<<<PAGE 1>>>

u.s. Department
of Transportation
PIpeline and Hazardous
Materials Safety
Adminlstratfon
1200 New Jersey Avenue, SE
Washington, D.C. 20590
JUN - 2 2009
Mr. Eric Amundsen
Vice President, Technical Services
Panhandle Energy
5444 Westheimer Road
Houston, TX 77056
Ref. No. PHP08-00 16
Dear Mr. Amundsen:
On February 6, 2009, you wrote to the Pipeline and Hazardous Materials Safety Administration
(PHMSA) on behalf of Trunkline LNG Company, LLC (TrunkIine) to request an interpretation of
PHMSA's safety regulations on liquefied natural gas (LNG) facilities in 49 CFR Part I 93 for the
design, manufacture, installation, and sizing of relief valves that protect remotely heated vaporizers
at Trunkline's new LNG vaporization facility in Lake Charles, Louisiana. Current pipeline safety
regulations require the operator of each LNG vaporization facility to comply with NFPA Standard
59A (2001 edition), which is incorporated by reference in § 193.2013.
PHMSA is pleased to provide Trunkline with this clarification regarding your inquiry. We
interpret § 193 .240 1 to require that vaporizer safety relief valves comply with all provisions in the
NFPA 59A standard including but not limited to Chapters 1,5, 12, Section 5.2.1, and Section
5.4.1 (a). Accordingly, Trunkline must design, size, install, operate, and maintain vaporizer safety
relief valves with a maximum pressure accumulation that is consistent with the NFPA standard
59A, the ASME Boiler and Pressure Vessel Code (1992 edition), Section VIII, Division 1 (which
is incorporated by reference in NFPA 59A), as well as 49 CFR Part 193. Where a conflict exists
between NFP A and ASME with respect to vaporizer safety relief valves, the incorporated NFP A
standard prevails.
I hope that this infonnation is helpful to you. If I can be of further assistance, please contact me
at (202) 366-3015.
Sincerely,
(;)~ )Lx /aJ
John k.1Ialer/ /VZv
Director, Office of Regulations
T Asebe:jrnd:64046:05127 108
cc:PHP-30:PHP- I 00-500:TQ: Webpage:Official File
T:PHP-30:Interps:Trunkline

<<<PAGE 2>>>

Houston, TX 77056~5306
~Yrt~ Trunkline LNG 5444 Westhelmer Road
PO, Box 4967
A Southem Union Company
Houston, TX 77210-4967
713,989,7000
February 17,2009
Mr. Jeffrey Wiese
Associate Administrator
Office of Pipeline Safety (PHP-30)
PHMSA
U.S. Department of Transportation
1200 New Jersey Avenue, SE
Washington, DC 20590-0001
Dear Mr. Wiese:
Re: Request for Interpretation
Pursuant to the availability of guidance and interpretive assistance described in 49 CFR
190.11 (b), Trunkline LNG (TLNG) requests the concurrence of the Pipeline and Hazardous
Materials Administration (PHMSA) that TLNG's interpretation ofa particular code requirement
regarding relief valve capacity is correct.
TLNG is in the final stages of construction leading toward commissioning of new facilities that
add to the capacity and efficiency of its LNG tenninal near Lake Charles, Louisiana. It is
required by 49 CFR 193.2101 that these new facilities must comply with the requirements of Part
193 and ofNFPA 59A. During an inspection of the construction project by the FERC, the staff
questioned the apparent capacity of the vaporizer relief valves. As a result of subsequent
discussions and the submittal of a detailed engineering analysis regarding the relief valve sizing,
FERC requested that TLNG seek concurrence from PHMSA on its regulatory and engineering
basis for the reliefvalve sizing. Two particular sections ofNFPA 59A are relevant and are
reproduced below.
1.2 Nothing in this standard is intended to prevent the use of systems, methods, or
devices of equivalent or superior quality, strength, fire resistance, effectiveness,
durability, and safety over those prescribed by this standard.
5.4.1 Each vaporizer shall be provided with a safety reliefvalve(s) sized in accordance
with either of the following requirements.
(a) The relief valve capacity of heated or process vaporizers shall be such that
the relief valve(s) discharges 110 percent of rated vaporizer natural gas flow
capacity without allowing the pressure to rise more than 10 percent above
the vaporizer maximum allowable working pressure.
(b) The relief valve capacity for ambient vaporizers shall be such that the relief
valve(s) discharges at least 150 percent of rated vaporizer natural gas flow
capacity (as specified for standard operating conditions) without allowing
the pressure to rise more than 10 percent above the vaporizer maximum
allowable working pressure.

<<<PAGE 3>>>

The safety system analysis and design for the LNG vaporization process incorporates provisions
and safety features that minimize the relief valve capacity requirements in the event of an upset
condition. This total system approach produces an equivalent level of protection as would be
provided by strict incorporation of the requirements ofNFPA 59A § 5.4.1. The applicable
calculations were conducted in accordance with API 521 - Guide for Pressure-Relieving and
Depressuring Systems. The materials designed and installed for this overpressure protection
service are of equivalent quality, strength, fire resistance, effectiveness and durability as would
have been provided by larger relief valves and vent systems. The system design provides optimal
service by minimizing the relief valve capacity requirement thus minimizing the amount of
fugitive emissions in the event of activation. This design also minimizes the sizing of the vent
system and conserves resources so required.
The vaporizers use a potassium formate heat transfer fluid to vaporize the LNG. This fluid is
then rewarmed by passing through ambient air heat exchangers. While the maximum rated flow
rate through the vaporizers is on the order of 1,000,000 lb/hr, studies and analysis of conditions
under which pressure relief could conceivably be required showed the maximum relieving
capacity requirement to be 100,000 Iblhr. This is a "blocked in" case. A thorough review and
consideration of other scenarios led to this conclusion. Those studies, calculations and results are
detailed in the attached document, which has also been provided to your technical staff.
Standard analytical methods were used. TLNG concluded that sizing the relief valves for the
maximum relief requirement rather than based on a flow rate is an acceptable method and results
in an equivalent level of safety, and is therefore consistent with the provisions ofNFPA 59A
§ I .2, cited above.
TLNG respectfully requests PHMSA consideration and concurrence in that interpretation. In
addition to providing the technical information to your staff, it has also been provided to the
FERC. We are available to answer any additional questions you may have on this matter or to
meet with you or your representatives. TLNG also requests that this review and interpretation be
expedited to the extent possible, as these facilities need to be commissioned within approximately
the next three months. The FERC staff has indicated they are relying on PHMSA's resolution of
this matter before they issue the operating permit.
You may contact me at any time at the above address, by telephone at 713.989.7460 or by email
at Eric.Amundsen@sug.com.
Thank you for your consideration.
Eric J. Amundsen
Vice President, Technical Services
Ene!.
Cc: R. Seeley - PHMSA
J. Jacobi - PHMSA
A. Mayberry - PHMSA
20f2

<<<PAGE 4>>>

%'''\
Trurikline LNG
5444 Westhemler Road
Houston, TX 77056,5306
PO Box 4967
Houston, TX 772104967
713,989,7000
CONTAINS "CEIl"
(DO NOT RELEASE)
December 22, 2008
Via e-Filing
Ms. Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
888 First Street, N.E.
Washington, D.C. 20426
Re: Infrastructure Enhancement Project (IEP)
Docket No. CP06-102-000
FERC Data Request OEP/DG2EILNGC
Dear Ms. Bose:
Enclosed herewith for filing with the Federal Energy Regulatory Commission
("Commission") is Trunkline LNG Company, LLC's ("Trunkline LNG") response to the
Commission's December 1,2008 request related to the IEP Construction Inspection in the subject
proceeding. Pursuant to the Commission's Filing Guide dated June 24,2008, Trunkline LNG
submits herewith this transmittal letter and data response identified as "PUBLIC" information.
In addition, under separate cover is this transmittal letter and data response with Attachments
identified as "CRITICAL ENERGY INFRASTRUCTURE INFORMATION" ("CEIl").
Trunkline LNG respectfully requests that only the information submitted as "Public" be
placed on the internet
Any questions regarding this submittal should be directed to the undersigned.
Respectfully submitted,
TRUNKLINE LNG COMPANY, LLC
/s/ Stephen T Veatch
By ________________________ __
Stephen T. Veatch
Sr. Director, Certificates and Tariffs
Enclosures
cc wlEnc: Mr. Andrew Kohout (FERC)
cc wlo Enc: Mr. Chris Zerby (FERC)

## Provenance

- Official: Yes
- Source: <https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/2009/PI-09-0013.pdf>
- Source ID: `phmsa`
- SHA-256: `bdcb5cc498a17bf8488b5fb7aa408d1b247802f39cc1b03e1c4df03329884992`
- Retrieved: 2026-08-20T00:59:31.977Z
- Exported: 2026-08-23T00:27:25.571Z
- Document slug: `phmsa-interpretation-pi-09-0013`

### Source metadata

```json
{
  "materialSubtype": "interpretation",
  "interpretationArea": "pipeline_safety",
  "representation": "full_text_from_official_pdf",
  "companies": [],
  "individuals": [],
  "refIds": [
    "PI-09-0013"
  ],
  "catalogDates": [
    "2009-06-02"
  ],
  "catalogParts": [
    193
  ],
  "catalogRowCount": 1,
  "sourceRecordUrls": [
    "https://www.phmsa.dot.gov/node/45291"
  ],
  "linkedAttachmentUrls": [],
  "unavailableResponseUrls": [],
  "duplicateRepresentationUrls": [],
  "citedSections": [
    "193.2401",
    "193.2013",
    "190.11",
    "193.2101"
  ],
  "catalogPageUrls": [
    "https://www.phmsa.dot.gov/regulations/title49/section/1932401"
  ],
  "pdfUrls": [
    "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/2009/PI-09-0013.pdf"
  ],
  "representations": [
    {
      "viewUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/2009/PI-09-0013.pdf",
      "detailUrl": null,
      "detailHtmlPath": null,
      "pdfUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/2009/PI-09-0013.pdf",
      "pdfArtifactPath": "data/sources/phmsa-interpretations/pi-09-0013.pdf",
      "pdfArtifactSha256": "73471534f4e5433e7e91202bb8d88da5afb210b43cbd2cc6e810f2ec41975183",
      "extractedTextPath": "data/sources/phmsa-interpretations/pi-09-0013.v2.txt",
      "extractedTextSha256": "a0b9af43f1b6e63e0b8fd1184d926f9049fcd9a9687eebe58aaaa6991c8bd023",
      "pageCount": 4,
      "extractionVersion": 2
    }
  ],
  "caveat": "Interpretations apply regulations to the facts presented and do not create independently enforceable requirements.",
  "jurisdiction": "US"
}
```