# NORTHERN NATURAL GAS CO — Gas transmission and gathering — incident on 2016-04-26

**Citation:** PHMSA Report 20160040  
**Type / status:** incident / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** 2016-04-26  
**Published:** 2016-05-23

Gas transmission and gathering incident in Not Within a Municipality, EAU CLAIRE County, WI. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 6172 NATURAL GAS released, $80,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.

## Document text

Gas transmission and gathering incident in Not Within a Municipality, EAU CLAIRE County, WI. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 6172 NATURAL GAS released, $80,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20160040.

Operator ID: 13750.

Reported incident date: 4/26/2016 15:35.

Location detail: 18.04

Cause detail: EXCAVATION DAMAGE BY THIRD PARTY

Cause detail: EXCAVATION ISSUE

Cause detail: IMPROPER BACKFILLING PRACTICES

Cause detail: ON APRIL 26, 2016, NORTHLAND EXCAVATION, A THIRD PARTY EXCAVATOR, STRUCK THE AUGUSTA BRANCH LINE (WIB19901) WITH A DEEP RIPPER ATTACHED TO A BULLDOZER. ALTHOUGH A ONE-CALL TICKET HAD BEEN MADE, IT WAS NOT SCHEDULED TO CLEAR UNTIL APRIL 28, 2016, AT 07:49. NORTHERN HAD PLANS TO LOCATE THE LINE ON APRIL 27, 2016. WISCONSIN HAS A 3-DAY WAIT PERIOD FOR ONE-CALL TICKETS. THE AUGUSTA #1 TBS HAS AN ALTERNATIVE FEED WITH VIKING GAS TRANSMISSION. WE ENERGIES SWITCHED OVER AND MAINTAINED SERVICE. NORTHERN STOPPLED THE AUGUSTA 3-INCH BRANCH LINE UPSTREAM OF THE FAILURE SITE AND REPAIRED THE DAMAGED SECTION OF THE LINE. THE DAMAGED SECTION WAS SENT TO A LABORATORY FOR ANALYSIS.

PHMSA trend classification: significant incident, not serious.

PHMSA standardized cause: EXCAVATION DAMAGE — THIRD PARTY EXCAVATION DAMAGE.

PHMSA indexed costs: $102,800 reported total cost, $57,839.84 in 1984 dollars, $126,927.954 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.

## Provenance

- Official: Yes
- Source: <https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip>
- Source ID: `phmsa-pipeline-incidents`
- SHA-256: `afcb578f28227d4b91621f250942d90ab0fb0907c3e7244649884b2f976c90e8`
- Retrieved: 2026-08-20T03:30:32.010Z
- Exported: 2026-08-24T04:45:42.501Z
- Document slug: `phmsa-incident-3ec88d235ac727e2523edafe`

### Source metadata

```json
{
  "recordKind": "pipeline_incident",
  "datasetType": "gas_transmission_gathering",
  "datasetLabel": "Gas transmission and gathering",
  "datasetPeriod": "January 2010 to present",
  "report": {
    "number": "20160040",
    "supplementalNumber": "17155",
    "type": "SUPPLEMENTAL FINAL",
    "receivedDate": "2016-05-23",
    "receivedDateRaw": "5/23/2016"
  },
  "operator": {
    "id": "13750",
    "name": "NORTHERN NATURAL GAS CO"
  },
  "incident": {
    "date": "2016-04-26",
    "dateRaw": "4/26/2016 15:35"
  },
  "location": {
    "city": "Not Within a Municipality",
    "county": "EAU CLAIRE",
    "state": "WI",
    "postalCode": "54722",
    "latitude": 44.6528,
    "longitude": -91.15295,
    "type": "PIPELINE RIGHT-OF-WAY",
    "details": {
      "DESIGNATED_NAME": "18.04"
    },
    "facilityName": "AUGUSTA WI 3-INCH BRANCH LINE"
  },
  "cause": {
    "category": "EXCAVATION DAMAGE",
    "details": {
      "CAUSE_DETAILS": "EXCAVATION DAMAGE BY THIRD PARTY",
      "ROOT_CAUSE_CATEGORY": "EXCAVATION ISSUE",
      "ROOT_CAUSE_TYPE": "IMPROPER BACKFILLING PRACTICES",
      "NARRATIVE": "ON APRIL 26, 2016, NORTHLAND EXCAVATION, A THIRD PARTY EXCAVATOR, STRUCK THE AUGUSTA BRANCH LINE (WIB19901) WITH A DEEP RIPPER ATTACHED TO A BULLDOZER. ALTHOUGH A ONE-CALL TICKET HAD BEEN MADE, IT WAS NOT SCHEDULED TO CLEAR UNTIL APRIL 28, 2016, AT 07:49. NORTHERN HAD PLANS TO LOCATE THE LINE ON APRIL 27, 2016. WISCONSIN HAS A 3-DAY WAIT PERIOD FOR ONE-CALL TICKETS. THE AUGUSTA #1 TBS HAS AN ALTERNATIVE FEED WITH VIKING GAS TRANSMISSION. WE ENERGIES SWITCHED OVER AND MAINTAINED SERVICE. NORTHERN STOPPLED THE AUGUSTA 3-INCH BRANCH LINE UPSTREAM OF THE FAILURE SITE AND REPAIRED THE DAMAGED SECTION OF THE LINE. THE DAMAGED SECTION WAS SENT TO A LABORATORY FOR ANALYSIS."
    }
  },
  "consequences": {
    "fatalities": 0,
    "injuries": 0,
    "commodity": "NATURAL GAS",
    "release": "6172",
    "propertyDamage": 80000,
    "estimatedOperatorCost": 1000,
    "estimatedEmergencyCost": 10000,
    "estimatedEnvironmentalCost": null,
    "ignition": "NO",
    "explosion": "NO",
    "evacuated": 0,
    "raw": {
      "FATAL": "0",
      "INJURE": "0",
      "UNINTENTIONAL_RELEASE": "6172",
      "EST_COST_PROP_DAMAGE": "80000",
      "PRPTY": "102800"
    }
  },
  "provenance": {
    "viewId": "27nc-rsge",
    "viewUrl": "https://data.transportation.gov/api/views/27nc-rsge",
    "assetId": "2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8",
    "archiveFilename": "Gas Transmission & Gathering Incident Data - January 2010 to present.zip",
    "archiveSha256": "fe0b136ca4b00ac987a8bc2e195098accf910d97512c5fc3b59e62d9da5f674e",
    "memberPath": "incident_gas_transmission_gathering_jan2010_present.txt",
    "memberSha256": "b435f2a25718cf54c54e00294e6788c4f9c6860e02fb86355e75d294c243c4dd",
    "rowNumber": 1205,
    "rowSha256": "bac5fc24c0380d9aa982ed35fccd5a6b13b7432def4f97c1957ba025e42203f7"
  },
  "caveat": "Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.",
  "operatorReported": true,
  "finalAgencyFinding": false,
  "flaggedAnalysis": {
    "dataAsOf": "2026-07-31",
    "flags": {
      "fireFirst": null,
      "significant": true,
      "serious": false
    },
    "standardizedCause": {
      "sevenCategory": "EXCAVATION DAMAGE",
      "sevenSubcategory": "THIRD PARTY EXCAVATION DAMAGE",
      "eightCategory": "EXCAVATION DAMAGE",
      "eightSubcategory": "THIRD PARTY EXCAVATION DAMAGE"
    },
    "costs": {
      "reported": 102800,
      "in1984Dollars": 57839.83957859211,
      "currentYearDollars": 126927.95422729402
    },
    "caveat": "PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.",
    "provenance": {
      "sourceUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/PHMSA_Pipeline_Safety_Flagged_Incidents.zip",
      "landingPageUrl": "https://www.phmsa.dot.gov/data-and-statistics/pipeline/pipeline-incident-flagged-files",
      "catalogUrl": "https://data.transportation.gov/Pipelines-and-Hazmat/Pipeline-Incident-Flagged-Files/qdme-9bbm",
      "retrievalMode": "official_live",
      "archivedAt": null,
      "archiveSha256": "317e6a3e16d60b9b677efe391dc40258b5dd7ead83fb8bea74cb553cedfbbdec",
      "workbook": "gtggungs2010toPresent.xlsx",
      "sheet": "gtggungs2010toPresent",
      "rowNumber": 791,
      "rowSha256": "d086f6a9e43cd1fe1abc4ce59df34d7fb5d7b9e995cb542f3806e4571799aade"
    }
  },
  "jurisdiction": "US",
  "operatorName": "NORTHERN NATURAL GAS CO"
}
```