# ENI US OPERATING CO, INC — Notice of Probable Violation

**Citation:** CPF 52022028NOPV  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2022-09-07

CLOSED notice of probable violation citing 195.446(c)(4), 195.446(e)(3), 195.446(e)(5), 195.446(f)(1), 195.446(h)(5), 195.446(j)(1).

## Document text

Notice of Probable Violation involving ENI US OPERATING CO, INC. PHMSA's enforcement data identifies the cited regulations as 195.446(c)(4),  195.446(e)(3),  195.446(e)(5),  195.446(f)(1),  195.446(h)(5),  195.446(j)(1). The case was opened on 2022-09-07 and is reported as closed as of 2023-04-26. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

52022028NOPV_Final Order_04262023_(21-201439).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022028NOPV/52022028NOPV_Final%20Order_04262023_(21-201439).pdf

52022028NOPV_Final Order_04262023_(21-201439)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022028NOPV/52022028NOPV_Final%20Order_04262023_(21-201439)_text.pdf

52022028NOPV_Operator Response to Notice_09202022_(21-201439).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022028NOPV/52022028NOPV_Operator%20Response%20to%20Notice_09202022_(21-201439).pdf

52022028NOPV_PCO_09072022_(21-201439).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022028NOPV/52022028NOPV_PCO_09072022_(21-201439).pdf

52022028NOPV_PCO_09072022_(21-201439)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022028NOPV/52022028NOPV_PCO_09072022_(21-201439)_text.pdf

52022028NOPV_Final Order_04262023_(21-201439)_text.pdf

April 26, 2023
VIA ELECTRONIC MAIL TO: massimo.insulla@eni.com
Mr. Massimo Insulla
President and Chief Executive Officer
Eni US Operating Co. Inc.
3800 Centerpoint Drive, Suite 300
Anchorage, Alaska 99503
Re: CPF No. 5-2022-028-NOPV
Dear Mr. Insulla:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation and finds that Eni US Operating Co. Inc., has completed the actions specified in the
Notice to comply with the pipeline safety regulations. Therefore, this case is now closed.
Service of the Final Order by e-mail is effective upon the date of transmission and
acknowledgement of receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Dustin Hubbard, Director, Western Region, Office of Pipeline Safety, PHMSA
Mr. Larry Burgess, SEQ Manager-Alaska, Eni US Operating Co. Inc.,
larry.burgess@eni.com
Mr. David Hart, Operations Manager-Alaska, Eni US Operating Co. Inc.,
david.hart@eni.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Eni US Operating Co. Inc., ) CPF No. 5-2022-028-NOPV
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
From August 2 through August 6, 2021, pursuant to 49 U.S.C. § 60117, the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS),
conducted an on-site pipeline safety inspection of the facilities and records of Eni US Operating
Co. Inc. (Eni or Respondent) in Anchorage and North Slope Borough, Alaska. Eni operates 25.4
miles of hazardous liquid pipeline in the North Slope Borough of Alaska.
As a result of the inspection, the Director, Western Region, OPS (Director), issued to
Respondent, by letter dated September 7, 2022, a Notice of Probable Violation and Proposed
Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed
finding that Eni had committed three violations of 49 C.F.R. Part 195 and proposed ordering
Respondent to take certain measures to correct the alleged violations. The Notice also included
an additional four warning items pursuant to 49 C.F.R. § 190.205, which warned the operator to
correct the probable violations or face possible future enforcement action.
Eni responded to the Notice by letter dated September 20, 2022 (Response). Eni contested one
of the allegations, offered additional information, and provided amended procedures in response
to the Notice. Respondent did not request a hearing and therefore has waived its right to one.
FINDINGS OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 195, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.446(c)(4), which states:
§ 195.446 Control room management.
(a) . . . .
(c) Provide adequate information. Each operator must provide its
controllers with the information, tools, processes and procedures necessary



for the controllers to carry out the roles and responsibilities the operator has
defined by performing each of the following:
(1) . . . .
(4) Test any backup SCADA systems at least once each calendar year,
but at intervals not to exceed 15 months;
The Notice alleged that Respondent violated 49 C.F.R. § 195.446(c)(4) by failing to conduct the
required testing of backup SCADA systems at least once each calendar year, but at intervals not
to exceed 15 months. Specifically, the Notice alleged that Eni’s control room management
(CRM) program did not require backup SCADA systems to be tested, even though Eni operated
three backup control consoles that required testing.
In its Response, Eni did not contest this item but provided additional information and amended
procedures.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 C.F.R.
§ 195.446(c)(4) by failing to conduct the required testing of backup SCADA systems at least
once each calendar year, but at intervals not to exceed 15 months.
Item 2: The Notice alleged that Respondent violated 49 C.F.R. § 195.446(e)(3), which states:
§ 195.446 Control room management.
(a) . . . .
(e) Alarm management. Each operator using a SCADA system must
have a written alarm management plan to provide for effective controller
response to alarms. An operator’s plan must include provisions to:
(1) . . . .
(3) Verify the correct safety-related alarm set-point values and alarm
descriptions when associated field instruments are calibrated or changed
and at least once each calendar year, but at intervals not to exceed 15
months;
The Notice alleged that Respondent violated 49 C.F.R. § 195.446(e)(3) by failing to verify the
correct safety-related alarm set-point valves and alarm descriptions when associated field
instruments were calibrated or changes, at least once per calendar year, but at intervals not to
exceed 15 months. Specifically, the Notice alleged that Eni was unable to provide
documentation to establish that it reviewed set point valves and alarm descriptions.
In its Response, Eni did not contest this item but provided additional information and amended
procedures.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 C.F.R.
§ 195.446(e)(3) by failing to verify the correct safety-related alarm set-point valves and alarm
descriptions when associated field instruments were calibrated or changes, at least once per
calendar year, but at intervals not to exceed 15 months.



Item 5: The Notice alleged that Respondent violated 49 C.F.R. § 195.446(h)(5), which states:
§ 195.446 Control room management.
(a) . . . .
(h) Training. Each operator must establish a controller training program
and review the training program content to identify potential improvements
at least once each calendar year, but at intervals not to exceed 15 months.
An operator’s program must provide for training each controller to carry out
the roles and responsibilities defined by the operator. In addition, the
training program must include the following elements:
(1) . . . .
(5) For pipeline operating setups that are periodically, but infrequently
used, providing an opportunity for controllers to review relevant procedures
in advance of their application;
The Notice alleged that Respondent violated 49 C.F.R. § 195.446(h)(5) by failing to include in
its training program an opportunity for controllers to review relevant procedures for infrequently
used pipeline operating setups in advance of their application. Specifically, the Notice alleged
that Eni failed to update its list of infrequent setups during annual manual reviews that would
need to be included in its training program.
In its Response, Eni requested clarification stating that while its CRM manual was missing
certain infrequently used setups, those setups were included in its training program. Eni stated
that it amended its CRM manual to include the missing setups.
After reviewing the record, I find that clarification is warranted. Paragraph C of the PCO in the
Notice describes the allegations of violation in Item 6, but references Item 5. In addition, the
Notice proposed compliance measures for Item 6, but also listed Item 6 as a warning item. I find
that the Notice erroneously referenced Item 5 in paragraph C of the PCO and that Item 6 should
have been referenced. I also find that Item 5, not Item 6, should have been listed as a warning
item in the Notice.
1 I also note that Eni, in its Response, treated Items 1, 2, and 6 as allegations
of violation with proposed compliance measures and treated Items 3, 4, 5, and 7 as warning
items, which is consistent with my understanding of the record.
Accordingly, Item 5 is issued as a warning item and is appropriately addressed below.
Item 6: The Notice alleged that Respondent violated 49 C.F.R. § 195.446(j)(1), which states:
§ 195.446 Control room management.
(a) . . . .
(j) Compliance and deviations. An operator must maintain for review
during inspection:
1 This clarification is consistent with the Response. Eni stated that Items 1, 2, and 6 “are applicable to the proposed
compliance order.” In addition, Item 5, and not Item 6, was addressed in section 2 of the Response, which Eni
stated provided additional information on each warning item.



(1) Records that demonstrate compliance with the requirements of this
section;
The Notice alleged that Respondent violated 49 C.F.R. § 195.446(j)(1) by failing to maintain
records that demonstrated compliance with the requirements of § 195.446(h). Specifically, the
Notice alleged that Eni failed to provide documentation of adequate training program reviews for
2019 and 2020 because the review forms contained limited or no notes.
For the reasons stated above, I find that paragraph C of the PCO should have referenced Item 6
and that Item 6 should not have been listed as a warning item.2
Eni did not contest this allegation of violation in its Response. Eni stated it “acknowledges [the]
past deficiency and requests that it be considered that [Eni was] able to demonstrate a pattern of
continuous improvement in fulfilling this requirement in 2021.” Eni emphasized that it
improved its training program review process after the inspection. Eni also provided amended
procedures and records of its 2021 training review that the Director indicated corrected the
deficiency described in the Notice. While PHMSA encourages prompt corrective action, the
evidence provided by Eni fails to show Eni’s training reviews met the requirements in
§ 195.446(j)(1) in 2019 and 2020.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 C.F.R.
§ 195.446(j)(1) by failing to maintain records that demonstrated compliance with the
requirements of § 195.446(h).
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Items 1, 2, and 6 in the Notice for
violations of 49 C.F.R. § 195.446. Under 49 U.S.C. § 60118(a), each person who engages in the
transportation of hazardous liquids or who owns or operates a pipeline facility is required to
comply with the applicable safety standards established under chapter 601. The Director has
indicated that Respondent has taken the following actions specified in the proposed compliance
order:
1. With respect to the violation of § 195.446(c)(4) (Item 1), Respondent amended its
procedures to require annual testing of the backup SCADA systems and conducted a
test of the backup SCADA systems.
2. With respect to the violation of § 195.446(e)(3) (Item 2), Respondent has
amended its procedures to provide instructions on how to conduct and document the
2 This clarification is consistent with the Response. Eni stated that Items 1, 2, and 6 “are applicable to the proposed
compliance order.” Eni also included Item 6 in section 1 of the Response, which it stated addressed allegations of
violation, and not warning items.



verification of the correct safety-related alarm set-point values and alarm descriptions
when associated field instruments are calibrated or changed and at least once each
calendar year, but at intervals not to exceed 15 months and submitted records of the
verification of the safety-related alarm set-point values and alarm descriptions.
3. With respect to the violation of § 195.446(j)(1) (Item 6), Respondent has amended
its procedures to provide instructions on how to conduct and document a review of
the controller training program and provided records of the 2021 completed controller
training program review.
Accordingly, I find that compliance has been achieved with respect to these violations.
Therefore, the compliance terms proposed in the Notice are not included in this Order.
WARNING ITEMS
With respect to Items 3, 4, 5 and 7, the Notice alleged probable violations of Part 195, but
identified them as warning items pursuant to § 190.205. The warnings were for:
49 C.F.R. § 195.446(e)(5) (Item 3) ─ Respondent’s alleged failure to monitor the
content and volume of general activity being directed to and required of each
controller at least once per calendar year, but at intervals not exceeding 15
months;
49 C.F.R. § 195.446(f)(1) (Item 4) ─ Respondent’s alleged failure to require
coordination between control room representatives, operator’s management, and
associated field personnel when planning and implementing physical changes to
pipeline equipment or configuration;
49 C.F.R. § 195.446(h)(5) (Item 5) ─ Respondent’s alleged failure to include, in
its controller training, an opportunity for controllers to review relevant procedures
for infrequently used pipeline operating setups in advance of their application;
and
49 C.F.R. § 195.446(j)(1) (Item 7) ─ Respondent’s alleged failure to maintain
records that demonstrated compliance with the requirements of this section.
Eni presented information in its Response showing that it had taken certain actions to address the
cited items. If OPS finds a violation of any of these items in a subsequent inspection,
Respondent may be subject to future enforcement action.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address. The written petition must be received no later than
20 days after receipt of the Final Order by Respondent. Any petition submitted must contain a



statement of the issue(s) and meet all other requirements of 49 C.F.R. § 190.243. The terms of
the order, including corrective action, remain in effect unless the Associate Administrator, upon
request, grants a stay.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
April 26, 2023
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/52022028NOPV>
- Source ID: `phmsa-enforcement`
- SHA-256: `c6dc3dff97f08a6d12297efecd2e54ff913b2175b7bd9ec9e1acb7f4dc71176b`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-25T06:28:29.060Z
- Document slug: `phmsa-enforcement-52022028nopv`

### Source metadata

```json
{
  "cpf": "52022028NOPV",
  "operator": "ENI US OPERATING CO, INC",
  "region": "Western",
  "pipelineType": "INTRASTATE LIQUID, OFFSHORE LIQUID (INTRA)",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.446(c)(4)",
    "195.446(e)(3)",
    "195.446(e)(5)",
    "195.446(f)(1)",
    "195.446(h)(5)",
    "195.446(j)(1)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "52022028NOPV_Final Order_04262023_(21-201439).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/52022028NOPV/52022028NOPV_Final%20Order_04262023_(21-201439).pdf",
      "bytes": 247356,
      "category": "agency_document"
    },
    {
      "name": "52022028NOPV_Final Order_04262023_(21-201439)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/52022028NOPV/52022028NOPV_Final%20Order_04262023_(21-201439)_text.pdf",
      "bytes": 101074,
      "category": "agency_document"
    },
    {
      "name": "52022028NOPV_Operator Response to Notice_09202022_(21-201439).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/52022028NOPV/52022028NOPV_Operator%20Response%20to%20Notice_09202022_(21-201439).pdf",
      "bytes": 2573965,
      "category": "party_submission"
    },
    {
      "name": "52022028NOPV_PCO_09072022_(21-201439).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/52022028NOPV/52022028NOPV_PCO_09072022_(21-201439).pdf",
      "bytes": 352616,
      "category": "case_document"
    },
    {
      "name": "52022028NOPV_PCO_09072022_(21-201439)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/52022028NOPV/52022028NOPV_PCO_09072022_(21-201439)_text.pdf",
      "bytes": 131963,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "ENI US OPERATING CO, INC"
}
```