# TALLGRASS PONY EXPRESS PIPELINE, LLC — Warning Letter

**Citation:** CPF 520195001W  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2019-01-16

CLOSED warning letter citing 195.202, 195.246(a).

## Document text

Warning Letter involving TALLGRASS PONY EXPRESS PIPELINE, LLC. PHMSA's enforcement data identifies the cited regulations as 195.202,  195.246(a). The case was opened on 2019-01-16 and is reported as closed as of 2019-01-16. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520195001W_Warning Letter_01162019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520195001W/520195001W_Warning%20Letter_01162019.pdf

520195001W_Warning Letter_01162019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520195001W/520195001W_Warning%20Letter_01162019_text.pdf

520195001W_Warning Letter_01162019_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
January 16, 2019
Mr. David Dehaemers
President
Tallgrass Pony Express Pipeline, LLC
370 Van Gordon St.
Lakewood, CO 80228
CPF 5-2019-5001W
Dear Mr. Dehaemers:
From October 29 through November 2, 2018, two representatives of the Pipeline &
Hazardous Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United
States Code, completed a construction field inspection of the Wyoming, Tallgrass Pony
Express Pipeline’s Guernsey Terminal and its associated laterals. Inspection of the
construction site included: (a) four 150,000 BBL Tanks, (b) two, twenty-inch diameter,
pipelines, (c) and an additional sixteen-inch diameter lateral at the new Guernsey Terminal.
The new pipeline facilities were being constructed from the existing Guernsey pump station
and terminated at the new Guernsey Terminal. As part of the inspection, the representatives
also reviewed your construction, operation and maintenance procedures, and records
documenting the implementation of those procedures.
During our inspection, the following probable violations of the Pipeline Safety Regulations,
Title 49, Code of Federal Regulations (CFR) were noted. The potential regulatory
deficiencies observed and probable violation(s) are:



1
2
§195.246 Installation of pipe in a ditch.
(a) All pipe installed in a ditch must be installed in a manner that minimized the
introduction of secondary stresses and the possibility of damage to the pipe.
The pipe being installed in the ditch was not following Tallgrass construction
standards developed to minimize secondary stresses and possible damage.
Per Tallgrass Construction Standards, Section: C1090, Title: Lowering-In Pipe,
Revised 02/10/2014; 3. Lowering-In Pipeline,
3.13. Pipe shall be lowered into trench gradually and uniformly so that each
joint of suspension bears a proportional part of total pipe weight. The
maximum distance between points of suspension is designated based upon the
outside diameter (OD) and wall thickness (wt). Calculation of the maximum
distance is performed by engineering and communicated to the project
manager. The project manager is responsible for communicating the maximum
distance associated with his/her projects.
Pipe being lowered into the trench appeared to exceed the distance allowed for
unsupported pipe length. The roller sling’s distance from the end of pipe being
lowered was too great and may have caused undue stress on the pipe and the recently
welded girth welds by not proportionally bearing a part of the total pipe weight. Two
roller booms were used but a third boom, near the pipe end being lowered into the
trench, would have alleviated the stress.
§195.202 Compliance with specifications or standards.
Each pipeline system must be constructed in accordance with comprehensive
written specifications or standards that are consistent with the requirements of
this part.
The pipe was not being constructed in compliance with Tallgrass’s comprehensive
written specifications. Observed non-compliances include:
a) Per Tallgrass Construction Standards, Section: C1090, Title: Lowering-In Pipe,
Revised 02/10/2014; 2. General,
2.4 Where trench runs through rock, trench sides and bottom shall be cleared of
all loose or projecting rock. Contractor shall provide a continuous 4-inch
padding of earth or sand in trench bottom. The pipe shall conform to bottom
contours of the trench grade so that it is uniformly and continuously
supported. The pipe shall not be closer than 6-inches to either side of the
trench.
2



b) c) Pipe which had been already lowered into trench lacked the adequate and
continuous support (sandbags underneath) while sitting in the ditch to conform to
the bottom contours of the trench grade. In certain areas, pipe does not track but
sags due to support(s) not being spaced near enough to one another.
Per Tallgrass Construction Standards, Section: C1040, Title: Unloading, Hauling,
and Stringing Materials, Revised 06/10/2013; 2. Unloading Material, 2.7:
To avoid damage to materials or equipment during stockpiling, hauling,
stringing, or loading and unloading from trucks or railroad cars, Contractor
shall provide material-handling equipment and tools to avoid damage of any
kind. Equipment used in handling, transporting, storing, and laying pipe shall
be padded effectively to prevent damage to pipe or coating.
Rope or cushion was not placed between pipe and skids in multiple locations
during stringing/welding process. Pipe was directly touching wood skids. When
laying of the pipe during stringing, operator did not effectively pad the skids to
prevent damage to the pipe or its coating.
Per Tallgrass O&M Procedure, Section: OM407_GL, Title: Welding Procedures
and Selection Guide, Effective: June 1, 2018;
3.2. Multiple Filler Metal Options
a. Many of the Tallgrass welding procedures include a choice of welding
options to join a specific range of O.D., wall thickness and pipe grade using
different electrode classes and electrode diameters. The options are indicated
within the procedure by subsections A, B, C, etc. The project manager must
direct the welder(s) to follow the specific procedure and subsection (if
applicable) prior to the start of work. The welding inspector must indicate on
any written document the specific procedure and subsection (if applicable)
used during the welder testing and project. The welding inspector will verify
that the welder is following the appropriate welding parameters including
volts, amps, travel speed, rod type and size.
Welder’s bucket on truck had welding rods which were not supported by
Tallgrass’s standard welding procedure for pipeline construction. In addition, these
existing rods were not the designated rod type(s) in Tallgrass’s repair procedure.
Thus, welding inspector failed to verify the welder had appropriate rod type in
their bucket. These rods remained in the bucket for duration of the welding
examination for at least three pipe joints and posed the risked of being mistakenly
used. The required rod type for the additional weld passes were not present in the
welding bucket as well.
3



d) Per Tallgrass O&M Procedure, Section: OM406_GL, Title: Weld Inspections and
Testing, Effective: June 1, 2018; 3. Core information and Requirements
A Tallgrass Certified Welding Inspector1 (TCWI) must inspect each weld to
ensure that the proper welding procedure was followed and that the finished weld
meets applicable standards and codes. For natural gas or hazardous liquids
pipelines and related facilities a Company welder is permitted to act as the welding
inspector.
External Undercut (UC) in a weld occurred at one repair location causing a UC defect.
This was not discovered during visual inspection by the WI but later discovered during
Non-Destructive Testing (NDT) and film review. Weld was shallow to bevel height
and did not appear to be capped over the bevel edges when visually examined during
inspection of the weld. WI should have observed this visually upon completion of the
weld during construction.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to
exceed $209,002 per violation per day the violation persists, up to a maximum of $2,090,022
for a related series of violations. For violations occurring prior to November 2, 2015, the
maximum penalty may not exceed $200,000 per violation per day, with a maximum penalty
not to exceed $2,000,000 for a related series of violations. We have reviewed the
circumstances and supporting documents involved in this case, and have decided not to
conduct additional enforcement action or penalty assessment proceedings at this time. We
advise you to correct the item(s) identified in this letter during future construction activities.
Failure to do so will result in Tallgrass Pony Express Pipeline, LLC being subject to
additional enforcement action. No reply to this letter is required. If you choose to reply, in
your correspondence please refer to CPF 5-2019-5001W. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If
you believe that any portion of your responsive material qualifies for confidential treatment
under 5 U.S.C. 552(b),
along with the complete original document you must provide a second copy of the document
with the portions you believe qualify for confidential treatment redacted and an explanation of
why you believe the redacted information qualifies for confidential treatment under 5 U.S.C.
552(b).
4



Sincerely,
Chris Hoidal
Acting Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP 60 Compliance Registry
PHP-500 H.M. Flaherty (#157168)
5

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520195001W>
- Source ID: `phmsa-enforcement`
- SHA-256: `07c081067d0279e59ce6cbcbf1574439fe0e973f2045a299670d15b17949ac32`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T20:13:32.002Z
- Document slug: `phmsa-enforcement-520195001w`

### Source metadata

```json
{
  "cpf": "520195001W",
  "operator": "TALLGRASS PONY EXPRESS PIPELINE, LLC",
  "region": "Western",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.202",
    "195.246(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "520195001W_Warning Letter_01162019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520195001W/520195001W_Warning%20Letter_01162019.pdf",
      "bytes": 3149410,
      "category": "agency_document"
    },
    {
      "name": "520195001W_Warning Letter_01162019_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520195001W/520195001W_Warning%20Letter_01162019_text.pdf",
      "bytes": 112831,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "TALLGRASS PONY EXPRESS PIPELINE, LLC"
}
```