# TESORO ALASKA PIPELINE COMPANY LLC — Notice of Amendment

**Citation:** CPF 520186008M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2018-03-16

CLOSED notice of amendment citing 195.446(a), 195.446(c), 195.446(e)(1), 195.446(j).

## Document text

Notice of Amendment involving TESORO ALASKA PIPELINE COMPANY LLC. PHMSA's enforcement data identifies the cited regulations as 195.446(a),  195.446(c),  195.446(e)(1),  195.446(j). The case was opened on 2018-03-16 and is reported as closed as of 2018-07-05. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520186008M_Notice of Amendment_03162018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520186008M/520186008M_Notice%20of%20Amendment_03162018.pdf

520186008M_Notice of Amendment_03162018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520186008M/520186008M_Notice%20of%20Amendment_03162018_text.pdf

520186008M_Operator Response To Notice and Request for Hearing_04202018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520186008M/520186008M_Operator%20Response%20To%20Notice%20and%20Request%20for%20Hearing_04202018.pdf

520186008M_Region Withdrawal of Notice Letter_07052018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520186008M/520186008M_Region%20Withdrawal%20of%20Notice%20Letter_07052018.pdf

520186008M_Region Withdrawal of Notice Letter_07052018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520186008M/520186008M_Region%20Withdrawal%20of%20Notice%20Letter_07052018_text.pdf

520186008M_Notice of Amendment_03162018_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
March 16, 2018
Mr. Don Sorenson
Senior Vice President, Logistics
Tesoro Alaska Pipeline Company LLC
19100 Ridgewood Parkway
San Antonio, TX 78259
CPF 5-2018-6008M
Dear Mr. Sorenson:
On several occasions between September 11, 2017 and September 20, 2017, a representative
of the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline
Safety (OPS), pursuant to Chapter 601 of 49 United States Code, inspected Tesoro Alaska
Pipeline Company LLC (Tesoro) procedures for Control Room Management (CRM) in
Nikiski and Anchorage, Alaska.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
Tesoro’s plans or procedures, as described below:



1. § 195.446 Control Room Management.
(a) General. This section applies to each operator of a pipeline facility with a
controller working in a control room who monitors and controls all or part of a
pipeline facility through a SCADA system. Each operator must have and follow
written control room management procedures that implement the requirements
of this section. The procedures required by this section must be integrated, as
appropriate, with the operator's written procedures required by § 195.402.
…
(c) Provide adequate information. Each operator must provide its controllers with
the information, tools, processes and procedures necessary for the controllers to
carry out the roles and responsibilities the operator has defined by performing
each of the following:
Tesoro’s Preventative Maintenance (SAP) system inventory was inadequate for not listing the
safety-related point for the pressure transmitter, PT 002a located at the Anchorage terminal.
PT 002a was not part of the SAP system inventory. There are four safety-related points in the
system, at the time of the inspection, only the three Nikiski Terminal safety-related points
were listed in the SAP system inventory. Operational procedures must insure that preventative
maintenance tasks for safety related points are completed and tracked in a comprehensive,
reliable, and repeatable manner. The tracking of preventative maintenance tasks for the three
safety related points at the Nikiski facility in one system separate from the system used for the
single Anchorage safety related points increases the likelihood that the four points will not be
maintained in a like manner.
2. § 195.446 Control Room Management.
(a) General. This section applies to each operator of a pipeline facility with a
controller working in a control room who monitors and controls all or part of a
pipeline facility through a SCADA system. Each operator must have and follow
written control room management procedures that implement the requirements
of this section. The procedures required by this section must be integrated, as
appropriate, with the operator's written procedures required by § 195.402.
…
(e) Alarm management. Each operator using a SCADA system must have a
written alarm management plan to provide for effective controller response to
alarms. An operator's plan must include provisions to:
(1) Review SCADA safety-related alarm operations using a process that ensures
alarms are accurate and support safe pipeline operations;
The Tesoro document, WP123, specifies that alarm reviews will be completed by the alarm
review team which includes, as one of its members, the Alarm System Coordinator. Section 6
of WP123 identifies specific roles and responsibilities of the Alarm System Coordinator;
however, the document fails to identify which Tesoro staff positions or personnel are deemed
competent to fill this role.
2



3. § 195.446 Control Room Management.
(a) General. This section applies to each operator of a pipeline facility with a
controller working in a control room who monitors and controls all or part of a
pipeline facility through a SCADA system. Each operator must have and follow
written control room management procedures that implement the requirements
of this section. The procedures required by this section must be integrated, as
appropriate, with the operator's written procedures required by §195.402.
. . . .
(j) Compliance and deviations. An operator must maintain for review during
inspection:
(1) Records that demonstrate compliance with the requirements of this section;
and
(2) Documentation to demonstrate that any deviation from the procedures
required by this section was necessary for the safe operation of the pipeline
facility.
Tesoro CRM Procedure 10.2 identifies the following key personnel required for completion of
the Tesoro CRM Annual Review Form:
DOT Compliance Manager
Logistics Regional Manager
Shift Leaders
Controller
The Tesoro procedures do not demonstrate a link between the Logistics Regional Manager
and what person/position fills that role at the Nikiski location. Further, the signature blocks of
the Tesoro Control Room Management Review form do not identify the four staff positions
(DOT Compliance Manager, Logistics Regional Manager, Shift Leaders, and Controller) for
the persons placing their signatures as reviewers.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed
as part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U.S.C. 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted
information qualifies for confidential treatment under 5 U.S.C. 552(b).
3



Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days
of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in
this Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as
alleged in this Notice without further notice to you and to issue an Order Directing
Amendment. If your plans or procedures are found inadequate as alleged in this Notice, you
may be ordered to amend your plans or procedures to correct the inadequacies (49 C.F.R. §
190.206). If you are not contesting this Notice, we propose that you submit your amended
procedures to my office within 60 days of receipt of this Notice. This period may be extended
by written request for good cause. Once the inadequacies identified herein have been
addressed in your amended procedures, this enforcement action will be closed.
It is requested (not mandated) that Tesoro Alaska Pipeline Company LLC maintain
documentation of the safety improvement costs associated with fulfilling this Notice of
Amendment (preparation/revision of plans, procedures) and submit the total to Kim West,
Acting Director, Western Region, Pipeline and Hazardous Materials Safety Administration. In
correspondence concerning this matter, please refer to CPF 5-2018-6008M and, for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Kim West
Acting Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 M. Chard (#155158)
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
4

520186008M_Region Withdrawal of Notice Letter_07052018_text.pdf

WITHDRAWAL of NOTICE LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
July 5, 2018
Mr. Don Sorenson
Senior Vice President, Logistics
Tesoro Alaska Pipeline Company LLC
19100 Ridgewood Parkway
San Antonio, TX 78259
CPF 5-2018-6008M
Dear Mr. Sorenson:
On March 16, 2018, Tesoro Alaska Pipeline Company LLC was issued a Notice of Amendment
letter for the case number referenced above. This Notice cited Tesoro Alaska Pipeline Company
LLC for:
1. § 195.446 Control Room Management.
(a) General. This section applies to each operator of a pipeline facility with a
controller working in a control room who monitors and controls all or part of a
pipeline facility through a SCADA system. Each operator must have and follow
written control room management procedures that implement the requirements of
this section. The procedures required by this section must be integrated, as
appropriate, with the operator's written procedures required by § 195.402.
…
(c) Provide adequate information. Each operator must provide its controllers with the
information, tools, processes and procedures necessary for the controllers to carry
out the roles and responsibilities the operator has defined by performing each of the
following:
Tesoro’s Preventative Maintenance (SAP) system inventory was inadequate for not listing the
safety-related point for the pressure transmitter, PT 002a located at the Anchorage terminal. PT



002a was not part of the SAP system inventory. There are four safety-related points in the system,
at the time of the inspection, only the three Nikiski Terminal safety-related points were listed in
the SAP system inventory. Operational procedures must insure that preventative maintenance
tasks for safety related points are completed and tracked in a comprehensive, reliable, and
repeatable manner. The tracking of preventative maintenance tasks for the three safety related
points at the Nikiski facility in one system separate from the system used for the single Anchorage
safety related points increases the likelihood that the four points will not be maintained in a like
manner.
2. § 195.446 Control Room Management.
(a) General. This section applies to each operator of a pipeline facility with a
controller working in a control room who monitors and controls all or part of a
pipeline facility through a SCADA system. Each operator must have and follow
written control room management procedures that implement the requirements of
this section. The procedures required by this section must be integrated, as
appropriate, with the operator's written procedures required by § 195.402.
…
(e) Alarm management. Each operator using a SCADA system must have a written
alarm management plan to provide for effective controller response to alarms. An
operator's plan must include provisions to:
(1) Review SCADA safety-related alarm operations using a process that ensures
alarms are accurate and support safe pipeline operations;
The Tesoro document, WP123, specifies that alarm reviews will be completed by the alarm
review team which includes, as one of its members, the Alarm System Coordinator. Section 6 of
WP123 identifies specific roles and responsibilities of the Alarm System Coordinator; however,
the document fails to identify which Tesoro staff positions or personnel are deemed competent to
fill this role.
3. § 195.446 Control Room Management.
(a) General. This section applies to each operator of a pipeline facility with a
controller working in a control room who monitors and controls all or part of a
pipeline facility through a SCADA system. Each operator must have and follow
written control room management procedures that implement the requirements of
this section. The procedures required by this section must be integrated, as
appropriate, with the operator's written procedures required by §195.402.
. . . .
(j) Compliance and deviations. An operator must maintain for review during
inspection:
(1) Records that demonstrate compliance with the requirements of this section; and
(2) Documentation to demonstrate that any deviation from the procedures required
by this section was necessary for the safe operation of the pipeline facility.
2



Tesoro CRM Procedure 10.2 identifies the following key personnel required for completion of the
Tesoro CRM Annual Review Form:
DOT Compliance Manager
Logistics Regional Manager
Shift Leaders
Controller
The Tesoro procedures do not demonstrate a link between the Logistics Regional Manager and
what person/position fills that role at the Nikiski location. Further, the signature blocks of the
Tesoro Control Room Management Review form do not identify the four staff positions (DOT
Compliance Manager, Logistics Regional Manager, Shift Leaders, and Controller) for the persons
placing their signatures as reviewers.
On June 7, 2018 Tesoro Alaska Pipeline Company LLC responded that they had listed the pressure
transmitter located at the Anchorage terminal in the preventative maintenance (SAP) system for the
Nikiski facility. Although the Tesoro Alaska Pipeline Company LLC previously tracked this
pressure transmitter separately from safety-related points in the Nikiski facility, all four safety-
related points in the system are now listed in the SAP system inventory. Tesoro Alaska Pipeline
Company LLC responded that they have amended the Annual Control Room Management
(“CRM”) and Alarm Management Plan review forms to identify the functional titles (e.g., Alarm
System Coordinator) of the personnel conducting the review and signing the form. This will enable
a reader to identify both the name and staff position of each of the four reviewers required by the
Tesoro Alaska Pipeline Company’s CRM procedure. My staff reviewed the amended forms that
Tesoro Alaska Pipeline Company LLC provided.
This letter is to inform you that PHMSA hereby withdraws the Notice and that the case is now
closed.
Sincerely,
Kim West
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 M. Chard (#155158)
3

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520186008M>
- Source ID: `phmsa-enforcement`
- SHA-256: `ad5ebda5dc14189c853540cfb486ec39a43f8d9b5945c9036b3d0887b94e23af`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T16:21:22.061Z
- Document slug: `phmsa-enforcement-520186008m`

### Source metadata

```json
{
  "cpf": "520186008M",
  "operator": "TESORO ALASKA PIPELINE COMPANY LLC",
  "region": "Western",
  "pipelineType": "INTRASTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.446(a)",
    "195.446(c)",
    "195.446(e)(1)",
    "195.446(j)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "520186008M_Notice of Amendment_03162018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520186008M/520186008M_Notice%20of%20Amendment_03162018.pdf",
      "bytes": 123421,
      "category": "agency_document"
    },
    {
      "name": "520186008M_Notice of Amendment_03162018_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520186008M/520186008M_Notice%20of%20Amendment_03162018_text.pdf",
      "bytes": 114876,
      "category": "agency_document"
    },
    {
      "name": "520186008M_Operator Response To Notice and Request for Hearing_04202018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520186008M/520186008M_Operator%20Response%20To%20Notice%20and%20Request%20for%20Hearing_04202018.pdf",
      "bytes": 162465,
      "category": "party_submission"
    },
    {
      "name": "520186008M_Region Withdrawal of Notice Letter_07052018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520186008M/520186008M_Region%20Withdrawal%20of%20Notice%20Letter_07052018.pdf",
      "bytes": 138643,
      "category": "agency_document"
    },
    {
      "name": "520186008M_Region Withdrawal of Notice Letter_07052018_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520186008M/520186008M_Region%20Withdrawal%20of%20Notice%20Letter_07052018_text.pdf",
      "bytes": 113668,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "TESORO ALASKA PIPELINE COMPANY LLC"
}
```
