# COLUMBIA GAS TRANSMISSION CORP — Gas transmission and gathering — incident on 2011-11-03

**Citation:** PHMSA Report 20110389  
**Type / status:** incident / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** 2011-11-03  
**Published:** 2011-12-02

Gas transmission and gathering incident in ARTEMAS, BEDFORD County, PA. Reported cause: CORROSION FAILURE. Reported consequences: 0 fatalities, 0 injuries, 15000 NATURAL GAS released, $23,300,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.

## Document text

Gas transmission and gathering incident in ARTEMAS, BEDFORD County, PA. Reported cause: CORROSION FAILURE. Reported consequences: 0 fatalities, 0 injuries, 15000 NATURAL GAS released, $23,300,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20110389.

Operator ID: 2616.

Reported incident date: 11/3/2011 0:45.

Location detail: C58

Cause detail: INTERNAL CORROSION

Cause detail: AT APPROXIMATELY 12:30 AM ON THURSDAY, NOVEMBER 3, 2011, A NEIGHBOR OF THE ARTEMAS COMPRESSOR STATION CALLED THE LOCAL COLUMBIA GAS TRANSMISSION MAINTENANCE MECHANIC TO REPORT AN INCIDENT AND FIRE AT THE STATION. THAT EMPLOYEE CONTACTED A SECOND COMPANY EMPLOYEE FOR ASSISTANCE AT THE STATION. THE NGT&S MONITORING CENTER WAS ALSO CONTACTED TO INFORM THEM OF THE POSSIBLE INCIDENT. UPON CONFIRMING THE FIRE AND INITIATING AN ESD OF THE STATION, THE AREA WAS SECURED. COMPANY PERSONNEL WORKED WITH THE LOCAL FIRE DEPARTMENT TO ENSURE THE SAFETY OF THE PUBLIC AND THE AREA. IT WAS FOUND THAT THE DUMP VALVE FOR THE ARTEMAS B FIELD SLUG CATCHER HAD FAILED IN THE OPEN POSITION. UPON CLOSING THIS VALVE, THE FIRE WAS FULLY EXTINGUISHED. THE RESULTS OF THE ANALYSIS BY A THIRD PARTY EXPERT IN METALLURGY AND FAILURE ANALYSIS INDICATED THAT THE RUPTURE WAS LIKELY DUE TO WATER FREEZING IN THE DRAIN LINE. THE FROZEN LIQUID CAUSED THE PIPING TO EXPAND, PRODUCING DUCTILE TEARING AT INTERNAL CORROSION FEATURES. THE RESULTANT FLAW SIZE WAS CRITICAL FOR THE MATERIAL PROPERTIES, DIMENSIONS, AND OPERATING PRESSURE OF THE PIPING. FREEZING OCCURRED SOMETIME PRIOR TO THE FAILURE. THE PRESENCE OF THE INTERNAL CORROSION WAS A CONTRIBUTING FACTOR TO THE FAILURE. THE COMPANY HAS DEVELOPED AN INTEGRITY PLAN COVERING PRESSURIZED LIQUID/DUMP PIPING FROM VESSELS AT ITS ACTIVE COMPRESSOR STATIONS. THE PLAN SUMMARIZES IMMEDIATE INITIAL STEPS AS WELL AS LONG TERM STEPS THAT WILL BE TAKEN TO ADDRESS DUMP/DRAIN VALVE PIPING COMPANY-WIDE.

PHMSA trend classification: significant incident, not serious.

PHMSA standardized cause: CORROSION — INTERNAL.

PHMSA indexed costs: $23,359,400 reported total cost, $12,537,740.517 in 1984 dollars, $30,830,332.326 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.

## Provenance

- Official: Yes
- Source: <https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip>
- Source ID: `phmsa-pipeline-incidents`
- SHA-256: `55fabc3b1676319071119c0faac6b16ba3f1f655b58cf64a362956e294ddc090`
- Retrieved: 2026-08-20T03:30:32.010Z
- Exported: 2026-08-27T13:15:47.785Z
- Document slug: `phmsa-incident-3eb4cedbca6a8bbb50c158ae`

### Source metadata

```json
{
  "recordKind": "pipeline_incident",
  "datasetType": "gas_transmission_gathering",
  "datasetLabel": "Gas transmission and gathering",
  "datasetPeriod": "January 2010 to present",
  "report": {
    "number": "20110389",
    "supplementalNumber": "16877",
    "type": "SUPPLEMENTAL FINAL",
    "receivedDate": "2011-12-02",
    "receivedDateRaw": "12/2/2011"
  },
  "operator": {
    "id": "2616",
    "name": "COLUMBIA GAS TRANSMISSION CORP"
  },
  "incident": {
    "date": "2011-11-03",
    "dateRaw": "11/3/2011 0:45"
  },
  "location": {
    "city": "ARTEMAS",
    "county": "BEDFORD",
    "state": "PA",
    "postalCode": "17211",
    "latitude": 39.72573,
    "longitude": -78.4217,
    "type": "OPERATOR-CONTROLLED PROPERTY",
    "details": {
      "DESIGNATED_NAME": "C58"
    },
    "facilityName": "ARTEMAS COMPRESSOR STATION"
  },
  "cause": {
    "category": "CORROSION FAILURE",
    "details": {
      "CAUSE_DETAILS": "INTERNAL CORROSION",
      "NARRATIVE": "AT APPROXIMATELY 12:30 AM ON THURSDAY, NOVEMBER 3, 2011, A NEIGHBOR OF THE ARTEMAS COMPRESSOR STATION CALLED THE LOCAL COLUMBIA GAS TRANSMISSION MAINTENANCE MECHANIC TO REPORT AN INCIDENT AND FIRE AT THE STATION. THAT EMPLOYEE CONTACTED A SECOND COMPANY EMPLOYEE FOR ASSISTANCE AT THE STATION. THE NGT&S MONITORING CENTER WAS ALSO CONTACTED TO INFORM THEM OF THE POSSIBLE INCIDENT. UPON CONFIRMING THE FIRE AND INITIATING AN ESD OF THE STATION, THE AREA WAS SECURED. COMPANY PERSONNEL WORKED WITH THE LOCAL FIRE DEPARTMENT TO ENSURE THE SAFETY OF THE PUBLIC AND THE AREA. IT WAS FOUND THAT THE DUMP VALVE FOR THE ARTEMAS B FIELD SLUG CATCHER HAD FAILED IN THE OPEN POSITION. UPON CLOSING THIS VALVE, THE FIRE WAS FULLY EXTINGUISHED. THE RESULTS OF THE ANALYSIS BY A THIRD PARTY EXPERT IN METALLURGY AND FAILURE ANALYSIS INDICATED THAT THE RUPTURE WAS LIKELY DUE TO WATER FREEZING IN THE DRAIN LINE. THE FROZEN LIQUID CAUSED THE PIPING TO EXPAND, PRODUCING DUCTILE TEARING AT INTERNAL CORROSION FEATURES. THE RESULTANT FLAW SIZE WAS CRITICAL FOR THE MATERIAL PROPERTIES, DIMENSIONS, AND OPERATING PRESSURE OF THE PIPING. FREEZING OCCURRED SOMETIME PRIOR TO THE FAILURE. THE PRESENCE OF THE INTERNAL CORROSION WAS A CONTRIBUTING FACTOR TO THE FAILURE. THE COMPANY HAS DEVELOPED AN INTEGRITY PLAN COVERING PRESSURIZED LIQUID/DUMP PIPING FROM VESSELS AT ITS ACTIVE COMPRESSOR STATIONS. THE PLAN SUMMARIZES IMMEDIATE INITIAL STEPS AS WELL AS LONG TERM STEPS THAT WILL BE TAKEN TO ADDRESS DUMP/DRAIN VALVE PIPING COMPANY-WIDE."
    }
  },
  "consequences": {
    "fatalities": 0,
    "injuries": 0,
    "commodity": "NATURAL GAS",
    "release": "15000",
    "propertyDamage": 23300000,
    "estimatedOperatorCost": 5000,
    "estimatedEmergencyCost": 1000,
    "estimatedEnvironmentalCost": null,
    "ignition": "YES",
    "explosion": "NO",
    "evacuated": 0,
    "raw": {
      "FATAL": "0",
      "INJURE": "0",
      "UNINTENTIONAL_RELEASE": "15000",
      "EST_COST_PROP_DAMAGE": "23300000",
      "PRPTY": "23359400"
    }
  },
  "provenance": {
    "viewId": "27nc-rsge",
    "viewUrl": "https://data.transportation.gov/api/views/27nc-rsge",
    "assetId": "2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8",
    "archiveFilename": "Gas Transmission & Gathering Incident Data - January 2010 to present.zip",
    "archiveSha256": "fe0b136ca4b00ac987a8bc2e195098accf910d97512c5fc3b59e62d9da5f674e",
    "memberPath": "incident_gas_transmission_gathering_jan2010_present.txt",
    "memberSha256": "b435f2a25718cf54c54e00294e6788c4f9c6860e02fb86355e75d294c243c4dd",
    "rowNumber": 1777,
    "rowSha256": "0a674e7e5545651c9f4fc3e57a004e65a78a310eb530caa450e43261a933e728"
  },
  "caveat": "Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.",
  "operatorReported": true,
  "finalAgencyFinding": false,
  "flaggedAnalysis": {
    "dataAsOf": "2026-07-31",
    "flags": {
      "fireFirst": null,
      "significant": true,
      "serious": false
    },
    "standardizedCause": {
      "sevenCategory": "CORROSION",
      "sevenSubcategory": "INTERNAL",
      "eightCategory": "CORROSION",
      "eightSubcategory": "INTERNAL"
    },
    "costs": {
      "reported": 23359400,
      "in1984Dollars": 12537740.516870266,
      "currentYearDollars": 30830332.326097097
    },
    "caveat": "PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.",
    "provenance": {
      "sourceUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/PHMSA_Pipeline_Safety_Flagged_Incidents.zip",
      "landingPageUrl": "https://www.phmsa.dot.gov/data-and-statistics/pipeline/pipeline-incident-flagged-files",
      "catalogUrl": "https://data.transportation.gov/Pipelines-and-Hazmat/Pipeline-Incident-Flagged-Files/qdme-9bbm",
      "retrievalMode": "official_live",
      "archivedAt": null,
      "archiveSha256": "317e6a3e16d60b9b677efe391dc40258b5dd7ead83fb8bea74cb553cedfbbdec",
      "workbook": "gtggungs2010toPresent.xlsx",
      "sheet": "gtggungs2010toPresent",
      "rowNumber": 218,
      "rowSha256": "476703d94cbe3b5bbbabc464b86a3b6c35445955c925fb4d9373495ddb4ad614"
    }
  },
  "jurisdiction": "US",
  "operatorName": "COLUMBIA GAS TRANSMISSION CORP"
}
```