# THUNDER CREEK NGL PIPELINE, LLC — Notice of Probable Violation

**Citation:** CPF 520175019  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2017-08-14

CLOSED notice of probable violation citing 195.403(b)(1), 195.404(b)(1), 195.420(b), 195.428(a), 195.55(a)(4).

## Document text

Notice of Probable Violation involving THUNDER CREEK NGL PIPELINE, LLC. PHMSA's enforcement data identifies the cited regulations as 195.403(b)(1),  195.404(b)(1),  195.420(b),  195.428(a),  195.55(a)(4). The case was opened on 2017-08-14 and is reported as closed as of 2018-03-30. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520175019_Closure Letter_03302018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520175019/520175019_Closure%20Letter_03302018.pdf

520175019_Closure Letter_03302018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520175019/520175019_Closure%20Letter_03302018_text.pdf

520175019_Final Order_03292018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520175019/520175019_Final%20Order_03292018.pdf

520175019_Final Order_03292018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520175019/520175019_Final%20Order_03292018_text.pdf

520175019_NOPV PCO_08142017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520175019/520175019_NOPV%20PCO_08142017.pdf

520175019_NOPV PCO_08142017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520175019/520175019_NOPV%20PCO_08142017_text.pdf

520175019_Operator Response to Notice_09072017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520175019/520175019_Operator%20Response%20to%20Notice_09072017.pdf

520175019_Final Order_03292018_text.pdf

March 29, 2018
Mr. Steven B. Huckaby
Chairman & CEO
Thunder Creek NGL Pipeline, LLC
1331 17th Street # 1100
Denver, CO 80202
Re: CPF No. 5-2017-5019
Dear Mr. Huckaby:
Enclosed please find the Final Order issued in the above-referenced case. It makes one finding
of violation and finds that Thunder Creek NGL Pipeline, LLC, a wholly-owned subsidiary of
Meritage Midstream Services II, LLC, has completed the actions specified in the Notice to
comply with the pipeline safety regulations. Therefore, this case is now closed. Service of the
Final Order by certified mail is effective upon the date of mailing as provided under 49 C.F.R.
§ 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Director, Western Region, Office of Pipeline Safety, PHMSA
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
_______________________________________________
In the Matter of )
Thunder Creek NGL Pipeline, LLC, ) CPF No. 5-2017-5019
a subsidiary of Meritage Midstream Services II, LLC, )
)
)
)
Respondent. )
_______________________________________________ )
FINAL ORDER
From September 26 through 28, 2016, pursuant to 49 U.S.C. § 60117, a representative of the
Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety
(OPS), conducted an on-site pipeline safety inspection of the facilities and records of Thunder
Creek NGL Pipeline, LLC (TCNGL or Respondent), a wholly-owned subsidiary of Meritage
Midstream Services II, LLC, in Gillette, Wyoming. TCNGL operates a 6-inch, 82.9-mile-long
natural gas liquids pipeline and an 8-inch, 22.7-mile-long natural gas liquids pipeline. The
pipelines run between Gillette and Douglas, Wyoming.1
As a result of the inspection, the Director, Western Region, OPS (Director), issued to
Respondent, by letter dated August 14, 2017, a Notice of Probable Violation and Proposed
Compliance Order (Notice), which also included warning items pursuant to 49 C.F.R. § 190.205.
In accordance with 49 C.F.R. § 190.207, the Notice proposed finding that TCNGL had violated
49 C.F.R. § 195.55(a)(4) and proposed ordering Respondent to take certain measures to correct
the alleged violation. The warning items required no further action but warned the operator to
correct the probable violations or face possible future enforcement action.
TCNGL responded to the Notice by letter dated September 7, 2017 (Response). The company
did not contest the allegation of violation and provided information concerning the corrective
actions it had taken. Respondent did not request a hearing and therefore has waived its right to
one.
FINDING OF VIOLATION
TCNGL did not contest the allegation in the Notice that it violated 49 C.F.R. Part 195, as
1 http://www.meritagemidstream.com/operations/powder-river-basin/thunder-creek-ngl-pipeline (visited Nov. 20,
2017); Pipeline Safety Violation Report (Violation Report) (Aug. 14, 2017) (on file with PHMSA), at 1.



CPF No. 5-2017-5019
Page 2
follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.55(a)(4), which states:
§ 195.55 Reporting safety-related conditions.
(a) Except as provided in paragraph (b) of this section, each operator
shall report in accordance with § 195.56 the existence of any of the
following safety-related conditions involving pipelines in service: . . .
(1) …
(4) Any malfunction or operating error that causes the pressure of a
pipeline to rise above 110 percent of its maximum operating pressure. . . .
The Notice alleged that Respondent violated 49 C.F.R. § 195.55(a)(4) by failing to report the
existence of a malfunction or operating error that caused the pressure of its pipeline to rise above
110 percent of its maximum operating pressure. Specifically, the Notice alleged that TCNGL
failed to report a safety-related condition after the operator over-pressured a segment of an
isolated four feet of pipe running from the mainline pumps to the pig launcher at the 50 Buttes
gas plant. During the inspection, a TCNGL representative confirmed that the pressure at this
isolated segment reached 2000 psi while the maximum operating pressure of the system was only
1440 psi.
Respondent did not contest this allegation of violation. Accordingly, based upon a review of all
of the evidence, I find that Respondent violated 49 C.F.R. § 195.55(a)(4) by failing to report the
existence of a malfunction or operating error that caused the pressure of its pipeline to rise above
110 percent of its maximum operating pressure.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Item 1 in the Notice for a violation of
49 C.F.R. § 195.55(a)(4). Under 49 U.S.C. § 60118(a), each person who engages in the
transportation of hazardous liquids or who owns or operates a pipeline facility is required to
comply with the applicable safety standards established under chapter 601. The Director
indicates that Respondent has taken the following actions specified in the proposed compliance
order:
1. With respect to the violation of § 195.55(a)(4) (Item 1), Respondent removed and
replaced the impacted pipe by June 13, 2015.2 Additionally, TCNGL reviewed
operating procedures with personnel to prevent the creation of thermal-expansion
pockets, as well as locked open certain manual valves that could be closed to
2 Response, at 2.



CPF No. 5-2017-5019
Page 3
create potential thermal-expansion pockets.3 On November 14, 2017, TCNGL
filed a safety-related condition report in accordance with § 195.55(a)(4).
Accordingly, I find that compliance has been achieved with respect to this violation. Therefore,
the compliance terms proposed in the Notice are not included in this Order.
WARNING ITEMS
With respect to Items 2, 3, 4, and 5, the Notice alleged probable violations of Part 195, but did
not propose a civil penalty or compliance order for these items. Therefore, these are considered
to be warning items. The warnings were for:
49 C.F.R. § 195.404(b)(1) (Item 2) ─ Respondent’s alleged failure to record and
maintain discharge records from March 2015 through July 2015;
49 C.F.R. § 195.403(b)(1) (Item 3) ─ Respondent’s alleged failure to review with
personnel their performance in meeting the objectives of the company’s
emergency-response program per the requirements of § 195.403;
49 C.F.R. § 195.420(b) (Item 4) ─ Respondent’s alleged failure to inspect its
mainline valves, pursuant to § 195.420(b), at intervals not exceeding 7½ months,
but at least twice each calendar year after commissioning the pipeline in March
2015; and
49 C.F.R. § 195.428(a) (Item 5) ─ Respondent’s alleged failure to inspect each
pressure-relief valve on a highly volatile liquid pipeline twice each calendar year,
at intervals not to exceed 7½ months.
TCNGL presented information in its Response showing that it had taken certain actions to
address the cited items. If OPS finds a violation of any of these items in a subsequent inspection,
Respondent may be subject to future enforcement action.
The terms and conditions of this Final Order are effective upon service in accordance with
49 C.F.R. § 190.5.
March 29, 2018
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety
3 Id.

520175019_Closure Letter_03302018_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
March 30, 2018
Mr. Steven B. Huckaby
Chairman & CEO
Meritage Midstream
1331 17th Street #1100
Denver, CO 80202
CPF 5-2017-5019
Closure Letter
Dear Mr. Huckaby:
On March 29, 2018, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Meritage Midstream a Final Order in the above-referenced case. This Order
included a Compliance Order requirement to take corrective actions on your pipeline. Based
on our review of the documentation you provided, it has been determined that you have
complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Kim West
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 G. Ogirima (#154353)

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520175019>
- Source ID: `phmsa-enforcement`
- SHA-256: `c0fd5502926ffb3819d5c807cb179af84e13a392958debe055c25eedd23c1a38`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-25T17:14:45.171Z
- Document slug: `phmsa-enforcement-520175019`

### Source metadata

```json
{
  "cpf": "520175019",
  "operator": "THUNDER CREEK NGL PIPELINE, LLC",
  "region": "Western",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.403(b)(1)",
    "195.404(b)(1)",
    "195.420(b)",
    "195.428(a)",
    "195.55(a)(4)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 7,
  "attachments": [
    {
      "name": "520175019_Closure Letter_03302018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520175019/520175019_Closure%20Letter_03302018.pdf",
      "bytes": 29982,
      "category": "agency_document"
    },
    {
      "name": "520175019_Closure Letter_03302018_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520175019/520175019_Closure%20Letter_03302018_text.pdf",
      "bytes": 72264,
      "category": "agency_document"
    },
    {
      "name": "520175019_Final Order_03292018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520175019/520175019_Final%20Order_03292018.pdf",
      "bytes": 706844,
      "category": "agency_document"
    },
    {
      "name": "520175019_Final Order_03292018_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520175019/520175019_Final%20Order_03292018_text.pdf",
      "bytes": 116013,
      "category": "agency_document"
    },
    {
      "name": "520175019_NOPV PCO_08142017.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520175019/520175019_NOPV%20PCO_08142017.pdf",
      "bytes": 212346,
      "category": "case_document"
    },
    {
      "name": "520175019_NOPV PCO_08142017_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520175019/520175019_NOPV%20PCO_08142017_text.pdf",
      "bytes": 110082,
      "category": "case_document"
    },
    {
      "name": "520175019_Operator Response to Notice_09072017.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520175019/520175019_Operator%20Response%20to%20Notice_09072017.pdf",
      "bytes": 336298,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "THUNDER CREEK NGL PIPELINE, LLC"
}
```