# Westar Transmission Company — Pipeline Safety Interpretation

**Citation:** PI-87-001  
**Type / status:** guidance / guidance  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 1987-01-20

PI-87-001 response to Westar Transmission Company concerning 192.229.

## Document text

<<<PAGE 1>>>

Mr. Nabil S. Dia, P.E.
Westar Transmission Company
P.O. Box 0-
Amarillo, Texas 79189
Dear Mr. Dia:
Your December 22, 1986, letter to this Office asks, if a welder qualified under the requirements of
§192.227(a), in accordance with Section IX of the ASME Boiler & Pressure Vessel Code
(destructive testing), has a production weld tested and accepted under section 6 of API Standard
1104 (nondestructive testing) every 6 months as required by §192.229(c), is that welder subject to
further follow-up destructive testing.
The requirements of §192.229(a) do not apply because the original welder qualification under
§192.227(a) was based on destructive testing. The periodic testing required by §192.229(c) as a
verification of the original qualification under Section IX of ASME is net by the 6-month x-rays.
Therefore, further destructive testing is not required to maintain the original qualification under
§192.227(a).
Sincerely,
/signed/
Richard L. Beam
Acting Director
Office of Pipeline Safety
DB
C:\WP51\INTERPRT\192\229\87-01-20
1

## Provenance

- Official: Yes
- Source: <https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1987/PI87001.pdf>
- Source ID: `phmsa`
- SHA-256: `d807a03576a8924d41537d80e0531379b566d0e9c8bc6133ac4671c740f0a6f8`
- Retrieved: 2026-08-20T00:59:31.977Z
- Exported: 2026-08-23T04:45:43.393Z
- Document slug: `phmsa-interpretation-pi-87-001`

### Source metadata

```json
{
  "materialSubtype": "interpretation",
  "interpretationArea": "pipeline_safety",
  "representation": "full_text_from_official_pdf",
  "companies": [
    "Westar Transmission Company"
  ],
  "individuals": [
    "Nabil S. Dia, P.E."
  ],
  "refIds": [
    "PI-87-001"
  ],
  "catalogDates": [
    "1987-01-20"
  ],
  "catalogParts": [
    192
  ],
  "catalogRowCount": 1,
  "sourceRecordUrls": [
    "https://www.phmsa.dot.gov/node/66156"
  ],
  "linkedAttachmentUrls": [],
  "unavailableResponseUrls": [],
  "duplicateRepresentationUrls": [],
  "citedSections": [
    "192.229",
    "192.229(c)",
    "192.227(a)"
  ],
  "catalogPageUrls": [
    "https://www.phmsa.dot.gov/regulations/title49/section/192229"
  ],
  "pdfUrls": [
    "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1987/PI87001.pdf"
  ],
  "representations": [
    {
      "viewUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1987/PI87001.pdf",
      "detailUrl": null,
      "detailHtmlPath": null,
      "pdfUrl": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1987/PI87001.pdf",
      "pdfArtifactPath": "data/sources/phmsa-interpretations/pi-87-001.pdf",
      "pdfArtifactSha256": "06d242a24b9f4324d75361964a94ff13d3ac71f2aa010e2f5c9a43b13475add6",
      "extractedTextPath": "data/sources/phmsa-interpretations/pi-87-001.v2.txt",
      "extractedTextSha256": "6e81b60eb8c8de7468a94e52465822b0dcf069ddad8ec018e389f349d6f8ac60",
      "pageCount": 1,
      "extractionVersion": 2
    }
  ],
  "caveat": "Interpretations apply regulations to the facts presented and do not create independently enforceable requirements.",
  "jurisdiction": "US"
}
```
