# MARATHON PIPE LINE (WEST) — Notice of Probable Violation

**Citation:** CPF 520195015  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2019-12-09

CLOSED notice of probable violation citing 195.402(a).

## Document text

Notice of Probable Violation involving MARATHON PIPE LINE (WEST). PHMSA's enforcement data identifies the cited regulation as 195.402(a). The case was opened on 2019-12-09 and is reported as closed as of 2020-02-21. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520195015_Closure Letter_02212020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520195015/520195015_Closure%20Letter_02212020.pdf

520195015_Closure Letter_02212020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520195015/520195015_Closure%20Letter_02212020_text.pdf

520195015_Final Order_02112020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520195015/520195015_Final%20Order_02112020.pdf

520195015_Final Order_02112020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520195015/520195015_Final%20Order_02112020_text.pdf

520195015_NOPV PCO_12092019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520195015/520195015_NOPV%20PCO_12092019.pdf

520195015_NOPV PCO_12092019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520195015/520195015_NOPV%20PCO_12092019_text.pdf

520195015_Operator Response to Notice_01082020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520195015/520195015_Operator%20Response%20to%20Notice_01082020.pdf

520195015_Closure Letter_02212020_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 21, 2020
Mr. Shawn Lyon
President
Marathon Petroleum Corporation
539 South Main Street
Findlay, Ohio 45840
CPF 5-2019-5015
Closure Letter
Dear Mr. Lyon:
On February 11, 2020, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
to Tesoro Logistics, Northwest Pipeline LLC a Final Order in the above-referenced case. This Final
Order included a Proposed Compliance Order. Based on our review of the documentation you
provided on your letter dated January 8, 2020, it has been determined that you have complied with the
terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the matters
involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Dustin Hubbard
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 A. Ceartin (#166461)
Sean Mayo, Pipeline Safety Director, Washington Utilities and Transportation
Commission
Mr. Jamey McLaughlin, Region Manager, Marathon Petroleum Corporation
Mr. Greg Smith, Senior Counsel, Marathon Petroleum Corporation
Mr. Duane DeBoo, Manager – Environmental, Safety, and Regulatory, Marathon
Petroleum Corporation

520195015_Final Order_02112020_text.pdf

February 11, 2020
Mr. Gary R. Heminger
Chairman and Chief Executive Officer
Marathon Petroleum Corporation
539 South Main Street
Findlay, Ohio 45840
Re: CPF No. 5-2019-5015
Dear Mr. Heminger:
Enclosed please find the Final Order issued in the above-referenced case to your subsidiary,
Tesoro Logistics, Northwest Pipeline LLC. It makes a finding of violation and specifies actions
that need to be taken to comply with the pipeline safety regulations. When the terms of the
compliance order are completed, as determined by the Director, Western Region, this
enforcement action will be closed. Service of the Final Order by certified mail is effective upon
the date of mailing as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Dustin Hubbard, Director, Western Region, Office of Pipeline Safety, PHMSA
Mr. Shawn Lyon, President, Marathon Petroleum Logistics, 19100 Ridgewood Parkway,
San Antonio, Texas 78259
Mr. Jamey McLaughlin, Region Manager, Marathon Petroleum Corporation, 474 West
900 North, Salt Lake City, Utah 84103
Mr. Greg Smith, Senior Counsel, Marathon Petroleum Corporation, 539 South Main
Street, Findlay, Ohio 45840
Mr. Duane DeBoo, Manager – Environmental, Safety, and Regulatory, Marathon
Petroleum Corporation, 539 South Main Street, Findlay, Ohio 45840
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
_____________________________________________
In the Matter of )
Tesoro Logistics, Northwest Pipeline, LLC, ) CPF No. 5-2019-5015
a subsidiary of Marathon Petroleum Corporation, )
)
)
)
Respondent. )
_____________________________________________)
FINAL ORDER
On December 9, 2019, pursuant to 49 C.F.R. § 190.207, the Director, Western Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Tesoro Logistics,
Northwest Pipeline, LLC (Respondent).1 The Notice proposed finding that Respondent had
violated the pipeline safety regulations in 49 C.F.R. Part 195. The Notice also proposed certain
measures to correct the violations. Respondent did not contest the allegations of violation or
corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulation listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.402(a) (Item 1) ─ Respondent failed to prepare and follow a
manual of written procedures for conducting normal operations and maintenance
activities for each pipeline system.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
COMPLIANCE ACTIONS
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
1 Tesoro Logistics, Northwest Pipeline, LLC was a subsidiary of Tesoro Corporation, which merged with Western
Refining Pipeline, LLC to become Andeavor Logistics, LP, which was acquired in turn by Marathon Petroleum
Corporation on July 30, 2019. Andeavor Logistics, LP and Marathon Petroleum Corporation websites, available at
http://www.andeavorlogistics.com/operations-services/asset-map/# and
http://www mplx.com/content/documents/mplx/investor center/MPLX 2018 AR 10-K.pdf at p181 (last accessed
January 22, 2020).



CPF No. 5-2019-5015
Page 2
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of ordered actions, Respondent may request that the Director close the case. Failure to comply
with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223 or in
referral to the Attorney General for appropriate relief in a district court of the United States.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
February 11, 2020
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520195015>
- Source ID: `phmsa-enforcement`
- SHA-256: `18a1c98a0235d1b0a918efb93b1a17e7ed5d29875c424751c95b41c3efa94258`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-24T19:40:19.212Z
- Document slug: `phmsa-enforcement-520195015`

### Source metadata

```json
{
  "cpf": "520195015",
  "operator": "MARATHON PIPE LINE (WEST)",
  "region": "Western",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.402(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 7,
  "attachments": [
    {
      "name": "520195015_Closure Letter_02212020.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520195015/520195015_Closure%20Letter_02212020.pdf",
      "bytes": 19631,
      "category": "agency_document"
    },
    {
      "name": "520195015_Closure Letter_02212020_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520195015/520195015_Closure%20Letter_02212020_text.pdf",
      "bytes": 95110,
      "category": "agency_document"
    },
    {
      "name": "520195015_Final Order_02112020.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520195015/520195015_Final%20Order_02112020.pdf",
      "bytes": 770647,
      "category": "agency_document"
    },
    {
      "name": "520195015_Final Order_02112020_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520195015/520195015_Final%20Order_02112020_text.pdf",
      "bytes": 124155,
      "category": "agency_document"
    },
    {
      "name": "520195015_NOPV PCO_12092019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520195015/520195015_NOPV%20PCO_12092019.pdf",
      "bytes": 73129,
      "category": "case_document"
    },
    {
      "name": "520195015_NOPV PCO_12092019_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520195015/520195015_NOPV%20PCO_12092019_text.pdf",
      "bytes": 155314,
      "category": "case_document"
    },
    {
      "name": "520195015_Operator Response to Notice_01082020.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520195015/520195015_Operator%20Response%20to%20Notice_01082020.pdf",
      "bytes": 248050,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "MARATHON PIPE LINE (WEST)"
}
```