CLOSED notice of amendment citing 192.631(f)(2).

## Document text

Notice of Amendment involving FLORIDA POWER & LIGHT CO. PHMSA's enforcement data identifies the cited regulation as 192.631(f)(2). The case was opened on 2023-01-09 and is reported as closed as of 2023-01-19. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

52023014NOA_Closure Letter_01192023_(21-210179).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023014NOA/52023014NOA_Closure%20Letter_01192023_(21-210179).pdf

52023014NOA_Closure Letter_01192023_(21-210179)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023014NOA/52023014NOA_Closure%20Letter_01192023_(21-210179)_text.pdf

52023014NOA_Notice of Amendment_01092023_(21-210179).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023014NOA/52023014NOA_Notice%20of%20Amendment_01092023_(21-210179).pdf

52023014NOA_Notice of Amendment_01092023_(21-210179)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023014NOA/52023014NOA_Notice%20of%20Amendment_01092023_(21-210179)_text.pdf

52023014NOA_Operator Response to Notice_01172023_(21-210179).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023014NOA/52023014NOA_Operator%20Response%20to%20Notice_01172023_(21-210179).pdf

52023014NOA_Closure Letter_01192023_(21-210179)_text.pdf

VIA E-MAIL TO MR. DANNY SCHEDULE
January 19, 2023
Mr. Danny Schedule
Senior Director
Midstream Operations
Florida Power & Light Company
601 Travis Street, Suite 1900
Houston, Texas 77002
CPF 5-2023-014-NOA
Closure Letter
Dear Mr. Schedule:
From June 7 through June 11, 2021, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.), inspected
Florida Power & Light’s procedures for control room operations in Houston, Texas.
As a result of the inspection, Florida Power & Light was issued a Notice of Amendment on January
9, 2023, which proposed amendment of your procedures. Florida Power & Light submitted amended
procedures on January 17, 2023.
My staff has reviewed the amended procedures, and it appears that the inadequacies outlined in this
Notice of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you for
your cooperation.
Sincerely,
Dustin Hubbard
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 D. Fehling (#21-210179)

52023014NOA_Notice of Amendment_01092023_(21-210179)_text.pdf

NOTICE OF AMENDMENT
VIA E-MAIL TO MR. DANNY SCHEDULE
January 9, 2023
Mr. Danny Schedule
Senior Director
Midstream Operations
Florida Power & Light Company
601 Travis Street, Suite 1900
Houston, Texas 77002
CPF 5-2023-014-NOA
Dear Mr. Schedule:
From June 7 through June 11, 2021, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.),
inspected Florida Power & Light’s procedures for control room operations in Houston, Texas.
Based on the inspection, PHMSA has identified the apparent inadequacies found within Florida
Power & Light’s plans or procedures, as described below:
1. §192.631 Control room management.
(a) …
(f) Change management. Each operator must assure that changes that could affect
control room operations are coordinated with the control room personnel by
performing each of the following:
(1) …
(2) Require its field personnel to contact the control room when emergency
conditions exist and when making field changes that affect control room operations;



Florida Power & Light’s written procedures are inadequate to assure the safe operation of a
pipeline facility.
Florida Power & Light’s revised procedure, M-15 Mainline Valves Inspection and Testing,
Document Number 2005220615, Revision 1, submitted to PHMSA after the inspection on
October 28, 2021, fails to require that field personnel contact the control room when making
field changes that affect control room operations pursuant to the requirements set forth in §
192.631(f)(2). Instead, under Section 5.0 – Instructions, and below subsection 5.1.4, the NOTE
box states, in relevant part, “… The person performing this function should contact Gas Control
Room before operating the valve and after the function is completed.” As this is a requirement
pursuant to §192.631(f)(2), the procedure must require this action. Accordingly, the “should”
should be changed to “must.” Furthermore, the information in the NOTE box regarding
contacting the control room should be more predominant in the procedure to ensure the reader
recognizes the need to contact the control room prior to beginning the inspection.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings.
Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. 552(b), along with the complete original document you must provide a second copy of
the document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment
under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue an Order Directing Amendment. If your
plans or procedures are found inadequate as alleged in this Notice, you may be ordered to amend
your plans or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not
contesting this Notice, we propose that you submit your amended procedures to my office within
30 days of receipt of this Notice. This period may be extended by written request for good
cause. Once the inadequacies identified herein have been addressed in your amended
procedures, this enforcement action will be closed.
It is requested (not mandated) that Florida Power & Light maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Dustin Hubbard, Director, Western Region, Pipeline
and Hazardous Materials Safety Administration. In correspondence concerning this matter,



please refer to CPF 5-2023-014-NOA and, for each document you submit, please provide a copy
in electronic format whenever possible.
Sincerely,
Dustin Hubbard
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
cc: PHP-60 Compliance Registry
PHP-500 D. Fehling (#21-210179)

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/52023014NOA>
- Source ID: `phmsa-enforcement`
- SHA-256: `f8f336d0283f65b9500e7a0823ec0036985c24b273a6e748f133b1f7c06d0bb0`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-24T18:08:16.738Z
- Document slug: `phmsa-enforcement-52023014noa`

### Source metadata

```json
{
  "cpf": "52023014NOA",
  "operator": "FLORIDA POWER & LIGHT CO",
  "region": "Western",
  "pipelineType": "INTRASTATE GAS TRANSMISSION",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.631(f)(2)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "52023014NOA_Closure Letter_01192023_(21-210179).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/52023014NOA/52023014NOA_Closure%20Letter_01192023_(21-210179).pdf",
      "bytes": 242062,
      "category": "agency_document"
    },
    {
      "name": "52023014NOA_Closure Letter_01192023_(21-210179)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/52023014NOA/52023014NOA_Closure%20Letter_01192023_(21-210179)_text.pdf",
      "bytes": 60655,
      "category": "agency_document"
    },
    {
      "name": "52023014NOA_Notice of Amendment_01092023_(21-210179).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/52023014NOA/52023014NOA_Notice%20of%20Amendment_01092023_(21-210179).pdf",
      "bytes": 309829,
      "category": "agency_document"
    },
    {
      "name": "52023014NOA_Notice of Amendment_01092023_(21-210179)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/52023014NOA/52023014NOA_Notice%20of%20Amendment_01092023_(21-210179)_text.pdf",
      "bytes": 115757,
      "category": "agency_document"
    },
    {
      "name": "52023014NOA_Operator Response to Notice_01172023_(21-210179).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/52023014NOA/52023014NOA_Operator%20Response%20to%20Notice_01172023_(21-210179).pdf",
      "bytes": 233101,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "FLORIDA POWER & LIGHT CO"
}
```