Gas transmission and gathering incident in CANTON, VAN ZANDT County, TX. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 1185 NATURAL GAS released, $15,350 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: not significant, not serious.

## Document text

Gas transmission and gathering incident in CANTON, VAN ZANDT County, TX. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 1185 NATURAL GAS released, $15,350 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20120047.

Operator ID: 31613.

Reported incident date: 4/13/2012 12:58.

Location detail: HWY. 17

Cause detail: EXCAVATION DAMAGE BY THIRD PARTY

Cause detail: NOTIFICATION ISSUE

Cause detail: NO NOTIFICATION MADE TO THE ONE-CALL CENTER/811

Cause detail: MORROW CONSTRUCTION (DANIEL MORROW 903-780-5658) WAS EXCAVATING ON THE PROPERTY OF A FRIEND. THE EXCAVATOR NOR LANDOWNER HAD CALLED 811 TO REQUEST A LINE LOCATE. DURING THE EXCAVATION MORROW CONSTRUCTION HIT ENBRIDGE'S 12.750' .219 X42 PIPELINE. THE EXCAVATOR CALLED ENBRIDGE'S GAS CONTROL IN HOUSTON AT 12:58 PM. GAS CONTROL DID NOT SEE A DECREASE IN PRESSURE ON LINES IN THE AREA OF DAMAGE. FIELD PERSONNEL WERE NOTIFIED AT 1:05 PM TO INVESTIGATE; FIELD PERSONNEL ARRIVED ON LOCATION AT 2:00 PM AND CONFIRMED THAT THE ENBRIDGE LINE HAD BEEN HIT. THE LINE WAS BLOCKED IN AND BLOWN DOWN BY 4:50 PM. REPAIRS WERE MADE ON 4-14-12 AND THE LINE WAS PUT BACK IN SERVICE 4:35 PM.

PHMSA trend classification: not significant, not serious.

PHMSA standardized cause: EXCAVATION DAMAGE — THIRD PARTY EXCAVATION DAMAGE.

PHMSA indexed costs: $27,815 reported total cost, $18,124.232 in 1984 dollars, $33,017.798 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.

## Provenance

- Official: Yes
- Source: <https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip>
- Source ID: `phmsa-pipeline-incidents`
- SHA-256: `f0069705acf404c6227e500f03b8f98738855c29ccd4f0b44b045fa072fbb07e`
- Retrieved: 2026-08-20T03:30:32.010Z
- Exported: 2026-08-26T02:46:52.486Z
- Document slug: `phmsa-incident-d33c53988e8a3475377b6506`

### Source metadata

```json
{
  "recordKind": "pipeline_incident",
  "datasetType": "gas_transmission_gathering",
  "datasetLabel": "Gas transmission and gathering",
  "datasetPeriod": "January 2010 to present",
  "report": {
    "number": "20120047",
    "supplementalNumber": "16380",
    "type": "SUPPLEMENTAL FINAL",
    "receivedDate": "2012-05-10",
    "receivedDateRaw": "5/10/2012"
  },
  "operator": {
    "id": "31613",
    "name": "ENBRIDGE PIPELINES (EAST TEXAS) L.P."
  },
  "incident": {
    "date": "2012-04-13",
    "dateRaw": "4/13/2012 12:58"
  },
  "location": {
    "city": "CANTON",
    "county": "VAN ZANDT",
    "state": "TX",
    "postalCode": "75103",
    "latitude": 32.40784,
    "longitude": -95.87515,
    "type": "PIPELINE RIGHT-OF-WAY",
    "details": {
      "DESIGNATED_NAME": "HWY. 17"
    },
    "facilityName": "AKER RESIDUE"
  },
  "cause": {
    "category": "EXCAVATION DAMAGE",
    "details": {
      "CAUSE_DETAILS": "EXCAVATION DAMAGE BY THIRD PARTY",
      "ROOT_CAUSE_CATEGORY": "NOTIFICATION ISSUE",
      "ROOT_CAUSE_TYPE": "NO NOTIFICATION MADE TO THE ONE-CALL CENTER/811",
      "NARRATIVE": "MORROW CONSTRUCTION (DANIEL MORROW 903-780-5658) WAS EXCAVATING ON THE PROPERTY OF A FRIEND. THE EXCAVATOR NOR LANDOWNER HAD CALLED 811 TO REQUEST A LINE LOCATE. DURING THE EXCAVATION MORROW CONSTRUCTION HIT ENBRIDGE'S 12.750' .219 X42 PIPELINE. THE EXCAVATOR CALLED ENBRIDGE'S GAS CONTROL IN HOUSTON AT 12:58 PM. GAS CONTROL DID NOT SEE A DECREASE IN PRESSURE ON LINES IN THE AREA OF DAMAGE. FIELD PERSONNEL WERE NOTIFIED AT 1:05 PM TO INVESTIGATE; FIELD PERSONNEL ARRIVED ON LOCATION AT 2:00 PM AND CONFIRMED THAT THE ENBRIDGE LINE HAD BEEN HIT. THE LINE WAS BLOCKED IN AND BLOWN DOWN BY 4:50 PM. REPAIRS WERE MADE ON 4-14-12 AND THE LINE WAS PUT BACK IN SERVICE 4:35 PM."
    }
  },
  "consequences": {
    "fatalities": 0,
    "injuries": 0,
    "commodity": "NATURAL GAS",
    "release": "1185",
    "propertyDamage": 15350,
    "estimatedOperatorCost": 0,
    "estimatedEmergencyCost": 1200,
    "estimatedEnvironmentalCost": null,
    "ignition": "NO",
    "explosion": "NO",
    "evacuated": 0,
    "raw": {
      "FATAL": "0",
      "INJURE": "0",
      "UNINTENTIONAL_RELEASE": "1185",
      "EST_COST_PROP_DAMAGE": "15350",
      "PRPTY": "27815"
    }
  },
  "provenance": {
    "viewId": "27nc-rsge",
    "viewUrl": "https://data.transportation.gov/api/views/27nc-rsge",
    "assetId": "2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8",
    "archiveFilename": "Gas Transmission & Gathering Incident Data - January 2010 to present.zip",
    "archiveSha256": "fe0b136ca4b00ac987a8bc2e195098accf910d97512c5fc3b59e62d9da5f674e",
    "memberPath": "incident_gas_transmission_gathering_jan2010_present.txt",
    "memberSha256": "b435f2a25718cf54c54e00294e6788c4f9c6860e02fb86355e75d294c243c4dd",
    "rowNumber": 1721,
    "rowSha256": "046efc9d55fed2e6d388dd8d1862188190b51a5f83fd1002646ea02d5fd14568"
  },
  "caveat": "Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.",
  "operatorReported": true,
  "finalAgencyFinding": false,
  "flaggedAnalysis": {
    "dataAsOf": "2026-07-31",
    "flags": {
      "fireFirst": null,
      "significant": false,
      "serious": false
    },
    "standardizedCause": {
      "sevenCategory": "EXCAVATION DAMAGE",
      "sevenSubcategory": "THIRD PARTY EXCAVATION DAMAGE",
      "eightCategory": "EXCAVATION DAMAGE",
      "eightSubcategory": "THIRD PARTY EXCAVATION DAMAGE"
    },
    "costs": {
      "reported": 27815,
      "in1984Dollars": 18124.2317230444,
      "currentYearDollars": 33017.79781183932
    },
    "caveat": "PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.",
    "provenance": {
      "sourceUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/PHMSA_Pipeline_Safety_Flagged_Incidents.zip",
      "landingPageUrl": "https://www.phmsa.dot.gov/data-and-statistics/pipeline/pipeline-incident-flagged-files",
      "catalogUrl": "https://data.transportation.gov/Pipelines-and-Hazmat/Pipeline-Incident-Flagged-Files/qdme-9bbm",
      "retrievalMode": "official_live",
      "archivedAt": null,
      "archiveSha256": "317e6a3e16d60b9b677efe391dc40258b5dd7ead83fb8bea74cb553cedfbbdec",
      "workbook": "gtggungs2010toPresent.xlsx",
      "sheet": "gtggungs2010toPresent",
      "rowNumber": 270,
      "rowSha256": "8dec313ef2f9563dae5fca3cffd8ea40febf6a7f298492fb6bd5c0e54c032ea7"
    }
  },
  "jurisdiction": "US",
  "operatorName": "ENBRIDGE PIPELINES (EAST TEXAS) L.P."
}
```