# AQUILA SOUTHWEST (EX. CLAJON GAS CO) — Gas transmission and gathering — incident on 2001-11-07

**Citation:** PHMSA Report 20040073  
**Type / status:** incident / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** 2001-11-07  
**Published:** 2002-02-15

Gas transmission and gathering incident in INDEPENDENCE, TX. Reported cause: 9. Reported consequences: 0 fatalities, 0 injuries, $63,342 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: not significant, not serious.

## Document text

Gas transmission and gathering incident in INDEPENDENCE, TX. Reported cause: 9. Reported consequences: 0 fatalities, 0 injuries, $63,342 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20040073.

Operator ID: 2436.

Reported incident date: 11/7/2001.

Cause detail: THIRD PARTY EXCAVATION DAMAGE

Cause detail: LANDOWNER WAS USING A BACKHOE TO DIG DITCHES AND A HOLE FOR A NEW SEPTIC SYSTEM ON HIS PROPERTY. UPON HITTING AQUILA'S 24" PIPELINE, LANDOWNER MADE A VISUAL INSPECTION, DETERMINED THAT THE PIPE WAS NOT DAMAGED JUST HAD SOME COATING SCRAPED OFF. LANDOWNER DECIDED TO COVER HOLE AND DITCHES BACK UP UNTIL A LATER DATE. AQUILA EMPLOYEE NOTICED DIGGING ON 1-15-02 WHILE MAKING HIS ROUNDS. THIS EMPLOYEE INVESTIGATED THE DIG SITE AND DISCOVERED LANDOWNER MAY HAVE HIT AQUILA'S 24" PIPELINE. WENT BACK 1-21-02 WITH DIGGING EQUIPMENT DISCOVERED 24" PIPELINE HAD BEEN HIT. (LANDOWNER STATED THAT THE PIPE HAD ACTUALLY BEEN HIT ON 11-7-2001). REPAIR BEGAN ON 1-22-02, COMPLETED ON 1-23-02.

PHMSA trend classification: not significant, not serious.

PHMSA standardized cause: EXCAVATION DAMAGE — THIRD PARTY EXCAVATION DAMAGE.

PHMSA indexed costs: $63,342 reported total cost, $43,111.238 in 1984 dollars, $69,613.037 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.

## Provenance

- Official: Yes
- Source: <https://data.transportation.gov/api/views/27nc-rsge/files/3f48859a-5658-4f64-acf0-e33e632af625?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%202002%20to%20December%202009.zip>
- Source ID: `phmsa-pipeline-incidents`
- SHA-256: `a772af015f4e6a619989f3a2f8dc311d3f154b369526cc10d9e99fe4df4b2998`
- Retrieved: 2026-08-20T03:30:32.010Z
- Exported: 2026-08-24T09:44:19.291Z
- Document slug: `phmsa-incident-cf24bec3ee10378d55d70f74`

### Source metadata

```json
{
  "recordKind": "pipeline_incident",
  "datasetType": "gas_transmission_gathering",
  "datasetLabel": "Gas transmission and gathering",
  "datasetPeriod": "2002 to December 2009",
  "report": {
    "number": "20040073",
    "supplementalNumber": null,
    "type": null,
    "receivedDate": "2002-02-15",
    "receivedDateRaw": "2/15/2002"
  },
  "operator": {
    "id": "2436",
    "name": "AQUILA SOUTHWEST (EX. CLAJON GAS CO)"
  },
  "incident": {
    "date": "2001-11-07",
    "dateRaw": "11/7/2001"
  },
  "location": {
    "city": "INDEPENDENCE",
    "county": null,
    "state": "TX",
    "postalCode": "77833",
    "latitude": 96,
    "longitude": null,
    "type": null,
    "details": {},
    "facilityName": null
  },
  "cause": {
    "category": "9",
    "details": {
      "CAUSE_DETAILS_TEXT": "THIRD PARTY EXCAVATION DAMAGE",
      "NARRATIVE": "LANDOWNER WAS USING A BACKHOE TO DIG DITCHES AND A HOLE FOR A NEW SEPTIC SYSTEM ON HIS PROPERTY. UPON HITTING AQUILA'S 24\" PIPELINE, LANDOWNER MADE A VISUAL INSPECTION, DETERMINED THAT THE PIPE WAS NOT DAMAGED JUST HAD SOME COATING SCRAPED OFF. LANDOWNER DECIDED TO COVER HOLE AND DITCHES BACK UP UNTIL A LATER DATE. AQUILA EMPLOYEE NOTICED DIGGING ON 1-15-02 WHILE MAKING HIS ROUNDS. THIS EMPLOYEE INVESTIGATED THE DIG SITE AND DISCOVERED LANDOWNER MAY HAVE HIT AQUILA'S 24\" PIPELINE. WENT BACK 1-21-02 WITH DIGGING EQUIPMENT DISCOVERED 24\" PIPELINE HAD BEEN HIT. (LANDOWNER STATED THAT THE PIPE HAD ACTUALLY BEEN HIT ON 11-7-2001). REPAIR BEGAN ON 1-22-02, COMPLETED ON 1-23-02."
    }
  },
  "consequences": {
    "fatalities": 0,
    "injuries": 0,
    "commodity": null,
    "release": null,
    "propertyDamage": 63342,
    "estimatedOperatorCost": null,
    "estimatedEmergencyCost": null,
    "estimatedEnvironmentalCost": null,
    "ignition": null,
    "explosion": null,
    "evacuated": null,
    "raw": {
      "FATAL": "0",
      "INJURE": "0",
      "PRPTY": "63342"
    }
  },
  "provenance": {
    "viewId": "27nc-rsge",
    "viewUrl": "https://data.transportation.gov/api/views/27nc-rsge",
    "assetId": "3f48859a-5658-4f64-acf0-e33e632af625",
    "archiveFilename": "Gas Transmission & Gathering Incident Data - 2002 to December 2009.zip",
    "archiveSha256": "a5398d47b1204d1287bc21c0cea560025654a23aab8b89f645cf23f6b130fcaf",
    "memberPath": "incident_gas_transmission_gathering_2002_dec2009.txt",
    "memberSha256": "d5a5565b25783f342f105d255b771153f682178d1cac7099484e4f4eef90881f",
    "rowNumber": 240,
    "rowSha256": "723e50c03d85cf766ec670fd59d053448118a38f86c024b969f5014e4b8db06c"
  },
  "caveat": "Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.",
  "operatorReported": true,
  "finalAgencyFinding": false,
  "flaggedAnalysis": {
    "dataAsOf": "2026-07-31",
    "flags": {
      "fireFirst": null,
      "significant": false,
      "serious": false
    },
    "standardizedCause": {
      "sevenCategory": "EXCAVATION DAMAGE",
      "sevenSubcategory": "THIRD PARTY EXCAVATION DAMAGE",
      "eightCategory": "EXCAVATION DAMAGE",
      "eightSubcategory": "THIRD PARTY EXCAVATION DAMAGE"
    },
    "costs": {
      "reported": 63342,
      "in1984Dollars": 43111.2384967531,
      "currentYearDollars": 69613.0368190621
    },
    "caveat": "PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.",
    "provenance": {
      "sourceUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/PHMSA_Pipeline_Safety_Flagged_Incidents.zip",
      "landingPageUrl": "https://www.phmsa.dot.gov/data-and-statistics/pipeline/pipeline-incident-flagged-files",
      "catalogUrl": "https://data.transportation.gov/Pipelines-and-Hazmat/Pipeline-Incident-Flagged-Files/qdme-9bbm",
      "retrievalMode": "official_live",
      "archivedAt": null,
      "archiveSha256": "317e6a3e16d60b9b677efe391dc40258b5dd7ead83fb8bea74cb553cedfbbdec",
      "workbook": "gtgg2002to2009.xlsx",
      "sheet": "gtgg2002to2009",
      "rowNumber": 240,
      "rowSha256": "64b2397a5f6e33a496f6fc6cf300ff53fafdfe46b69c8b0e074b770cd4023f7c"
    }
  },
  "jurisdiction": "US",
  "operatorName": "AQUILA SOUTHWEST (EX. CLAJON GAS CO)"
}
```