# Pipeline Safety Interpretation PI-78-0103

**Citation:** PI-78-0103  
**Type / status:** guidance / guidance  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 1978-05-12

PI-78-0103 concerning 195.116.

## Document text

<<<PAGE 1>>>

PI-78-0103
MAY 12, 1978
Interpretation of §195.410
Chief, Technical Division
Acting Director, Office of Pipeline Safety Operations
Section 195.410 requires line markers in . . . sufficient number . . . that its (pipeline) location is accurately
known. From the remaining requirements of §195.410, the standard practices of the industry, and other
actions of this office, it is apparent that the intent of §195.410 is to require line markers at crossings of
navigable waterways.
I have attached copies of two previous interpretations of §195.410 that appear to be in conflict. I agree with
the 1974 interpretation to Mr. Collins. I do not agree with the 1976 interpretation to Mr. Merriman even
though it had Technical Division concurrence.
Original signed by
Frank E. Fulton

<<<PAGE 2>>>

April 2, 1974
Mr. Fred J. Collins
Manager, Right of Way Department
Colonial Pipeline Company
3390 Peachtree Road, N.E.
Lenox Towers
Atlanta, GA 30326
Dear Mr. Collins:
This refers to your letter of March 6, 1974, concerning Section 195.410, placement of line markers. Specifically you
requested our review and advice concerning five water crossings, and possible consideration for waiver.
Section 195.410 requires each carrier to place and maintain line markers over each buried line in sufficient number so
that its location is accurately known. Also, line markers placed on each side of a navigable waterway crossing must have
the additional words, "Do Not Anchor or Dredge." If the water crossing is not a navigable waterway crossing, then a
normal line marker placed on each side of the crossing will satisfy Section 195.410.
The Office of Pipeline Safety does not give preliminary opinions as to whether particular circumstances present sufficient
grounds for a waiver. Therefore, we are returning your plats covering the Elizabeth and Raritan River, Rancocas and
Raccoon Creeks, all in New Jersey, and the Nansemond River located in Virginia.
To determine if a waiver should be granted in accordance with 49 CFR, Part 5, the carrier should show why Section
195.410 is not appropriate, why the public interest would be served, and a discussion of the basis upon which the
proposal would not be inconsistent with liquid pipeline safety.
The requirement to mark the location of pipelines is considered an essential part of our program to reduce the number
of accidents on pipeline systems and thus improve public safety.
If we may be of any further assistance to you in this matter, please advise.
Sincerely,
Joseph C. Caldwell
Director
Office of Pipeline Safety

<<<PAGE 3>>>

OCT 5 1976
Mr. Donald R. Merriman
Buckeye Pipe Line Company
P.O. Box 368
Emmaus, Pennsylvania 18049
Dear Mr. Merriman:
This refers to your letter of September 15, 1976, requesting an exemption from the line marking requirements
of 49 CFR 195.410(a)(2) with regard to two 10-inch pipelines installed within a 24-inch concrete coated steel
casing beneath The Narrows crossing between Staten Island and Brooklyn, New York.
Section 195.410(a)(2) requires that line markers which are installed at navigable waterway crossings must bear
a prescribed legend written in letters of a certain size on a background of sharply contrasting color. It is not
clear from your exemption request whether Buckeye would prefer to nest some alternative marking
requirements at The Narrows crossing or not to install any markers at the crossing. If the former is the case,
you have not proposed what alternative marking requirements would be appropriate. If the latter is the case,
since Section 195.410 does not require that carriers install line markers at navigable waterway crossings, an
exemption is unnecessary. Therefore, we have not accepted your letter as a petition for exemption.
Should Buckeye wish to install markers at The Narrows crossing in a manner contrary to that required by
Section 195.410(a) we would, of course, consider the matter upon a showing of what alternative requirements
are proposed to be met.
Sincerely,
Cesar DeLeon
Acting Director Office of Pipeline Safety Operations

<<<PAGE 4>>>

10/27/77
Possible Violations of 49 CFR Part 195 on TAPS
Buck Furrow
Cesar DeLeon
This memorandum states my views on Lloyd's recommendations regarding the TAPS.
Recommendation #1:
Sections 195.254(a)(5) and 195.410(d) are not inconsistent inasmuch as other provisions of Section 195.254
permit aboveground installations in areas which may be "accessible" to the public (such as "spans over
ditches"). In addition, as a maintenance requirement, Section 195.410(d) applies to all lines not just new ones
subject to section 195.254(a)(5).
The phrase "inaccessible to the public" should be interpreted in light of the purpose of the rule — to permit
aboveground installations in areas where the opportunity for interference by the public (other than sabotage)
is minimal. This description fits areas where access is controlled by the carrier (§195.254(a)(4), areas that are
not generally open for use by the public (e.g., private noncommercial property, farm land), and areas which,
although open to the public, are remotely located and very difficult to reach (e.g., portions of a national
forest).
The proximity of a pipeline to existing public roads is a factor to consider in determining "accessibility." The
same would not be true for haul roads used solely by the carrier for construction and maintenance. A more
relevant consideration is whether the immediate area of the pipeline is legally open or closed to the public,
and if open, how easy would it be for someone to get to the pipeline. A decision on whether Section
192.254(a) (5) is violated should be made on the basis of all circumstances pertaining to the location of the
line and the opportunity for public access. Lloyd's memo does not provide sufficient information upon which
to base a sound decision on whether the pipeline is "accessible to the public."
Recommendation #2:
Section 195.116(e) does not specifically require that a valve's position be indicated at the valve. Thus, an
electrical means for remote indication would satisfy the requirement, particularly since it is written in
performance language.
The NPRM was more specific. It proposed that a valve be "equipped with a device that clearly indicates... valve
position." If the language of this proposal had been adopted as final, the rule would require that valve position
be shown at the valve. While there is no discussion of the language change in the final rule, we can presume it
was to relax the proposed requirement to permit valve readings at remote locations as well as at the valve.
L M. Furrow

## Provenance

- Official: Yes
- Source: <https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1978/g78-05-12_Fulton_195.116-DBx.pdf>
- Source ID: `phmsa`
- SHA-256: `626867b317b3367fd91914b07baf3a425c78fdd1bc6224d16505cfed2a761ec0`
- Retrieved: 2026-08-20T00:59:31.977Z
- Exported: 2026-08-22T21:19:31.861Z
- Document slug: `phmsa-interpretation-pi-78-0103`

### Source metadata

```json
{
  "materialSubtype": "interpretation",
  "interpretationArea": "pipeline_safety",
  "representation": "full_text_from_official_pdf",
  "companies": [],
  "individuals": [],
  "refIds": [
    "PI-78-0103"
  ],
  "catalogDates": [
    "1978-05-12"
  ],
  "catalogParts": [
    195
  ],
  "catalogRowCount": 1,
  "sourceRecordUrls": [
    "https://www.phmsa.dot.gov/node/47496"
  ],
  "linkedAttachmentUrls": [],
  "unavailableResponseUrls": [],
  "duplicateRepresentationUrls": [],
  "citedSections": [
    "195.116",
    "195.116(e)",
    "195.410",
    "195.254(a)(5)",
    "192.254(a)"
  ],
  "catalogPageUrls": [
    "https://www.phmsa.dot.gov/regulations/title49/section/195116"
  ],
  "pdfUrls": [
    "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1978/g78-05-12_Fulton_195.116-DBx.pdf"
  ],
  "representations": [
    {
      "viewUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1978/g78-05-12_Fulton_195.116-DBx.pdf",
      "detailUrl": null,
      "detailHtmlPath": null,
      "pdfUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1978/g78-05-12_Fulton_195.116-DBx.pdf",
      "pdfArtifactPath": "data/sources/phmsa-interpretations/pi-78-0103.pdf",
      "pdfArtifactSha256": "9028dfc83fb4090df77ebf596e0686220b130aa234f95abe80ccc1fd7497ea63",
      "extractedTextPath": "data/sources/phmsa-interpretations/pi-78-0103.v2.txt",
      "extractedTextSha256": "a655f02d320cff484ecdd874c55a9e8fc4d49d6579141bd1f28da20df15f3ed5",
      "pageCount": 4,
      "extractionVersion": 2
    }
  ],
  "caveat": "Interpretations apply regulations to the facts presented and do not create independently enforceable requirements.",
  "jurisdiction": "US"
}
```