# GULF SOUTH PIPELINE COMPANY, LP — Gas transmission and gathering — incident on 2011-06-01

**Citation:** PHMSA Report 20110211  
**Type / status:** incident / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** 2011-06-01  
**Published:** 2011-06-29

Gas transmission and gathering incident in JACKSON, HINDS County, MS. Reported cause: OTHER INCIDENT CAUSE. Reported consequences: 0 fatalities, 0 injuries, 227 NATURAL GAS released, $80,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: not significant, not serious.

## Document text

Gas transmission and gathering incident in JACKSON, HINDS County, MS. Reported cause: OTHER INCIDENT CAUSE. Reported consequences: 0 fatalities, 0 injuries, 227 NATURAL GAS released, $80,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20110211.

Operator ID: 31728.

Reported incident date: 6/1/2011 15:05.

Location detail: 070+60

Cause detail: UNKNOWN

Cause detail: GULF SOUTH WAS IN THE PROCESS OF PERFORMING A PIGGING PROJECT ON THE INDEX 301-18 CANTON 6" IN HINDS COUNTY, MISSISSIPPI, WHEN NOTIFICED OF A POSSIBLE LEAK ON THE PIPELINE SYSTEM AT WHITE OAK CREEK CROSSING. GULF SOUTH EMPLOYEES INVESTIGATED AND DETERMINED THAT THERE WAS A LEAK ON THE SYSTEM AND ISOLATED THE PIPELINE SEGMENT BY CLOSING BLOCK VALVES ON EACH SIDE OF THE INCIDENT LOCATION AND BLEW THE PIPELINE DOWN TO ZERO. A DETERMINATION WAS MADE TO INSTALL A NEW CROSSING DUE TO THE LEAK LOCATION WITHIN A DITCH EMBANKMENT. THE PIPELINE SECTION WITH THE LEAK WAS ABANDONED IN PLACE. THE NEW SECTION IS OPERATING NORMALLY.

PHMSA trend classification: not significant, not serious.

PHMSA standardized cause: ALL OTHER CAUSES — UNKNOWN.

PHMSA indexed costs: $81,824 reported total cost, $44,155.017 in 1984 dollars, $107,333.242 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.

## Provenance

- Official: Yes
- Source: <https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip>
- Source ID: `phmsa-pipeline-incidents`
- SHA-256: `98e058dad72a6c3f67106090dfe7977f6eaaf48b2dc4ba8d4f6540f6923b85d7`
- Retrieved: 2026-08-20T03:30:32.010Z
- Exported: 2026-08-27T13:28:35.014Z
- Document slug: `phmsa-incident-c26412894eac59560d1d1860`

### Source metadata

```json
{
  "recordKind": "pipeline_incident",
  "datasetType": "gas_transmission_gathering",
  "datasetLabel": "Gas transmission and gathering",
  "datasetPeriod": "January 2010 to present",
  "report": {
    "number": "20110211",
    "supplementalNumber": "15280",
    "type": "ORIGINAL FINAL",
    "receivedDate": "2011-06-29",
    "receivedDateRaw": "6/29/2011"
  },
  "operator": {
    "id": "31728",
    "name": "GULF SOUTH PIPELINE COMPANY, LP"
  },
  "incident": {
    "date": "2011-06-01",
    "dateRaw": "6/1/2011 15:05"
  },
  "location": {
    "city": "JACKSON",
    "county": "HINDS",
    "state": "MS",
    "postalCode": "39211",
    "latitude": 32.38402,
    "longitude": -90.14187,
    "type": "PIPELINE RIGHT-OF-WAY",
    "details": {
      "DESIGNATED_NAME": "070+60"
    },
    "facilityName": "CANTON 6\""
  },
  "cause": {
    "category": "OTHER INCIDENT CAUSE",
    "details": {
      "CAUSE_DETAILS": "UNKNOWN",
      "NARRATIVE": "GULF SOUTH WAS IN THE PROCESS OF PERFORMING A PIGGING PROJECT ON THE INDEX 301-18 CANTON 6\" IN HINDS COUNTY, MISSISSIPPI, WHEN NOTIFICED OF A POSSIBLE LEAK ON THE PIPELINE SYSTEM AT WHITE OAK CREEK CROSSING. GULF SOUTH EMPLOYEES INVESTIGATED AND DETERMINED THAT THERE WAS A LEAK ON THE SYSTEM AND ISOLATED THE PIPELINE SEGMENT BY CLOSING BLOCK VALVES ON EACH SIDE OF THE INCIDENT LOCATION AND BLEW THE PIPELINE DOWN TO ZERO. A DETERMINATION WAS MADE TO INSTALL A NEW CROSSING DUE TO THE LEAK LOCATION WITHIN A DITCH EMBANKMENT. THE PIPELINE SECTION WITH THE LEAK WAS ABANDONED IN PLACE. THE NEW SECTION IS OPERATING NORMALLY."
    }
  },
  "consequences": {
    "fatalities": 0,
    "injuries": 0,
    "commodity": "NATURAL GAS",
    "release": "227",
    "propertyDamage": 80000,
    "estimatedOperatorCost": 0,
    "estimatedEmergencyCost": 200,
    "estimatedEnvironmentalCost": null,
    "ignition": "NO",
    "explosion": "NO",
    "evacuated": 0,
    "raw": {
      "FATAL": "0",
      "INJURE": "0",
      "UNINTENTIONAL_RELEASE": "227",
      "EST_COST_PROP_DAMAGE": "80000",
      "PRPTY": "81824"
    }
  },
  "provenance": {
    "viewId": "27nc-rsge",
    "viewUrl": "https://data.transportation.gov/api/views/27nc-rsge",
    "assetId": "2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8",
    "archiveFilename": "Gas Transmission & Gathering Incident Data - January 2010 to present.zip",
    "archiveSha256": "fe0b136ca4b00ac987a8bc2e195098accf910d97512c5fc3b59e62d9da5f674e",
    "memberPath": "incident_gas_transmission_gathering_jan2010_present.txt",
    "memberSha256": "b435f2a25718cf54c54e00294e6788c4f9c6860e02fb86355e75d294c243c4dd",
    "rowNumber": 1820,
    "rowSha256": "4fdb98bb2f2c34eb5c91ca0a899dc04a631da7bdc0366db2b35753b3809e2897"
  },
  "caveat": "Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.",
  "operatorReported": true,
  "finalAgencyFinding": false,
  "flaggedAnalysis": {
    "dataAsOf": "2026-07-31",
    "flags": {
      "fireFirst": null,
      "significant": false,
      "serious": false
    },
    "standardizedCause": {
      "sevenCategory": "ALL OTHER CAUSES",
      "sevenSubcategory": "UNKNOWN",
      "eightCategory": "ALL OTHER CAUSES",
      "eightSubcategory": "UNKNOWN"
    },
    "costs": {
      "reported": 81824,
      "in1984Dollars": 44155.01727362505,
      "currentYearDollars": 107333.24158114262
    },
    "caveat": "PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.",
    "provenance": {
      "sourceUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/PHMSA_Pipeline_Safety_Flagged_Incidents.zip",
      "landingPageUrl": "https://www.phmsa.dot.gov/data-and-statistics/pipeline/pipeline-incident-flagged-files",
      "catalogUrl": "https://data.transportation.gov/Pipelines-and-Hazmat/Pipeline-Incident-Flagged-Files/qdme-9bbm",
      "retrievalMode": "official_live",
      "archivedAt": null,
      "archiveSha256": "317e6a3e16d60b9b677efe391dc40258b5dd7ead83fb8bea74cb553cedfbbdec",
      "workbook": "gtggungs2010toPresent.xlsx",
      "sheet": "gtggungs2010toPresent",
      "rowNumber": 176,
      "rowSha256": "a022e5c09e11e85d8dde2c4e63e3cc8f3c62a6e83f3e42acbc2c6098a643d583"
    }
  },
  "jurisdiction": "US",
  "operatorName": "GULF SOUTH PIPELINE COMPANY, LP"
}
```