# Enstar Natural Gas Company — Pipeline Safety Interpretation

**Citation:** PI-18-0003  
**Type / status:** guidance / guidance  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2019-03-11

PI-18-0003 response to Enstar Natural Gas Company concerning 192.467.

## Document text

<<<PAGE 1>>>

U.S. Department
ofTransportation
Pipeline and Hazardous Materials
S afety Administration
1200 New Jersey Avenue SE
Washington DC 20590
HAR TT28 1 9
Mr. Steve Cooper
Director of Operations
Enstar Natural Gas Company
3000 Spenard Road
P.O. Box 190288
Anchorage, AK 99519-0288
Dear Mr. Cooper:
In a letter to the Pipeline and Hazardous Materials Safety Administration (PHMSA), you
requested an interpretation of 49 Code of Federal Regulations (CFR) Part 192. Specifically, you
requested interpretation for external corrosion control under § 192.467.
You stated that in cases where a casing is shorted with a pipeline, electrical isolation of the
pipeline would not be practical, and as an alternative solution to compliance with the
requirement, Enstar Natural Gas Co. (Enstar) has been performing increased interval leak
surveys to ensure integrity of the pipeline system. You stated that the inspection process has
been completed annually. You stated, in the past, PHMSA issued an interpretation
(Interpretation PI-86-004) that allowed this compliance method. You asked PHMSA to provide
Enstar a similar interpretation.
As to the referenced interpretation (PI-86-004) compliance alternative, the tests under
§ 192.465(a) is for a pipeline that is under cathodic protection and the test is conducted once
each calendar year. Section 192.465 governs how often external corrosion must be monitored,
whereas§ 192.467 provides the requirements for achieving electrical isolation of buried or
submerged pipelines. The § 192.467 requirements apply to pipelines that must be electrically
isolated from other underground metallic structures (in this case, casing) and, therefore, each
pipeline must be electrically isolated from metallic casings that are a part of the underground
system. Therefore, an operator must comply with the monitoring requirements under
§ 192.465(a), as well as following the§ 192.467 requirements for casings shorted to the
pipelines.
As you know, a pipeline system is not cathodically protected if it is not protected in its entirety.
As in this case, a pipeline inside a casing is not cathodically protected where the casing is shorted
to the pipeline. Paragraph 192.467(c) states that "if isolation is not achieved because it is
impractical, other measures must be taken to minimize corrosion of the pipeline inside the
casing."
The Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety provides written clarifications of the Regulations (49 CFR
Parts 190-199) in the form of interpretation letters. These letters reflect the agency's current application of the regulations to the specific facts
presented by the person requesting the clarification. Interpretations do not create legally-enforceable rights or obligations and are provided to
help the public understand how to comply with the regulations.

<<<PAGE 2>>>

2
Performing annual leak surveys identifies where corrosion has already occurred to such a degree
on Enstar's pipeline that it is leaking. Depending upon the pipeline maximwn allowable
operating pressures (MAOP), diameter, operating stress levels, gas odorization, and pipe material
properties, leak detection may not be effective for maintaining safety. As such, Enstar's usage of
annual leak surveys for casings shorted to the casing may not be an acceptable "other measure to
minimize corrosion of the pipeline inside the casing" as required by§ 192.467.
In the case of a casing shorted to the pipeline, Enstar must develop and implement procedures for
performing inspections and tests, implementing remedial measures, and docwnenting the
findings in accordance with§ 192.467(c) and (d) to determine the adequacy of electrical
isolation. If there is a short to the casing, Enstar must perform remedial actions to attempt to
clear the short. PHMSA would expect Enstar, at a minimwn, to clear any shorts that are
practical to clear such as through the excavation of both ends of the casing, performing
inspections, re-centering- the carrier pipe inside the casing pipe, and removing or repairing
materials that may cause the short such as: metallic shorts and damaged casing insulator spacers
at the casing end points and any electrolytes between the casing and pipeline. If after attempting
to clear the short, it is determined impractical to achieve electrical isolation, Enstar must take
other preventive measures to mitigate corrosion of the pipeline inside the casing and to maintain
safety.
The following are examples of other preventive methods that may be used when isolation
measures to clear the short are impractical, if the operator determines they will minimize
corrosion of the pipeline inside the casing. These examples clarify and supersede the 1986
interpretation (PI-86-004) referenced by Enstar:
1) filling "high dielectric fill or corrosion inhibiting materials" between the casing/carrier
pipe that the operator can demonstrate will minimize corrosion of the carrier pipe and
monitoring of the dielectric fill or corrosion inhibiting materials at a minimum in
accordance with the timing and during the patrolling and leakage surveys required in
§§ 192.705(b) and 192.706;
2) monitoring corrosion with in-line inspection (ILi) tools that have demonstrated that they
can properly detect and assess corrosion over the shorted locations and including
concentrated pinhole corrosion areas along the carrier pipe. When assessing the shorted
locations, the operator must use the proper application of ILi tool tolerance, class location
safety factor in determining the safe operating pressure for any shorted corrosion area,
and corrosion growth rate, and at intervals that meet either§ 192.939 or at a more often
reassessment interval if required based upon corrosion growth rate. If the shorted casing
masks a proper inline inspection tool assessment, this would not be an applicable method;
3) utilizing leak detection monitoring and intervals in combination with Items 1 or 2 above,
if leak monitoring can maintain safety based upon parameters such as assessments of risk
and the consequences to the public. The risk assessment must be based upon the pipeline
MAOP, diameter, operating stress levels, odorization of the gas, usage of remote or
automatic closure valves for isolation, the pipeline material properties, whether the
pipeline would only leak at operating pressures, and that leak detection monitoring
(periodic or ongoing) would reduce the impact of an in-service leak to safety;
The Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety provides written clarifications of the Regulations
(49 CFR Parts 190-199) in the form of interpretation letters. These letters reflect the agency's current application of the regulations to the
specific facts presented by the person requesting the clarification. Interpretations do not create legally-enforceable rights or obligations and
are provided to help the public understand how to comply with the regulations.

<<<PAGE 3>>>

3
4) 5) implementing remedial measures to maintain the carrier pipe MAOP based upon suitable
remaining strength calculation methods(§ 192.933(d)(l)(i)) and using the class location
design factor (§ 192.111) of the pipeline whether it is in a high consequence area or non-
high consequence area for any assessment findings, and whether through findings in
conducting Items 1, 2, or 3 above or other findings; or
applying for a special permit in accordance with§ 191.341 that is applicable to the
pipeline operating, safety, and environmental conditions.
In the case of casing shorted to the pipeline, Enstar must perform inspection, tests, and
remediation with procedures that are in accordance with§ 192.467. lfwe can be of further
assistance, please contact Tewabe Asebe at 202-366-5523 .
. Gale
Director, Office of Standards
and Rulemaking
The Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety provides written clarifications of the Regulations
(49 CFR Parts 190-199) in the form of interpretation letters. These letters reflect the agency's current application of the regulations to the
specific facts presented by the person requesting tlie clarification. Interpretations do not create legally-enforceable rights or obligations and
are provided to help the public understand how to comply with the regulations.

<<<PAGE 4>>>

EN STAR
.....
Natural Gas Company
3000 Spenard Road
P.O. Box 190288
Anchorage, AK 99519-0288
www.enstarnaturalgas.com
November 14, 2016
U.S. DOT
PHMSA Office of Hazardous Materials Standards
Attn: Pllli-10
East Building
1200 New Jersey A venue, SE.
Washington, DC 20590-0001
RE: Interpretation Request, Title 49 Code of Federal Regulations §192.467
Pipeline Safety Officer,
With this letter ENST AR Natural Gas Company (ENST AR) requests an interpretation of
§192.467 External corrosion control: electrical isolation (c) as it pertains to the conditions present at
specific locations on its natural gas system. In cases where a casing is shorted with a pipeline, electrical
isolation of the pipeline as contemplated in 49 C.F.R. 192.467, and as strictly construed, would not be
practical. Challenges posed by difficulty of construction in areas where maintaining continuity of service
to end-of-the-road communities during the work have made resolving isolation issues difficult.
As an alternative solution to date ENST AR has been performing increased interval leak surveys
to ensure integrity of the system. This process has been completed annually in accordance with a
previous PHMSA interpretation, PI-86-004, which was given to the Public Service Commission of
Kentucky in 1986. ENST AR requests that PHMSA grant the same guidance to ENST AR as described in
the interpretation PI-86-004, specifically part 3. Reasonable time allowance and methods for operator
correction of shorted casings.
Should you have any questions regarding this request for interpretation, please feel free to call me
at 907-334-7730 between 8:00 AM and 5:00 PM AST.
Sincerely
ENST AR Natural Gas Company
Steve Cooper, P.E.
Director of Operations
Steve.Cooper@EnstarNaturalGas.com
Anchorage: 907-277-5551 • Kenai Peninsula Office: 907-262-9334 • Mat-Su Office: 907 376-7979

## Provenance

- Official: Yes
- Source: <https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/standards-rulemaking/pipeline/interpretations/70716/enstar-pi-18-0003-03-11-2019-part-192467.pdf>
- Source ID: `phmsa`
- SHA-256: `8760dec1fda84e350cd60a95f487d66d797dd226925b08a694b3081f20bd7d00`
- Retrieved: 2026-08-20T00:59:31.977Z
- Exported: 2026-08-23T18:44:44.785Z
- Document slug: `phmsa-interpretation-pi-18-0003`

### Source metadata

```json
{
  "materialSubtype": "interpretation",
  "interpretationArea": "pipeline_safety",
  "representation": "full_text_from_official_pdf",
  "companies": [
    "Enstar Natural Gas Company"
  ],
  "individuals": [
    "Mr. Steve Cooper"
  ],
  "refIds": [
    "PI-18-0003"
  ],
  "catalogDates": [
    "2019-03-11"
  ],
  "catalogParts": [
    192
  ],
  "catalogRowCount": 1,
  "sourceRecordUrls": [
    "https://www.phmsa.dot.gov/node/71186"
  ],
  "linkedAttachmentUrls": [],
  "unavailableResponseUrls": [],
  "duplicateRepresentationUrls": [],
  "citedSections": [
    "192.467",
    "192.465(a)",
    "192.705(b)",
    "192.706",
    "192.939",
    "192.933(d)(l)(i)",
    "192.111",
    "191.341"
  ],
  "catalogPageUrls": [
    "https://www.phmsa.dot.gov/regulations/title49/section/192467"
  ],
  "pdfUrls": [
    "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/standards-rulemaking/pipeline/interpretations/70716/enstar-pi-18-0003-03-11-2019-part-192467.pdf"
  ],
  "representations": [
    {
      "viewUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/standards-rulemaking/pipeline/interpretations/70716/enstar-pi-18-0003-03-11-2019-part-192467.pdf",
      "detailUrl": null,
      "detailHtmlPath": null,
      "pdfUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/standards-rulemaking/pipeline/interpretations/70716/enstar-pi-18-0003-03-11-2019-part-192467.pdf",
      "pdfArtifactPath": "data/sources/phmsa-interpretations/pi-18-0003.pdf",
      "pdfArtifactSha256": "fe1557e414a292c330b3ed87836298c30251c43a4b2c8998506e2ba54321c85b",
      "extractedTextPath": "data/sources/phmsa-interpretations/pi-18-0003.v2.txt",
      "extractedTextSha256": "1780eda5fd8aa32a66ee9bea9e906ac9f66dfb5f596774d4a27638a38cb11713",
      "pageCount": 4,
      "extractionVersion": 2
    }
  ],
  "caveat": "Interpretations apply regulations to the facts presented and do not create independently enforceable requirements.",
  "jurisdiction": "US"
}
```