# TESORO ALASKA PIPELINE COMPANY LLC — Warning Letter

**Citation:** CPF 520186009W  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2018-03-16

CLOSED warning letter citing 195.222(a), 195.228(a), 195.446(c)(4), 195.446(e)(4), 195.446(h), 195.589(c).

## Document text

Warning Letter involving TESORO ALASKA PIPELINE COMPANY LLC. PHMSA's enforcement data identifies the cited regulations as 195.222(a),  195.228(a),  195.446(c)(4),  195.446(e)(4),  195.446(h),  195.589(c). The case was opened on 2018-03-16 and is reported as closed as of 2018-03-16. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520186009W_Warning Letter_03162018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520186009W/520186009W_Warning%20Letter_03162018.pdf

520186009W_Warning Letter_03162018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520186009W/520186009W_Warning%20Letter_03162018_text.pdf

520186009W_Warning Letter_03162018_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
March 16, 2018
Mr. Don Sorenson
Senior Vice President, Logistics
Tesoro Alaska Pipeline Company LLC
19100 Ridgewood Parkway
San Antonio, TX 78259
CPF 5-2018-6009W
Dear Mr. Sorenson:
On September 11 through 20, 2017, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code,
inspected Tesoro Alaska Pipeline Company LLC (Tesoro) procedures and records in Nikiski
and Anchorage, Alaska.
As a result of the inspection, it is alleged that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items
inspected and the probable violations are:
1. § 195.446 Control Room Management.
(c) Provide adequate information. Each operator must provide its controllers with
the information, tools, processes and procedures necessary for the controllers to
carry out the roles and responsibilities the operator has defined by performing
each of the following:



(4) Test any backup SCADA systems at least once each calendar year, but at
intervals not to exceed 15 months;
Records which demonstrate that the backup SCADA system has been tested at least once each
calendar year, at intervals not to exceed 15 months, are not adequate. No Tesoro Alaska
Pipeline (TAPL) testing records exist prior to 2017.
2. §195.446 Control Room Management.
(c) Provide adequate information. Each operator must provide its controllers with
the information, tools, processes and procedures necessary for the controllers to
carry out the roles and responsibilities the operator has defined by performing
each of the following:
(4) Test any backup SCADA systems at least once each calendar year, but at
intervals not to exceed 15 months;
The testing records, which verify that there are adequate processes in place for decision-
making and internal communications to successfully implement a transition from primary
SCADA to backup SCADA, and back to primary SCADA, are incomplete. No such TAPL
records of testing and verification exist prior to 2017.
3. § 195.446 Control Room Management.
(c) Provide adequate information. Each operator must provide its controllers with
the information, tools, processes and procedures necessary for the controllers to
carry out the roles and responsibilities the operator has defined by performing
each of the following:
(4) Test any backup SCADA systems at least once each calendar year, but at
intervals not to exceed 15 months;
The TAPL records are incomplete as relating to the sampling of critical functions of the back-
up SCADA system. Such testing validates the proper operation of the backup system. No
such TAPL records of sampling or validating the critical functions in the back-up SCADA
system exist prior to 2017.
4. § 195.446 Control Room Management.
(e) Alarm management. Each operator using a SCADA system must have a
written alarm management plan to provide for effective controller response to
alarms. An operator's plan must include provisions to:
(4) Review the alarm management plan required by this paragraph at least once
each calendar year, but at intervals not exceeding 15 months, to determine the
effectiveness of the plan;
TAPL records do not indicate review of the alarm management plan at least once each
calendar year, but at intervals not exceeding 15 months, in order to determine the
effectiveness of the plan. Tesoro staff conducted alarm management plan reviews on January
2



21, 2016 and August 31, 2017, thus exceeding the maximum interval of 15 months. Further,
Tesoro Compliance and Deviation Policy 10.2 was not followed in 2016 and 2017 since only
two staff members completed the review. Tesoro’s policy states: “The following list identifies
the key personnel required for the compliance review to be considered complete: DOT
Compliance Manager, Logistics Regional Managers, Shift Leaders/Supervisors, Controller.”
The Tesoro 2016 and 2017 CRM Annual Review Forms were only signed by two individuals
whose staff positions are unidentified. It is unclear whether the individuals held any one of
the 4 identified positions.
5. § 195.446 Control Room Management.
(h) Training. Each operator must establish a controller training program and
review the training program content to identify potential improvements at least
once each calendar year, but at intervals not to exceed 15 months. An operator's
program must provide for training each controller to carry out the roles and
responsibilities defined by the operator. In addition, the training program must
include the following elements:
TAPL records do not indicate processes have been implemented to review the controller
training program content to identify potential improvements at least once each calendar year,
but at intervals not to exceed 15 months. Tesoro staff conducted training manual reviews on
January 21, 2016 and August 31, 2017, thus exceeding the maximum interval of 15 months.
Further, Tesoro Compliance and Deviation Policy 10.2 was not followed in 2016 and 2017
since only two staff members completed the review. Tesoro’s policy states: “The following
list identifies the key personnel required for the compliance review to be considered complete:
DOT Compliance Manager, Logistics Regional Managers, Shift Leaders/Supervisors,
Controller.” The Tesoro 2016 and 2017 CRM Annual Review Forms were only signed by two
individuals whose staff positions are unidentified. It is unclear whether the individuals held
any one of the 4 identified positions.
6. § 195.589 What corrosion control information do I have to maintain?
(c) You must maintain a record of each analysis, check, demonstration,
examination, inspection, investigation, review, survey, and test required by this
subpart in sufficient detail to demonstrate the adequacy of corrosion control
measures or that corrosion requiring control measures does not exist. You must
retain these records for at least 5 years, except that records related to §§ 195.569,
195.573(a) and (b), and 195.579(b)(3) and (c) must be retained for as long as the
pipeline remains in service.
Records do not document inspection of all aboveground pipe exposed to atmospheric
corrosion. No TAPL coating inspection reports for the Nikiski terminal pig launcher were
available.
3



7. § 195.222 Welders and welding operators: Qualification of welders and welding
operators.
(a) Each welder or welding operator must be qualified in accordance with section
6, section 12 or Appendix A of API Std 1104 (incorporated by reference, see §
195.3), or section IX of ASME Boiler and Pressure Vessel Code (BPVC),
(incorporated by reference, see § 195.3), except that a welder or welding operator
qualified under an earlier edition than an edition listed in § 195.3, may weld but
may not re-qualify under that earlier edition.
TAPL integrity assessment and remediation projects records were incomplete regarding
repairs requiring welding performed by qualified welders with qualified welding procedures.
The Welder Qualification Records for Jarid Bush were incomplete at the time of inspection.
The records did not indicate what type of test the welder was qualifying to perform and
whether the welder was determined to be qualified. Further, the records fail to indicate
whether the qualifying weld was visually inspected and determined to be acceptable
according to the requirements of API 1104, Section 6.4. The welder qualification records fail
to record whether the welder complied with or was even aware of the pre-heat requirements of
Tesoro WPS P42. At the time of the welder's P42 test the ambient temperature was recorded
as 47° F. Tesoro WPS P24 specifies "At temperatures below 50° F: The preheat temperature
shall be 150° F. Min. - 250° F. Max."
The Welder Qualification Records for Nick Wagner and Josh Walters were also incomplete at
the time of inspection. The records did not indicate whether the welders were determined to
be qualified. Further, the records fail to indicate whether the qualifying welds were visually
inspected and determined to be acceptable according to the requirements of API 1104, Section
6.4. The welder qualification records failed to record whether the welders complied with or
were even aware of the pre-heat requirements of Tesoro WPS P60. At the time of the welder's
P60 tests the ambient temperature was recorded as 47° F. Tesoro WPS P60 specifies "At
temperatures below 50° F: The preheat temperature shall be 150° F. Min. - 250° F. Max."
8. § 195.228 Welds and welding inspection: Standards of acceptability.
(a) Each weld and welding must be inspected to insure compliance with the
requirements of this subpart. Visual inspection must be supplemented by
nondestructive testing.
TAPL records were not adequate to determine whether the new welds were inspected and
examined in accordance with §§ 195.228 or 195.234. The inspection records were not signed
and dated.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to
exceed $209,002 per violation per day the violation persists, up to a maximum of $2,090,022
for a related series of violations. For violations occurring prior to November 2, 2015, the
maximum penalty may not exceed $200,000 per violation per day, with a maximum penalty
4



not to exceed $2,000,000 for a related series of violations. We have reviewed the
circumstances and supporting documents involved in this case, and have decided not to
conduct additional enforcement action or penalty assessment proceedings at this time. We
advise you to correct the items identified in this letter. Failure to do so will result in Tesoro
Alaska Pipeline Company LLC being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF 5-2018-6009W. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any
portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b),
along with the complete original document you must provide a second copy of the document
with the portions you believe qualify for confidential treatment redacted and an explanation of
why you believe the redacted information qualifies for confidential treatment under 5 U.S.C.
552(b).
Sincerely,
Kim West
Acting Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP 60 - Compliance Registry
PHP 500 – M. Chard (#155158)
5

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520186009W>
- Source ID: `phmsa-enforcement`
- SHA-256: `61d279bf9ec73346c8671f9d81a85725e4fbb02ed584940bcdeea6720d127bb0`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T16:34:31.595Z
- Document slug: `phmsa-enforcement-520186009w`

### Source metadata

```json
{
  "cpf": "520186009W",
  "operator": "TESORO ALASKA PIPELINE COMPANY LLC",
  "region": "Western",
  "pipelineType": "INTRASTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.222(a)",
    "195.228(a)",
    "195.446(c)(4)",
    "195.446(e)(4)",
    "195.446(h)",
    "195.589(c)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "520186009W_Warning Letter_03162018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520186009W/520186009W_Warning%20Letter_03162018.pdf",
      "bytes": 135970,
      "category": "agency_document"
    },
    {
      "name": "520186009W_Warning Letter_03162018_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520186009W/520186009W_Warning%20Letter_03162018_text.pdf",
      "bytes": 106497,
      "category": "agency_document"
    }
  ],