# Central Telephone & Utilities Corp — Pipeline Safety Interpretation

**Citation:** PI-71-023  
**Type / status:** guidance / guidance  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 1971-02-19

PI-71-023 response to Central Telephone & Utilities Corp concerning 192.511, 192.513.

## Document text

<<<PAGE 1>>>

Mr. W. E. Mickelson
Chief Engineer-Gas Operations
Central Telephone & Utilities Corp
P. O. Box 82888
Lincoln, Nebraska 68501
Dear Mr. Mickelson:
This is in reply to your request for an interpretation of 49 CFR, Section 192.511 and Section
192.513.
You are correct that Section 192.511 does not apply to plastic lines.
Section 192.3 was intended to use the word "pipeline" in its broadest sense, that is all parts of
those physical facilities through which gas moves in transportation. It therefore includes service
lines.
Therefore, it is the intention of the regulations that Section 192.513 apply to all plastic lines,
whether they be transmission, mains or service lines.
The requirements for testing plastic are higher particularly for intended higher operating pressures
than those for steel because the design specifications for plastic are much less detailed.
We hope that this answers your question. If you have any further questions, please let us know.
Sincerely,
/signed/
Joseph C. Caldwell
Director, Acting
Office of Pipeline Safety
DB
C:\WP51\INTERPRT\192\512\71-02-19
1

## Provenance

- Official: Yes
- Source: <https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1971/PI71023.pdf>
- Source ID: `phmsa`
- SHA-256: `3fbe166b7b445e476a08bda074b3deb3a58effe22cdb995dd6c3e04546d70aa9`
- Retrieved: 2026-08-20T00:59:31.977Z
- Exported: 2026-08-23T18:39:52.960Z
- Document slug: `phmsa-interpretation-pi-71-023`

### Source metadata

```json
{
  "materialSubtype": "interpretation",
  "interpretationArea": "pipeline_safety",
  "representation": "full_text_from_official_pdf",
  "companies": [
    "Central Telephone & Utilities Corp"
  ],
  "individuals": [
    "W. E. Mickelson"
  ],
  "refIds": [
    "PI-71-023"
  ],
  "catalogDates": [
    "1971-02-19"
  ],
  "catalogParts": [
    192
  ],
  "catalogRowCount": 2,
  "sourceRecordUrls": [
    "https://www.phmsa.dot.gov/node/53081"
  ],
  "linkedAttachmentUrls": [],
  "unavailableResponseUrls": [],
  "duplicateRepresentationUrls": [],
  "citedSections": [
    "192.511",
    "192.513",
    "192.3"
  ],
  "catalogPageUrls": [
    "https://www.phmsa.dot.gov/regulations/title49/section/192511",
    "https://www.phmsa.dot.gov/regulations/title49/section/192513"
  ],
  "pdfUrls": [
    "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1971/PI71023.pdf"
  ],
  "representations": [
    {
      "viewUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1971/PI71023.pdf",
      "detailUrl": null,
      "detailHtmlPath": null,
      "pdfUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1971/PI71023.pdf",
      "pdfArtifactPath": "data/sources/phmsa-interpretations/pi-71-023.pdf",
      "pdfArtifactSha256": "e690499eb7abd31e8759ea7b9b6876cb4a05b779acefacb6e0cbcdf5b57bd92b",
      "extractedTextPath": "data/sources/phmsa-interpretations/pi-71-023.v2.txt",
      "extractedTextSha256": "f45441d8d7448f7da0d65bb45ae03995877a09f8d8c42146e7449dfd04bc256e",
      "pageCount": 1,
      "extractionVersion": 2
    }
  ],
  "caveat": "Interpretations apply regulations to the facts presented and do not create independently enforceable requirements.",
  "jurisdiction": "US"
}
```
