<<<PAGE 1>>>

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
October 4, 2023
Mr. Brad Bean
Senior Partner and Managing Member
B3PE LLC
419 East Columbia Street
Colorado Springs, Colorado 80907
Dear Mr. Bean:
In a letter to the Pipeline and Hazardous Materials Safety Administration (PHMSA) dated
March 10, 2023, you requested an interpretation of the Federal pipeline safety regulations in
49 Code of Federal Regulations (CFR) Part 192 with respect to the § 192.3 definition of
“transmission line.”
You stated that the paragraph (2) definition of a “transmission line” was revised by the
Amendment 192-132 of the August 24, 2022, final rule (87 Fed. Reg. 52267), from “(2) Operates
at a hoop stress of 20 percent or more of SMYS; or” to “(2) Has an MAOP of 20 percent or more
of SMYS;”
You stated that the maximum allowable operating pressure (MAOP) is a measure of pressure and
specified minimum yield strength (SMYS) is a measure of stress, and the new wording of
“transmission line” therefore evaluates a pressure value against a stress value while the original
wording made it clear that the evaluation criteria was between two stress values. You believe the
new wording meant to evaluate an MAOP that would produce a hoop stress of 20 percent or
more of SMYS, such that two stress values would be compared in defining a “transmission line”
under § 192.3. You suggested if PHMSA meant to indicate the latter (i.e., an MAOP that would
produce a hoop stress of 20 percent or more of SMYS) in the new wording of “transmission line”
that PHMSA should amend the paragraph (2) definition of “transmission line” to clearly state the
intended evaluation criteria. You requested confirmation that the August 24, 2022, final rule
regulatory language intended operators to evaluate if the hoop stress produced by the MAOP is
equal to or greater than 20 percent of SMYS. The relevant regulatory language is reprinted
below.
§ 192.3 Definitions.
Transmission line means a pipeline or connected series of pipelines, other
than a gathering line that:
(1) ….
The Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety provides written clarifications of the Regulations (49 CFR
Parts 190-199) in the form of interpretation letters. These letters reflect the agency's current application of the regulations to the specific facts
presented by the person requesting the clarification. Interpretations are not generally applicable, do not create legally-enforceable rights or
obligations, and are provided to help the specific requestor understand how to comply with the regulations.

<<<PAGE 2>>>

Page 2 of 2
(2) Has an MAOP of 20 percent or more of SMYS;
Response: The August 24, 2022, final rule regulatory language intended operators to evaluate if
the hoop stress produced by the MAOP is equal to or greater than 20 percent of SMYS;
therefore, a pipeline with an MAOP that produces a hoop stress of 20 percent or more of SMYS
would be a transmission line under paragraph (2) of 49 CFR § 192.3.
PHMSA will consider clarifying the § 192.3 regulatory definition of “transmission line” in a
future rulemaking.
If we can be of further assistance, please contact Tewabe Asebe at 202-366-5523.
Sincerely,
John A. Gale
Director, Office of Standards
and Rulemaking
The Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety provides written clarifications of the Regulations (49 CFR
Parts 190-199) in the form of interpretation letters. These letters reflect the agency's current application of the regulations to the specific facts
presented by the person requesting the clarification. Interpretations are not generally applicable, do not create legally-enforceable rights or
obligations, and are provided to help the specific requestor understand how to comply with the regulations.

<<<PAGE 3>>>

83PE
Engineering & Software Services
March 10, 2023
Mr. Shane Kelley
Director, Standards and Rulemaking Division
U.S. DOT/PHMSA (PHH-10)
1200 New Jersey Avenue, SE East Building, 2nd Floor
Washington, DC 20590
Re: Request For Formal Interpretation 49 CFR 192.3 "Transmission line" Definition
The definition of a "Transmission line" was revised by Amendment 192-132 August 24, 2022. Paragraph
(2) of the definition previously read,
"(2) operates at a hoop stress of 20 percent or more of SMYS; or"
The revised Paragraph (2) reads,
"(2) Has an MAOP of 20 percent or more of SMYS;"
As you may be aware, MAOP is a measure of pressure, SMYS is a measure of stress. The original wording
made it clear that the evaluation criteria was between two stress values. The new wording (as written) is
evaluating a pressure value against a stress value. With this wording the evaluation would be calculated as:
MAOP I SMYS x 100 Equation 1
I suspect that the new wording was intended to say something like "Has an MAOP that would produce a hoop
stress of 20 percent or more of SMYS". With this wording the evaluation would be calculated as:
Hoop Stress At MAOP I SMYS x 100 Equation 2
Please confirm whether the 20 percent evaluation criteria is to be calculated using Equation 1 or Equation
2. If Equation 2 is correct, I would suggest amending the definition to clearly state the intended evaluation
criteria.
Please advise. Respectfully Submitted,
Brad Bean
Senior Partner/Managing Member
83PE LLC • 419 East Columbia Street • Colorado Springs, Colorado 80907 • USA
(719) 578-9391 • www.b3pe.com

## Provenance

- Official: Yes
- Source: <https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/standards-rulemaking/pipeline/interpretations/77991/b3pe-llc-pi-23-0010-10-02-2023-part1923.pdf>
- Source ID: `phmsa`
- SHA-256: `992c4b3ad82f1174ef4d7a8c81d50f6294655511feb9c1d966d9afa51c774649`
- Retrieved: 2026-08-20T00:59:31.977Z
- Exported: 2026-08-23T03:26:44.871Z
- Document slug: `phmsa-interpretation-pi-23-0010`

### Source metadata

```json
{
  "materialSubtype": "interpretation",
  "interpretationArea": "pipeline_safety",
  "representation": "full_text_from_official_pdf",
  "companies": [
    "B3PE LLC"
  ],
  "individuals": [
    "Mr. Brad Bean"
  ],
  "refIds": [
    "PI-23-0010"
  ],
  "catalogDates": [
    "2023-10-04"
  ],
  "catalogParts": [
    192
  ],
  "catalogRowCount": 1,
  "sourceRecordUrls": [
    "https://www.phmsa.dot.gov/node/73871"
  ],
  "linkedAttachmentUrls": [],
  "unavailableResponseUrls": [],
  "duplicateRepresentationUrls": [],
  "citedSections": [
    "192.3"
  ],
  "catalogPageUrls": [
    "https://www.phmsa.dot.gov/regulations/title49/section/1923"
  ],
  "pdfUrls": [
    "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/standards-rulemaking/pipeline/interpretations/77991/b3pe-llc-pi-23-0010-10-02-2023-part1923.pdf"
  ],
  "representations": [
    {
      "viewUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/standards-rulemaking/pipeline/interpretations/77991/b3pe-llc-pi-23-0010-10-02-2023-part1923.pdf",
      "detailUrl": null,
      "detailHtmlPath": null,
      "pdfUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/standards-rulemaking/pipeline/interpretations/77991/b3pe-llc-pi-23-0010-10-02-2023-part1923.pdf",
      "pdfArtifactPath": "data/sources/phmsa-interpretations/pi-23-0010.pdf",
      "pdfArtifactSha256": "2d26dab4643ad85c120160da1daa0ee7d102559db5320a08299a595b5e09349f",
      "extractedTextPath": "data/sources/phmsa-interpretations/pi-23-0010.v2.txt",
      "extractedTextSha256": "b695fc136074a6c45d786ec2fe466deba15bc2c361c141077ffc1b2389883e72",
      "pageCount": 3,
      "extractionVersion": 2
    }
  ],
  "caveat": "Interpretations apply regulations to the facts presented and do not create independently enforceable requirements.",
  "jurisdiction": "US"
}
```