# HazMat Resources, Inc. — Hazardous Materials Safety Interpretation

**Citation:** 08-0125  
**Type / status:** guidance / guidance  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2008-08-21

08-0125 response to HazMat Resources, Inc. concerning 180.407, 180.417.

## Document text

<<<PAGE 1>>>

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, D.C. 20590
Mr. Daniel G. Shelton
Vice President
HazMat Resources, Inc.
1 0 1 04 Creedmoor Road
Raleigh, NC 276 15
Ref. No. 08-0 125
Dear Mr. Shelton:
This is in response to your May 3,2008 letter requesting clarification of the Hazardous Materials
Regulations (HMR; 49 CFR Parts 171-1 80) applicable to registration and recordkeeping
requirements pertaining to Department of Transportation (DOT) specification cargo tanks.
Your questions are paraphrased and answered as follows:
Q1. Do the registration requirements specified in Part 107, Subpart F of the HMR apply to a
company that performs a Wet Fluorescent Magnetic Particle Examination (WFMPE) on
MC 330 and MC 33 1 cargo tanks?
A l . Yes. In accordance with § 107.502, no person may engage in the manufacture, assembly,
certification, inspection or repair of a cargo tank or cargo tank motor vehicle
manufactured under the terms of a DOT specification or a special permit unless the
person is registered with the Department in accordance with the provisions of Subpart F.
A person employed as an inspector or design certifying engineer is considered to be
registered if the person's employer is registered.
42. Section V of the ASME code requires a written report when a WFMPE is performed. Is
a written report required as part of the pressure test when a WFMPE is performed, or is it
allowable to indicate on the pressure test report required by'$ 180.41 7 that a WFMPE
was completed?
A2. In accordance with Section V of the ASME Code, a written report is required when a
WFMPE is performed. In addition, each person performing a test or inspection specified
in 5 180.407 must prepare a written report in accordance with the reporting and
recordkeeping requirements specified in 5 180.4 17.
43. Section V of the ASME Code requires specific qualification and training requirements
and documentation for persons performing a WFMPE. Are these documents required to
be maintained and produced in accordance with the requirements of Section V of the
ASME Code?

<<<PAGE 2>>>

A3. Yes.
44. A4. Q5. A5. What DOT regulations require the maintenance of the additional documentation
referenced in Q3?
As required in 8 180.407(g)(3), the wet fluorescent magnetic particle inspection must be
in accordance with Section V of the ASME Code and CGA Technical Bulletin TB-2.
CGA Technical Bulletin TB-2, Section 5.6 states: "Determine the proper documentation
has been completed, including marking of the tank. Refer to 49 CFR 180.41 5 and
180.41 7." Is this documentation required by the ASME Code or the HMR?
The HMR incorporate Section V of the ASME Code by reference. Thus, when a
WFMPE is performed, the HMR require a written report in accordance with Section V.
In addition, the requirements of test and marking requirements specified in 8 180.41 5 and
the reporting and record retention requirements specified in 8 180.41 7 must also be met.
I hope this information is helpful.
Sincerely,
Susan Gorsky, U
Acting Chief, Standards Development
Office of Hazardous Materials Standards

<<<PAGE 3>>>

/
10104 Creedmoor Road K9isbaii bvl/b~
Raleigh, N.C. 27615 08-0125
May 3,2608
Mr. Edward Mazzullo
Office Director, Office of Hazardous Materials Standards
U.S. Department of Transportation
Pipeline and Hazardous Materials Safety Administration
East Building, 2nd Floor
Mail Stop: E21-3 17
1200 New Jersey Ave., SE
Washington, DC 20590
Mr. Mazzullo,
Please accept this letter as our request for an interpretation of the registration
requirements in 49 CFR 107.502(b) which states in part the following:
"(b) No person may engage in the manufacture, assembly, certification, inspection or
repair of a cargo tank or cargo tank motor vehicle manufactured under the terms of a
DOT specification under subchapter C of this chapter or a special pennit issued under
this part unless the person is registered with the Department in accordance with the
provisions of this subpart.. . ."
I have attached for your reference e-mail correspondence dated October 6,2004 which
states that a person performing a welded repair to the cargo tank wall must have a CT
number. I am sorry that the question was not in the attached e-mail but the question that
prompted this response was this:
"If a facility that is registered with the Department does not have an " R stamp, can they
sub-contract the welded repair to a company that has an " R stamp but does not have a
CT number"
I addition, I have attached for your reference interpretation 05-0071 dated April 27,2005
which further supports the Departments' position and creates the appearance that, even
though a CT number is only a registration requirement, this interpretation states very
clearly that without a CT number you are not AUTHORIZED (emphasis added) to
Fax (877) 841 -6023 Phone (423)863-2252

<<<PAGE 4>>>

perform any function where registration is required. So, in effect, a CT number is an
authorization to perform any of the functions where registration is required. I have also
provided for your reference materials incorporated by reference CGA P-26 (formerly TB-
2 titled Guidelines for Inspection and Repair of MC 330 and MC 33 1 anhydrous
ammonia cargo tanks) and Section V article 7 of the ASME code.
MC 330 and 331 cargo tank motor vehicles are generally required to undergo a pressure
test at certain intervals. The requirements in 49 CFR 1 80a407(g)(3)state as follows:
"Each MC 330 and MC 33 1 cargo tank constructed of quenched and tempered steel in
accordance with Part UHT in Section VIII of the ASME Code (IBR, see $ 17 1.7 of this
subchapter), or constructed of other than quenched and tempered steel but without
postweld heat treatment, used for the transportation of anhydrous ammonia or any other
hazardous materials that may cause corrosion stress cracking, must be internally
inspected by the wet fluorescent magnetic particle method immediately prior to and in
conjunction with the performance of the pressure test prescribed in this section. Each MC
330 and MC 33 1 cargo tank constructed of quenched and tempered steel in accordance
with Part UHT in Section VIII of the ASME Code and used for the transportation of
liquefied petroleum gas must be internally inspected by the wet fluorescent magnetic
particle method immediately prior to and in conjunction with the performance of the
pressure test prescribed in this section. The wet fluorescent magnetic particle inspection
must be in accordance with Section V of the ASME Code and CGA Technical Bulletin
TB-2 (IBR, see $171.7 of this subchapter). This paragraph does not apply to cargo tanks
that do not have manholes. (See $180.4 17(c) for reporting requirements.)
Question 1: Not all MC 330 and MC 33 1 cargo tanks requ.ired a Wet Fluorescent
Magnetic Particle Examination (WFMPE) immediately prior to and in conjunction with a
pressure test so it appears this WFMPE is an additional test that must be performed.
Because this non destructive testing (NDE) is very technical in nature most facilities
contract this service out to companies that specialize in NDE. Because this is a separate
test, is the person who performs the WFMPE required to be registered with the
Department and get a CT number.
The WFMPE must be performed in accordance with Section V of the ASME Code and
CGA Technical Bulletin TB-2. The following questions refer to these documents:
Question 1 : Section V of the ASME Code requires a written report. Is a written report
required as part of the pressure test when a WFMPE is performed or can one simply say
on the pressure test report required by 180.417 that a WFMPE was completed?
Question 2: Section V of the ASME Code requires specific qualification and training
requirements and documentation for anyone performing a WFMPE. Are these
documents required to be maintained and produced in accordance with the requirements
of Section V of the ASME Code?

<<<PAGE 5>>>

Question 3: Regarding the qualification and training documents reference in Question 2,
what DOT regulations would require me to maintain these additional qualification
documents over and above what is currently required in 49 CFR 172.704(d).
Question 4: CGA Technical Bulletin TB-2 Section 5.6 states as follows: "Determine the
proper documentation has been completed, including marking of the tank. Refer to 49
CFR 180.4 1 5 and 180.4 17. What proper documentation is this bulletin referring to? Is it
the documentation required by Section V of the ASME Code, the documentation required
in 180.41 7(b), the documentation required in 180.41 7(c), none of the above, all of the
above or some combination?
Thank you in advance for your reply.
Sincerely
Daniel G. Shelton
Vice President
HazMat Resources, Inc.
Attachments: Reply from Joe Solomey dated 10/06/2004
Letter to Determan Brownie, Inc. dated 04/27/2005 Ref - 05-0071
CGA Pamphlet 26
Section V of the ASME Code

<<<PAGE 6>>>

From: Solomey, Joe <RSPA>
Sent: Wednesday, October 06, 2004 12:44 PM
To: Shelton, Danny
Danny sorry for the delayed reply. Repair is defined in 49 CFR Part 5
180.403 as any welding on a cargo tank wall done to return a cargo tank or a
cargo tank motor vehicle to its original design and construction specification,
or to a condition prescribed for a later equivalent specification in effect at
the time of the repair. The repair function is identified in 49 CFR Part 5
107.502 as a function where registration is required. 49 CFR § 107.502(b)
specifically states that no person may engage in the manufacture, assembly,
certification, inspection or repair of a cargo tank or cargo tank motor vehicle
manufactured under the terms of a DOT specification under subchapter C of this
chapter or an exemption issued under this part unless the person is registered
with the Department in accordance with the provisions of this subpart. The
short version of this is if you are performing a function where registration is
required, you need to be registered with the Department. There is no cost to
the registration process and places no unnecessary burden on the public.
I hope this information is helpful.
Joe
Joseph Solomey
Research and Special Programs Administration Assistant Chief Counsel Hazardous
Materials Safety and Emergency Transportation Law Division 400 7th. Street,
S.W., Room 8417 Washington, D.C. 20590
(202) 366-0977 (Phone)
(202) 366-7041 (Fax)

<<<PAGE 7>>>

US. Departmerit
of Ttdnsgondlon
Plpeline and
Hazwdaus MateslaBs S e w
Adminis?ration
400 Seventh sveet, S.W.
VarsMngton, D.C. 20590
a m 2 7 36
Mr. Dave Anderson
Detman Brownie, Inc.
124 1 - 72"d Avenue Northeast
Minneapolis, MN 55432
Ref No-: 05-0071
Dear Mr. Andexson,
This is in response to your 1,etter dated March 24,2005, requesting clarification of ae.
requirements contained in the Hazardous Materials Regulations (HMR 49 CFR Parts
100-185) applicable to manufa~turing apd retesting a DOT .Specification 406 cargo tank
motor vehicle (CTMV). Specifically, you ask several questions regarding the testing
requirements for a DOT Specificati~n 406 CTMV. In addition, you indicate that the
cargo tank does not meet the requirements prescribed in Part 278, Subpart 5 for the
specification.
Your questions are paraphrased and answered as follows:
Q1. May a company that is not registered with the D~partment, in accordance with
Part 107, Subpart F, manufactme a DOT Specification 406 CTMVS
' A1 . No. The definition of a ~atldacturer provided in 5 178.320 states that a
manufa~turer must register with the Deparhmt in accordance with Part 107, Subpart F
of the HMFL h addition, 5 107.502(b) indicates that no pmon may manufacture a DOT
specification cargo tank or CTMV unless that person is registered
42. In accordance with tj 180.417(a)(3), may thc owner prepare a manufa~tura's
certificate based on specificatiofi markings that were placed on the cargo tank by a person.
who manufactured the C W, but was not registered with the Department?
A2. No. Section 180.41 7(a)(3) applies to DOT specification CTMVs manuf~cttued
before September 1, 1995. However, even if the C W was manufactured prior to
Sqtemba 1,1995, you may not prepare a manufacturer's certificate based on
informntim supplied by a person who was not authorized to manufacture the CTMV.
43. ' May the owner ~f the CTMV create the documents that are required to be
maintaiaed by 4 178.345-15?
A3. No. The owner o f the CTMV is not permitted to create thc documents identified
in 8 178.345- 15. The docummts must be supplied to the owner by the manufacturer of
the CTMV. This hcludss the certification documents that display the registration

<<<PAGE 8>>>

number of the manufacturer, the Design. Certifying Engineer, and the Registered
Inspmtor. h addition, these dc~cumetlts must iaclude a certificate signed by a responsible
official of the manufacturer and a Design Certifying Engineer certifying that the CTMV
meas the applicable specification.
Because the owner is unable to provide any of the required documents and because the
person who manufactured the CTMV was not an authorized manufacturer, the cargo tank
must be ctxhl'ied wder the procedures applicable to newly constructed cargo tanks. In
the situation described in your letter, you would be converting a non-specification CTMV
into a POT specification CTMV, To accomplish this, your company could b e c ~ m the
manufacturer of the CTMV and issue the certificates identified in 3 178.345-15. This
would entail registration as a cargo tank manufacturer in accordance with Part 107,
Subpart F and performance of all, tests and inspecdons under Pm 178, Subpart J, as
applicable to the DOT Specification 406 CTMV described in your documented QC
program used to obtain your ASME Code "W" stamp.
I hope this information is helpful. Please contact us if you require additional assistance.
'Sincerely,
Chief, Standards Development
M f i c e of Hazarbus Materials. Standards

<<<PAGE 9>>>

-.
' CGA P-26--1997 (Formerly TB-2)
. .
, GUIDELINES FOR INSPECTION AND
. REPAIR OF MC-330 AND MC-331
'ANHYDROUS AMMONLA CARGO TANKS
, .
Fifth Edition, 1997
COMPRESSED GAS ASSOCIATION, INC.
1725 Jeffaraoa Davb Hwy., Suite 1004
Arlington, VA 22202
703-412-0900

<<<PAGE 10>>>

PAGE ii COMPRBSSED a / i , & J . , & J . . INC. COA P-261997
PLEASE NOTE:
The information contained in this document was obtained fiom sources believed to be reliable and is based on
technical infom.atlon and experience currently available fimm members of the Compressed Gas Association,
Inc. and othm. However, the Association or their membsrs, jointly or saverally, make no guaranQe of the re-
sults and assume no liability or responsibility in comedon with the information or suggeetions herein con-
tained. Moreover, it should not be assumed that every acceptable commodity grade, test or safety procedure or
method, precaution, equipment or device is contained within, or that abnormal or unusual circumstances may
not warrant or suggest further requirements or addltlonal procedure.
This document is ~ubject to periodic review and wers an cautioned to obtain the larest edition. Comments and
suggestions are invitad from all usm for consideration by the Assaclation in connection with such review; any
such comments or suggestions will be Nly reviewed by the Associatiw after giving the party, upon request, a
reasonable opportunity to be heard. (See proposed change sheet on iast printed page of this document.)
This document should not be confused with federal, stale, provincial or municipal specifications or regulations,
insurance requirements or national safety codes. While the Association rdcommends reference to or use of this
document by government agencies and others, this document is purely voluntary and not binding.
A c.stdog listing of all publications, audiovisual pmpams, safety and technical bulletins, and safety posten is
available at no charge upon =quest fKrm the Compressed Gas Association, Inc. Phone 70341 2-0900, ext. 799.
Fax 703-4 12-0 128. E-mail CustomtrService@cganet.com.
BOTE: Technical & ~ B S from the Iq~vious editipaate underlined to identifv them forthe reader. 3
FIFTH EDITION: 1997 a .,I.
FOURTH EDITION: 1989 ?. :.I
. .I -
TWRD EDITION! 1900
SECOND EDITION: 1975
O 1997 BY THE COMPRESSED GAS ASSOCIATION INC. ALL RIGHTS RESERVED.
1723 JEFFERSON DAVIS HWY.. SUlTE 1004. ARLINGTON. VA. 22202

<<<PAGE 11>>>

.
CGA P-26-1997 . CO-D G A S ~ ~ T I O N J N C . PAGE iii
1 Introduction .......................... :.. ........................................................................................................ 1
2 Inspe~tlon ................... ;.\l..y.l..l ........................................................................................................................ I
3 Repair 1
.............................................................................................................................................................
4 Preparetlons prior to cargo tank entry. inspection, and =pair 2
.........................................................................
5 Stqgastad inspection procedure ...................................................................................................................... 3
6 Pereonnel health, safety and tnhing ................................................................................................................ 4
7 Reference ................................................................................................................................................. 4
8 Additionel source of information ... 5...........................................................................
.........................

<<<PAGE 12>>>

1 Inhoducllon 1.1 The US. Department c$ Traruportation (DOT) HazarQus Materials Regplathns in 49 CFR . 4 0 7 U q u i r e that MC-330 and MC-33 1 8 Wucted of quenched and tempered steel or con- A struded of at.m than quenched and tnmpewi i h l at a level that does not appreciably lessen the fluo-
rescent hags. Fluarescant ,materials should be
mixed according to the recommenddons of the
manufacturer md should be agitated frequently
during we. Black light output diminishoe with use
and should be cheoked poriodicdly with a light
meter according to the rscommendatlons of the
fluorescent mabrlal'er manufacturer.
but without poalweld heat treatment be intenrally
inspected by the wet Duororcclt rnlpMic p.lhcle 2 m d o d a c e d n promibed intowals. Cracka and 2.3 The wet fluorescent magnetic particle inspec-
tion shall include:
other defects found during the inspection shall be
repairud in accordance with the nquirements in 49 - all welds in or on the interior surface of the tank,
$ CFR Part 180. Subuart E, "Qualification and and the adjacent base plate axtending 2 inches
% Maintenance of Cargo Tanks," if a cargo tank is to (5 cm) from either side of such welds;
% be returned m traneportatlon servica [I],'
8 - the entire Interior 8urface of tank heads; and
1.2 In order to promote uniformity within tho in-
3 dwtry, the Comprcesed Gas Association has pre- - all interior surfaces at least 2 inches (5 cm) in all
pared these guidelines for use by pnonnol havlng directions from exterior welds that are visibly
~ e s p o n s i b i l i t y fn the inspecti611 and repair of them f cargo bnb.
discernible on the interior d t h o tank.
5 In addition, the entire intarior surface of the tank
\ 2 Inspec tion should be visually inspected, and any areas show-
'r ing evidence of grinding or other repairs or distur-
4 2.1 The wet fluarescant magnetic particle method bmcss of the plate surface should be inspected by
? shall be used, and the test procedure shall be In the wet flucrescent miignetic particle method. If
accordance with the applicable portions of Section any cracks are found, the entire interior surface
I V of the ASME Code [2]. The alternating cunent shall also be inspected.
yoke mothod shall be used.
i 3 Rsprlr
! 2.2 The surfaces to be inspected shall be cleaned to
! remove oil, loose scale, and rust. All of these mate- : rials shall be removed from surfaces with BUS- oient cam to clean crevices end corners so that416 : test solution will flow h l y . Failure to do this will I result in erroneous indications w the masking of indications. Care should be exercised to magnetize each area in directions that would cross any crack regardless of the crack's orientation. Yokes should be positioned to effectively overlap magnetimd amas. The speed of inspecdon should be slow enough to allow particle buildup at cracks. The continuous method of inspection should be wed eo t . currant and tost solution ers flowing while the inspection is being made with the black light. Visible light should be.eliminated entirely or kept References in this document are shown by bmckacd numbers and are listed iu order of eppcarance in section 7, Refennccs.3.1 All craaks and otha defects, areopt porosity
and dag incluelons in the weld deposit that are
mptable under the ASME Code, Section VIII
Division I shdl be m o v e d or repaired [3], The
rsmoval and repair procedures employed shall
comply with those contained in the latsst edition
and addenda of the National Board Inspection
Code [4]. Where specific procedures are not given,
it is intended that, subject to the approval of the
inspector, dl repairs shall conform Insofar as pose
sible to the ASME Coda most applicable to the
best perfarmance of the work planned [S]. The
construction standard selected shall be the one
considered by ths inspector as the most compatible
with the nahw of the repalr and the conditions of
origind construction. Before procssdlng with any
welded repairs, the repair facility should have a
copy of the Manufacturer's Data Report, Form U1
or UIA.

<<<PAGE 13>>>

PAGE 2, COMPRESSED GAS ASSOCIATION. INC. CGA P-26-1997
32 Some minor cracks and other defects may be
removed by grinding. Iu no case shall grinding be
done that would reduce the wall thickness below
that shown on the data plate minus 0.010 inch
(0.254 mm). Oiindlng pressure should be light, and
the material should not be overheated, Heavy
pinding preesure will produce mechanical work
hardening, and werheating will induce hard spots
and high residual stresses. Material can be pre-
vented. fiam getting too hot by using a coolant or
intermittently grinding and cooling. All ground
areas must be properly contoured and feathered to
eliminate stress raisers such m a sharp dlscontinu-
ity h the surface.
3.3 Repairs by welding on the pressure vessel shall
only be performed by a repair organization holding
a valid Nadonal Board Certificate authorizing the
use of the 'R" stamp and rtglstered in accordance
with Title 49 CFR 107, Subpart F [I].
A u t h o ~ o n and acceptan* of any repain mlds
shall be in accordance with the requirements of
Paranra~w-IOOQ of the National Board Inspec-
tion Code (41.
3.4 Welding on the pressute vessel, thermal heat
treatment, materids ernployod for repdrs, re-
placement of pressure parts, nondestructive exmi-
nation, and pressure tests as required shall, all. con-
fonn to the requirements of Prnmanhs RC-100Q
BPQRC-2004 of the National Board Inspecdon
Code [4].
36 Defect rsmoval, replacement of major pressure
pans, and the repair methods employed shall'meet .
the applicable roquimsnts of Paraprmh RD- 100Q
of the Natiod B o d Inspection Code [4].
3.6 Cracks that ari not removable in accordance
with the ASME Code by surface grinding shall be
removed by acceptable means until no avther
cracks are revealed by wet fluo~scent magnetic
particle inspection, and the m a filled by waldiag
Ln an approved manner. Preheat the m a td be-
twmn 100 "F to 200 OF (37.8 'C to 933 O C ) to
remove moisture and prevent too rapid cooling,
'which occurs on small welds. The straight-
stringer-bead technique is suggatod for weld '
metal deposition. This is considered a minor re-
Pair.
3.7 In some was, cracks may be so numerous that
repairing oaoh crack would not be practical. In this
case, a section may be removed and a new section
installed &P the aame vrocedums a
W n tecMoua@red by the A-
a 4 9 CFR 180. S- E 117.
3.8 AAer welding, the weld reinfmemeni should
be ground k accordnnce with the ASME Codu,
and any undercuts .found should either be h a t h
ground or weld-repai,md and ground. Precautiops
should be taken to avoid overheating a d creating
coarse eurfkces from grinding. Groove weld m-
pairs Bhdl be radiographed whemer practical.
3.9 No post-weld heat troatmont after minor rep&
is required. Post-weld heat batment Is required
after d o r repairs. . .
3,10 Aftar welding npalrs, the area shell'.be *in-
~pected by the wet fluorescent magnetic particle
method. The tank shall ale0 be hydrcistatically
retested to a preesm a! least twice the tank design
pressure for quonchsd. and tempered swls or I 1R
times the tank design pressuro for other than
quenched and tempered steels. The repalred are+
including tho URador pordon of tha weld. if it
penetrates the entire thickness of tho nymial,.shall
then be rehspected by tho wet fluorescent mag.
netic, particle method.
3.11 Documontatlon and niarkii of any prassura
vessel repair made shall aatisfy the applicable re;;
quiromenb of @riimnuhs RC-2070 and RC-206a
of the National Board Inspection Code ind re-
quirements of the DOT [4]. See 5.6.
4 Preparrfionr pdor b esrgd bnk entry, in-
rpsrtlon, ind repalr
The following suggestions are general in nature
and are not Intended to be all~inclusive or fully
.descriptive of a plan to provide for every conse-
qwxe that may occur. Rspalt shop owners or
managers are advised to devdop specific proce-
dures auitad to their panlcular workplace require-
ments for the prorcftj~n of .employees, the general
public, property, bnd ~ surrounding environment
from liquid or gaseous hazardous materials, which
may be corrosive, explosive, or otherwise harmful.
4.1 Repair shop ownen or ma&&ers should com-
ply with the requirements promulga!ed by the

<<<PAGE 14>>>

CGA P-261997 COMPRESSED Gd
isB- INC. PAGE 3
DOT in 49 CFR 177.854(g), "Repairs and Mainte-
nance of Vehicles Containing Certain Hazardous
Materials;" 49 CFR 180.413, 'Repalrl Modifica-
tion, Stretchiig, or ~e-bakr$lk of Cargo Tanks;"
and 29 CFR 19 10.146, "Permit-required Confined
Spaces" [I, 1, 61. State and local regulations may
also apply and should be obsenred accordingly, At
a minimum, no work shoul,d be performed on a
cargo tank containing a hazardous material inslde a
shop building wlass:
- the cargo tank and .auxiliary piping have been
datermined to be fieo of leakage;
- means are provided to immediately remove the
cargo tank fmm the building, if necessary, in an
emergency; and
- d l sources of spark, flame, or glowing heat
witbin the building (including any heating sys-
tem drawing air there) are extinguished, .made
inopkable, or rendered explosion-proof by. suit-
able means if the h d o u s materlal is flammp-
bls or can be ignited.
4.i .Identify any residual. material in tank Review
the Materid Safety Data Sheet (MSDS) to deter-
mina the chemical and physical properties, meth-
ods of haadling, health hazards, personal protec-
tive requhments, and environmental protective
requirements.
4.3 Transfer residual material from the tank and
awillary piping to a suitable and approved storage
moalner or to a properly en'gIneered disppsd
ayatem that is designed and operated In a manner
consistent with all applicable requirements of lo-
cal, emto, and federal environmental and safkfy
.regulatory agencies;
4.4 Remove residual impor fiom the tank 8nd aw-
#iay piping by suitable means, which lhay include
ventilating with air, hert gas, or displacing with
water. The method selected shall be mmpetible
with the reslduel vapor being m o v e d and shall
not msult in.off-slte contamination or cause condi-
tions that can lead to combustion, respiratory ef-
fects, or other harmful oonsequemss,
AS Rovlde an d e q w supply of h tank interior.
h air to ths
4.6 Determine that a safe atmosphere exists within
the tank before allowing personnel to enter. Oxy-
gen, combustible gas, md alr contaminant level
readings shall be taken with suitable monitoring
instruments properly operated and maintained in
accordance with fhe manufircturer's itlstructions. In
general, oxygen antent should be greater than
19.5% and not more than 20.9%. Combustible gas
levels should be less than 10% of the Lower EK-
plosive Limit GEL) for tho material involved, and
air contaminant levels ahould be held within Ilmits
that will permit compliance .with tho standards set
by the Occupational Safety and Health Admini-
stration (OSHA) in 29 CFR 1910.1000, which
governs employee exposure in the workplace [6].
Guidelines for threshold limit values';for chemical
sub-ces in t2le work environment are given in
the American Confe~ence of aovemmeMal Indus-
trial Hygienist's publication, TLVs: Threshold
Limit Valuesjor Chemical Stlbstmrces in the Work
Environment [7]. State and local regulations may
impose more stringent requinmonts than those
Indicatad and should be reviewed.
5 Suggested Inspection procedure
For the added guidance of those not experienced in
the inspection of cargo lanks, the following steps
are suggested:
5.1 Remove the manhole cover(s), valves, and fit-
tings as required.
5.2 Check that the interior surface is clean and free
from all, loose tust or scale, and residue at h e
bottom. Clean ns rsquind wlrh the following s u p
gestiom:
- oil: Steam or solvent cIcan. (Avoid flammable
solvenrs.);
'- rust and loose scele: Wire brush or sandblast;
and
- residue: Scoop out and vacuum;
63 Visdly inspea che interior with a floodlight,
: marking any a m showing evidence of weld re-
pair of the parent mdal, manufacturing cllps,
grindin& or other disturbance of the plate surface.

<<<PAGE 15>>>

PAOE4. .CO~~E&SSED GAS A s 9 0 ~ INC. CQA P-26--1997
. W,
5.4 Mark interior areas corresponding to external
stmaural pad attachmex&, which must be in-
spected in accordance with 2.3.
or permitting welding, grlndi, cutting, clean-
ing, or other activities. Pkriodic d r quality de-
terminatlous during a work cycle may be appro-
priate;
3.3 Inspect marked areas, interior of heads, and
anas up to 2 Jnches (5 cm) from all interior welds
using the wet fluorescent magnetic particle
method.
- maintaining continuous and adequate fiesh air
flow into the lank interlor for employee safety
during the work cycle; .
5.5.1 Start on the head opposite the manhole;
work toward the manhole.
5.53 Work from the bottom up.
5.5.3 Be equippod with a grinder to evaluate the
-requiring employees working In a confined
spacs to use the "hddy" system. Provisions
should be made to maintain constant visual and
audlble communication betweon the employees
who should be trained in rescue and first hid
procedures;
findings.
- avoiding excessive contact wlth cleaning and
inspection fluids, und using protective creams;
S.S,4 Proceed with an inspection of the entire in:
terior surface if craoks or defects requiring such
inspection are discovered.
2
5.5.5 Mark and record the repaired areas.
- providing appropriate protective clothing for
employee uae euch as chemical-resistant .cloth-
ing, boots, gloves, goggles, and face shields;
S.6 Determine that the proper documentation hss - fiunbhing approved respiratory protective
@ been complttsd, inoluding marking of the tank. equipment for employee use as needed together
R Refer to 49 CFR m415 and 180.417 111. wlth safety belts, safety lines, and ladders;
6 Pemonnel health, rafety, m d trniniig
- grounding the tank, and using only lighting and
electrical tquipment that is either intrineically
safe or grounded; and
The health and safety hazands et a repair ahop will'
ba speciflc to that particular facility. Thus, a corn-
plete list of precautions and recommendations ad:
dressing all possible hazards is beyond the scope
'of this publication. Ri6k~ associated with shop op-
eration om be minimizad through the implem?nta-
don of appropriate engineering, administrative,
&rid personal protective controls, These include the
proper selection and application of facility de~ign,
shop equipment, personal protective quipment
and clothing, snfety preoautiom, and thorough ern-
ployee training. Smndards and guidelines for
minimizing hazards to personnel in the, workplace
may be found in the OSHA Standards, 29 CFR
1910 [6]. Repalr shop owners or managers should
and comply with these regulations.
- providing employee training on a periodic basis
in areas such es, but not limited to, firat aid eafe
job procedures, proper use of mspir~tory pmtec-
tive equipment, mergmcy contingency plans,
, . and phydcal and ohemieal W d s msociated
'with the work, kquirsrnents,
' 7 References
[l] Code ofFederal Regulatiom, Title 49 CFR
: Parts 100-180, Superintendent of Documente, U.S.
Governem Printing Office, Washington, D.C.
20402.
Some examples of safety procedures and programs
to be implemented and vfgarously enforced we:
,
[2] ASh4E Boiler and Pre~sure Vessel Code, Sec-
tion V-Nondeshrclivq &aminatton, American So-
ciety of Me~haniod h&neea, 345 East 47th St,,
New York, NY 1001'7.
- determining that the Interior tank &nosphere is
such as combustible gas, oxygen, and air con- [3] ASMIG Boller and ~ r e s w r e Ve68el Code, SBC-
lion ~111 (Dtvlston 1) .- Unflred Pwsure Vessels,
C

<<<PAGE 16>>>

CGA P-261997 COMPRESSED GAS ASSOCIATION. INC.
American Sooiety of Mechanioal Engineers, 345 East 47th St., New York, NY 10017. 14) ~ a t l ~ n a l ~ o m d ~ns~e&pwc'ode - I995 MI-
tton: NB-23, National Board of Boiler and Res- sure Vessel Inspectors, 1055 Crupper Avenue, Columbus. Ohio, 43229. [5 J ASME Boller and Pressure Vessel Code, Sec-
tion IX- Welding Qualipcatrons, American Soci- cty of Mechanical Enginem, 345 East 47th St.,
New York, NY 10017. @ [[a] Coda ofFederal Ragulatfm~, Title 29 Pane W . 1900 - 1910, Superintendent of Documerits, U.S. $4
6%
S 4
R
Q
a
3
'f
4 3
a
B
L
t
t
t
t
I
1
I
:
?
I
I
1 I
Government Printing Oflce, Washington, D.C.
20402.
Substances h the Work Environment, 1997,
American Conference of Governmentel Industrial
Hygienists 1330 Kemper .Meadow Dr., Cincinnati,
OH 45240.
8 AddltIonal source of informstlon
Pocket Guide to Chemical Hazards,
NIOSWOSHA, DHEW (NIOSH) Publication No.
85-1 14, Superintendent of Documents, U.S. Qov-
emment Printing Office, Washington, D.C. 20402,

<<<PAGE 17>>>

ARTICLE 7
Scope ....................................................................................................................................
General .................................................................................................................................
Equipment
...........................................................................................................................
Examination Medium ........................................................................................................
Requirements ......................................................................................................................
Surface Conditioning .........................................................................................................
Procedure/Technique ........................................................................................................
Method of Examination ....................................................................................................
Techniques and Materials .................................................................................................
Magnetizing Field Adequacy and Direction .................................................................
Rectified Current ................................................................................................................
Demagnetization ................................................................................................................
Postexamination Cleaning ................................................................................................
Calibration of Equipment .................................................................................................
Frequency of Calibration ..................................................................................................
Lifting Power of Yokes .....................................................................................................
Gaussmeters ........................................................................................................................
Examination ........................................................................................................................
Direction of Magnetization ..............................................................................................
Examination Coverage ......................................................................................................
Prod Technique ..................................................................................................................
Longitudinal Magnetization Technique .........................................................................
Circular Magnetization Technique .................................................................................
Yoke Technique .................................................................................................................
Multidirectional Magnetization Technique ...................................................................
Interpretation .....................................................................................................................
Evaluation
............................................................................................................................
Records
................................................................................................................................
Multidirectional Magnetization Technique Sketch ......................................................
Figures
T.753.1.1 T.753.1.2 T.775.2 Pie-Shaped Magnetic Particle Field Indicator ............................................................... 150
Artificial Flaw Shims ........................................................................................................ 151
Single-Turn and Two-Turn Central Conductor Technique ........................................ 154
Mandatory Appendices
Appendix 1 Magnetic Particle Examination on Coated Ferritic Materials Using the
AC Yoke Technique ..................................................................................................... 155
1-710 Scope ...................................................................................................................................... 155
1-720 General .................................................................................................................................. 155
1-72 1 Personnel Qualification ...................................................................................................... 155
1-730 Equipment ............................................................................................................................ 155
1-750 ProcedureITechnique ......................................................................................................... 155
Copyright ASME International
Provided by IHS under license with ASME
No reprodudion or nelworhng permined without license from IHS
Licensee=Dept of Transparlat1an15908201001
Not far Resale . 0Z0612006 14:14:05 MST

<<<PAGE 18>>>

1-751 Coating Thickness Measurement ................................................................................. 155
1-752 Procedure Demonstration .................................................................................................. 156
1-753 Procedure Qualification ..................................................................................................... 156
1-770 Examination ............................................................................................. ; .................... 156
1-780 Evaluation ............................................................................................................................. 156
1-790 Documentation/Records .................................................................................................... 156
Appendix I1 11-7 2 0 Glossary of Terms for Magnetic Particle Examination ................................................ 157
11-7 10 Scope ..................................................................................................................................... 157
General Requirements ........................................................................................................ 157
11-730 Requirements ....................................................................................................................... 157
: Nonmandatory Appendix
: Appendix A Measurement of Tangential Field Strength With Gaussmeters ...................................
158.1
i A-710 Scope ..................................................................................................................................... 158.1
:' A-720 General Requirements ........................................................................................................ 158.1
.. A-730 Equipment ............................................................................................................................. 158.1
... A-750 Procedure .............................................................................................................................. 158.1
: A-790 Documentation/Records ............................................................................................... 158.1
Copyright ASME International
Provided by IHS under license with ASME
NO reproduction or nehvaRing prminsd wthaut license from IHS
Licensee=Dept of Transporlalionl59082OlOOl
Not for Resale . 0210612006 14:14.05 MST

<<<PAGE 19>>>

ARTICLE 7
MAGNETIC PARTICLE EXAMINATION
T-710 SCOPE
When specified by the referencing Code Section, the
magnetic particle examination techniques described in
this Article shall be used. In general, this Article is in
conformance with SEr709, Standard Guide for Magnetic
Particle Examination. This document provides details
to be considered in the procedures used.
When this Article is specified by a referencing Code
Section, the magnetic particle method described in this
Article shall be used together with Article 1, General
Requirements. Definition of terms used in this Article
are in Mandatory Appendix 11.
T-730 EQUIPMENT A99
A suitable and appropriate means for producing the
necessary magnetic flux in the part shall be employed,
using one or more of the techniques listed in T752
and described in T-770.
T-731 Examination Medium A99
A00
The finely divided ferromagnetic particles used for
the examination shall meet the following requirements.
(a) Particle Types. The particles shall be treated
to impart color (fluorescent pigments, nonfluorescent
pigments, or both) in order to make them highly visible
(contrasting) against the background of the surface
being examined.
(b) Particles. Dry and wet particles, including wet
particle suspension vehicles, and particle concentrations
shall be in accordance with SE-709.
(c) Temperature Limitations. Particles shall be used
within the temperature range limitations set by the
manufacturer. Alternatively, particles may be used out-
side the manufacturer's recommendations providing the
procedure is qualified in accordance with Article 1,
T-150.
2 7 2 0 GENERAL
:'The magnetic particle examination method may be
applied to detect cracks and other discontinuities on
or near the surfaces of ferromagnetic materials. The
sensitivity is greatest for surface discontinuities and
diminishes rapidly with increasing depth of subsurface
discontinuities below the surface. Typical types of
discontinuities that can be detected by this method are
cracks, laps, seams, cold shuts, and laminations.
In principle, this method involves magnetizing an
area to be examined, and applying ferromagnetic parti-
cles (the examinations medium) to the surface. The
particles will form patterns on the surface where cracks
and other discontinuities cause distortions in the normal
magnetic field. These patterns are usually characteristic
of the type of discontinuity that is detected.
Whichever technique is used to produce the magnetic
flux in the part, maximum sensitivity will be to linear
discontinuities oriented perpendicular to the lines of
flux. For optimum effectiveness in detecting all types
of discontinuities, each area should be examined at
least twice, with the lines of flux during one examination
approximately perpendicular to the lines of flux during
the other.
T-740 REQUIREMENTS
T-741 Surface Conditioning
T-741.1 Preparation A99
(a) Satisfactory results are usually obtained when
the surfaces are in the as-welded, as-rolled, as-cast, or
as-forged conditions. However, surface preparation by
grinding or machining may be necessary where surface
irregularities could mask indications due to discontinu-
ities.
(b) Prior to magnetic particle examination, the surface
to be examined and all adjacent areas within at least
1 in. shall be dry and free of all dirt, grease, lint,
Copyright ASME International
Pmvided by IHS under license wlth ASME
NO repmduction or netwoking permitted without license from IHS
Licensee=Dopl of Transparlation15908201001
Not for Resale, 0210612006 14:14:05 MST

<<<PAGE 20>>>

T-741.1 1998 SECTION V
A99 scale, welding flux and spatter, oil, or other extraneous
matter that could interfere with the examination.
(c) Cleaning may be accomplished using detergents,
drganic solvents, descaling solutions, paint removers,
Yapor degreasing, sand or grit blasting, or ultrasonic
cleaning methods.
'. (d) If coatings are left on the part in the area being
examined, it must be demonstrated that indications can
$e detected through the existing maximum coating
thickness applied. When AC yoke technique is used, the
demonstration must be in accordance with Mandatory
Appendix I of this Article.
T-741.2 Surface Contrast Enhancement. When
coatings are applied temporarily to uncoated surfaces
only in amounts sufficient to enhance particle contrast,
it must be demonstrated that indications can be detected
through the enhancement coating.
NOTE: Refer to T-150(a) for guidance for the demonstration required
in T-741.l(d) and T-741.2.
Eight low carbon steel pie
sections furnace brazed
together and copper plated
(0.79 mm),
max.
of convenient
Nonferrous trunions
Copper plate 0.010 in. * 0.001 in.
(0.25 mm : 0.025 mml thick
'I8 in.
(3.176 mml
FIG. T-753.1.1 PIE - SHAPED MAGNETIC PARTICLE A99
FIELD INDICATOR
Examination procedures shall be based on the follow-
ing information:
(a) the materials, shapes, or sizes to be examined,
and the extent ofthe examination;
(b) magnetization techniques to be used;
(c) equipment to be used for magnetization;
(d) surface preparation (finishing and cleaning);
(e) type of ferromagnetic particles to be used: manu.
facturer, color, wet or dry, etc.;
Cf) magnetization currents (type and amperage);
(g) demagnetization;
(h) postexamination cleaning.
(c) circular magnetization technique;
(d) yoke technique;
(e) multidirectional magnetization technique.
T-751 Method of Examination
Examination shall be done by the continuous method;
that is, the magnetizing current remains on while the
examination medium is being applied and while excess
of the examination medium is being removed.
T-752 Techniques and Materials
The ferromagnetic particles used as an examination
medium shall be either wet or dry, and may be either
fluorescent or nonfluorescent.
One or more of the following five magnetization
techniques shall be used:
(a) prod technique;
(b) longitudinal magnetization technique;
T-753 Magnetizing Field Adequacy and
Direction
T-753.1 Magnetic Field Adequacy. The applied
magnetic field shall have sufficient strength to produce
satisfactory indications, but it shall not be so strong
that it causes the masking of relevant indications by
nonrelevant accumulations of magnetic particles. Factors
that influence the required field strength include the
size, shape, and material permeability of the part; the
technique of magnetization; coatings; the method of
particle application; and the type and location of discon-
tinuities to be detected. When it is necessary to verify
the adequacy of magnetic field strength. it shall be
verified by using one or more of the following three
methods.
T-753.1.1 Pie-Shaped Magnetic Particle Field
Indicator. The indicator, shown in Fig. T-753.1.1, shall
be positioned on the surface to be examined, such that
the copper-plated side is away from the inspected
Copyrighl ASME inlernali~nal
Provided by IHS under license with ASME
No repraductlon or networking permined wilhout license from IHS
Licen~ee-Depl of Transpo~alion15908201OOl
Nal for Resale, 0210612006 14.14:05 MST

<<<PAGE 21>>>

T-753.1.1 ARTICLE 7 - MAGNETIC PARTICLE EXAMINATION T-754
0 , t ~ in. (0.05 mml
O,W5 irp.
f W.1Z3 mrnf
7 twbel
O.t10? In,
(8,435 mm I
6+OGM in.
IO,Q16 mml
GENERAL NOTE:
Above are examples of artificial flaw shims used in magnetic
particle inspection system verification (not drawn to scale).
The shims are made of low carbon steel (1005 steel foil).
The artificial flaw is etched or machined on one side of the
foil to a depth of 30% of the foil thickness.
are applied simultaneously with the magnetizing force.
When a clearly defined line of particles is not formed,
the magnetizing technique shall be changed as needed.
Shimtype indicators are best used with wet particle
procedures.
T-753.1.3 Hall-Effect Tangential-Field Probe. A
gaussmeter and Hall-Effect tangential-field probe shall
be used for measuring the peak value of a tangential
field. The probe shall be positioned on the surface to
be examined, such that the maximum field strength is
determined. A suitable field strength is indicated when
the measured field is within the range of 30 G to 60
G (2.4 k ~ m ' to 4.8 k ~ m ' ) while the magnetizing
force is being applied. See Article 7, Nonmandatory
Appendix A.
T-753.2 Magnetic Field Direction. The direction of
magnetization shall be determined by particle indications
obtained using an indicator or shims as shown in Fig.
T-753.1.1 or Fig. T-753.1.2. When a clearly defined
line of particles is not formed in the desired direction,
the magnetizing technique shall be changedas needed.
T-753.2.1 For multidirectional magnetization tech-
niques, the orientation of the lines of flux shall be in
at least two nearly perpendicular directions. When
clearly defined lines of particles are not formed in at least
two nearly perpendicular directions, the magnetizing
technique shall be changed a s needed.
T-753.3 Determination of the adequacy and direction
of magnetizing fields using magnetic field indicators
or artificial flaws are only permitted when specifically
referenced by the magnetizing technique in T774.2(c),
T-774.2(d), T-775.l(b)(3), T775.2(a), T-775.2(b), and
T-777.2.
surface. A suitable field strength is indicated when a
clearly defined line (or lines) of magnetic particles
form(s) across the copper face of the indicator when
the magnetic particles are applied simultaneously with
the magnetizing force. When a clearly defined line of
particles is not formed, the magnetizing technique shall
be changed as needed. Pie-type indicators are best used
with dry particle procedures.
T-753.1.2 Artificial Flaw Shims. The shim, shown
in Fig. T-753.1.2, shall be attached to the surface to
be examined, such that the artificial flaw side of the
shim is toward the inspected surface. A suitable field
strength is indicated when a clearly defined line (or
lines) of magnetic particles, representing the 30% depth
flaw, appear(s) on the shim face when magnetic particles
T-754 Rectified Current
(a) Whenever direct current is required rectified cur-
rent may be used. The rectified current for magnetization
shall be either three-phase (full-wave rectified) current,
or single phase (half-wave rectified) current.
(b) The amperage required with three-phase, full-
wave rectified current shall be verified by measuring
the average current.
(c) The amperage required with single-phase (half-
wave rectified) current shall be verified by measuring
the average current output during the conducting half
cycle only.
(d) When measuring half-wave rectified current with
a direct current test meter, readings shall be multiplied
by two.
Copyright ASME International
Provided by IHS under license with ASME
NO reproduction or networking perrn~ned without license from IHS
Licensee=Depl of Transpo~at1onl5908201001
Not for Resale. 02/06/2006 14.14:OS MST

<<<PAGE 22>>>

1998 SECTION V
T-755 Demagnetization
When residual magnetism in the part could interfere
with subsequent processing or usage, the part shall
be demagnetized any time after completion of the
examination.
T-763 Gaussmeters
Hall-Effect probe gaussmeters used to verify mag-
netizing field strength in accordance with T753 shall
be calibrated at least once a year or whenever the
equipment has been subjected to a major repair, periodic
overhaul, or damage. If equipment has not been in use
for a year or more, calibration shall be done prior to
first use.
A00 T-756 Postexamination Cleaning
When postexamination cleaning is required by the
procedure, it should be conducted as soon as practical
using a process that does not adversely affect the part.
T-770 EXAMINATION
T-771 Direction of Magnetization
At least two separate examinations shall be performed
on each area. During the second examination, the lines
of magnetic flux shall be approximately perpendicular
to those used during the first examination. A different
technique for magnetization may be used for the second
examination.
T-760 CALIBRATION OF EQUIPMENT
A99 T-761 Frequency of Calibration
(a) Frequency. Each piece of magnetizing equipment
with an ammeter shall be calibrated at least once a
year, or whenever the equipment has been subjected
to major electric repair, periodic overhaul, or damage.
If equipment has not been in use for a year or more,
calibration shall be done prior to first use.
(b) Procedure. The accuracy of the unit's meter shall
be verified annually by equipment traceable to a national
standard. Comparative readings shall be taken for at
least three different current output levels encompassing
the usable range.
(c) Tolerance. The unit's meter reading shall not
deviate by more than +lo% of full scale, relative to
the actual current value as shown by the test meter.
T-772 Examination Coverage A99
All examinations shall be conducted with sufficient .'
field overlap to ensure 100% coverage at the required :
sensitivity (T-753).
A00 T-762 Lifting Power of Yokes
(a) Prior to use, the magnetizing power of electro-
magnetic yokes shall have been checked within the
past year. The magnetizing power of permanent mag-
netic yokes shall be checked daily prior to use. The
magnetizing power of all yokes shall be checked when-
ever the yoke has been damaged o r repaired.
(b) Each alternating current electromagnetic yoke
shall have a lifting power of at least 10 lb (4.5 kg)
at the maximum pole spacing that will be used.
(c) Each direct current or permanent magnetic yoke
shall have a lifting power of at least 40 lb (18.1 kg)
at the maximum pole spacing that will be used.
(d) Each weight shall be weighed with a scale from a
reputable manufacturer and stenciled with the applicable
nominal weight prior to first use. A weight need only
be verified again if damaged in a manner that could
have caused potential loss of material.
T-773 Prod Technique
T-773.1 Magnetizing Procedure. For the prod tech-
nique, magnetization is accomplished by portable prod
type electrical contacts pressed against the surface in
the area to be examined. To avoid arcing, a remote
control switch, which may be built into the prod handles,
shall be provided to permit the current to be turned
on after the prods have been properly positioned.
T-773.2 Magnetizing Current. Direct or rectified
magnetizing current shall be used. The current shall
be 100 (minimum) amplin. to 125 (maximum) amplin.
of prod spacing for sections 314 in. (19 mm) thick or
greater. For sections less than 314 in. (19 mm) thick,
the current shall be 90 amplin. to 110 amplin. of prod
spacing.
T-773.3 Prod Spacing. Prod spacing shall not exceed
8 in. (203 mm). Shorter spacing may be used to
accommodate the geometric limitations of the area
being examined or to increase the sensitivity, but prod
spacings of less than 3 in. (76 mm) are usually not
practical due to banding of the particles around the
prods. The prod tips shall be kept clean and dressed.
If the open circuit voltage of the magnetizing current
source is greater than 25 V, lead, steel, or aluminum
Copyright ASME International
Provided by IHS under license with ASME
NO reprodudion or nsrwoning permitted wilhaut license from IHS
Llcsnsee=Depl of Tianspanat~an.5938201001
No1 lot Resa e. 0210612306 14 14 05 MST

<<<PAGE 23>>>

ARTICLE 7 - MAGNETIC PARTICLE EXAMINATION
(rather than copper) tipped prods are recommended to
avoid copper deposits on the part being examined.
T-774 Longitudinal Magnetization Technique
T-774.1 Magnetizing Procedure. For this technique,
magnetization is accomplished by passing current
through a multi-turn fixed coil (or cables) that is
wrapped around the part or section of the part to be
examined. This produces a longitudinal magnetic field
parallel to the axis of the coil.
Copyright ASME inlernatlonal
Pmvided by IHS under license with ASME
NO reproduction or networking permitted wilhout license from IHS
- censea=Dopl of Tran~p0rtal.on~5908201001
hot for Resa e. 020612006 1.4 14 05 MST

<<<PAGE 24>>>

T-774.1 ARTICLE 7 - MAGNETIC PARTICLE EXAMINATION T-775.2
If a fixed, prewound coil is used the part shall be Amperes (meter reading) =
placed near the side of the coil during inspection. This ampere-turns
turns
is of special importance when the coil opening is more
than 10 times the cross-sectional area of the part. For example, if a 5-turn coil is used and the ampere-
A99 T-774.2 Magnetic Field Strength. Direct or rectified required are 50007 use
current shall be used to magnetize parts examined by
this technique. The required field strength shall be 5000 = 1000 amperes ( 2 10%)
calculated based on the length L and the diameter D 5
of the part in accordance with (a), (b), or as established
in (c), below. Long parts shall be examined in sections
not to exceed 18 in. (457 mm), and 18 in. (457 mm) shall be used for the part L in calculating the required
field strength. For noncylindrical parts, D shall be the maximum cross-sectional diagonal. (a) Parts With L/D Ratios Equal to or Greater Than 4. The magnetizing current shall be within 2 10% of the ampere-turns' value determined as follows: Ampere-turns =
35,000 (L/D) + 2 For example, a part 10 in. long x 2 in. diameter has
an L/D ratio of 5. Therefore,
-- 353000 - 5000 ampere-turns
(5 + 2)
(b) Parts With L / D Ratios Less Than 4 but Not
Less Than 2. The magnetizing ampere-turns shall be
within 210% of the ampere-turns' value determined
as follows:
(c) If the area to be magnetized extends beyond 6
in. on either side of the coils, field adequacy shall be
demonstrated using the magnetic field indicator per
T-753.
(d) For large parts due to size and shape, the mag-
netizing current shall be 1200 ampere-turns to 4500
ampere-turns. The field adequacy shall be demonstrated
using artificial flaw shims or a pie-shaped magnetic
field indicator in accordance with T-753. A Hall-Effect
probe gaussmeter shall not be used with encircling coil
magnetization techniques.
T-774.3 Magnetizing Current. The current required
to obtain the necessary magnetizing field strength shall
be determined by dividing the ampere-turns obtained
in steps (a) or (b) above by the number of turns in
the coil as follows:
T-775 Circular Magnetization Technique
T-775.1 Direct Contact Technique (a) Magnetizing Procedure. For this technique, mag-
netization is accomplished by passing current through
the part to be examined. This produces a circular
magnetic field that is approximately perpendicular to
the direction of current flow in the part.
(b) Magnetizing Current. Direct or rectified (half-
wave rectified or full-wave rectified) magnetizing cur-
rent shall be used.
(1) The current shall be 300 amplin. (12AImm)
to 800 amplin. (31Almm) of outer diameter.
(2) Parts with geometric shapes other than round
with the greatest cross-sectional diagonal in a plane at
right angles to the current flow shall determine the
inches to be used in (b)(l) above.
(3) If the current levels required for (b)(l) cannot
be obtained, the maximum current obtainable shall be
used and the field adequacy shall be demonstrated in
accordance with T-753.
A99
T-775.2 Central Conductor Technique A99
(a) Magnetizing Procedure. For this technique, a
central conductor is used to examine the internal surfaces
of cylindrically or ring-shaped parts. The central conduc-
tor technique may also be used for examining the
outside surfaces of these shapes. Where large diameter :
cylinders are to be examined, the conductor shall be positioned close to the internal surface of the cylinder. When the conductor is not centered, the circumference of the cylinder shall be examined in increments. Field ':
- i
j:
' I
strength measurements in accordance with T-753 shall
be used to determine the extent of the arc that may
be examined for each conductor position. Bars or cables, ',
passed through the bore of a cylinder, may be used
to induce circular magnetization.
(b) Magnetizing Current. The field strength required
shall be equal to that determined in T-775.l(b) for a
single-turn central conductor. The magnetic field will
increase in proportion to the number of times the central
conductor cable passes through a hollow part. For
example, if 6000 amperes are required to examine a

<<<PAGE 25>>>

1998 SECTION V T-778.2
Single-Turn
+ Central Conductor
Technique
+ Two-Turn
Central Conductor
- 3000 A Technique
FIG. T-775.2 SINGLE-TURN A N D TWO-TURN CENTRAL CONDUCTOR TECHNIQUE
part using a single central conductor, then 3000 amperes
are required when 2 turns of the through-cable are
used, and 1200 amperes are required if 5 turns are
used (see Fig. T-775.2). When the central conductor
technique is used, magnetic field adequacy shall be
verified using a magnetic particle field indicator in
accordance with T-753.
T-776 Yoke Technique
T-776.1 Application. This method shall only be
applied to detect discontinuities that are open to the
surface of the part.
T-776.2 Magnetizing Procedure. For this technique
alternating or direct current electromagnetic yokes, or
permanent magnet yokes, shall be used.
NOTE: Except for materials 1/4 in. (6 mm) or less in thickness,
alternating current yokes are superior to direct or permanent magnet
yokes of equal lifting power for the detection of surface discontinuities.
for each circuit shall be established using the previously
described guidelines (see T-774 and T-775). The ade-
quacy of the magnetic field shall be demonstrated using
artificial flaw shims or a pie-shaped magnetic particle
field indicator in accordance with T-753. A Hall-Effect
probe gaussmeter shall not be used to measure field
adequacy for the multidirectional magnetization tech-
nique. An adequate field shall be obtained in at least
two nearly perpendicular directions, and the field intensi-
ties shall be balanced so that a strong field in one
direction does not overwhelm the field in the other
direction. For areas where adequate field strengths
cannot be demonstrated, additional magnetic particle
techniques shall be used to obtain the required two-
directional coverage.
A99 T-777 Multidirectional Magnetization
Technique
T-777.1 Magnetizing Procedure. For this technique
magnetization is accomplished by high amperage power
packs operating as many as three circuits that are
energized one at a time in rapid succession. The effect
of these rapidly alternating magnetizing currents is to
produce an overall magnetization of the part in multiple
directions. Circular or longitudinal magnetic fields may
be generated in any combination using the various
techniques described in T-774 and T-775.
T-777.2 Magnetic Field Strength. Only three phase, full-wave rectified current shall be used to magnetize the part. The initial magnetizing current requirements T-778 Interpretation , A99
T-778.1 Nonfluorescent Particles. With nonfluores- A99
cent particles, the examination is performed using visible
light. A minimum light intensity of 50 fc (500 Lx)
is required to ensure adequate sensitivity during the
examination and evaluation of indications.
T-778.2 Fluorescent Particles. With fluorescent par-
ticles the examination is performed using an ultraviolet
light, called black light. The examination shall be
performed as follows:
(a) It shall be performed in a darkened area.
(b) The examiner shall be in the darkened area for
at least 5 min prior to performing the examination to
enable his eyes to adapt to dark viewing. If the examiner
wears glasses or lenses, they shall not be photosensitive.
(c) The black light shall be allowed to warm up for
a minimum of 5 min prior to use or measurement of
the intensity of the ultraviolet light emitted.

<<<PAGE 26>>>

T-778.2 ARTICLE 7 - MAGNETIC PARTICLE EXAMINATION T-791
(d) The black light intensity shall be measured with
a black light meter. A minimum of 1000 pWlcm2 on
the surface of the part being examined shall be required.
The black light intensity shall be measured at least
once every 8 hr, and whenever the work station is
changed.
(c) Broad areas of particle accumulation which might
mask indications from discontinuities are prohibited,
and such areas shall be cleaned and reexamined.
T-780 EVALUATION
(a) All indications shall be evaluated in terms of the
acceptance standards of the referencing Code Section.
(b) Discontinuities on or near the surface are indi-
cated by retention of the examination medium. However,
localized surface irregularities due to machining marks
or other surface conditions may produce false indica-
tions.
T-790 RECORDS
T-791 Multidirectional Magnetization
Technique Sketch
A technique sketch shall be prepared for each different
geometry examined, showing the part geometry, cable
arrangement and connections, magnetizing current for
each circuit, and the areas of examination where ade-
quate field strengths are obtained. Parts with repetitive
geometries, but different dimensions, may be examined
using a single sketch provided that the magnetic field
strength is adequate when demonstrated in accordance
with T-777.2.

<<<PAGE 27>>>

A99 A99 ARTICLE 7
MANDATORY APPENDICES
APPENDIX I - MAGNETIC
PARTICLE EXAMINATION ON
COATED FERRITIC MATERIALS
USING THE AC YOKE TECHNIQUE
1-71 0 SCOPE
This Appendix provides the Magnetic Particle exami-
nation methodology and equipment requirements appli-
cable for performing Magnetic Particle examination on
coated ferritic materials.
1-720 GENERAL
1-721 Personnel Qualification
Personnel qualification requirements shall be in ac-
cordance with the referencing Code Section.
1-730 EQUIPMENT
1-730.1 The magnetizing equipment shall be in ac-
cordance with Article 7.
1-750 PROCEDURE /TECHNIQUE
1-750.1 Procedure
Magnetic particle examination shall be performed in
accordance with a written procedure. The procedure
shall include the following:
(a) identification of surface configurations to be ex-
amined, including coating materials, maximum qualified
coating thickness, and product forms (e.g., base material
or welded surface)
(b) surface condition requirements and preparation
methods
(c) manufacturer and model of AC yoke
(a') manufacturer and type of magnetic particles
(e) minimum and maximum yoke leg separation
0 method of measuring coating thickness
(g;) identification of the steps in performing the exam-
ination
(h) minimum lighting and AC yoke lifiing power
requirements (as measured in accordance with Procedure
Qualification 1-752)
(i) methods of identifying flaw indications and dis-
criminating between flaw indications and nonrelevant
indications (e.g., magnetic writing or particle held by
surface irregularities)
(j,) instructions for identification and confirmation of
suspected flaw indications
(k) recording criteria
(I) personnel qualification requirements
(m) reference to the procedure qualification records
(n) method of verifying that the yoke lifting power
and the illumination source used in the production
examination are at least as great as specified.
1-730.2 When the dry powder technique is used, a
powder blower shall be utilized for powder application.
Hand squeezed particle applicators shall not be used
when the dry powder technique is utilized.
1-730.3 Magnetic particles shall contrast with the
component background.
1-730.4 Nonconductive materials such as plastic shim
stock may be used to simulate nonconductive coatings
for procedure and personnel qualification.
1-751 Coating Thickness Measurement
The procedure demonstration and performance of examinations shall be preceded by measurement of the
coating thickness in the areas to be examined. If the
coating is nonconductive, an eddy current technique
may be used to measure the coating thickness. If the
.i

<<<PAGE 28>>>

1-751 1998 SECTION V 1-790
coating is conductive, a magnetic coating thickness
technique shall be used in accordance with ASTM
Dl 186. Coating measurement equipment shall be used
in accordance with the equipment manufacturer's in-
structions. Coating thickness measurements shall be
taken at the intersections of a 2 in. (51 mm) maximum
grid pattern over the area of examination and at least
one-half the maximum yoke leg separation beyond the
examination area. The thickness shall be the mean of
three separate readings within '/, in. (6 mm) of each
intersection.
0 Examine the coated specimen in the most unfavor-
able orientation expected during the performance of
the production examination. Document the measured
yoke maximum lifting power, illumination level, and
examination results.
(g;) Compare the length of the indication resulting
from the longest flaw no longer than the maximum
flaw size allowed by the applicable acceptance criteria,
before and after coating. The coating thickness is
qualified when the length of the indication on the
coated surface is at least 50% of the length of the
corresponding indication prior to coating.
(h) Requalification of the procedure is required for
a decrease in either the AC yoke lifting power or the
illumination level, or for an increase in the coating
thickness.
1-752 Procedure Demonstration
The procedure shall be demonstrated to the satisfac-
tion of the Inspector in accordance with the requirements
of the referencing Code Section.
Procedure Qualification
(a) A qualification specimen is required. The speci-
men shall be of similar geometry or weld profile and
contain at least one surface crack no longer than the
maximum flaw size allowed in the applicable acceptance
criteria. The material used for the specimen shall be
the same specification and heat treatment as the coated
ferromagnetic material to be examined. As an alternative
to the material requirement, other materials and heat
treatments may be qualified provided:
(I) The measured yoke maximum lifting force on
the material to be examined is equal to or greater than
the maximum lifting force on the qualification specimen
material. Both values shall be determined with the same
or comparable equipment and shall be documented as
required in paragraph (c).
(2) All the requirements of paragraphs (b) through
(g) are met for the alternate material.
(b) Examine the uncoated specimen in the most
unfavorable orientation expected during the performance
of the production examination.
(c) Document the measured yoke maximum lifting
power, illumination levels, and the results.
( 4 Measure the maximum coating thickness on the
item to be examined in accordance with the requirements
of 1-75 1.
(e) Coat the specimen with the same type of coating,
conductive or nonconductive, to the maximum thickness
measured on the production item to be examined.
Alternately, nonconductive shim stock may be used to
simulate nonconductive coatings.
EXAMINATION
(a) Surfaces to be examined, and all adjacent areas
within at least 1 in. (25 mm), shall be free of all dirt,
grease, lint, scale, welding flux and spatter, oil, and
loose, blistered, flaking, or peeling coating.
(b) Examine the coated item in accordance with the
qualified procedure.
1-780 EVALUATION
If an indication greater than 50% of the maximum
allowable flaw size is detected, the coating in the area
of the indication shall be removed and the examination
repeated.
1-790 DOCUMENTATION IRECORDS
Procedure qualification documentation shall include
the following:
(a) identification of the procedure
(b) identification of the personnel performing and
witnessing the qualification
(c) description and drawings or sketches of the quali-
fication specimen, including coating thickness measure-
ments and flaw dimensions
( 4 equipment and materials used
(e) illumination level and yoke lifting power
@ qualification results, including maximum coating
thickness and flaws detected.

<<<PAGE 29>>>

I1 ARTICLE 7 - MANDATORY APPENDICES 11-730
APPENDIX I1 - GLOSSARY OF
TERMS FOR
MAGNETIC PARTICLE
EXAMINATION
11-710 SCOPE
This Mandatory Appendix is used for the purpose
of establishing standard terms and definition of terms
which appear in Article 7, Magnetic Particle Exami-
nation.
11-720 GENERAL REQUIREMENTS
(a) The Standard Terminology for Nondestructive
Examinations (ASTM E 13 16) has been adopted by
the Committee as SE-13 16.
(b) SE-1316 Section G provides the definitions of
terms listed in 11-730(a).
(c) For general terms, such as Indica~ion, Flaw,
Disconfinuity, Evaluafion, etc., refer to Article 1, Man-
datory Appendix 1.
(d) Paragraph 11-730(b) provides a list of terms and
definitions which are in addition to SE-13 16 and are
Code specific.
11-730 REQUIREMENTS
(a) The following SE-13 16 terms are used in conjunc-
tion with this Article: ampere turns, black light, central
conductor, circular magnetization, demagnetization, dry
powder, full-wave direct current, half-wave current,
longitudinal magnetization, magnetic field, magnetic
field strength, magnetic particle examination, magnetic
particle field indicator, magnetic particles, multidirec-
tional magnetization, permanent magnet, prods, sensitiv-
ity, suspension, yoke.
(b) The following Code terms are used in conjunction
with this Article:
black light infensity - a quantitative expression of
ultraviolet irradiance
magnefic flux - the concept that the magnetic field
is flowing along the lines of force suggests that these
lines are therefore "flux7' lines, and they are called
magnetic flux. The strength of the field is defined by
the number of flux lines crossing a unit area taken at
right angles to the direction of the lines.
rectified magnefic current - by means of a device
called a rectifier, which permits current to flow in one
direction only, alternating current can be converted to
unidirectional current. This differs from direct current
in that the current value varies from a steady level.
This variation may be extreme, as in the case of the
half-wave rectified single phase AC, or slight, as in
the case of three-phase rectified AC.
half-wave rectified current AC - when a single-
phase alternating current is rectified in the simplest
manner, the reverse of the cycle is blocked out entirely.
The result is a pulsating unidirectional current with
intervals when no current at all is flowing. This is ,
often referred to as "half-wave" or pulsating direct ,:
current.
full-wave rectified current - when the reverse half .,
of the cycle is turned around to flow in the same ,:
direction as the forward half. The result is full-wave : i
rectified current. Three-phase alternating current when i
full-wave rectified is unidirectional with very little !,
pulsation; only a ripple of varying voltage distinguishes '
it from straight DC single-phase, full rectified current is
usually not employed for magnetic particle examination.

<<<PAGE 30>>>

ARTICLE
NONMANDATORY APPENDIX
A99 APPENDIX A - MEASUREMENT
OF TANGENTIAL FIELD STRENGTH
WITH GAUSSMETERS
A-710 SCOPE
This Nonrnandatory Appendix is used for the purpose
of establishing procedures and 'equipment specifications
for measuring the tangential applied magnetic field
strength.
A-720 GENERAL REQUIREMENTS
Personnel qualification requirements shall be in ac-
cordance with Article 1.
Gaussmeters and related equipment shall be calibrated
in accordance with T-763 of Article 7.
Definitions: standard terminology for magnetic parti-
cle examinations is presented in SE-1316.
A-750 PROCEDURE
Care must be exercised when measuring the tangential
applied field strengths specified in T-753.1.3. The plane
of the probe must be perpendicular to the surface of
the part at the location of measurement to within 5
deg. This may be difficult to accomplish by hand
orientation. A jig or fixture may be used to ensure
this orientation is achieved and maintained.
The direction and magnitude of the tangential field
on the part surface can be determined by placing the
Hall-Effect tangential field probe on the part surface
in the area of interest. The direction of the field can
be determined during the application of the magnetizing
field by rotating the tangential field probe while in
contact with the part until the highest field reading is
obtained on the Gaussmeter. The orientation of the
probe, when the highest field is obtained, will indicate
the field direction at that point. Gaussmeters cannot be
used to determine the adequacy of magnetizing fields
for multidirectional and coil magnetization techniques.
Once adequate field strength has been demonstrated
with artificial flaw shims, Gaussmeter readings may be
used at the location of shim attachment on identical
parts or similar configurations to verify field intensity
and direction.
A-730 EQUIPMENT
Gaussmeter having the capability of being set to
read peak values of field intensity. The frequency
response of the gaussmeter shall be at least 0 Hz to
300 Hz.
The Hall-Effect tangential field probe should be no
larger than 0.2 in. (5 mrn) by 0.2 in. (5 mm) and
should have a maximum center location 0.2 in. (5 mm)
from the part surface. Probe leads shall be shielded or
twisted to prevent reading errors due to voltage induced
during the large field changes encountered during mag-
netic particle examinations.
Documentation should include the following:
(a) equipment model and probe description;
(b) sketch or drawing showing where measurements
are made; and
(c) field intensity and direction of measurement.

## Provenance

- Official: Yes
- Source: <https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2008/080125.pdf>
- Source ID: `phmsa`
- SHA-256: `e15d930ae0967aa6af82f8ecf75d1f7800ff44e343c0726fad5bb3d6cc26703d`
- Retrieved: 2026-08-20T00:59:31.977Z
- Exported: 2026-08-23T09:11:40.897Z
- Document slug: `phmsa-interpretation-08-0125`

### Source metadata

```json
{
  "materialSubtype": "interpretation",
  "interpretationArea": "hazardous_materials",
  "representation": "full_text_from_official_pdf",
  "companies": [
    "HazMat Resources, Inc."
  ],
  "individuals": [
    "Mr. Daniel G. Shelton"
  ],
  "refIds": [
    "08-0125"
  ],
  "catalogDates": [
    "2008-08-21"
  ],
  "catalogParts": [
    180
  ],
  "catalogRowCount": 2,
  "sourceRecordUrls": [
    "https://www.phmsa.dot.gov/node/56646"
  ],
  "linkedAttachmentUrls": [],
  "unavailableResponseUrls": [],
  "duplicateRepresentationUrls": [],
  "citedSections": [
    "180.407",
    "180.417",
    "107.502",
    "180.41",
    "180.4",
    "171.7",
    "172.704(d)",
    "180.403",
    "178.320",
    "178.345",
    "177.854(g)",
    "180.413"
  ],
  "catalogPageUrls": [
    "https://www.phmsa.dot.gov/regulations/title49/section/180407",
    "https://www.phmsa.dot.gov/regulations/title49/section/180417"
  ],
  "pdfUrls": [
    "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2008/080125.pdf"
  ],
  "representations": [
    {
      "viewUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2008/080125.pdf",
      "detailUrl": null,
      "detailHtmlPath": null,
      "pdfUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2008/080125.pdf",
      "pdfArtifactPath": "data/sources/phmsa-interpretations/08-0125-49d58026f0.pdf",
      "pdfArtifactSha256": "36dd4afe2291903bf70e0843a2c9e2f40d6c269b11894edd18825b2cdedd6e6c",
      "extractedTextPath": "data/sources/phmsa-interpretations/08-0125-49d58026f0.v2.txt",
      "extractedTextSha256": "d1278502c13549bd8f41dcb321b63dd6c9d9d71c646227e8603614ef21db10ca",
      "pageCount": 30,
      "extractionVersion": 2
    }
  ],
  "caveat": "Interpretations apply regulations to the facts presented and do not create independently enforceable requirements.",
  "jurisdiction": "US"
}
```
