# Mr. Jack Baker — Pipeline Safety Interpretation

**Citation:** PI-78-009  
**Type / status:** guidance / guidance  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 1978-04-04

PI-78-009 concerning 195.228.

## Document text

<<<PAGE 1>>>

April 4, 1978
Mr. Jack Baker
Consulting Engineer
P.O. Box 34179
Omaha, NB [sic] 68134
Dear Mr. Baker:
This refers to your letter dated March 11, 1978, in which you
ask, "Does the Office of Pipeline Safety Operation believe that
crater cracks or star cracks 5/32 inch long or less are
significant discontinuities in the assessment of a weld in a
pipeline being constructed in accordance with Part 192?"
Under Section 192.241(c), "The acceptability of a weld that is
nondestructively tested or visually inspected is determined
according to the standards in Section 6 of the 1973 edition of
API Standard 1104." Section 6.7 of API 1104 states, "Shallow
crater cracks or star cracks which are located at the stopping
point of weld beads and which are the result of weld metal
contraction during solidification are not considered injurious
defects unless their length exceeds 5/32 inch. With exception of
these shallow crater cracks, no weld containing cracks,
regardless of size or location, shall be acceptable." The Office
of Pipeline Safety Operations interpreted the requirement to mean
that shallow crater cracks or star cracks 5/32 inch or less are
not significant in the assessment of a weld.
We trust that we have satisfactorily responded to your inquiry.
Sincerely,
\signed\
Cesar DeLeon
Acting Director
Office of Pipeline
Safety Operations
dal\195\228\78-04-04
1

<<<PAGE 2>>>

March 11, 1978
Mr. Cesar DeLeon
Acting Director
Office of Pipeline Safety Operations
MATERIALS TRANSPORTATION BUREAU
Trans Point Building
2100 Second Avenue, SW
Washington, D.C. 20590
Dear Mr. DeLeon:
Your letter of February 10, 1978 to Mr. Robert R. Young,
Cleveland, Ohio has come to my attention. As I understand it,
the thrust of this message is that OPSO does not regard crater
cracks or star cracks having a length of 5/32 inch or less as
injurious discontinuities in the case of liquid pipelines subject
to the provisions of Part 195. This is based on your statement:
"The Office of Pipeline Safety Operations interpreted the
requirements to mean that shallow crater cracks or star cracks
5/32 inch or less are not significant in the assessment of a
weld."
The foregoing statement solves a practical, everyday problem in
the case of pipelines constructed in accordance with Part 195,
but it appears to beg the question in the case of gas pipelines,
which are subject to Part 192 requirements. Therefore, I wish to
ask you this question: Does the Office of Pipeline Safety
Operations believe that crater cracks or star cracks 5/32 inch
long or less are significant discontinuities in the assessment of
a weld in a pipeline being constructed in accordance with Part
192?
Your answer to this question will be appreciated.
Sincerely,
\signed\
Jack Baker
dal\195\228\78-04-04 2

<<<PAGE 3>>>

February 10, 1978
Mr. Robert R. Young
The Standard Oil Company
Midland Building
Cleveland, Ohio 44115
Dear Mr. Young:
This responds to your letter dated November 18, 1977, in which
you ask, "does the term 'cracks' as stated in DOT Section 195.230
and Section 195.232 exclude 'shallow crater cracks or star
cracks' which are of acceptable dimensions and 'not considered
injurious defects' according to Secion [sic] 6.7 of API 1104 and
DOT Section 195.228?" The answer is Yes, because the
acceptability of a weld is determined according to the standards
in Section 6 of the 1973 edition of API Standard 1104.
Section 6.7 of API 1104 states: "Shallow crater cracks or star
cracks which are located at the stopping point of weld beads and
which are the result of weld metal contraction during
solidification are not considered injurious defects unless their
length exceeds 5/32 inch. With exception of these shallow crater
cracks, no weld containing cracks, regardless of size or
location, shall be acceptable." The Office of Pipeline Safety
Operations interpreted the requirement to mean that shallow
crater cracks or star cracks 5/32 inch or less are not
significant in the assessment of a weld. We believe that it
would be incorrect to conclude that these specific cracks are
identified in Section 195.230(a)(1) and Section 195.232(a), since
they are not considered injurious defects.
We trust that we have satisfactorily responded to your inquiry.
Sincerely,
/signed/
Cesar DeLeon
Acting Director
Office of Pipeline
Safety Operations
dal\195\228\78-04-04 3

## Provenance

- Official: Yes
- Source: <https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1978/PI78009.pdf>
- Source ID: `phmsa`
- SHA-256: `2ed0ba05a584392b627e27780573f7acb76b6ea479f80e71c912d68938a36fc5`
- Retrieved: 2026-08-20T00:59:31.977Z
- Exported: 2026-08-24T22:51:04.716Z
- Document slug: `phmsa-interpretation-pi-78-009`

### Source metadata

```json
{
  "materialSubtype": "interpretation",
  "interpretationArea": "pipeline_safety",
  "representation": "full_text_from_official_pdf",
  "companies": [],
  "individuals": [
    "Mr. Jack Baker"
  ],
  "refIds": [
    "PI-78-009"
  ],
  "catalogDates": [
    "1978-04-04"
  ],
  "catalogParts": [
    195
  ],
  "catalogRowCount": 1,
  "sourceRecordUrls": [
    "https://www.phmsa.dot.gov/node/57091"
  ],
  "linkedAttachmentUrls": [],
  "unavailableResponseUrls": [],
  "duplicateRepresentationUrls": [],
  "citedSections": [
    "195.228",
    "192.241(c)",
    "195.230",
    "195.232"
  ],
  "catalogPageUrls": [
    "https://www.phmsa.dot.gov/regulations/title49/section/195228"
  ],
  "pdfUrls": [
    "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1978/PI78009.pdf"
  ],
  "representations": [
    {
      "viewUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1978/PI78009.pdf",
      "detailUrl": null,
      "detailHtmlPath": null,
      "pdfUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1978/PI78009.pdf",
      "pdfArtifactPath": "data/sources/phmsa-interpretations/pi-78-009.pdf",
      "pdfArtifactSha256": "a7ea0c0b780afdc4680f4b213cfa219cb6665dab8a0cdc815e1c72dc45332bbf",
      "extractedTextPath": "data/sources/phmsa-interpretations/pi-78-009.v2.txt",
      "extractedTextSha256": "6f474ce677c2beb90f53dc51192329e7d64c777bb5d186ba2e685230699f6c64",
      "pageCount": 3,
      "extractionVersion": 2
    }
  ],
  "caveat": "Interpretations apply regulations to the facts presented and do not create independently enforceable requirements.",
  "jurisdiction": "US"
}
```
