# FREEPORT-MCMORAN OIL & GAS — Notice of Amendment

**Citation:** CPF 52021043NOA  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2021-08-02

CLOSED notice of amendment citing 195.446(a), 195.446(e)(1), 195.446(e)(2), 195.446(e)(3), 195.446(e)(4), 195.446(e)(5), 195.446(e)(6), 195.446(h)(6), 195.446(j)(2).

## Document text

Notice of Amendment involving FREEPORT-MCMORAN OIL & GAS. PHMSA's enforcement data identifies the cited regulations as 195.446(a),  195.446(e)(1),  195.446(e)(2),  195.446(e)(3),  195.446(e)(4),  195.446(e)(5),  195.446(e)(6),  195.446(h)(6),  195.446(j)(2). The case was opened on 2021-08-02 and is reported as closed as of 2025-03-18. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

52021043NOA_Closure Letter_03182025_(20-173099).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52021043NOA/52021043NOA_Closure%20Letter_03182025_(20-173099).pdf

52021043NOA_Closure Letter_03182025_(20-173099)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52021043NOA/52021043NOA_Closure%20Letter_03182025_(20-173099)_text.pdf

52021043NOA_Notice of Amendment_08022021_(20-173099).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52021043NOA/52021043NOA_Notice%20of%20Amendment_08022021_(20-173099).pdf

52021043NOA_Notice of Amendment_08022021_(20-173099)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52021043NOA/52021043NOA_Notice%20of%20Amendment_08022021_(20-173099)_text.pdf

52021043NOA_Operator Response to Notice and Request Time Extension_09302021_(20-173099).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52021043NOA/52021043NOA_Operator%20Response%20to%20Notice%20and%20Request%20Time%20Extension_09302021_(20-173099).pdf

52021043NOA_Notice of Amendment_08022021_(20-173099)_text.pdf

NOTICE OF AMENDMENT
VIA E-MAIL TO MR. DAVID ROSE
August 2, 2021
Mr. David Rose
Director, Environmental Health & Safety
Freeport-McMoRan Oil & Gas
201 S. Broadway Street
Orcutt, CA 93455
CPF 5-2021-043-NOA
Dear Mr. Rose:
During the week of October 26 through 30, 2020, representatives of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code
(U.S.C.), performed an inspection of the Freeport-McMoRan Oil & Gas (Freeport-McMoRan)
Lompoc Oil & Gas Plant (LOGP) Control Room located in Lompoc, California. This inspection
included a review of company procedures and records, and personnel observations associated
with Freeport-McMoRan’s Control Room Management Program.
Based on the inspection, PHMSA has identified apparent inadequacies found within Freeport
McMoRan’s plans or procedures, as described below:
1. § 195.446 - Control room management.
(a) General. This section applies to each operator of a pipeline facility with a
controller working in a control room who monitors and controls all or part of a
pipeline facility through a SCADA system. Each operator must have and follow
written control room management procedures that implement the requirements of
this section…



Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility. Specifically, Freeport-McMoRan failed to have and follow
written control room management procedures that defined the controller’s role when an
abnormal operating condition is detected, even if the controller is not the first to detect the
condition, including the controller’s responsibility to take specific actions to communicate with
others, pursuant to the requirements set forth in § 195.446(b)(2).
The operator’s Control Room Management Operations and Maintenance Plan, Section 3001
–
Roles, Authorities, and Responsibilities, Subsection 303 R&Rs – Primary Controller
Responsibilities and Level of Authority, table on page 10 (revised October 2014)2 sets forth the
controller’s responsibilities during abnormal operations. The procedure states that the controller
must follow procedures, cannot revise procedures, and must notify a supervisor if the procedures
need revising. It is unclear, however, how these instructions relate the controller’s roles and
responsibilities during abnormal operations, which must include the controller’s responsibility to
take specific actions and to communicate to others.
The operator must amend its procedures to clearly define the controller’s responsibility and
authority during abnormal operations.
2. § 195.446 - Control room management.
(a) General. This section applies to each operator of a pipeline facility with a
controller working in a control room who monitors and controls all or part of a
pipeline facility through a SCADA system. Each operator must have and follow
written control room management procedures that implement the requirements of
this section…
Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility. Specifically, Freeport-McMoRan failed to have and follow
written control room management procedures that adequately defined a controller’s role during
an emergency, even if the controller is not the first to detect the emergency, including the
controller’s responsibility to take specific actions and to communicate with others pursuant to the
requirements set forth in § 195.446(b)(3).
The operator’s Control Room Management Operations and Maintenance Plan, Section 300 –
Roles, Authorities, and Responsibilities, Subsection 303 R&Rs – Primary Controller
Responsibilities and Level of Authority, table on page 11 (revised October 2014) sets forth the
controller’s responsibilities during emergency operations. The table states that the controllers
must complete training on emergency procedures, follow emergency procedures, and notify a
supervisor if emergency procedures need revising. It is unclear, however, how these instructions
relate to the controller’s roles and responsibilities during emergency operations, which must
include the controller’s responsibility to take specific actions and to communicate with others.
1 The title of Section 300 includes a typographical error, citing to § 195.436(b) rather than § 195.446(b).
2 The table uses the acronym PSOM, which is not defined.
2



The operator must amend its procedures to clearly define the controller’s responsibility and
authority during emergency operations. This should include actions required during specific
types of communication loss during emergency operations, including but not limited to loss of
SCADA and/or loss of leak detection.
3. § 195.446 - Control room management.
(a) General. This section applies to each operator of a pipeline facility with a
controller working in a control room who monitors and controls all or part of a
pipeline facility through a SCADA system. Each operator must have and follow
written control room management procedures that implement the requirements of
this section…
Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility. Specifically, Freeport-McMoRan failed to have and follow
written control room management procedures that adequately defined the roles, responsibilities
and qualifications of others who have the authority to direct or supersede the specific technical
actions of controllers pursuant to the requirements set forth in § 195.446(b)(5).
The operator's procedure listed under Section 303 is not clear on who has the authority to direct
or supersede the specific technical actions of a controller during normal, abnormal, and
emergency operating conditions. For example, the procedures do not provide a list,
organizational chart, or other means by which to define who has this authority. Nor do the
procedures specify how an individual may direct or supersede the specific technical actions of
the controller (e.g., under what conditions) and how this is documented if the situation occurs.3
Instead, the procedure mentions others “directing or advising” a controller, which is not the same
as “directing or superseding” a controller (emphasis added). Additionally, the procedure states
that a “non-qualified” controller can advise another controller on what tasks to accomplish, but
not the precise actions to take. A non-qualified controller, however, should never have the
authority to advise a qualified controller on what actions to take during operation, especially
during abnormal or emergency conditions.
The operator must amend its procedure to clearly identify who has the authority to direct or
supersede the technical actions of a controller during normal, abnormal and emergency
operations, including how this authority would be specifically exercised, and how it will be
documented.
4. § 195.446 - Control room management.
(a) General. This section applies to each operator of a pipeline facility with a
controller working in a control room who monitors and controls all or part of a
pipeline facility through a SCADA system. Each operator must have and follow
3 See 49 C.F.R. § 195.446(j)(1) requiring operators to maintain for review during inspection records that
demonstrate compliance with the requirements of this section.
3



written control room management procedures that implement the requirements of
this section…
Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility. Specifically, Freeport-McMoRan failed to have and follow
written control room management procedures that adequately provided its controllers with the
information, tools, processes and procedures necessary for the controllers to carry out the roles
and responsibilities the operator has defined for point-to-point (P2P) verifications pursuant to the
requirements set forth in § 195.446(c)(2).
Freeport-McMoRan’s procedure in the Control Room Management (CRM) manual on P2P
verifications is not the procedure the operator has implemented in its control room. During
PHMSA’s inspection, Freeport-McMoRan control room staff stated to PHMSA that they use the
form found in the P2P Test Plan, which is more comprehensive than the CRM manual
procedures on P2P verifications. For example, Section 403 of the CRM manual procedures on
P2P verifications does not cover all the safety-related points that must be included in P2P
verifications, which should include (but is not limited to) points supplying data on flow,
pressure, density, temperature, valve/pump/pig status, set points and pipeline control points.
The operator must amend its procedure for P2P verification to reflect the actual process used in
the control room. The procedures must also identify all points that can impact safety and require
P2P verification, and how the verification will be documented.4
5. § 195.446 - Control room management.
(a) General. This section applies to each operator of a pipeline facility with a
controller working in a control room who monitors and controls all or part of a
pipeline facility through a SCADA system. Each operator must have and follow
written control room management procedures that implement the requirements of
this section…
Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility. Specifically, Freeport-McMoRan failed to have and follow
written control room management procedures that adequately address testing and verifying an
internal communication plan to provide adequate means for manual operation of the pipeline
safely, pursuant to the requirements set forth in § 195.446(c)(3).
For example, neither the company’s procedures nor its internal communication plan addresses
the difference between a catastrophic failure and a complete SCADA failure, despite noting each
of these emergency scenarios separately.5
4 See 49 C.F.R. § 195.446(j)(1) requiring operators to maintain for review during inspection records that
demonstrate compliance with the requirements of this section.
5 It is also unclear to PHMSA what distinguishes a “catastrophic failure” from a “complete SCADA failure.”
4



It is also unclear how the internal communication plan is properly tested and verified. For
example, the procedures require all qualified controllers to sign off on the drill (i.e. the testing of
the internal communication plan), even if they did not participate. This incorrectly implies that
all qualified controllers are being trained on the company’s internal communications plan. Only
personnel participating in a drill, however, should be certifying that they were present during the
drill.
Finally, during the PHMSA inspection, Freeport-McMoRan control room staff informed
PHMSA that they implement a different internal communication plan than the one set forth in
the company’s written procedures.
The operator must amend its procedure to clearly and accurately describe the process for testing
and verifying the internal communication plan and to correct the deficiencies noted above.
6. § 195.446 - Control room management.
(a) General. This section applies to each operator of a pipeline facility with a
controller working in a control room who monitors and controls all or part of a
pipeline facility through a SCADA system. Each operator must have and follow
written control room management procedures that implement the requirements of
this section…
Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility. Specifically, Freeport-McMoRan failed to have and follow
written control room management procedures that adequately establish a maximum limit on
controller hours-of-service, which may provide for an emergency deviation from the maximum
limit if necessary for the safe operation of a pipeline facility pursuant to the requirements set
forth in § 195.446(d)(4).
During the inspection, PHMSA noted that the control room utilizes two schedules for controller
shifts but only one schedule is listed in the control room procedures manual.6 The operator must
amend its procedures to accurately reflect the operating schedules and maximum limits on
controller’s hours of service for both controller shift schedules.
7. § 195.446 - Control room management.
(a) …
(e) Alarm management. Each operator using a SCADA system must have a written
alarm management plan to provide for effective controller response to alarms. An
operator's plan must include provisions to:
(1) Review SCADA safety-related alarm operations using a process that ensures
alarms are accurate and support safe pipeline operations;
6 Freeport-McMoRan has specific controllers who only work the night shift. They do not rotate through the schedule
as the one schedule implies.
5



Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility. Specifically, its written alarm management plan does not
adequately provide for effective controller response to alarms by reviewing SCADA safety-
related alarm operations using a process that ensures alarms are accurate and support safe
pipeline operations.
Section 604 of its CRM (revised October 2014) addresses Alarm Priorities, Categories, and
Types. PHMSA has identified the following inadequacies:
1. Page 41 documents the list of alarms and their priorities, categories, and types.
However, the alarms listed do not add up to the total number of alarms shown. For
example:
a. 2. 3. 4. 5. 6. The Gaviota Oil Heating Facility (GOHF) lists three priority categories (1,
2, 3) with the number of alarms being 5, 30, and 13, respectively, which
equals 48 but the total listed is 45.
b. The LOGP lists three priority categories (1, 2, 3) with the number of alarms
being 15, 28, and 15, respectively, which equals 58 but the total listed is
214.
The table on page 39 shows a column that is titled “percentage of occurrence” but
fails to identify any percentages.
The bottom of page 39 continuing onto the top of page 40 states: “The safety
related alarms are audible and/or visual indications on the control console of an
abnormal condition that require at least two actions by an operator” but the operator
confirmed that all alarms are both audible and visual.
Forms identified as 304 and 508 in the procedure do not exist.
The Alarm Management Plan fails to have an adequate procedure in place to explain
the administrative controls for the disabling of safety-related alarms.
Section 608 SCADA/Control Room Point to Point Review, page 46 discusses the
procedure for stale alarms. However, during the PHMSA inspection, Freeport-
McMoRan control room staff confirmed to PHMSA that this written procedure is not
accurate and does not reflect the process they follow for stale alarms in the control
room.
The operator must amend its procedures to correct the errors noted above. The amended
procedures must also accurately reflect the process it uses for reviewing SCADA safety-related
alarm operations using a process that ensures alarms are accurate and support safe pipeline
operations. This must include adequate procedures to identify how leak detection alarms would
be configured in SCADA.
8. § 195.446 - Control room management.
(a) …
(e) Alarm management. Each operator using a SCADA system must have a written
alarm management plan to provide for effective controller response to alarms. An
operator's plan must include provisions to:
(1) …
6



(2) Identify at least once each calendar month points affecting safety that have been
taken off scan in the SCADA host, have had alarms inhibited, generated false
alarms, or that have had forced or manual values for periods of time exceeding that
required for associated maintenance or operating activities;
Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility. Specifically, its written alarm management plan does not include
adequate provisions to identify at least once each calendar month points affecting safety that
have been taken off scan in the SCADA host, have had alarms inhibited, generated false alarms,
or that have had forced or manual values for periods of time exceeding that required for
associated maintenance or operating activities.
For example, while it appears that the CRM manual, Section 608 – SCADA/ Control Room
Point to Point Review, indicates that monthly reviews of alarms are performed, the process is
disjointed and lacks specificity to be a clear procedure.7 Additionally, although Freeport-
McMoRan has a process for investigating problems associated with its alarms (LOGP Alarm and
Procedures), it only addresses leak detection alarms and fails to identify the process for promptly
correcting identified problem alarms that are not associated with leak detection. Further, the
CRM manual fails to mention the LOGP Alarm and Procedures document referenced above.
The operator must amend its procedure to correct the deficiencies noted above.
9. § 195.446 - Control room management.
(a) …
(e) Alarm management. Each operator using a SCADA system must have a written
alarm management plan to provide for effective controller response to alarms. An
operator's plan must include provisions to:
(1) …
(3) Verify the correct safety-related alarm set-point values and alarm descriptions
when associated field instruments are calibrated or changed and at least once each
calendar year, but at intervals not to exceed 15 months;
Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility. Specifically, its written alarm management plan does not provide
for effective controller response to alarms, because it fails to identify a procedure to verify the
correct safety related alarm set points and alarm descriptors when field instruments are calibrated
or changed, at least once each calendar year, but at intervals not to exceed 15 months.
The operator must develop a procedure to clearly identify how controllers will verify the correct
safety-related alarm set-point values and alarm descriptions when associated field instruments
are calibrated or changed and at least once each calendar year, but at intervals not to exceed 15
months.
7 Given this procedural uncertainty, during the inspection, PHMSA asked Freeport-McMoRan control room
personnel to explain how they follow and implement the company’s procedures on conducting point-to-point
reviews, but they were unable to do so.
7



10. § 195.446 - Control room management.
(a) …
(e) Alarm management. Each operator using a SCADA system must have a written
alarm management plan to provide for effective controller response to alarms. An
operator's plan must include provisions to:
(1) …
(4) Review the alarm management plan required by this paragraph at least once
each calendar year, but at intervals not exceeding 15 months, to determine the
effectiveness of the plan;
Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility. Specifically, Section 609 – Alarm Management Plan Review
states that the alarm management review is to be documented on one form (Form 609) but then
states the review will be documented on another form (Form 509), which doesn’t exist.
The operator must amend its procedure to accurately reflect the process for performing the
review of the alarm management plan at least once each calendar year, but at intervals not
exceeding 15 months, and how the review will be documented.
11. § 195.446 - Control room management.
(a) …
(e) Alarm management. Each operator using a SCADA system must have a written
alarm management plan to provide for effective controller response to alarms. An
operator's plan must include provisions to:
(1) …
(5) Monitor the content and volume of general activity being directed to and
required of each controller at least once each calendar year, but at intervals not
exceeding 15 months, that will assure controllers have sufficient time to analyze and
react to incoming alarms;
Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility. Specifically, its written alarm management plan fails to include a
provision that sufficiently addresses monitoring the content and volume of general activity being
directed to and required of each controller at least once each calendar year, but at intervals not
exceeding 15 months, to assure controllers have sufficient time to analyze and react to incoming
alarms.
Section 610 – Controller Activity Review states: “The content and volume of activities for each
controller shall be monitored, and if necessary remedied, to assure sufficient time to analyze and
properly act on incoming alarms, as appropriate. Circadian was brought in to perform an initial
baseline study to determine controller workload.”8 It further states: “Once per calendar year or
8 Since the operator could not produce the study, it is unclear if the company is named Circadian, or if it is a
company that conducts circadian studies.
8



whenever significant changes are being made as determined by the MOC process, an activity
review will be conducted, with the findings documented on memorandum or other acceptable
method. This review will use the Circadian study and document any changes and how they
impact the findings from this study. If the change shows a major impact, FM O&G will
investigate the need to have Circadian or a similar company perform another full study.”
During the PHMSA inspection, the initial baseline study to determine controller workload
performed by Circadian could not be provided. Despite this, Freeport-McMoRan’s procedures
require that its yearly reviews use this study to document any proposed changes and how these
changes impact the findings from this study. When asked about how this can be accomplished
without a copy of the initial baseline study performed by Circadian, Freeport-McMoRan’s staff
explained that without the initial study, they always note that nothing has changed.
The operator must amend its procedure to provide an accurate process to monitor the content and
volume of general activity being directed to, and required of each controller at least once each
calendar year, but at intervals not exceeding 15 months, that will assure controllers have
sufficient time to analyze and react to incoming alarms. If the company cannot locate the initial
report from Circadian, PHMSA recommends having Circadian or a similar company perform
another full study to use as its baseline assessment.
12. § 195.446 - Control room management.
(a) …
(e) Alarm management. Each operator using a SCADA system must have a written
alarm management plan to provide for effective controller response to alarms. An
operator's plan must include provisions to:
(1) …
(6) Address deficiencies identified through the implementation of paragraphs (e)(1)
through (e)(5) of this section.
Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility. Specifically, its written alarm management plan, Section 612 –
Alarm Management Plan Deficiencies of the Control Room Management Manual, does not
include procedures for addressing deficiencies identified through implementation of
§195.446(e)(1)-(5). Instead, the section paraphrases agency guidance material (Control Room
Management FAQ E.16), and also references Section 607, which simply restates the regulatory
requirements in subsection (e). For example, the procedure does not include any clear instruction
on how the company will discover, evaluate, and remediate identified deficiencies, or identify
root cause(s), trends, etc. that may be indicative of systemic deficiencies that need to be
corrected.
The operator must develop a procedure for how it will address deficiencies identified through the
implementation of §195.446(e)(1)-(5).
9



13. § 195.446 - Control room management.
(a) General. This section applies to each operator of a pipeline facility with a
controller working in a control room who monitors and controls all or part of a
pipeline facility through a SCADA system. Each operator must have and follow
written control room management procedures that implement the requirements of
this section…
Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility. Specifically, Freeport-McMoRan failed to have and follow
written control room management procedures that adequately assure that changes that could
affect control room operations are coordinated with control room personnel by requiring its field
personnel to contact the control room when emergency conditions exist and when making field
changes that affect control room operations pursuant to the requirements set forth in
§ 195.446(f)(2).
Specifically, Freeport-McMoRan’s Standard Operating and Maintenance Procedures Manual for
Hazardous Liquid Pipelines (Revision 2018), Procedure 7.01 (Fed/Cal) for inspecting and
maintaining emergency valves fails to explicitly require that field personnel contact the control
room when emergency conditions exist, or when making field changes that affect control room
operations. Additionally, the required form mentioned in the procedure (Form 7.01A) does not
provide an area to indicate that the control room was notified prior to and after the valve is
operated.
The operator’s procedure and form documentation must be revised to require field personnel to
contact the control room when emergency conditions exist and when making field changes that
affect control room operations.
14. § 195.446 - Control room management.
(a) General. This section applies to each operator of a pipeline facility with a
controller working in a control room who monitors and controls all or part of a
pipeline facility through a SCADA system. Each operator must have and follow
written control room management procedures that implement the requirements of
this section…
Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility. Specifically, Freeport-McMoRan failed to have and follow
written control room management procedures that adequately explain in sufficient detail how the
operator includes lessons learned from the operator’s experience in its control room management
training program pursuant to the requirements set forth in § 195.446(g)(2).
Specifically, Section 802 – Lessons Learned, of the Control Room Management manual merely
paraphrases the § 195.446(g)(2) regulatory text and does not include an established method for
10



identifying lessons learned from experience and incorporating them into its training program.9
The operator must develop a detailed procedure that explains how the company will include
lessons learned from the operator’s experience into the training program required by this section.
15. § 195.446 - Control room management.
(a) …
(h) Training. Each operator must establish a controller training program and review
the training program content to identify potential improvements at least once each
calendar year, but at intervals not to exceed 15 months. An operator's program
must provide for training each controller to carry out the roles and responsibilities
defined by the operator. In addition, the training program must include the
following elements:
(1) Responding to abnormal operating conditions likely to occur simultaneously or
in sequence;
(2) Use of a computerized simulator or non-computerized (tabletop) method for
training controllers to recognize abnormal operating conditions;
(3) Training controllers on their responsibilities for communication under the
operator's emergency response procedures;
(4) Training that will provide a controller a working knowledge of the pipeline
system, especially during the development of abnormal operating conditions;
(5) For pipeline operating setups that are periodically, but infrequently used,
providing an opportunity for controllers to review relevant procedures in advance
of their application; and
(6) Control room team training and exercises that include both controllers and other
individuals, defined by the operator, who would reasonably be expected to
operationally collaborate with controllers (control room personnel) during normal,
abnormal or emergency situations. Operators must comply with the team training
requirements under this paragraph no later than January 23, 2018.
Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility. Specifically, Freeport-McMoRan failed to establish a controller
training program that sufficiently incorporates the requirements set forth in § 195.446(h). While
the training program generally states the training elements that will be covered, the program fails
to explain in sufficient detail how controllers will be trained on these elements.
For example, the training program fails to identify how controllers will be trained (e.g., types of
exercises), or how they will be evaluated (e.g., assigning pass/fail criteria for training elements),
including specifying how many times a controller can retake any failed training element before
additional training is required. Additionally, the training program includes a controller’s ability
9 Section 802 also incorrectly cites to reporting requirements under Part 191, which only applies to the transportation
of natural and other gas by pipeline. Freeport-McMoRan operates hazardous liquid assets and therefore is subject to
the reporting requirements under Part 195, subpart B.
11



to see colors as a component of training, when this really is a matter of SCADA display
standards.10
Additionally, the required annual review of the training program to identify potential
improvements is a statement rather than a procedure. The metrics listed for use in determining
the effectiveness of the training program are unclear and difficult to discern, and include items
that do not measure effectiveness, such as participation in drills.
The operator must develop an adequate training program that provides the details necessary to
understand how controllers will be trained on the elements set forth in § 195.446(h)(1)-(6) and
addresses the deficiencies noted above. The training content must require each controller to
demonstrate proficiency in each of the roles and responsibilities identified by the operator as well
as the applicable operator qualification (OQ) covered tasks.
16. § 195.446 - Control room management.
(a) …
(j) Compliance and deviations. An operator must maintain for review during
inspection:
(1) …
(2) Documentation to demonstrate that any deviation from the procedures required
by this section was necessary for the safe operation of the pipeline facility.
Freeport-McMoRan’s control room management procedures are inadequate to assure safe
operation of a pipeline facility.
Specifically, Section 1000 – Compliance Validation and Deviations, is disjointed and unclear.
For example, several parts of this section simply paraphrase the regulatory text and/or agency
guidance documents, and does not set forth an actual process that explains how the company will
document instances of deviation from its procedures when it is deemed necessary for the safe
operation of the pipeline facility.
Further, Subsection 1003 – Deviation and Exception Process fails to include acceptable criteria
for determining whether a deviation was necessary for safe operation. For example, the
procedure states that the Facility Supervisor may approve hours of service (HOS) deviation on
Form #503. However, the form could not be found and it could not be determined if the form
ever existed. It is unclear under which circumstances a Facility Supervisor could approve HOS
deviation, or when they should be denied. The procedures do not offer any decision-trees,
guidelines, or other explanation for when and how deviation may occur.
The operator must amend its procedure to accurately reflect the deviation process and
documentation for deviations, addressing the deficiencies noted above.
10 The training manual lists this under operator qualifications. The ability to see SCADA display symbols, colors,
etc. is not, however, an operator qualified (OQ) covered task. Section 903 – Training and Qualification Program
Elements fails to identify appropriate covered tasks for operator qualifications.
12



Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings.
Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. 552(b), along with the complete original document you must provide a second copy of
the document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment
under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue an Order Directing Amendment. If your
plans or procedures are found inadequate as alleged in this Notice, you may be ordered to amend
your plans or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not
contesting this Notice, we propose that you submit your amended procedures to my office within
30 days of receipt of this Notice. This period may be extended by written request for good
cause. Once the inadequacies identified herein have been addressed in your amended
procedures, this enforcement action will be closed.
It is requested (not mandated) that Freeport McMoRan maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Dustin Hubbard, Director, Western Region, Pipeline
and Hazardous Materials Safety Administration. In correspondence concerning this matter,
please refer to CPF 5-2021-043-NOA and, for each document you submit, please provide a copy
in electronic format whenever possible.
Sincerely,
Dustin Hubbard
Director, Western Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
cc: PHP-60 Compliance Registry
PHP-500 D. Fehling (#20-173099)
13

52021043NOA_Closure Letter_03182025_(20-173099)_text.pdf

VIA ELECTRONIC MAIL TO:
March 18, 2025
Mr. David Rose
Director, Environmental Health & Safety
Freeport-McMoRan Oil & Gas
201 S. Broadway Street
Orcutt, CA 93455
CPF 5-2021-043-NOA
Dear Mr. Rose:
During the week of October 26 through 30, 2020, a representative from the Pipeline and
Hazardous Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United
States Code, conducted an on-site pipeline safety inspection of Freeport-McMoRan Oil & Gas
(Freeport-McMoRan) Lompoc Oil & Gas Plant (LOGP) Control Room and written control room
management procedures, located in Lompoc, California. As a result of the inspection, Freeport-
McMoRan was issued a Notice of Amendment (NOA) on August 2, 2021, which proposed
amendment of your procedures. Freeport-McMoRan submitted a response on December 9,
2021.
Regrettably, PHMSA never responded to your submission. Given the passage of time, this letter
is to notify you that PHMSA will review your current written procedures, including any changes
since your 2021 submission, at the upcoming 2025 inspection rather than continue the current
proceeding. PHMSA will address any remaining items with Freeport-McMoran at that time.
Accordingly, this case is now withdrawn.
Thank you for your cooperation.
Sincerely,
Dustin Hubbard
Director, Western Region
Pipeline and Hazardous Materials Safety Administration



cc: PHP-60 Compliance Registry
PHP-500 D. Fehling (20-173099)

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/52021043NOA>
- Source ID: `phmsa-enforcement`
- SHA-256: `2d5aa17d49b4af9db5992a8fbe5e1c61cb5b863c49afa55f8528be842b7970ad`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T09:49:23.469Z
- Document slug: `phmsa-enforcement-52021043noa`

### Source metadata

```json
{
  "cpf": "52021043NOA",
  "operator": "FREEPORT-MCMORAN OIL & GAS",
  "region": "Western",
  "pipelineType": "OFFSHORE LIQUID",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.446(a)",
    "195.446(e)(1)",
    "195.446(e)(2)",
    "195.446(e)(3)",
    "195.446(e)(4)",
    "195.446(e)(5)",
    "195.446(e)(6)",
    "195.446(h)(6)",
    "195.446(j)(2)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "52021043NOA_Closure Letter_03182025_(20-173099).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/52021043NOA/52021043NOA_Closure%20Letter_03182025_(20-173099).pdf",
      "bytes": 216848,
      "category": "agency_document"
    },
    {
      "name": "52021043NOA_Closure Letter_03182025_(20-173099)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/52021043NOA/52021043NOA_Closure%20Letter_03182025_(20-173099)_text.pdf",
      "bytes": 80951,
      "category": "agency_document"
    },
    {
      "name": "52021043NOA_Notice of Amendment_08022021_(20-173099).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/52021043NOA/52021043NOA_Notice%20of%20Amendment_08022021_(20-173099).pdf",
      "bytes": 400863,
      "category": "agency_document"
    },
    {
      "name": "52021043NOA_Notice of Amendment_08022021_(20-173099)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/52021043NOA/52021043NOA_Notice%20of%20Amendment_08022021_(20-173099)_text.pdf",
      "bytes": 252138,
      "category": "agency_document"
    },
    {
      "name": "52021043NOA_Operator Response to Notice and Request Time Extension_09302021_(20-173099).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/52021043NOA/52021043NOA_Operator%20Response%20to%20Notice%20and%20Request%20Time%20Extension_09302021_(20-173099).pdf",
      "bytes": 206674,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "FREEPORT-MCMORAN OIL & GAS"
}
```