# Qantas — Hazardous Materials Safety Interpretation

**Citation:** 16-0147  
**Type / status:** guidance / guidance  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2017-03-03

16-0147 response to Qantas concerning 180.209.

## Document text

<<<PAGE 1>>>

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
MAR 0 3 2017
Mr. Neil Smith
Cabin Fleet Manager - International & Domestic Fleets
Qantas
C Wing Level 4
10 Bourke Street
Mascot NSW 2020 Australia
Reference No. 16-0147
Dear Mr. Smith:
This letter is in response to your September 7, 2016, email and subsequent conversations
requesting clarification of the Hazardous Materials Regulations (HMR; 49 CFR Parts 171-180)
applicable to requalification requirements in§ 180.209(b)(l) for a specification DOT 3AA
cylinder. Specifically, you state that your company uses DOT 3AA cylinders filled exclusively
with oxygen. Based on your company practices, the cylinders are routinely refilled before the
pressure falls below 50 psi and are requalified every 10 years instead of 5 years in accordance
with§ 180.209(b)(l). You also reference the July 26, 2016 Notice of Proposed Rulemaking
(NPRM) titled, "Hazardous Materials: Miscellaneous Amendments Pertaining to DOT
Specification Cylinders (RRR)" [HM-234; 81 FR 48977], which proposes to amend some of the
requalification requirements in § 180.209(b ).
We have paraphrased and answered your questions as follows:
Q 1. You ask if a DOT 3AA cylinder is subject to the hammer test requirement in
§ 180.209(b)(l)(iii) at the time ofrefill. You note that your company interprets the
meaning of "refill" as it applies to § 180.209(b) as filling an oxygen cylinder when it
contains less than 50 psi.
Al. The answer is yes. If your company wishes to requalify a DOT 3AA cylinder every 10
years instead of every 5 years, as outlined in § 180.209(b )(1 ), the cylinder must meet all
applicable requirements, including the hammer test, prior to being refilled. The HMR is
silent on the definition of "refill" for this exception, but generally "refill" has meant the
filling of a cylinder regardless of the pressure at the time of refill.
As it is currently written in the HMR and as a condition to allow a 10-year requalification
period instead of a 5-year period, the cylinder must pass the hammer test in accordance
with CGA C-6 before each refill. The test protocol calls for the cylinder to be empty
prior to performing the hammer test. For the purposes of the HMR, a cylinder
containing a permanent Division 2.2 gas is empty when the pressure is less than 29.0 psig
at 20 °C.

<<<PAGE 2>>>

Q2. A2. Q3. A3. Q4. A4. You ask if an internal inspection is required each time you refill a DOT 3AA cylinder.
The answer is no. There is no regulatory requirement to conduct an internal inspection
each time a cylinder is refilled. However, there is a requirement to internally inspect a
DOT 3AA cylinder at the time of requalification. Specifically, § 180.205(f)(l) requires
that a steel cylinder be visually inspected in accordance with CGA C-6, which requires an
internal inspection be conducted each time a cylinder is requalified or if the cylinder fails
the hammer test.
Please note that ifthe cylinder is subject to the hammer test at the time of refill, such as is
required in§ 180.209(b)(l), failure of the hammer test may present conditions rendering
the cylinder unsafe and subject to testing and inspection in accordance with
§ 180.205(d)(l).
You ask if it was PHMSA's intention in the HM-234 NPRM [81 FR 48977] to remove
the authorization to requalify a DOT 3AA cylinder every 10 years. Specifically, you
reference the table in§ 180.209(a), which proposes to list a 5- or 12-year requalification
period for a DOT 3AA cylinder.
The answer is no. The§ 180.209(a) table should specify a 5-, 10-, or 12-year
requalification period for a DOT 3AA cylinder. This was an inadvertent error and will be
amended in the publication of the final rule.
You ask if it was PHMSA's intention in the HM-234 NPRM to restrict those cylinders
removed from aircraft from the 10-year requalification period exception as outlined in §
180.209(b )(1 ).
The answer is no. It is not PHMSA's intention to restrict cylinders removed from aircraft
from the 10-year requalification in § 180.209(b ). This will be addressed in the final rule.
I hope this information is helpful. Please contact us if we can be of further assistance.
Si:~~l~y , //
.. /· -
,,
.!/ irk De · nde en
Chief, Standard Development Branch
Standards and Rulemaking Division

<<<PAGE 3>>>

Goodall, Shante CTR (PHMSA)
From:
Sent:
To:
Attachments:
Importance:
Betts, Charles (PHMSA)
Wednesday, September 07, 2016 9:46 AM
Goodall, Shante CTR (PHMSA)
image2016-09-07-092814.pdf
High
Please log and assign to a specialist for response. Please treat this for expedited handling.
Thanks,
Charles
1

<<<PAGE 4>>>

[)ear Mr Betts
Please find attached a letter requesting clarification on CFR 180. 209.
Yours sincerl y
\ ,,.,q,..,.
··w~ .
t~
... , .... ,~
Neil Smith
Cabin Fleet Manager -International & Domes tic Fleets
Engineering Services I Qantas Airways Umited
Address C Wing Level 4, 10 Bourke Street, Mascot NSW 2020 Aust ralia
Phone +61 2 9691 0548 I Mobile +61402 38 65 69 I Email: ne i l. smith@.MD!~.H9fll·au

<<<PAGE 5>>>

~QANTAS
Facsimile Transmission
From
~ Fa x Numbm 001112023665713 Fax Number
Email
> company Company
~> Ad d ress Address
i> Telephone Telephone
t> Total number of pages inclusive of this Sheet 8 Date 07.09.16
•Confidentiality. Tho? 1nformnnc.n corta1ned 1n th.1?58 1jc..:um>?nt; is i:c·n!rd·:r.ua! and s in t ~nljed tor .;i ~ · clu:ue ust- vi the adrJr~~SO:-!? na;n-?1J a:.:io·;~ 11 :.:rt-Jn :as-s-s 111s .:!lsr:· !-:9211·1
;nqlo.:~-:-d l' vou ar'!? n.)'. tn.a ad•jresst-t-. any disc!i)sur-:: r~pr..:du.:t;.:.•n. d1s t roun1.~n u (!htir J;ssi:m1n t10n er JS~ c~ :r 1s ccrnrr.v' ct::t1·:.-n s s:rct!j pr ... r-1t1t~c If you !"£!\·-:-re·.<::1\~·: m1;
~Subject FAD: Mr Charles Betts Clarification of CFR 180.209
Qantas Airways Limited
ACN 009 661 90 1

<<<PAGE 6>>>

Qantas Engineering._
Charles Betts
Director
Standards and Rulemaking
Department of Transport
By Fax: +1 202 366 7435
Neil Smith
Cabin Fleet Manager
Engineering Services
Qantas Airways Limited
Address C Wing Level 4
1 O Bourke Street
Mascot NSW 2020 Australia
7 September 2016
Dear Mr Betts,
I wish to seek clarification of Qantas Airways' understanding of the existing regulation and NPRM of 49
CFR 180.209 per PHMSA-2011-0140 (HM-234).
Qantas operates cylinders that are manufactured to the DOT 3AA specification (ref Figure1), they are
used exclusively for oxygen, have a capacity of 11cu foot and manufactured by Avox Systems Inc.
These cylinders are maintained under an approved System of Maintenance, to a vendor supplied,
Component Maintenance Manual, CMM 35-31-55.
When we have viewed the proposed changes in the NPRM, Qantas reassessed the maintenance of
these cylinders and wanted to confirm our understanding of this requirement, especially for the
hammer test and requirements for a 10years interval between Hydrostatic Test.
The CMM refers to DOT requirements per 49 CFR180.209 to determine the additional conditions
required to certify the cylinders to 10years (nominally 5years) between Hydrostatic Test (HT).
Cylinders conforming to these additional criteria are identified with a star shaped stamp. The 1 Oyear
option has been chosen by Qantas.
Figure 1 - Typical oxygen cylinder with 3AA DOT marking
One of the requirements per 49 CFR180.209 (b) (iii) is
Before each refill. the cylinder is removed from any cluster, bank, group, rack or vehicle and passes
the hammer test specified in CGA Pamphlet C-6 (I BR, see §171 .7 of this subchapter).
···-··-······-······ ······················· · ·· ~---- -------------..
--
__...,, .. ~ . .-. .. '
•
Qantas Airways Limited
ABN 1 6 009 661 9C l
qantas.com

<<<PAGE 7>>>

Qantas Engineering._
The referenced CGA (Compressed Gas Associated) C-6 document shows the requirements of the
Hammer Test.
6.2 Hammer test
The hammer test is a valuable indicator or internal corrosion and is a convenient test that can be made without
. removing the valve before each charging or the cylinder. The hammer test should be perfom1ed on empty un-
pressurized cylinders.
The hammer test consists of tapping lhe cylinder sidewall with a light blow using a 112 lb (0.23 kg) ball-peen
hammer or equivalent. A cylinder will normally have a clear ring. A dull ring would indicate internal eorrosion,
: liquid, or accumulation of foreign material in the cylinder. Such cylinders shall be inspected internally In accor-
. dance with 6.4 .
. NOTE-The hammer test Is not 11prlir.Rh1A on ;;il11min11rn r.ylinrlf.lrs
. ..... .. .. .
······· ............ .............. .
If fails hammer test I or in doubt, inspect per 6.4
6.4 Internal Inspection
Cylinders shall be inspected internally at least every time the cylinder is periodically retested, or when they fail
the hammer test before filling, or when there is reason to believe that there is internal contamination, or corro·
sion.
6.4.1 Preparation for inspection
The Interior of cylinders shall be prepared for inspection by removing dirt, scale, or other condition as neces-
sary to permit the inspection of the internal surface. Cylinders with interior coating shall be examined for de-
fects in the coating. If the coaling is defective, it shall be removed.
A goo· d inspection light of sufficient intensity to clearly illuminate interior walls is mandatory for internal inspec-
tion. Cylinders containing hazardous materials shalt be purged to remove residual gas or liquid before being
examined with a light.
•
Qantas Airways Limited
,< 3 N 1 6 '.J09 661 901
qantas.com

<<<PAGE 8>>>

- - -
·
-- ·-----·u ------·--Z!' ._ ...
Qantas Engineering .. .
Within Qantas we complete the requirements per the vendor CMM, which aligns with CGA 6.4. 1.
B. DOT-3AA·1800 Steel Cylinder
(Refer to 500 thru 5000, IPL Fig. 1; 500 thru SOOA, IPL Fig. 1 B).
(1) Look at the last and inillal cylinder hydrostalic test dates found on the cylinder crown, near the
cylinder neck.
Hydrostatic tests must be performed as noted In Table 5003 using appro11ed procedures by
service locations ha11ing up-to-date United States Department of Transportation
approval. Additional hydrostatic tests may be required in your country.
(2) DOT·3AA·1600 steel cylinder service-life is given in Table 5003.
( t) Do a dleck of the cylinder surfaces for either heal or fire damage.
(2) Do a check of the cylinder for dents, gouges, digs or bulges.
NOTE: It may be necessary to remove any heavy paint coatings from the exterior surface of the •
~y fi ndt:r t~· : cc::«:-<:t1y cht: \~ ~~r ~1ents , 9;.. ·;t.:g<!r :; , C:g~~ ·':; f ~ ul~ $.
(3) Make sure that identification plates and waming labels can be read and are not damaged.
(4) Do a check of the cylinder neck tor craci<s, distortion, contamination or thread damage.
(5) Put a Bright Inspection Light (Table 5002) inside the cylinder and do a check for contamination
and corroded surfaces.
(8) Make sure the inside of the cylinder does not have an odor.
Furthermore, the Bright Light Inspection ensures that there is NO corrosion/contamination and is
completed at each Hydrostatic Test (currently every 10years) and when a regulator is overhauled
(every 5years) and when the cylinder is returned to the workshop with less than 50PSI.
The Hammer Test 1 s part of the qualification to 10years. it is not required for qualification to 5years per
the existing regulation.
The Qantas interpretation of the term, refill, is the filling of the oxygen cylinder when the cylinder has
less than 50PSI. Empty to full- refill.
The term 'top up' is used when oxygen is added between 26PSI and 1 BOOPSI. Qantas typically uses
the 50PSI for our in-service criteria and 26PSI for new cylinder deliveries, with reference to the
document below:
From OEM (Original Equipment Manufacturer) documentation The OEM, Avox, describes in SIL-35-
126 NEW US DEPARTMENT OF TRANSPORTATION (US DOT) RULE HM224B FOR AIR
SHIPMENT OF CHEMICAL OXYGEN GENERA TORS AND CYLINDER ASSEMBLIES THAT
CONTAIN COMPRESSED OXYGEN INTO AND WITHIN THE US, that when a partially filled bottle is
received, than it is to be charged There is NO indication in this documentation for a further Hammer
Test prior to charging the cylinder; steps as follows:
•
Qantas Airways Limited
ABN 16 009 661 901
qantas.com

<<<PAGE 9>>>

Qantas Engineering._
( 4) After arrival at destination
(a) Charge the cylinder assembly to full operating pressure before placing into service.
(b) Remove the shipping tag (PIN 10015660; see Figure 3) from the neck of the cylinder.
(c) Verify that the cylinder is charged to full operating pressure.
(d) Check the cylinder assembly for leaks.
(e) Issue an EASA Form 1 or equivalent as required.
m Add statement to block 13 on the EASA Form 1 or equivalent stating that service was
performed in accordance with the CMM and the SIL.
(g) Add in block 12 of the EASA Form 1 or equivalent "Inspected/Tested. "
(h) Sign on the right side in block 20.
(j) Install in aircraft or place in stores ready for service.
The NPRM for the revision of 49 CFR 180.209 removes the requirement for the Hammer Test. This is
in part due to the Hammer Test noi being an effective tool to determine corrosion and there is NO
control of the filling operation, post qualifying the cylinder, extract below .
. . .. . .. . . . .. . .. . .. .. . . . .
·;: ::- ;.::::: :; :;; : : : :: ::; : : : : ~ ;.; ::; ;; :- :::: :; :;:: ~-.'
o.e.tell: Bcfors e11 d1 r • ! 1l l
' ~·' . · .......... ............ ..................... ..... .-....
·· -·: .
. · ~: rCJ"10v crdir 01n
. .......................... ,, ...
j :::-&;~):1 : >;::1 :·-: :.:v-! ;. : :~:.
: : ~#·. :.•.:.:.· '.::-.:: s .; .~:~ 4! ~Y. J ::: ~ .. ~,~ .
: ('~#~ ;: :-.~$. c ~ ! ~!);~ . S'·) .. ~ '. . .:.·.:
: ::. .. ~.·1 -:.~ ::.· •n v -J>..lv.-~·~: <. .-. ~ ·
Rational for submitred changes to 49 CFR J 80.200 - 215
180.209 (b)(l)(ii) Removed hammer test. I have never heard of a single cylinder being
condemned for corrosion that was detected by the hanuner test. Furthennorc, no one is
disassembling banks of cylinders in order to do the hammer lest "each time it is filled".
And more importantly, that is a fill operation, not part of the requalification. It is more
appropriate to simply disallow these applications from the 10 year test. Added "cascade"
'
·
·
.. ) .,, .. ) .\ .. ..... , .~ ~~ -;- . ..,...,..,. ,,, ... . ... ~. ;;.;,.. ................ ....... ....... .... .. .. ... .. ... ... .
The last sentence above is significant, as the qualification to 10years should not be subject to a 'fill
operation' that the qualification has no control over. The NPRM is written to remove these cylinders as
candidates for 1 Oyear interval between HT.
The NPRM in 49 CFR 180.209 (a) Periodic qualification of cylinder for DOT 3A, 3AA has removed the
option for 10years, giving a 5 or 12year option.
~equ . .:ii; ~ . .-~:i~ ; p psr . .::·IJ
~,.~~i::;ur~ h:-<:~ pr~:;~· t :rn
::p:~:,.~i I
1. ~· f ~;;:: SJ
.! G~:r; :'.: :'Y;} ... . . ..... .
S/'3 ~i : :i -r ,:; fc~:·\::r6 µ:(' ;~:l:..tQ , tl~!:~p: r:n::r;~".·tr~· !..
5~· '.':? ~~-~ry': ~ ~ . ! ~~ ~ :,t:;1 ~\:~f l~ . :} ..
•
Qantas Airways Limited
/1 n ~i 1 & OO'! 66. ~J·
qantas.com

<<<PAGE 10>>>

~ QANTAS
However, in 49 CFR 180.209 (b) There remains requirements to meet a 1 Oyear requalification
1 o years instead of every 5 ars
provided e cylinder conforms to all of
the 1 conditions:
In 49 CFR 180.209(ii) the requirement is for the "cylinder not used in any cascade, bank, group, rack
or vehicle."
The existing requirement for 49 CFR 180.209 b(iii) "the cylinder is removed from any cluster, bank,
group, rack or vehicle".
Qantas has understood this to advise that the cylinder is removed from its location and filled away
from its installation. Many of the cylinders Qantas have installed are single cylinders and we also note
that the DOT differentiates between vehicles and aircraft in other rules but the term aircraft is not
mentioned in 49 CFR180.209 b(iii).
Qantas conducts an internal examination of the cylinder with a bright light, which is a superior
inspection for corrosion than the hammer test.
If the understanding above is correct, we would consider that Qantas can remain certifying the 3AA
cylinders to 1 Oyears.
Could the DOT please clarify the option to requalify cylinders to 1 Oyears and confirm that a bright light
corrosion inspection is required only at re-fill (lower than 50PSI) not 'top-up'.
If possible Qantas would like to arrange a telecon, at your convenience, to discuss this topic with your
representative(s).
Yours sin
Neil Smith
Cabin Fleet Manager - International & Domestic Fleets
Engineering Services
Qantas Airways Limited
Phone +61 2 9691 0548 I Mobile +61 402 38 65 69 I Email: neil.smith@qantas.com.au
•
Qantas Airways Limited
ABN 16 009 661 901
qantas.com

## Provenance

- Official: Yes
- Source: <https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2017/160147.pdf>
- Source ID: `phmsa`
- SHA-256: `3f07d018d0873f321837a5d68011c5ef1fca271aec3708893f1ed4493dc937ef`
- Retrieved: 2026-08-20T00:59:31.977Z
- Exported: 2026-08-22T11:39:09.045Z
- Document slug: `phmsa-interpretation-16-0147`

### Source metadata

```json
{
  "materialSubtype": "interpretation",
  "interpretationArea": "hazardous_materials",
  "representation": "full_text_from_official_pdf",
  "companies": [
    "Qantas"
  ],
  "individuals": [
    "Mr. Neil Smith"
  ],
  "refIds": [
    "16-0147"
  ],
  "catalogDates": [
    "2017-03-03"
  ],
  "catalogParts": [
    180
  ],
  "catalogRowCount": 1,
  "sourceRecordUrls": [
    "https://www.phmsa.dot.gov/node/50691"
  ],
  "linkedAttachmentUrls": [],
  "unavailableResponseUrls": [],
  "duplicateRepresentationUrls": [],
  "citedSections": [
    "180.209",
    "180.209(b)(l)",
    "180.205(f)(l)"
  ],
  "catalogPageUrls": [
    "https://www.phmsa.dot.gov/regulations/title49/section/180209"
  ],
  "pdfUrls": [
    "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2017/160147.pdf"
  ],
  "representations": [
    {
      "viewUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2017/160147.pdf",
      "detailUrl": null,
      "detailHtmlPath": null,
      "pdfUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2017/160147.pdf",
      "pdfArtifactPath": "data/sources/phmsa-interpretations/16-0147-d66510f7b3.pdf",
      "pdfArtifactSha256": "911fbaaff8525470ddf7542cc34a324ba011abb233aacea6d4bf8c7e016ecde3",
      "extractedTextPath": "data/sources/phmsa-interpretations/16-0147-d66510f7b3.v2.txt",
      "extractedTextSha256": "e4503fe3b2938c979f4aa63d6b6a563438de865de98611cfbde81760dcba169f",
      "pageCount": 10,
      "extractionVersion": 2
    }
  ],
  "caveat": "Interpretations apply regulations to the facts presented and do not create independently enforceable requirements.",
  "jurisdiction": "US"
}
```
