# MARKWEST JAVELINA PIPELINE COMPANY, LLC — Gas transmission and gathering — incident on 2015-04-28

**Citation:** PHMSA Report 20150071  
**Type / status:** incident / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** 2015-04-28  
**Published:** 2015-05-22

Gas transmission and gathering incident in CORPUS CHRISTI, NUECES County, TX. Reported cause: EQUIPMENT FAILURE. Reported consequences: 0 fatalities, 0 injuries, 833 HYDROGEN GAS released, $1,450,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.

## Document text

Gas transmission and gathering incident in CORPUS CHRISTI, NUECES County, TX. Reported cause: EQUIPMENT FAILURE. Reported consequences: 0 fatalities, 0 injuries, 833 HYDROGEN GAS released, $1,450,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20150071.

Operator ID: 9171.

Reported incident date: 4/28/2015 13:41.

Location detail: CITGO WEST

Cause detail: NON-THREADED CONNECTION FAILURE

Cause detail: AN IN-LINE INSPECTION OF THE HYDROGEN PIPELINE WAS BEING CONDUCTED AND PRIOR TO THE LAST RUN OF THE IN-LINE INSPECTION TOOL (MFL), HYDROGEN GAS WAS RELEASED AND IGNITED FROM A BLIND FLANGE CONNECTION FAILURE ON A TEMPORARY SEPARATOR FILTER INSTALLED AT THE RECEIVER SITE. THE FIRE WAS IMMEDIATELY IDENTIFIED BY ON-SITE PERSONNEL. THERE WERE NO INJURIES SUSTAINED AS A RESULT OF THE INCIDENT. THE PIPELINE SECTION WAS ISOLATED AND DE-PRESSURED TO THE FACILITY FLARE. LOCAL EMERGENCY RESPONDERS WERE DISPATCHED AND CONTAINED/EXTINGUISHED THE FIRE. THE FIRE AFFECTED THE STATION PIPING AND EQUIPMENT IN THE SURROUNDING AREA. REPAIRS AND/OR REPLACEMENT OF AFFECTED PIPING AND EQUIPMENT WERE COMPLETED AND RE-COMMISSIONED.

PHMSA trend classification: significant incident, not serious.

PHMSA standardized cause: EQUIPMENT FAILURE — NON-THREADED CONNECTION FAILURE.

PHMSA indexed costs: $1,451,027 reported total cost, $728,369.162 in 1984 dollars, $1,792,573.18 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.

## Provenance

- Official: Yes
- Source: <https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip>
- Source ID: `phmsa-pipeline-incidents`
- SHA-256: `0f9d934d663710340dde2116d494edf4d9fa361ac51947fc96b7e05084b3dd0a`
- Retrieved: 2026-08-20T03:30:32.010Z
- Exported: 2026-08-23T21:46:35.991Z
- Document slug: `phmsa-incident-a1663d1f8131c55e49779feb`

### Source metadata

```json
{
  "recordKind": "pipeline_incident",
  "datasetType": "gas_transmission_gathering",
  "datasetLabel": "Gas transmission and gathering",
  "datasetPeriod": "January 2010 to present",
  "report": {
    "number": "20150071",
    "supplementalNumber": "17221",
    "type": "SUPPLEMENTAL FINAL",
    "receivedDate": "2015-05-22",
    "receivedDateRaw": "5/22/2015"
  },
  "operator": {
    "id": "9171",
    "name": "MARKWEST JAVELINA PIPELINE COMPANY, LLC"
  },
  "incident": {
    "date": "2015-04-28",
    "dateRaw": "4/28/2015 13:41"
  },
  "location": {
    "city": "CORPUS CHRISTI",
    "county": "NUECES",
    "state": "TX",
    "postalCode": "78410",
    "latitude": 27.809064,
    "longitude": -97.495622,
    "type": "OPERATOR-CONTROLLED PROPERTY",
    "details": {
      "DESIGNATED_NAME": "CITGO WEST"
    },
    "facilityName": "CITGO WEST VALVE-METERING STATION"
  },
  "cause": {
    "category": "EQUIPMENT FAILURE",
    "details": {
      "CAUSE_DETAILS": "NON-THREADED CONNECTION FAILURE",
      "NARRATIVE": "AN IN-LINE INSPECTION OF THE HYDROGEN PIPELINE WAS BEING CONDUCTED AND PRIOR TO THE LAST RUN OF THE IN-LINE INSPECTION TOOL (MFL), HYDROGEN GAS WAS RELEASED AND IGNITED FROM A BLIND FLANGE CONNECTION FAILURE ON A TEMPORARY SEPARATOR FILTER INSTALLED AT THE RECEIVER SITE. THE FIRE WAS IMMEDIATELY IDENTIFIED BY ON-SITE PERSONNEL. THERE WERE NO INJURIES SUSTAINED AS A RESULT OF THE INCIDENT. THE PIPELINE SECTION WAS ISOLATED AND DE-PRESSURED TO THE FACILITY FLARE. LOCAL EMERGENCY RESPONDERS WERE DISPATCHED AND CONTAINED/EXTINGUISHED THE FIRE. THE FIRE AFFECTED THE STATION PIPING AND EQUIPMENT IN THE SURROUNDING AREA. REPAIRS AND/OR REPLACEMENT OF AFFECTED PIPING AND EQUIPMENT WERE COMPLETED AND RE-COMMISSIONED."
    }
  },
  "consequences": {
    "fatalities": 0,
    "injuries": 0,
    "commodity": "HYDROGEN GAS",
    "release": "833",
    "propertyDamage": 1450000,
    "estimatedOperatorCost": 0,
    "estimatedEmergencyCost": 0,
    "estimatedEnvironmentalCost": null,
    "ignition": "YES",
    "explosion": "YES",
    "evacuated": 0,
    "raw": {
      "FATAL": "0",
      "INJURE": "0",
      "UNINTENTIONAL_RELEASE": "833",
      "EST_COST_PROP_DAMAGE": "1450000",
      "PRPTY": "1451027"
    }
  },
  "provenance": {
    "viewId": "27nc-rsge",
    "viewUrl": "https://data.transportation.gov/api/views/27nc-rsge",
    "assetId": "2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8",
    "archiveFilename": "Gas Transmission & Gathering Incident Data - January 2010 to present.zip",
    "archiveSha256": "fe0b136ca4b00ac987a8bc2e195098accf910d97512c5fc3b59e62d9da5f674e",
    "memberPath": "incident_gas_transmission_gathering_jan2010_present.txt",
    "memberSha256": "b435f2a25718cf54c54e00294e6788c4f9c6860e02fb86355e75d294c243c4dd",
    "rowNumber": 1324,
    "rowSha256": "d0825f5a9ec7c2f0e8d9f725d414b4c34170976681fc82e71a2f2fa284d2e857"
  },
  "caveat": "Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.",
  "operatorReported": true,
  "finalAgencyFinding": false,
  "flaggedAnalysis": {
    "dataAsOf": "2026-07-31",
    "flags": {
      "fireFirst": null,
      "significant": true,
      "serious": false
    },
    "standardizedCause": {
      "sevenCategory": "MATERIAL/WELD/EQUIP FAILURE",
      "sevenSubcategory": "NON-THREADED CONNECTION FAILURE",
      "eightCategory": "EQUIPMENT FAILURE",
      "eightSubcategory": "NON-THREADED CONNECTION FAILURE"
    },
    "costs": {
      "reported": 1451027,
      "in1984Dollars": 728369.1621055348,
      "currentYearDollars": 1792573.1803218909
    },
    "caveat": "PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.",
    "provenance": {
      "sourceUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/PHMSA_Pipeline_Safety_Flagged_Incidents.zip",
      "landingPageUrl": "https://www.phmsa.dot.gov/data-and-statistics/pipeline/pipeline-incident-flagged-files",
      "catalogUrl": "https://data.transportation.gov/Pipelines-and-Hazmat/Pipeline-Incident-Flagged-Files/qdme-9bbm",
      "retrievalMode": "official_live",
      "archivedAt": null,
      "archiveSha256": "317e6a3e16d60b9b677efe391dc40258b5dd7ead83fb8bea74cb553cedfbbdec",
      "workbook": "gtggungs2010toPresent.xlsx",
      "sheet": "gtggungs2010toPresent",
      "rowNumber": 670,
      "rowSha256": "5fddbc2df3c28ad0183975f37e7e2548895a0b0e2178aa4345f2751c55166178"
    }
  },
  "jurisdiction": "US",
  "operatorName": "MARKWEST JAVELINA PIPELINE COMPANY, LLC"
}
```