation of § 195.402(a) (Item 2), Respondent must amend
the Bridge/Span Inspection Report Form to include an indication on the form that the
pipe spans inspected are pipe casing;
3. With respect to the violation of § 195.402(a) (Item 2), Respondent must conduct a
full survey to locate all pipeline components that have been inadvertently buried and
mitigate any issues found; and
4. Submit to the Director, Western Region, OPS, within 180 days following receipt
of this Final Order, written documentation of steps taken to satisfy Compliance Order
Items 1 through 3 above.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension.
In addition, pursuant to the authority of 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217,
Respondent is requested (not mandated) to take the following action:
CALNEV should maintain documentation of the safety improvement costs associated
with fulfilling this Compliance Order and submit the total to Director, Western
Region, Pipeline and Hazardous Materials Safety Administration. It is requested that
these costs be reported in two categories: 1) total cost associated with
preparation/revision of plans, procedures, studies and analyses; and 2) total cost
associated with replacements, additions and other changes to pipeline infrastructure.
Failure to comply with this Order may result in the administrative assessment of civil penalties
not to exceed $200,000, as adjusted for inflation (49 C.F.R. § 190.223), for each violation for
each day the violation continues or in referral to the Attorney General for appropriate relief in a
district court of the United States.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address, no later than 20 days after receipt of service of this
Final Order by Respondent. Any petition submitted must contain a statement of the issue(s) and
meet all other requirements of 49 C.F.R. § 190.243. The terms of the order, including corrective
action, remain in effect unless the Associate Administrator, upon request, grants a stay. The
terms and conditions of this Final Order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
May 1, 2018
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

520175011_Closure Letter_02252019_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 25, 2019
Mr. Steven J. Kean
President and Chief Executive Officer
Kinder Morgan, Inc.
1001 Louisiana Street, Suite 1000
Houston, Texas 77002
CPF 5-2017-5011
Case Closure
Dear Mr. Kean:
On May 1, 2018, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Kinder Morgan’s subsidiary, CALNEV Pipeline, LLC a Final Order in the above-
referenced case. This Order included a Compliance Order. Based on our review of the
documentation you provided on January 31, 2019 in your office at Orange, California, it has
been determined that you have complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Chris Hoidal
Acting Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 M. Garcia

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520175011>
- Source ID: `phmsa-enforcement`
- SHA-256: `db9fe81f0887365b4489bb2f48f5d1185891bef0d6d7acdfb2c650918a2dd8d7`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T01:02:12.709Z
- Document slug: `phmsa-enforcement-520175011`

### Source metadata

```json
{
  "cpf": "520175011",
  "operator": "CALNEV PIPELINE CO",
  "region": "Western",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.402(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 7,
  "attachments": [
    {
      "name": "520175011_Closure Letter_02252019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520175011/520175011_Closure%20Letter_02252019.pdf",
      "bytes": 29269,
      "category": "agency_document"
    },
    {
      "name": "520175011_Closure Letter_02252019_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520175011/520175011_Closure%20Letter_02252019_text.pdf",
      "bytes": 83930,
      "category": "agency_document"
    },
    {
      "name": "520175011_Final Order_05012018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520175011/520175011_Final%20Order_05012018.pdf",
      "bytes": 1414448,
      "category": "agency_document"
    },
    {
      "name": "520175011_Final Order_05012018_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520175011/520175011_Final%20Order_05012018_text.pdf",
      "bytes": 147643,
      "category": "agency_document"
    },
    {
      "name": "520175011_NOPV PCO_07062017.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520175011/520175011_NOPV%20PCO_07062017.pdf",
      "bytes": 317828,
      "category": "case_document"
    },
    {
      "name": "520175011_NOPV PCO_07062017_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520175011/520175011_NOPV%20PCO_07062017_text.pdf",
      "bytes": 113619,
      "category": "case_document"
    },
    {
      "name": "520175011_Operator Response to Notice_08102017.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520175011/520175011_Operator%20Response%20to%20Notice_08102017.pdf",
      "bytes": 1082937,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "CALNEV PIPELINE CO"
}
```