# Durham, Jones & Pinegar, P.C. — Hazardous Materials Safety Interpretation

**Citation:** 08-0289  
**Type / status:** guidance / guidance  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2009-02-19

08-0289 response to Durham, Jones & Pinegar, P.C. concerning 173.320.

## Document text

<<<PAGE 1>>>

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, D.C. 20590
Mr. Michael F. Leavitt
Durham, Jones & Pinegar, P.C.
193 East 200 North, Third Floor
St. George, Utah 84770-2879
Ref. No.: 08-0289
Dear Mr. Leavitt:
This responds to your letter regarding the highway transportation of a small bulk delivery
tank containing oxygen, refrigerated liquid for home delivery for healthcare purposes. Your
client, Rotech Healthcare, Inc., (Rotech) received a citation from the Utah Highway Patrol
(UHP) concerning a violation of $ 173.24 of the Hazardous Materials Regulations (HMR; 49
CFR Parts 171 - 180). Specifically, you ask if your client's understanding is correct that
venting is permissible to reduce internal pressure that may develop by the evolution of gas
from the contents under certain conditions.
Based on the information enclosed with your letter, the tank conforms to the requirements in
$ 173.320. Under $ 173.320, atmospheric gases (e.g., oxygen, nitrogen, carbon dioxide) and
helium in Dewar flasks, insulated cylinders, insulated portable tanks, insulated cargo tanks,
and insulated tank cars, designed and constructed so that the pressure in such packagings will
not exceed 25.3 psig under ambient temperature conditions during transportation are not
subject to the requirements of the HMR when transported by motor vehicle or railcar except
as specified in paragraphs (a)(l), (a)(2), and (a)(3) of this section. Thus, as stated in
$ 173.320(a)(l), the design of the tank must allow venting through the pressure control valve
to prevent any buildup of any internal pressure.
I hope this information is helpful. If we can be of further assistance, please contact us.
Sincerely, /
I Charles E. B\etts
Chief, Standards Development
ffice of Hazardous Materials Standards

<<<PAGE 2>>>

DURHAM JONES & PINEGAR, P.C. 192 East 200 North, Third Floor Michael F. Leavitt
Attorney at Law Jo8-~Zg'j
St. George, Utah 84770-2879 mike.leavitt@utahlaw.com
435.674.0400
435.628.161 0 Fax
www.djpIaw.com
November 1 I, 2008
Via U.S. Mail and Email (Edward.mazzullo@dot.gov)
Edward Mazzullo
UNITED STATES DEPARTMENT OF TRANSPORTATION
1200 New Jersey Avenue SE
Washington DC, 20590
Re: Request for Written Interruption
49 CFR 5 173.24
Dear Mr. Mazzullo:
This firm represents a company called Rotech Healthcare, Inc., which is engaged in the
business of, among other things, transporting oxygen over roadways to individuals in their
homes for healthcare purposes. Mr. David Clark, a hazardous materials inspector for the
Department of Transportation, suggested that we contact you concerning a citation issued
from the Utah Highway Patrol ("UHP") to one of Rotech's drivers concerning the alleged
violation of 49 C.F.R. 5173.24 entitled "General Requirements for packagings and packages."
On or about February 28, 2008, Rotech's driver, Van Gudmundson, was traveling on a
highway in Utah when he was pulled over for a routine vehicle examination by a UHP officer.
Mounted in Mr. Gudmundson's truck was a small bulk delivery tank filled with oxygen,
refrigerated liquid UN1073. The tank is equipped with an "over the road" relief valve, which
is designed, by the manufacturer, to open and release oxygen into the air during transit any
time the pressure in the tank reaches 25.3 psi.
Mr. Gudmundson had already receive a warning from the same UHP officer. On this
occasion, Mr. Gudmundson received a citation fiom the UHP officer under 49 C.F.R. 5173.24.
The officer justified the citation by claiming that, under that regulation, the tank is releasing a
"hazardous material" into the environment during transit. . It is Rotech's understanding that
under 49 C.F.R. 5173.24 part (g), venting is permissible to reduce internal pressure which may
develop by the evolution of gas from the contents under certain conditions. The vessels used
by Rotech meet these conditions so therefore it is their contention that the valves should and
must be used to reduce the internal pressure while in transit. A copy of the manufacturers
manual has been provided for your convenience. Rotech has been unable to persuade the
SALT LAKE CITY 1 OGDEN 1 ST. GEORGE ( LAS VEGAS

<<<PAGE 3>>>

Edward Mazzulo
November 1 1,2008
Page 2
UHP officer officer or his supervisor that the officer's interpretation of these regulations is
incorrect. Consequently, criminal misdemeanor charges are pending for the use of the
pressure release valve in the manner which clearly seems to be required by the regulation.
In addition, Rotech has been cited and paid a fine in the past in Maine for not using the
equipped over-the-road relief valve while the vehicle was in transit. This inconsistency among
state transportation inspectors has left Rotech at a loss as to how it should proceed in the state
of Utah. Currently, it is not activating these valves in Utah out of concern of getting another
citation. Again these over-the-road relief valves were designed, by the manufacturer,
specifically to be used to reduce the internal tank pressure while in transit. It seems clear that
not having the release valve activated poses a greater danger to the public than merely
releasing a non-poisonous, non-flammable gas into the atmosphere during transit. The UDOT
officer and his superiors, however, do not agree, based on the fact that these valves are hand-
activated. What they fail to realize is that the valves, even though they are hand-activated, have
an incorporated automatic reseating relief valve that is used to maintain the internal pressure
of the vessel below 25.3 psi while in transit.
Mr. Clark mentioned that Rotech should request a "Written Interruption" from the United
States Department of Transportation concerning this matter and forward it to the officer here
in Utah responsible for the citation and the prosecutor responsible for this case. He noted that
you would be the appropriate person to contact for this.
Any assistance from you would be greatly appreciated. Rotech has a pre-trial conference on
this matter on December 1, 2008. We are hopeful you can help us resolve this issue before
then.
Very truly yours,
DURHAM JONES & PINEGAR, P.C.
Michael F. Leavitt
cc: David Clark (via email)
Kim Lee (via email)

<<<PAGE 4>>>

- 4 . 4 r - c r - I - - /@
MODS
I
The MODS- I20.190 and 300 are
Medical Oxygen Delivery Systems
deslgned for economical transportation
and delivery of liquid oxygen. Improved
plurnblng design facilitates driver DOT
compliance and efficiency of operations.
The MODS provide consistent fan and
efffclent reservoir fills, especially when
used In conjunction with other Caire
liquid system products. Whlle the
MODS fast fill process makesit the
perfect delivery tank for high denslty fill
routes, its law evaporation rate makes It
also Ideal for rural dimibuiion.
Design allows fast filling from the bulk tank and into home reservoirs. Dual fill valves on the MODS allow
one valve to be dedicated to the BulkTank and the other dedicated to the Home Delivery Unit
Plumbing conveniently located for operator use.
Oversize cryogenic valves prevent freed1
Low evaporation rate.
Design for easy DOT compliance.
Convenient truck mounting.
MODS system has I " stainless steel pk
~mbl
allowing this unit to fill all low pressure
liqui
required when using other systems.
whfch
utilizes the fast fill p
roc(
zdure
!quipm
tent In 114 to 112 of -
the
time

<<<PAGE 5>>>

Tag Definition
C-1 Connection. Fill &Withdrawal
C-1A Connection. Fill &Withdrawal
C-2 Connection Vent Stack
HCW-1 Valve, Fill & Withdmwal
HCW-1A Valve, Fill &Withdrawal
HCW-2 Valve, Pressure Build
HCV-3 Valve. Vent
HCV4 Valve, Full Tycock
(kcll.7 Valve. Road ~elief)
HCV-9 U-I. Equalization Valve
11-1 Level Indicator, Inner Vessel
PBC-1 Pressure Build Coil
PSE-1 Pressure Safety Element. INR
PSV-1 Pressure Safety Valve, INR
PSV-2 Pressure Safety Valve, Road
PI-l Pressure Indicator Gauge
UP-1 Vacuum Port
PRODUCT SPECIFICATIONS
Dimensions MODS-120
Oxygen Nitrogen
42"w x 45"h x 57"d
-. -
MODS-190
Oxygen Nitrogen
42"w x 45"h x 70"d MODS 300
Oxygen Nitrogen
42"w x 45"h x 100"d
Weight 1100 lbs. Empty 1200 Ibs. Empty 1600 lbs. Empty
2100 Ibs. Full - 1800 Lbs Full 2900 U15. Full - 2400 Lbs Full .- 4400 Lbs Full - 3600 lbs Full
I I Capacity (Net). 111 Gal 179 Gal 297 Gal
Max. Working Pressure 100 psig 100 psiq 100 psig
Evaporation Rate. . 1.6O0l0 02/Day - 2.6% NZ/Day 1.35% 02/0ay - 2.16% NZ/Day 0.70°/~02/day - 1.08O/oN2/Day
1 I Ordering Information
Tank 11818705 11814721 11848234
I I Vent Kit 11864277
-- 11864277 11864277
Mount K i t 10591449 10591449 10591449
Service Kit 11830211 - 11830237 11830211 - 11830237 11830211 - 11830237
I
I CAIRE INC. CHART BIOMEDICAL
1800 Sandy Plains Industrial Parkway, Suite 316 U n i t 2, Maxdata Centre
Maiietta, GA 30066 Downmill Road, Brackrlell
Ph/770-425-4470 Toll Freell-800-482-1473 {/ . Bcrks RG I 2 I QS, I-lnitcd Kingdom
Fax/770-425-~40 (.: A I R E.
I< Clch&...,l,.a.s., Ph/ +44(0) 1341 403100
wwv.cairemedical.com Fx/ +44(0) 1341 429224
B, 11U15 C-41RL. Inc. All riyhti rr.rrved. htadr on 1I.S.A. nmdtdct r~ccitintion ~ u b ~ c c ~ to chun~r without nutrcr. Printcd in U.S.A.
Rcl 1OUDZ.liT) RN K

<<<PAGE 6>>>

OPERATING INSTRUCTIONS FOR ULTRA SERIES
LIQUJD DELIVERY SYSTEM
ODUCTION
The container system consists of a stainless steel inner vessel safely supported within acarbn steel auter vessel.
The inner cylinder is wrapped in a highly efficient insulation material and the annular space bctween the vessels is
evacuated to provide vacuum insulation reducing heat trensfer and product evaporation. Loss of this vacuum will
result in diminished insulation and loss of product.
M A T Z U L HANDLING SAFE-
Material Safetv Datasheets for the product to be stored in the vessel should be read and understood by aU personnel
using the vessel for filling, storage, or discharge before operating the vessel. It is critical that all cautionsand
warnings related to such product be strictly adhcred to and proper safety equipment should be used at all times.
W M G Do not operate this vessel in a closed compartment or confined area unless the vent stack is ducted to
the outside. Do not open the filllwithdrawal or the fbll trycock valve if in a confined area. The trycock should have
an extension piped to it which directs gas andlor liquid outside the compartment and away from the operator.
WMlWNG- All transfer lines used with this vessel should be equipped with a relief valve.
WARMNG- Do not remove, disable, or otherwise i n k ~ e r e with the operation of any safety devices on this vessel.
CHANGING S E R ~ The Ultraseries Delivery Vessels are suitable for carrying liquid oxygen, nitrogen or
argon. However, if changing service, purge according to DOT regulations. Minor component changes may also be
necessary.
/ ~ * . E - D E ~ ~ ~ )
I 1) Reliefvalve (RnThere is an automatically reseating relief valve protecting the inner vessel from over
pressure. This valve is not to be set at a pressure exceeding the rated normal operating limit of the vtssel.
2) Pu~ture Disk (RDI Also referred to as a "head safetyw, this rupture disk is a backup safety device designed to
protect the inner vessel from over pressure should the relief valve (BV) fail to open prior to pressure reaching
the rupture disk set point. This is a "onetime" use device with a frangible membrane that must be replaced in
the event of activation. The pressure rating of the head safety is not to exceed 1.5 times the normal operating
limit of the vessel. I
Road Relief Valve (RRVlThis device is designed to be opened in the event that the vessel is used for
transporting cryogenic liquids. The Road Relief Valve is set at less than 25.3 psi and is an automatically
reseating relief valve with operation similar to that of the &Lief Valve (RV). The valve to this device may be
closed when the vehicle containing the vessel is stationary for the purpose of increasing overall pressure to off-
load liquid. The Road Valve (V-7) must be open and pressure relieved to less than the set point any time tbe
vehicle is in motion.
4) -Rupture Diskis "one-time" frangible disk device is affixed to the external vessel and it designed to
provide free reIief of pressure in the event that Liquid or gas may be released into the annular space bchveen the
inner and outer vessel.
There is a common vent line connecting the Relief Valve (RV), Rupture Disk (RD), and Road Relief Valve (RRV).
If the tank is installed in a closed container or vehicle, this line is to be piped directly to an external vent to assun
gases do vent directly into the vehicle.
NOTE- VK-IT Vent Kits are available from West Cryogenics, Inc.

<<<PAGE 7>>>

A pressure gauge is provided indicating the inner vessel pressure. There is also a liquid level gauge indicating the
approximate level of liquid in the vessel. These are two isolation valves between vessel and these gauges allowing
the gauges to he replaced without emptying the vessel. Both valves should be open during normal operation.
The vessel is equipped with an external pressure building system to assist in liquid discharge. 'Ilk system consists
of the Pressure Building Coil (PBC) and a Pressure Building Valve 01-1). When V-1 is opened, liquid is able to
travel through the system. Tbe Relief Valve (RV) provides control to prevent pressure from exceed the operating
limits of the vessel. If the Road Relief Valve (RRV) is left open then it wilI scrve as the primary regulator keeping
pressure below 25.3 psi. Pnssure may also be rnanually relieved by opening the Vent Valve (V-2).
To increase pressure, open the Pressure Building Valve ('4-1) and be sure the Vent (V-2) is closed. If pressure
greater than 25.3 psi is requited the Road Valve (V-7) must also be closed. The Pressure Building Valve (V-1)
should be closed anytime the vessel is not being used for discharge or is in transit. When discharge operation is
complete, the Pressure Building Valve (V-I) should be closed and the Vent Valve (V-2) shouId be opened to
manually relieve pressure to below 25psi prior to reopening the Road Valve (V-7).
NOTE- Prior to filling, it is important to consuIt DOT regulations or your Iocal supplier for the maximum allowable
liquid load consistent with your working pressure.
The UltraSeries Delivery Vessels are fitted with two (2) Liquid Valves (V-4) as standard equipment. Both valves
can be used for fill or discharge of cryogenic liquids as needed.
These vessels can be filled from apressurized liquid source using the following procedure:
1) An extension should be in place on the full trycock (Fill) valve (V-3) to discharge out of the vehicle and away
2) from the operator.
Connect the liquid source to the Fill/ Drain Valve 01-4) using a suitable transfer line. Be sure the Road Relief
kolation Valve is closed.
WAIWZNG- It is critical that all transfer lines connected to the vessel he fitted with a relief valve to prevent trapping
of liquid or gas in the transfer line. Expanding gases from vaporizing liquid create rapid increases in pressure
resdting in violent rupture of the transfer line. This rupture can lead to serious injury or death to individuals struck
by the line or debris thrown @om the line.
3) 4) Open the FillDrain Valve (V-4) and the Full Trycock (Fill) Valve (V-3).
To begin the transfer, open the liquid source valve. Pressure at the vessel may be relieved manually using the
Vent Valve (V-2) by opening to reduce pressure or closing to increase pressure.
WWWING- A cold stream of gas will exit fmm the full trycock extension. Keep clear of the exiting stream.
5) When the container is filIed, Liquid will start to exit from the Full Trycock (Fill) Valve (V-3) extension. At that
point, shut off the liquid source valve.
6) Shut off the FillBrain Valve (V-4) and the Full Trycock (Fill) Valve (V-3). Open the Vent Valve
(V-2) to relieve pressure from the vessel.
7) Disconnect the transfer line.
8) Open the Road Relief Valve (RRV) prior to transporting the filled vessel.

<<<PAGE 8>>>

The Ultraseries Delivery Vessels are fitted with two (2) Liquid Valves (V-4) as standard equipment. Both valves
can be used for fill or discharge of cryogenic liquids as needed.
I
I Transferring Iiquid from the UftraSeries vessel is accomplished by the following procedure:
1) Be sure the Vent Valve (V-2) and Full Trycock (V-3) are closed
2) Check the pressure gauge to see that the vessel pressure is appropriate for the intended application. If additional
pressurization is required, open the Pressure Building Valve (V-1) to operate the external pressure building coil.
If less pressure is needed, open the Vent Valve (V-2) to lower pressure.
3) Attach a suitable transfer line to the FilVDmin Valve (V-4).
WARNING- It is critical that a11 transfer lines connected to the vessel be fitted with a relief valve to prevent trapping
of liquid or gas in the transfer line. Expanding gases from vaporizing liquid create rapid increases in pressure
resulting in violent rupture of the transfer line. This rupture can lead to serious injury or death to individuals struck
by the line or debris thrown from the line.
4) 5) 6) Open the Fill/ Drain Valve (V-4) as fare as necessary to obtain the desired flow rate.
When the transfer is complete, close the Fill/Drain Valve w).
WhiIe at the same location, the Pressure Building Valve (V-1) may be left open until fill operations are
complete. To prevent excessive venting of gas, the Pressure Building Valve (V-1) should be closed prior to
opening the Road Valve (V7) for transit.
CAUTION- Before operating this vessel, please consult your supplier for the product MSDS and applicable
"Precautions for the safe handling and storage of liquetied gases" for additional precautions and good practice
regarding cryogenics.
WC210/WC290
ULTRA FLOW SCHEMATIC
PBC NOMENCLATURE
ITEM OESCRlPTlON
V1 fWSSURE BUILD VALVE
V2 VENT VPAM
VJ FULL TRYCDCK
V4 FILL/DRAIN VALVE
V5 LOV PRESSURE GAUGE VALVE
V6 HIGH PRESSURE G A W VALVE
-
v7 RWD VALVE
RR RDRD RELIEF
PR PRItW7Y RELIEF
RO RUPTUK DISC (MAIN SAFETY)
VO VENT DUTLET FITTING
-
Ex-v4
rc
LLG LIQUID LEVEL GAUGE
V4
pt PRESSURE GAUGE
FC VI
FC FILL CONNLCTIIR
PBC Py -

## Provenance

- Official: Yes
- Source: <https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2008/080289.pdf>
- Source ID: `phmsa`
- SHA-256: `187bba75d6d25e39deba36db1dc4cb2062c559b010d4c7a20cd62af7fdc93c86`
- Retrieved: 2026-08-20T00:59:31.977Z
- Exported: 2026-08-25T20:24:11.074Z
- Document slug: `phmsa-interpretation-08-0289`

### Source metadata

```json
{
  "materialSubtype": "interpretation",
  "interpretationArea": "hazardous_materials",
  "representation": "full_text_from_official_pdf",
  "companies": [
    "Durham, Jones & Pinegar, P.C."
  ],
  "individuals": [
    "Mr. Michael F. Leavitt"
  ],
  "refIds": [
    "08-0289"
  ],
  "catalogDates": [
    "2009-02-19"
  ],
  "catalogParts": [
    173
  ],
  "catalogRowCount": 1,
  "sourceRecordUrls": [
    "https://www.phmsa.dot.gov/node/45616"
  ],
  "linkedAttachmentUrls": [],
  "unavailableResponseUrls": [],
  "duplicateRepresentationUrls": [],
  "citedSections": [
    "173.320",
    "173.24"
  ],
  "catalogPageUrls": [
    "https://www.phmsa.dot.gov/regulations/title49/section/173320"
  ],
  "pdfUrls": [
    "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2008/080289.pdf"
  ],
  "representations": [
    {
      "viewUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2008/080289.pdf",
      "detailUrl": null,
      "detailHtmlPath": null,
      "pdfUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2008/080289.pdf",
      "pdfArtifactPath": "data/sources/phmsa-interpretations/08-0289-414d51cd0c.pdf",
      "pdfArtifactSha256": "61d37d1860350c279a881d176a7eb9b8f929a28fca5aaf5f7533f1055971a763",
      "extractedTextPath": "data/sources/phmsa-interpretations/08-0289-414d51cd0c.v2.txt",
      "extractedTextSha256": "2077c5b85ab11c5e5ec6d860bb968805b428f7014327cb5445bb2fc3816aaf3e",
      "pageCount": 8,
      "extractionVersion": 2
    }
  ],
  "caveat": "Interpretations apply regulations to the facts presented and do not create independently enforceable requirements.",
  "jurisdiction": "US"
}
```
