# Pace International Union — Hazardous Materials Safety Interpretation

**Citation:** 05-0129  
**Type / status:** guidance / guidance  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2005-08-03

05-0129 response to Pace International Union concerning 174.67.

## Document text

<<<PAGE 1>>>

U.S. Depanment
of Transportation
A00
205
Washington, D.C. 20590
400 Seventh Street, S.W.
Pipeline and
Hazardous Materials Safety
Administration
Mr. Randy Johnson
Reference No.: 05-0129
President
Pace International Union
P.O. Box 405
Calvert City, KY 42029
Dear Mr. Johnson:
This responds to your letter requesting clarification of the tank car unloading attendance
requirements in § 173.64(i) of the Hazardous Materials Regulations (HMR; 49 CFR parts
171-180).
On October 30, 2003, the Research and Special Programs Administration (RSPA, we)
published a final rule under Docket HM-223 (68 FR 61906) titled "Applicability of the
Hazardous Materials Regulations to Loading, Unloading and Storage" (copy enclosed). The
HM-223 final rule clarifies the applicability of the HMR to specific functions and activities,
including hazardous materials loading and unloading operations and storage of hazardous
materials during transportation. The final rule codifies in the HMR long-standing policies and
interpretations concerning the applicability of the regulations to specific functions and
operations. The provisions of the HM-223 final rule became effective on June 1, 2005.
Under the HM-223 final rule, tank car unloading operations conducted by consignee
personnel after the rail carrier has departed the consignee's premises generally are not subject
to regulation under the HMR (see § 171.1(c)(3)). As adopted in the HM-223 final rule,
however, the requirements in § 173.31(g) apply to all tank car unloading operations as of
June 1, 2005, even when those operations are conducted by consignee personnel. Thus, as
stated in the October 30 final rule,
"requirements related to the protection of train and engine
crews operating within a shipper or consignee facility, such as posting warning signs, setting
I trust this satisfies your inquiry.
incerely
Hall Z. Mothel
Hattie L. Mitchell, Chief
Regulator Review and Reinvention
Office of Hazardous Materials Standards
174.67()
Enclosures (2)
050129

<<<PAGE 2>>>

Webb
5174.67(1
TarkCar Unloading
05-0129
Allied-Industrial,
May 16, 2005
Mr. Edward Mazzullo
AFL-CIO, CIC
Office of Hazardous Materials Standards
USDOT/RSPA (DHM-10)
400 7h Street SW
LOCAL 5-727
Washington, DC 20590
Dear Sir:
I am writing to request clarification of 49 CFR 174.67(i) "Tank Car
Unloading". Specifically, remote rail car unloading/ unattended
• Reference No. 02-0027 from Mr. Joe Campbell at Air Products
and Chemicals, 246 Johnson-Riley Road, Calvert City, Ky. 42029
• Reference No. 99-0217 from Mr. Carlton W. Hendrix, DOT
Compliance Manager, LaRoche Industries Inc., 1100 Johnson
Ferry Road N.E., Atlanta Ga. 30342
Air Products & Chemicals Inc. (Reference No. 02-0027) has completed the
camera equipped remote unloading system for unloading ethylene rail cars
at their Calvert City, Ky. facility prompting concerns regarding the
"continuous monitoring" requirement.
Under Air Products' plan, the attendant duties will be assigned to a fully
same individual is simultaneously required to operate/monitor, an
ıtilized individual as an additional - and potentially, secondary task. Thi
reactor systems and related equipment, in addition to monitoring the
troubleshoot a chemical process that includes many other high pressure
ethylene unloading activity making it virtually impossible to
Could you please define continuous monitoring? Is it the unloading
P.D. Box 405
attendant's job to solely monitor the unloading process or, in this case,
ivert Ci
will it be an ancillary task to be performed by the process operator along
502.395.4403

<<<PAGE 3>>>

with many other responsibilities? Does this satisfy the continuous
monitoring regulation requirement?
Further, the lone control room operator who will be assigned these
attendant duties of monitoring the video display will not be the person
responding to any problems in the field. If a problem occurs he/she will
be notifying a field operator who is normally occupied with other tasks.
Does this satisfy the regulation for attendant?
During human unloading, the attendant will be on location with the rail
car. Human intervention and response time when a problem occurs is
almost immediate. As you may have guessed, response time will be
severely diminished under the Air Products plan. Are there any criteria on
response time?
In Mr. Campbell's letter, he stated that the software for the video image,
will measure the amount of white space to detect a leak and shutdown the
unloading program. Is there a requirement on how to calibrate this video
system?
Thanks in advance for your timely attention to this request.
Sincerely,
Randy Johnson
Pres.

## Provenance

- Official: Yes
- Source: <https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2005/050129.pdf>
- Source ID: `phmsa`
- SHA-256: `2d801e72cfb75804ad8dbf080c030e63efa2501d89c9e4a34ddf88564c880074`
- Retrieved: 2026-08-20T00:59:31.977Z
- Exported: 2026-08-22T14:24:49.810Z
- Document slug: `phmsa-interpretation-05-0129`

### Source metadata

```json
{
  "materialSubtype": "interpretation",
  "interpretationArea": "hazardous_materials",
  "representation": "full_text_from_official_pdf",
  "companies": [
    "Pace International Union"
  ],
  "individuals": [
    "Mr. Randy Johnson"
  ],
  "refIds": [
    "05-0129"
  ],
  "catalogDates": [
    "2005-08-03"
  ],
  "catalogParts": [
    174
  ],
  "catalogRowCount": 1,
  "sourceRecordUrls": [
    "https://www.phmsa.dot.gov/node/49636"
  ],
  "linkedAttachmentUrls": [],
  "unavailableResponseUrls": [],
  "duplicateRepresentationUrls": [],
  "citedSections": [
    "174.67",
    "173.64(i)",
    "171.1(c)(3)",
    "173.31(g)"
  ],
  "catalogPageUrls": [
    "https://www.phmsa.dot.gov/regulations/title49/section/17467"
  ],
  "pdfUrls": [
    "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2005/050129.pdf"
  ],
  "representations": [
    {
      "viewUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2005/050129.pdf",
      "detailUrl": null,
      "detailHtmlPath": null,
      "pdfUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2005/050129.pdf",
      "pdfArtifactPath": "data/sources/phmsa-interpretations/05-0129-f979549c04.pdf",
      "pdfArtifactSha256": "56cf19fc90ca4f2946edd065b4d00c7606eaace4816c804a7ba8fecc0b179e3e",
      "extractedTextPath": "data/sources/phmsa-interpretations/05-0129-f979549c04.v2.txt",
      "extractedTextSha256": "10b7c431646b4e6f5e3cccae3553dde481264d807d67a26f752557abc951f216",
      "pageCount": 3,
      "extractionVersion": 2
    }
  ],
  "caveat": "Interpretations apply regulations to the facts presented and do not create independently enforceable requirements.",
  "jurisdiction": "US"
}
```
