# Tennessee Gas Pipeline Company, L.L.C. — Pipeline Special Permit

**Citation:** PHMSA-2016-0004  
**Type / status:** permit / current  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** 2016-09-01  
**Published:** 2016-09-01

PHMSA-2016-0004, issued 2016-09-01 for Tennessee Gas Pipeline Company, L.L.C.'s gas transmission system.

## Document text

PHMSA pipeline special permit PHMSA-2016-0004. Operator: Tennessee Gas Pipeline Company, L.L.C.. System: Gas Transmission. Issue date: 2016-09-01. Renewal: Mar 17, 2023.

<<<PAGE 1>>>

U.S. Department
of Transportat"1on
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, D.C. 20590
September I , 20 16
Mr. Gary Buchler
Chief Operating Officer
Tennessee Gas Pipeline Company, L.L.C.
Kinder Morgan Natural Gas Division
100 I Louisiana Street, Suite I 000
Houston. Texas 77002
Docket No. PHMSA-2016-0004
Dear Mr. Buchler:
On January 11 , 20 16. T ennessee Gas Pipeline Company, L.L.C. (TGP) wrote to the Pipeline and
Hazardous Materials Safety Administration (PHMSA) requesting a special permit to waive
compliance from PHMSA ·s pipeline safety regulation in 49 CFR ** 192.6 11 (a) and (d).
192.619(a), and 192.5 for pipeline segments where the class location of the segment had been
changed in accordance with* 192.5(c), cluster rule. The regulation requires confirmation or
revision of the maximum allowable operating pressure (MAOP) of a pipeline segment where the
class location has changed.
T he special permit request is for 192 segments and 49.00 miles of the TGP natural gas
transmission pipeline system located in the states of Kentucky. Louisiana. Mississippi. New
Jersey. New York, Ohio, Pennsylvania, Tennessee, Texas and West Virginia. The pipeline
segments are generally short in length, not continuous . and are located in multiple states and
counties/parishes within those states. T he regulatory relie f from 49 CFR ** 192.611. 192.6 19
and 192.5 through a special permit would include additional time (5-years) to either replace or
pressure test the pipeline segments in the class location sliding mile and outside the cluster area.
where there arc over I 0 dwellings for human occupancy. Pipeline segments w ith I 0 or fewer
dwellings for human occupancy outside the cluster area. but w ithin the sliding mile. would not
be replaced and TGP would be required by the special permit conditions to implement
procedures to maintain pipeline safety by identifying, assessing, and rcmediating integrit y threats
to the pipeline segments.
PHMSA is granting this special permit (enclosed). which will allow TGP to continue to operate
segments of the TGP pipeline at the ir current MAOPs by implementing integrity management
practices as defined in the special permit conditions until the pipe is replaced. pressure tested. or
remecliatecl. This special permit provides re lief from the Federal pipe line safety regulations for

<<<PAGE 2>>>

the TGP special permit segments and requires TGP to compl y w ith certain conditions and
limitations designed to maintain pipeline safety.
PHMSA grants this special permit based on the findings set forth in the "Special Permit Analysis
and Findings" document, which can be read in its entirety in Docket No. PHMSA-2016-0004 in
the Federal Docket Management System (FDMS) located on the internet at
www.Regulations.gov.
My staff would be pleased to discuss this matter or any other regulatory matter with you.
Mr. John Gale, Director of Standards and Rulemaking Division may be contacted at
202-366-0434, on regulatory matters and Mr. Kenneth Lee. Director of Engineering and
Research Division, may be contacted at 202-366-2694. on technical matters specific to this
special permit application
Sincerely.
A~!4/0
Acting Associate Administrator
for Pipeline Safety
Enclosure : Special Permit - PHMSA-20 16-0004
PHMSA-2016-0004- Tennessee Gas Pipeline, L.L.C Letter of Decision Page 2 of2

<<<PAGE 1>>>

U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
Special Permit Analysis and Findings
Special Permit Information:
Docket Number:
Requested By:
Operator ID#:
Date Requested:
Code Section(s):
PHMSA-20I 6-0004
Tennessee Gas Pipeline Company, L.L.C.
19160
January II , 20 I6
49 CFR §§ I92.6 1I (a) and (d), I92.6 I9(a), and I92.5
Purpose:
The Pipeline and Hazardous Materials Safety Administration (PHMSA) provides this
information to describe the facts of the subject special permit application submitted by
Tennessee Gas Pipeline Company L.L.C. 1 (TOP), to discuss any relevant public comments
received with respect to the application, to present the engineering/safety analysis of the special
permit application, and to make findings regarding whether the requested special permit should
be granted and if so under what conditions. TGP requests that PHMSA waive compliance from
49 Code of Federal Regulations (CFR) §§ I92.6 Il (a) and (d), 192.6 19(a), and 192.5 for 192
segments and 49.00 miles of natural gas transmission pipeline as described in Appendix A?
Pipeline System Affected:
This special permit request applies to 192 pipeline segments and 49.00 miles of natural gas
transmission pipeline operated by TOP and located in the states of Kentucky, Louisiana,
Mississippi, New Jersey, New York, Ohio, Pennsylvania, Tennessee, Texas and West Virginia
where a change has occurred from an original Class 1 location to a Class 3 location. This special
1 Tennessee Gas Pipeline Company L.L.C. is owned by Kinder Morgan, Inc.
2 Appendix A of this special permit lists the pipeline special permit segment location (County and State), MAOP,
class location, diameter, wall thickness, grade, seam type, boundaries, and other attributes. Appendix A can be
reviewed in Docket PHMSA-20 16-0004 at www.regulations.gov.
Page 1 of 10
PHMSA-2016-0004 - Tennessee Gas Pipeline, L.L.C. Special Permit Analysis and Findings

<<<PAGE 2>>>

permit allows TGP to continue to operate the 192 pipeline segments and 49.00 mites at their
cunent maximum allowable operating pressure (MAOP).
Special Permit Request:
TGP submitted an application to PHMSA on January II , 20 I6, for a special permit seeking relief
from the Federal pipeline safety regulations in §§ 192.6II(a) and (d), I92.6I9(a), and I92.5 for
192 segments and 49.00 miles of natural gas transmission pipeline as described in Appendix A of
the Special Permit Conditions. The special permit segments are located in the states of
Kentucky, Louisiana, Mississippi, New Jersey, New York, Ohio, Pennsylvania, Tennessee,
Texas and West Virginia.
This special permit applies to the special permit segments listed in Appendix A. Special permit
segments shall be divided into two (2) categories: Type A special permit segments and T ype B
special permit segments.
• Type A special permit segments include those special permit segments where there is a
cluster, as described in 49 CFR § I92.5(c), of more than 10 buildings intended for human
occupancy in a "class location unit" and for which the MAOP has.not been confirmed in
accordance with 49 CFR § 192.6 11 (a). Type A special permit segments must be replaced
or pressure tested so that the MAOP is commensurate with the present class location
within five (5) years of issuance of this special permit. There are 11 .22 miles of Type A
special permit segments and of this total I 0.59 miles must be replaced and 0.63 miles
must be pressure tested as listed on Attachment A.
• Type A special permit segments with pipe with integrity issues as determined by
Conditions 6(c) and 14 or that have not been pressure tested in accordance with 49 CFR
Part 192, Subpart J to 1.25 times MAOP of this special permit must be replaced within
two and one-half(2 Y2) years of the grant ofthis special permit or within two (2) years of
assessment find ing.
• Type B special permit segments include those special permit segments where there is a
cluster, as described in 49 CFR § I92.5(c), of 10 or fewer buildings intended for human
occupancy in a "class location unit" and for which the MAOP has not been confirmed in
accordance with 49 CFR § I92.6 II . There are 3 7. 78 miles of Type B special permit
segments and 3.84 miles of this total must be pressure tested as listed on Attachment A.
Page 2 of 10
PHMSA-2016-0004- Tennessee Gas Pipeline, L.L.C. Special Permit Analysis and Findings

<<<PAGE 3>>>

• Special permit inspection area3
- is defined as a one ( 1) mile continuous segment on
both sides of the special permit segment (Type A and Type B) plus the footage in the
special permit segment. Appendix A lists the boundaries for the special permit
inspection area associated with each special permit segment. The special permit
inspection areas total 433.71 miles of pipe as detailed in Attachment A.
Subsequent to the issuance of this special permit, those special permit segments that have been
pressure tested or replaced such that the MAOP has been made commensurate with the present
class location as defined in 49 CFR § 192.611 would no longer be included in this special permit.
This special permit allows TOP to continue to operate the pipeline segments at their current
maximum allowable operating pressure (MAOP) until either replaced, hydrostatically tested, or
operated in accordance with the special permit conditions. The Federal pipeline safety
regulations in 49 CFR § 192.611 (a) require natural gas pipeline operators to confirm or revise the
MAOP of a pipeline segment after a change in class location. A special permit would allow TOP
to continue to operate each of the 192 special permit segments at their existing MAOP's despite
a change in class location for the special permit specified time interval.
Public Notice:
On February 23, 2016, PHMSA posted a notice of this special permit request in the Federal
Register (81 FR 9075). PHMSA received one ( I) public comment letter in response to the draft
EA from the '·Pipeline Safety Trust" dated March 24, 2016, concerning this proposed special
permit. The public comments are summarized as noted below and the referenced Findings of No
Significant Impact (FONSI) can be reviewed on the docket (PHMSA-2016-0004) at
www.regulations.Q.ov.
• A summary of the questions asked by Pipeline Safety Trust are below:
• Only PHMSA announcement of the permit noted the fact that the operator' s
previous class locations had been in error. (FONSI Review: Section II)
3 Special permit inspection areas throughout these conditions include special permit segments unless specifically
defined as not applicable or if the special permit segment has more stringent conditions.
Page 3 of 10
PHMSA-2016-0004- Tennessee Gas Pipeline, L.L.C. Special Permit Analysis and Findings

<<<PAGE 4>>>

•
The 5-year waiver to accomplish this seems unreasonably long. (FONSI Review:
Section II, Footnote 2)
•
The Pipeline Safety Trust had several concerns with the information presented in
the application and the environmental assessment.
• Claimed environmental and safety benefit of the permit would occur from
the elimination of the methane emissions from pipeline blowdowns;
(FONSI Review: Section Vlll)
• Application fails in a couple of cases to provide a complete comparison of
the effects of granting or denying the permit including the impact on
adjacent right-of-way owners by allowing the existing pipe to remain in-
service; (FONSI Review: Section V)
• In the section of Safety Risks the operator indicates that the consequence
of a failure would be no different if the permit is granted or is denied,
without an indication of whether denying the permit would result in a
reduction of pressure or pipe replacement; ( FONSI Review: Section V)
• There appears to be many segments included in the application which have never
been tested in that their MAOP was determined by the Grandfather Clause
(§ 192.61 9(c)). (FONSI Review: The special permit conditions would require as a
minimum pressure tests for any segments that had not been pressure tested.)
• The application fails to give a complete useful response to § 190.341 (c)( 4).
(FONSI Review: Section II)
• Rather than use the special permit process in a situation like this, PHMSA should
consider entering a consent agreement with the operator with both acknowledging
the operator is out of compliance. PHMSA risks regulating many individual
operators by special permit, without any justification for why the regulations
should not be met, in effect negating the safety factors in place under § 192.6 11 or
other regulations. (FONSI Review: Section II on pages 3 and 4 of 3 1 of the
FONSI notes as follows: "PHMSA considered both a Consent Agreement and
Safety Order in reviewing the issues of the TGP request. Since the operator
notified PHMSA of the violation, PHMSA considered a special permit with
integrity management concepts in a special permit with conditions an appropriate
Page 4 of 10
PHMSA-2016-0004 - Tennessee Gas Pipeline, L.L.C. Special Permit Analysis and Findings

<<<PAGE 5>>>

mechanism for this situation to maintain safety. Also, the special permit
conditions would ensure the special permit segments were maintained while the
segments could be upgraded with pipe replacements or pressure tests. With
integrity management procedures being effective in other safety situations,
PHMSA considers this to be an effective approach for the sliding mile areas with
I 0 or fewer dwellings or structures for human occupancy, which is the case for
over 89 percent (171 of 192 segments) of the TOP 192 special permit segments."
The special permit requires replacement or pressure testing of segments with over
10 dwelling. The special permit has conditions and integrity management
procedures for the special permit inspection area, 433.71 miles of pipeline.)
The request letter, Federal Register notice, public comments, FONSI, and all other pertinent
documents are available for review in Docket No. PHMSA-20 16-0004 in the Federal Docket
Management System (FDMS) located on the internet at www.Regulations.gov.
Analysis:
Background: On June 29, 2004, PHMSA published in the Federal Register (69 FR 38948) the
criteria it uses for the consideration of class location change waivers, now being granted through
special permits. First, certain threshold requirements must be met for a pipeline section to be
further evaluated for a class location change special permit. Second, the age and manufacturing
process of the pipe; system design and construction; environmental, operating and maintenance
histories; and integrity management program elements are evaluated as significant criteria.
These significant criteria are presented in matrix form and can be reviewed in the FDMS, Docket
Number PHMSA- RSPA-2004-1740 l. Third, such special permits will only then be granted
when pipe conditions and the operator's integrity management program provides a level of safety
equal to a pipe replacement or pressure reduction.
Threshold Requirements: Each of the threshold requirements published by PHMSA in the
June 29, 2004, Federal Register notice is discussed below in regards to the TGP special permit
petition.
Page 5 of 10
PHMSA-2016-0004- Tennessee Gas Pipeline, L.L.C. Special Permit Analysis and Findings

<<<PAGE 6>>>

1) No pipeline segments in a class location changing to Class 4 location will be considered.
This special permit request is for 192 segments on the TOP pipeline system where a class
location change has occurred from Class 1 to Class 3 locations as defined in § 192.5(c) for
cluster locations and segments outside the cluster (and inside the sliding mile for the class
location) where an additional dwelling(s) have been identified. TOP has met this
requirement.
2) No bare pipe will be considered. These TOP special permit segments are coated with an
external protective coating. TOP has met this requirement.
3) No pipe containing wrinkle bends will be considered. There are no wrinkle bends in the
special permit segments. TOP has met this requirement.
4) No pipe segments operating above 72% of the specified minimum yield strength (SMYS)
will be considered for a Class 3 special permit. The .special permil segments operate at or
below 72% SMYS. TOP has met this requirement.
5) Records must be produced that show a hydrostatic test to at least 1.25 x maximum allowable
operating pressure (MAOP). TOP will pressure test any segments that do not meet this
requirement through the special permit conditions.
6) In~lin
inspection (ILl) must have been performed with no significant anomalies identified
that indicate systemic problems. TOP will meet this requirement through the special permit
conditions.
7) Criteria for consideration of class location change waiver, now being granted through special
permits, published by PHMSA in the Federal Register (69 FR 38948), define a waiver
inspection area (.special permit inspection area) as up to 25 miles of pipe either side of the
waiver segment (special permit segment). The special permit inspection area must be
inspected according to TOP's integrity management program and periodically inspected with
an in~line inspection technique. The special permit inspection area extends one~mile out
from either side of the special permit segments long. This additional length was used since
the Type B areas that are not being replaced are locations with 10 or fewer buildings intended
for human occupancy in a "class location unit" and are outside the original "cluster area'·.
This special permit is contingent upon TOP's incorporation of each of the special permit
segments in its written integrity management program as a ··covered segment " in a "high
consequence area " (HCA) per 49 CFR § 192.903.
e
Page 6 of 10
PHMSA-2016-0004 - Tennessee Gas Pipeline, L.L.C. Special Permit Analysis and Findings

<<<PAGE 7>>>

Criteria Matrix: The original and supplemental data submitted by TGP for the special permit
segment have been compared to the class location change special permit criteria matrix. The
special permit segments fall in the probable acceptance column of the criteria matrix for all
criteria except for:
• Possible acceptance - pipe manufacture and pipe material
• Requires substantial justification - pipe coating, Stress Corrosion Cracking Direct
Assessment (SCCDA), and several leaks within 20-miles of the special permit segment.
The data findings below fall within the "probable acceptance" or the "requires substantial
justification" columns of the criteria matrix:
1) Pipe design and construction, including pipe manufacture, material and design stress:
• TGP pipeline special permit segments have:
o Pipe manufactured with the following pipe seams: low-frequency electric
resistance welded, flash welded, double submerged arc welded, seamless, and
electric welded pipe seams.
o Pipe coatings included: coal tar enamel, hot applied wax, fusion bonded epoxy,
and tape.
o Pipe design stress was 72% specified minimum yield strength or lower.
2) Pipe coating, SCCDA, and several leaks: TGP will be required to conduct a stress corrosion
cracking assessment (SCCDA) of the special permit segments to evaluate where the risk of
stress corrosion cracking (SCC) is present. TOP will be required to implement a plan to
improve cathodic protection reliability and perform inspections for sec during excavations.
• To further address pipe manufacturing, material, construction, pipe coating, SCCDA,
and possible pipe leak issues, this special permit will include conditions requiring TOP to
treat all special permit segments as "covered segments" in an HCA per 49 CFR
§ 192.903.
• TOP will also be required to perform ILl assessments, anomaly repairs, close interval
surveys, identify any pipeline segment that may be susceptible to pipe seam issues
because of the vintage of the pipe, the manufacturing process of the pipe, or other issues
Page 7 of 10
PHMSA-2016-0004 - Tennessee Gas Pipeline, L.L.C. Special Permit Analysis and Findings

<<<PAGE 8>>>

and stress corrosion cracking direct assessment (SCCDA) along the entire length of the
special permit inspection areas and special permit segments according to the
requirements of 49 CFR § 192.929 after the grant of this special permit.
• This special permit will include a condition that TGP must continue to operate each
5pecial permit segment at or below its existing MAOP.
PHMSA has determined that imposing the special permit conditions will address these concerns
and provide equivalent safety for these areas.
Operational Integrity Compliance: PHMSA has reviewed this special permit request to ensure
that integrity threats to the pipeline in the special permit segments and special permit inspection
areas are addressed in the operator' s operations and management plan (O&M Plan). TGP must
have a systematic program to review and remediate pipeline safety concerns. Additional
operational integrity review and remediation requirements will be required by this special permit
for this special permit segment class location change. The pipeline operational integrity
requirements are to ensure that the operator has an ongoing program to locate and remediate
safety threats. Some of these threats to integrity and safety are the pipe coating quality, cathodic
protection effectiveness, anomalies in the pipe steel, and material and structures either along or
near the pipeline that could cause the cathodic protection system to be ineffective. PHMSA
carefully designed a comprehensive set of conditions that TGP would be required to meet in
order for the special permit to be granted. Among other things, the conditions include:
1) Special permit inspection areas must be incorporated into its TOP's written integrity
management program (IMP) as a "covered segment " in a "high consequence area
(HCA) " in accordance with 49 CFR § 192.903.
2) A close interval survey to determine the effectiveness of the cathodic protection system
must be performed within the 5pecial permit segments and special permit inspection area
and all areas with inadequate cathodic protection must be remediated. Close interval
surveys must be performed on a seven (7) year reassessment interval.
3) Cathodic protection reliability and inspections for stress corrosion cracking (SCC) must
be performed.
Page 8 of 10
PHMSA-2016-0004- Tennessee Gas Pipeline, L.L.C. Special Permit Analysis and Findings

<<<PAGE 9>>>

4) Stress corrosion cracking surveys on the pipeline will be required to ensure that the pipe
steel is not cracking due to the effects of high and near neutral pH SCC within the special
permit segments and special permit inspection area.
5) Operations and maintenance (O&M) manual(s) must include the conditions of the special
permit including in-line inspection (ILl), close interval inspections (CIS), remediation,
and reassessment intervals.
6) Annual reports must be sent by TGP to PHMSA updating compliance.
7) Interference currents from electric transmission lines and other interfering structures in
the special permit segments and special permit inspection area must be identified,
controlled and mitigated by conducting surveys and installing remediation measures
where required.
8) Anomalies and dents on the pipeline must be repaired based upon the special permit
repair criteria for the special permit segments and special permit inspection areas.
9) Pipeline longitudinal seams within the special permit segments and special permit
inspection areas must have an engineering analysis to determine if there are any threats
and remediated if integrity threats are determined.
l 0) Data integration of special permit condition findings and remediation must be maintained
for the special permit segments and special permit inspection areas.
11 ) Long term pipeline system flow reversals that include a special permit segment must
have a written plan that corresponds to those applicable criteria identified in PHMSA
Advisory Bulletin (ADB-2014-04), "Guidance for Pipeline Flow Reversals, Product
Changes and Conversion of Service" issued on September 18, 20 14 (79 FR 56121,
Docket PHMSA-20 14-0400).
12) A senior executive officer, vice president or higher must certify in writing that TGP is
complying with the special permit conditions.
The special permit will contain numerous conditions to ensure TGP meets or exceeds the
threshold requirements with equivalent safety and to ensure that granting the special permit will
not be inconsistent with safety.
Page 9 of 10
PHMSA-2016-0004- Tennessee Gas Pipeline, L.L.C. Special Permit Analysis and Findings

<<<PAGE 10>>>

Past Enforcement History - 2005 through Mach 28. 2016
The enforcement history is an important reflection of how TGP has been observed to follow
pipeline safety regulations and is a major area of focus for the review of this application.
Below is a listing of PHMSA closed enforcement matters of all types in all PHMSA Regions for
TGP (OPID # 19160) from 2005 through March 28, 20 16:
• Letters - of Concern or Warning - 7 matters
• Notices - of Amendment or of Probable Violation - 11 matters
• Orders - Corrective Action - 5 matters
• Orders - Safety - 1 matter
• Fines - $227,500- 100% collected
• TGP had no repeat offences during this period.
PHMSA has determined that imposing the special permit conditions summarized in this
document will ensure that granting the special permit will not be inconsistent with safety.
Findings:
Based on the information submitted by TGP and PHMSA' s analysis of technical, operational and
safety issues, and given the conditions that will be imposed in the special permit, PHMSA finds
that granting this special permit to TGP to operate special permit segments at the current MAOP,
where a change in class location has occurred from an original Class I locati on to a Class 3
location, would not be inconsistent with pipeline safety.
Completed in Washington DC on: September 1, 2016
Prepared By: PHMSA - Engineering and Research Division
Page 10 of 10
PHMSA-2016-0004- Tennessee Gas Pipeline, L.L.C. Special Permit Analysis and Findings

<<<PAGE 1>>>

PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
SPECIAL PERMIT
FINAL ENVIRONMENTAL ASSESSMENT and
FINDING OF NO SIGNIFICANT IMPACT (FONSI)
Docket Number: PHMSA-2016-0004
Requested By: Tennessee Gas Pipeline Company, L.L.C.
Operator ID#: 19160
Date Requested: January 11, 2016
Original Issuance Date:  September 1, 2016
Effective Dates: September 1, 2016 to September 1, 2021
Code Section(s): 49 CFR §§ 192.611(a) and (d), 192.619(a), and 192.5
I.  Background
The National Environmental Policy Act (NEPA), 42 USC §§ 4321 — 4375, Council on
Environmental Quality regulations, 40 CFR §§ 1500-1508, and DOT Order 5610.1C,
require that PHMSA analyze a proposed action to determine whether the action will have
a significant impact on the human environment. PHMSA analyzes special permit
requests for potential risks to public safety and the environment that could result from our
decision to grant or deny the request. As part of this analysis, PHMSA evaluates whether
a special permit would impact the likelihood or consequence of a pipeline failure when
compared to operation of the pipeline in full compliance with the Pipeline Safety
Regulations.
PHMSA may grant the special permit request with additional conditions or deny the
request. PHMSA developed this assessment to determine the effects of our decision, if
any, on the environment.
Pursuant to 49 USC § 60118(c) and 49 CFR § 190.341, PHMSA may only grant special
permit requests that are not inconsistent with pipeline safety. PHMSA will impose
conditions in the special permit if we conclude they are necessary for safety,
environmental protection, or are otherwise in the public interest. If PHMSA determines
that a special permit would be inconsistent with pipeline safety or is not justified, the
application will be denied.
11.  Purpose and Need
• Describe the purpose of the requested special permit. What will it allow the
operator to do that it could not do under the existing regulations?
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C.  FONSI Page 1 of 31

<<<PAGE 2>>>

Pursuant to 49 CFR §190.341, Tennessee Gas Pipeline Company, L.L.C. (TGP)1
requests a special permit seeking relief from 49 CFR §§ 192.611(a) and (d),
192.619(a), and 192.5 for pipeline segments where the class location of the
segment had been changed in accordance with 192.5(c), cluster rule, and where
additional dwellings for human occupancy have been built within the sliding mile
for class location changes outside of the cluster area. TGP found a regulatory
compliance issue with past TGP procedure methodology for the determination of
class location boundaries using the clustering and sliding mile criteria in 49 CFR
§ 192.5(c) and has updated operating procedures for usage of 49 CFR § 192.5(c),
cluster rule, and the sliding mile for confirmation of maximum allowable
operating pressure (MAOP).
Following the purchase of TGP, Kinder Morgan, notified PHMSA of code
violation issues it discovered in the TGP procedures for evaluating class locations,
where pipe had been previously updated to meet class location changes from
Class 1 to 3 locations in accordance with § 192.5. TGP had rnisapplied the usage
of the sliding mile and cluster rule portions of § 192.5. TGP had properly
conducted pipe upgrades to meet the cluster provisions in § 192.5, but had not
later upgraded the pipe when a single or more dwelling were added in the sliding
mile area outside the cluster area.
This special permit is requested by TGP in order to postpone in some cases and
waive in others cases compliance with certain regulations for the determination of
class location boundaries using the clustering criteria in 49 CFR § 192.5(c). This
change in clustering methodology due to misapplication of 49 CFR § 192.5(c) in
TGP procedures resulted in a number of new class location units, and more
specifically class 3 locations, for which pressure testing or pipe replacements are
now required. This misapplication impacted 192 special permit segments2 and
49.00 miles of TGP mainline piping located in the states of Kentucky, Louisiana,
Mississippi, New Jersey, New York, Ohio, Pennsylvania, Tennessee, Texas and
West Virginia as detailed in Attachment A for Type A and B special permit
segments. These clustered class location units are identified as "Special Perrnit
Segments." The proposed special permit would: 1) require the replacement or
pressure testing of approximately 11.22 miles of natural gas transmission pipe
(Type A3) and provides a schedule for this replacement or pressure testing work
Tennessee Gas Pipeline Company, L.L.C. is owned by Kinder Morgan, Inc.
2 In the 192 segments TGP has 11.22 miles of pipe to replace or pressure test (Type A special permit
segments) and other special permit segments including special permit inspection areas will implement
integrity management procedures and the special permit conditions during the entire 5-year period.
3 Type A special permit segments include those special permit segments where there is a cluster, as
described in 49 CFR § 192.5(c), of more than 10 buildings intended for human occupancy in a "class
location unit" and for which the maximum allowable operating pressure (MAOP) has not been confirmed
in accordance with 49 CFR § 192.611(a). Type A special permit segments must be replaced so that the
MAOP is commensurate with the present class location within five (5) years of issuance of this special
permit. There are 21 segments and 11.22 miles of Type A special permit segments and of this total 10.59
miles must be replaced and 0.63 miles must be pressure tested as listed on Attachment A.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C.  FONSI Page 2 of 31

<<<PAGE 3>>>

and 2) establish enhanced integrity management procedures to maintain pipe
integrity and protect both the public and the environment for the class location
units in which the Special Permit Segments are located for the other 37.78 miles
of pipe that are not replaced (Type B4). All of the proposed Special Permit
Segments, even those not replaced or pressure tested would be treated as high
consequence areas (HCAs) with the implementation of integrity management
(1M) practices. In addition, TGP would comply with Conditions as provided in
the terms of the special permit for all the impacted Special Permit Segments and
the designated "Special Permit Inspection Aree in the proposed special permit.
The Special Permit Inspection Area is defined as a one (1) mile continuous
segment on both sides of the Special Permit Segment (Type A and Type B) plus
the footage in the Special Permit Segment and extending 220 yards on each side
of the centerline. In the instance that the pipeline does not extend a full mile
either upstream from the beginning of the Special Permit Segment or downstream
from the end of the Special Permit Segment, the Special Permit Inspection Area
will not extend beyond the pipeline initiation or termination points. The Special
Permit Inspection area will total 433.71 miles of pipe as detailed in Attachment A.
In those cases where the proposed special permit would allow for the current
pipeline segments to remain in place, the Conditions as prescribed in the proposed
special permit would provide an additional level of safety without the impacts of
excavation to remove existing pipe and install the replacement pipe. Due to the
significant number of new class location segments that will require replacement
or pressure testing, a special permit with IM based conditions would allow TGP a
more reasonable time interval to schedule the required pipeline outages. The
replacement and pressure testing of the 11.22 miles of pipe will be in accordance
with the applicable sections of 49 CFR §§ 192.105, 192.611, 192.619, and
Subpart J for the current class location.
PHMSA found in reviewing TGP's response that a misapplication of § 192.5 had
been used (under procedures in use before the Kinder Morgan acquisition) after
installing upgraded pipe in a cluster area. Attachment A shows the segment
locations with the number of dwellings outside of the cluster area but inside the
sliding mile area. PHMSA considered both a Consent Agreement and Safety
Order in reviewing the issues of the TGP request. Since the operator notified
PHMSA of the violation, PHMSA considered a special permit with integrity
management concepts in a special permit with conditions an appropriate
mechanism for this situation to maintain safety. Also, the special permit
conditions would ensure the special permit segments were maintained while the
segments could be upgraded with pipe replacements or pressure tests. With
integrity management procedures being effective in other safety situations,
PHMSA considers this to be an effective approach for the sliding mile areas with
4 Type B special permit segments include those special permit segments where there is a cluster, as
described in 49 CFR § I92.5(c), of 10 or fewer buildings intended for human occupancy in a "class
location unit" and for which the MAOP has not been confirmed in accordance with 49 CFR § 192.611.
There are 171 segments and 37.78 miles of Type B special permit segments and 3.84 miles of this total
must be pressure tested as listed on Attachment A.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. 
FONSI Page 3 of 31

<<<PAGE 4>>>

10 or fewer dwellings or structures for human occupancy, which is the case for
over 89 percent (171 of 192 segments) of the TGP 192 special permit segments.
Special permit conditions are measures to assess, evaluate, and implement
measures to manage and eliminate threats to pipe integrity and public safety in
areas of high consequence such as these sliding mile special permit segments.
• List the regulation(s) for which the operator seeks the permit.
The special permit would address the requirements of 49 CFR §§ 192.5,
192.611(a) and (d), and 192.619(a).
• Describe the need for the requested special permit. How would a special permit
benefit the operator? Would a special permit benefit the public? If so, please
explain how.
Implementation of the special permit conditions would allow TGP to avoid the
replacement of 37.78 miles of pipeline. Instead, the special permit would require
implementation of the special permit conditions, including enhanced integrity
management procedures. The special permit would benefit the public by
reducing any disruptions due to construction activities near their homes in the
Special Permit Segments.
• Indicate whether this is an existing or proposed pipeline.
This special permit impacts only existing pipeline facilities as outlined in
Attachment A.
• Describe pipeline, the materials transported in the pipeline, and specift the
counties and states where the affected segments of the pipeline are or would be
located.
The TGP pipeline transports natural gas in the pipeline segments included in the
special permit that are located in the states of Kentucky, Louisiana, Mississippi,
New Jersey, New York, Ohio, Pennsylvania, Tennessee, Texas and West
Virginia. The pipeline Special Permit Segments are generally short in length, not
contiguous and are located in multiple States and counties/parishes within those
states. Attachment A (Pipeline Segments and Map) outlines the specific locations
— state and county — of the Special Permit Segments.
111.  Alternatives
• Alternative 1: Granting the Special Permit Request With Conditions
▪ Describe Alternative: Describe what PHMSA would do under this
alternative. i.e. grant a permit that allows operator to schedule the
replacement or pressure testing of certain pipeline segments and leave
certain pipeline segment in place under added integrity measures defined
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C.  FONSI Page 4 of 31

<<<PAGE 5>>>

in the Conditions of the special permit and while also treating all of the
identified pzpeline segments as high consequence areas.
TGP proposes a special permit with conditions that includes two types of
class location units (special permit segments) with clusters that impact
approximately 49.00 miles of pipe. These units would be designated as
either Type A or Type B special permit segments.
The Type A special permit segrnents are those with more than 10
dwellings intended for human occupancy and for which the MAOP has
not been confirmed in accordance with 49 CFR § 192.611.
Approximately 11.22 miles of pipe located in these special permit
segments would be replaced or pressure tested. A special permit would
provide a schedule for the completion of the required pipe replacements
andlor pressure testing for the Type A special permit segments.
Type B special permit segments that have 10 or fewer dwellings would
also be subject to the Conditions of the special permit for its term. All of
these special perrnit segments would be treated as high consequence areas
(HCAs) under an integrity management (IM) program (49 CFR Part 192,
Subpart 0) as a requirement of the special permit. Approximately 37.7g
miles of pipe are located in Type B locations.
The special permit would incorporate conditions (enhanced integrity
management activities) to maintain pipeline integrity. All of the permit
conditions are attributes of a robust IM program (49 CFR Part 192,
Subpart 0). These proposed Conditions include conducting periodic:
close interval surveys, cathodic protection reliability improvements, stress
corrosion cracking direct assessment, running inline inspection (ILI)
assessments (srnart pigs), interference current control surveys, remediating
ILI findings through anomaly evaluation and repairs, pipe seam
evaluations, pipe properties records review and documentation, and
maintaining line-of-sight markers. Many of these proposed integrity
activities are currently required in 49 CFR Part 192, Subpart 0 for an IM
program to manage high consequence areas (HCAs) at specified
reassessment intervals. The assessment and reassessment intervals, the
level of remediation and the maintenance activities in a proposed special
permit would be more stringent to maintain pipe integrity and protect both
the public and the environment for the class location units in which the
Special Permit Segments are located.
The erthanced integrity management activities that TGP would implement
as proposed special permit conditions for the pipeline segments include:
PIIMSA-2016-0004 Tennessee Gas Pipeline, L.L.C.  FONSI Page 5 of 31

<<<PAGE 6>>>

1. TGP would incorporate the pipeline segments into its written integrity
management program (IMP) as a "covered segment" in a "HCA" in
accordance with 49 CFR §192.903.
2. TGP would perform a close interval survey (CIS) along the entire
length of pipeline segments and remediate any areas of inadequate
cathodic protection no later than three (3) years after the issuance of
this special permit. TGP will perform periodic CIS of the pipeline
segments with a reassessment interval not to exceed seven (7) years.
3. TGP would implement a plan to improve cathodic protection
reliability and perform inspections for stress corrosion cracking (SCC)
during all excavations.
4. TGP would perform Stress Corrosion Direct Assessments to evaluate
pipeline segments where the risk of SCC is present.
5. TGP would perform integrity assessments along the pipeline segments
using appropriate assessment methods based on threats identified
during the risk assessment process including both high resolution
magnetic flux leakage (HR-MFL) and either HR-geometry or HR-
deformation tools. TGP would reassess the pipeline segments at an
interval not to exceed seven (7) years from the last assessment in
accordance with 49 CFR § 192.939.
6. TGP would not let this special permit be a basis for deferring any of its
assessments for HCAs in accordance with 49 CFR Part 192, Subpart
O.
7. TGP would address induced alternating current (AC) from parallel
electric transmission lines and other interference issues such as direct
current (DC) along the pipeline segments that may affect the pipeline.
8. TGP would identify any pipeline segment that may be susceptible to
pipe seam issues because of the vintage of the pipe, the manufacturing
process of the pipe, or other issues.
9. TGP would install and maintain line-of-sight pipeline markers on the
pipeline segments except in agricultural areas or large water crossings
such as lakes where line-of-sight signage is not practical.
10. TGP would maintain data integration of all integrity findings and
remediation along the pipeline segments.
11. For long term pipeline system flow reversals occurring after the
effective date of the Special Permit and exceeding 90 days, TGP
would prepare a written plan in accordance with Advisory Bulletin
(ADB-2014-04) prior to implementing the pipeline system flow
reversal through the Special Permit Segment.
12. TGP would maintain the following records for each pipeline segment:
documentation showing that each Special Permit Segment has received
a 49 CFR § 192.505, Subpart .1, hydrostatic test for eight (8)
continuous hours and at a minimum pressure of 1.25 times MAOP,
documentation of mechanical and chemical properties including pipe
toughness (mill test reports) showing that the pipe in each Special
Permit Segment meets the wall thickness, yield strength, tensile
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. 
FONSI Page 6 of 31

<<<PAGE 7>>>

strength and chemical composition of either the API Standard 5L,
5LX, or 5LS in usage at the time of manufacturing.
• Alternative 2: Denial of the Request
• Describe Alternative:
Denial of the special permit would require the replacement and pressure
testing of all the pipeline segments associated with this special permit
request, which includes approximately 49.00 miles of mainline pipe. If
TGP opted not to replace or pressure test the relevant segments of
pipeline, 49 CFR § 192.611 requires a reduction in the pipeline maximum
allowable operating pressure (MAOP).5
• Summary
• A special permit allows TGP to continue to operate the pipeline segments
at their current maximum allowable operating pressure (MAOP).
However, according to the special permit, the pipeline segments must be
replaced, hydrostatically tested, or operated in accordance with the special
permit conditions. The Federal pipeline safety regulations in 49 CFR
§ 192.611(a) require natural gas pipeline operators to confirm or revise the
MAOP of a pipeline segment after a change in class location. A special
permit would allow TGP to continue to operate each of the 192 special
permit segments at their existing MAOP's despite a change in class
location for the special permit specified time interval.
• A special permit would require TGP to replace or pressure test all
segments that have over 10 dwelling in the sliding mile area that are
outside the Cluster area to meet § 192.611. Segments within the sliding
mile and outside the Cluster area will be allowed to implement the special
permit conditions and integrity management procedures with the sliding
mile and one-mile on either side of the segment. This would be similar to
requiring a Class 1 location to implement integrity management
procedures (49 CFR Part 192, Subpart 0) for all mileage, whether it meets
the definition of a high consequence area or not.
• Background on Class Location Special Permits: On June 29, 2004,
PHMSA published in the Federal Register (69 FR 38948) the criteria it
uses for the consideration of class location change waivers, now being
granted through special permits. First, certain threshold requirements
must be met for a pipeline section to be further evaluated for a class
location change special permit. Second, the age and manufacturing
process of the pipe; system design and construction; environmental,
operating and maintenance histories; and integrity management program
elements are evaluated as significant criteria. These significant criteria are
presented in matrix form and can be reviewed in the FDMS, Docket
5 These regulatory options are specified in 49 CFR § 192.611 Change in class location: Confirmation or
revision of maximum allowable operating pressure.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C.  FONSI Page 7 of 31

<<<PAGE 8>>>

Number PHMSA—RSPA-2004-17401. Third, such special permits will
only then be granted when pipe conditions and the operator's integrity
management program provides a level of safety equal to a pipe
replacement or pressure reduction.
IV.  Site Description
• Describe the environment in the vicinity of the portions of pipeline that would be
subject to the special permit.
The pipeline segments are generally short in length, not contiguous and are
located in multiple States and counties/parishes within those states. Attachment A
outlines the specific locations — state and county — of the proposed Special Permit
Segments. Due to the number of Special Permit Segments and the multiple
locations and topography of each proposed location varies.6 The pipeline
segments identified as part of this special permit that include approximately 49.00
miles of mainline pipe.
TOP proposes a special permit that includes two types of class location units
(units) with clusters that impact approximately 49.00 miles of pipe. These units
would be designated as either Type A or Type B special permit segments.
The Type A special permit segments are those with more than 10 dwellings
intended for human occupancy and for which the MAOP has not been confirmed
in accordance with 49 CFR § 192.611. Approximately 11.22 miles of pipe
located in these units would be replaced or pressure tested. A special permit
would provide a schedule for the completion of the required pipe replacements
and/or pressure testing for the Type A units.
Type B special permit segments that have 10 or fewer dwellings would also be
subject to the Conditions of the special permit for its term. All of these special
permit segments would be treated as high consequence areas (HCAs) under an
integrity management (1M) program (49 CFR Part 192, Subpart 0) as a
requirement of the special permit.
V.  Environmental Impacts of Each Alternative
In this section, you must describe the different alternatives for agency action on your
special permit request. Describe at least two alternatives.
• Alternative 1: Granting the Special Permit Request With Conditions
6 The TGP pipeline facilities described in Attachment A, which include the Special Perrnit Segments, are
regulated by the Federal Energy Regulatory Commission (FERC). Prior to approving natural gas
pipeline siting, FERC analyzes the environmental impacts of siting, construction, and operation along the
proposed pipeline routes.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C.  FONSI Page 8 of 31

<<<PAGE 9>>>

• Describe Alternative: Describe what PHMSA would do under this
alternative. i.e. grant a permit that allows operator to schedule the
replacement or pressure testing of certain pipeline segments and leave
certain pipeline segrnent in place under added integrity measures defined
in the Conditions of the special permit and while also treating all of the
identified pipeline segments as high consequence areas..
The special permit includes two types of class location units (units) with
clusters that impact approximately 49.00 miles of pipe. These units would
be designated as either Type A or Type B special permit segments. The
Type A special permit segments are those with more than 10 dwellings
intended for human occupancy and for which the MAOP has not been
confirmed in accordance with 49 CFR § 192.611. Approximately 11.22
miles of pipe located in these units would be replaced or pressure tested.
The special permit provides for a schedule for the completion of the
required pipe replacements and/or pressure testing for the Type A special
permit segments. Type B special permit segments that have 10 or fewer
dwellings would also be subject to the Conditions of the special permit for
its term. All of these special permit segments would be treated as high
consequence areas (HCAs) under an integrity management (IM) program
(49 CFR Part 192, Subpart 0) as a requirement of the special permit.
The special permit would incorporate a minimum of 12 enhanced integrity
management activities described above. All of the proposed special
permit conditions are attributes of a robust IM program. These Conditions
include conducting periodic: close interval surveys, cathodic protection
reliability improvements, stress corrosion cracking direct assessment,
running inline inspection (ILI) assessments (smart pigs), interference
current control surveys, remediating ILI findings through anomaly
evaluation and repairs, pipe seam evaluations, pipe properties records
review and documentation, and maintaining line-of-sight markers. All of
these integrity activities are currently required in 49 CFR Part 192 for
either normal operational activities or within an IM program at some
reassessment intervals. The assessment and reassessment intervals, the
level of remediation and the maintenance activities in the special permit
are more stringent to maintain pipe integrity and protect both the public
and the environment for the class location units in which the pipe
segments are located.
• Safety Risks: special permit.
Describe what, i f any, safety risks would result i f the
regulation were waived as compared to the safety risks in the absence of a
Sections 192.5, 192.611(a) and (d), and 192.619(a) are in the gas pipeline
regulations to maintain the safety of the pipeline based upon maximum
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C.  FONSI Page 9 of 31

<<<PAGE 10>>>

allowable operating pressure (MAOP), population (Class locations) and
population growth along the pipeline. Class locations are based upon the
population (dwellings for human occupancy) within a "class location unit"
which is defined as an onshore area that extends 220 yards on either side
of the centerline of any continuous 1-mile of pipeline. These locations are
determined by surveying the pipeline for population growth. The more
conservative safety factors are required as dwellings for human occupancy
(population growth) increases near the pipeline. Pipeline operators must
conduct surveys and document population growth within 220 yards on
either side of the pipeline. A higher population along the pipeline may
trigger any of the following for the pipeline segment with the higher
population: a reduced MAOP, a new pressure test at a higher pressure, or
new pipe with either or both heavier walled or higher grade pipe to protect
against integrity risks to occupants along the pipeline segment.
The proposed special permit enhanced integrity management conditions
would be designed to identify and mitigate integrity issues that could
threaten the pipeline segment and cause failure. The effect of the
monitoring and maintenance requirements in the proposed special permit
conditions will ensure the integrity of the pipe and protection of the
population living near the pipeline segment to a similar degree of a lower
MAOP, new pressure test, or a thicker walled or higher grade pipe
without the enhanced IM protections.
If PHMSA were to deny the special permit request, TGP would be
required to reduce the pressure in the affected pipeline segments. In this
situation, the consequences, and the PIR (a separate question and
response) would be less than if the permit is granted because the pipeline
would operate at a higher operating pressure under the special permit. In
most cases a pressure reduction would be approximately 20 percent of
current operating pressures. This reduction would be the difference in a
Class 1 versus Class 2 location design safety factor (0.72 versus 0.60). A
pressure reduction would reduce gas flow volumes to customers.
The safety risk with respect to this request for a special permit focuses on
maintaining the integrity of the pipeline and on the risk it poses to the
increased population to mitigate a failure of this pipeline. Granting this
special permit does not increase the potential impact radius (PIR (the
radius of a circle within which the potential failure of a pipeline could
have significant impact on people or property)) of the pipeline. However,
the risk from the increased human population around the pipeline would
be mitigated through IM procedures.
PIR is the radius of a circle within which the potential failure of a pipeline
could have significant impact on people or property. The current PIR's
for these pipeline segments are calculated using Section 3 of ASME
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. 
FONS1 Page 10 of 31

<<<PAGE 11>>>

B31.8S-2004, "Managing System Integrity of Gas Pipelines, incorporated
by reference by 49 CFR §192.903. The formula and resulting calculation
are as follows: (see Attachment D for a more in depth discussion of PIR).
r = radius of the circular area in feet surrounding the point of failure,
otherwise known as the PIR
d  nominal diameter of the pipeline in inches;
p = pipeline segment's maximum allowable operating pressure
(MAOP), psig
Note: the coefficient for natural gas is 0.69. This number will vary for
other gases depending on their heat of combustion.
r = 0.69 * d *
TGP proposes to increase integrity management inspections for pipeline
segments adjacent to the Special Permit Segments, which would lower the
risk in areas beyond the special permit. TGP proposes to conduct IM type
procedures (proposed Conditions in the Special Permit) on the Special
Permit Inspection Areas (433.71 miles) as defined in the Special Permit.
TGP would implement the proposed condition in Type B Special Permit
Inspection Areas for the duration of the special permit, and in Type A
Special Permit Inspection Areas until the Special Permit Segment has been
replaced with new pipe.
Special permit conditions would include the enhanced IM protections in
Section III — Alternative , Items 1 through 12, which would require
conducting periodic: close interval surveys, cathodic protection reliability
improvements, stress corrosion cracking direct assessment, running inline
inspection (ILI) assessments (smart pigs), interference current control
surveys, remediating ILI findings through anomaly evaluation and repairs,
pipe seam evaluations, pipe properties records review and documentation,
and maintaining line-of-sight markers to identify, assess, and mitigate
threats to the integrity of the pipeline both for Special Permit Segments
and the larger Special Permit Inspection Area.
The special permit conditions will require TGP to conduct hydrostatic
pressure tests on any Type B special permit segments that have not been
pressure tested to 1.25 times MAOP or greater to be pressure tested. None
of the special permit segments have MAOPs established using 192.619(c)
Grandfather Clause, which operate above 72 percent pipe design factor or
without a prior pressure test for a Class 1 location.
Requiring most of the special permit conditions to be applicable to the
Special Permit Inspection Areas, which extends a mile out from either side
of the special permit segments, larger areas of the pipeline will be assessed
and remediated for threats to the integrity of the pipeline than a PIR that is
PIIMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. 
FONSI Page 11 of 31

<<<PAGE 12>>>

used to establish a high consequence area (HCA). Attachment A gives
the integrity management PIR for each TGP pipeline segment, which in all
eases is less 760 feet or less and is much less than the l-mile length used
to establish the Special Permit Inspection Area.
Performance of the Conditions in the special permit provides an equivalent
or greater level of safety for the public and environment; and imposes no
additional safety risks as a result of the waived regulation. As already
noted, all of the pipeline segments included under the special perrnit
would be treated as HCAs with the additional risk analysis and remedial
activities associated with this designation. The special permit also
includes a number of conditions that address potential safety risks.
Among these are incorporation of these segments into the Kinder Morgan
Integrity Management Program, additional close interval corrosion
surveys, implementation of a cathodic protection reliability improvernent
plan, a more comprehensive stress corrosion cracking direct assessment
program, an in-line inspection (ILI) program with intervals not to exceed
seven years, anomaly evaluation and repair meeting more stringent
criteria, additional testing and remediation of interference currents caused
by induced alternating current sources, pipe seam evaluations, criteria for
the identification of pipe properties, installation of line-of-sight markers
and the integration of all inspection and remediation data. This
comprehensive list of additional risk related Conditions incorporated in
the special permit is intended to provide for a significant added level of
safety for the existing pipeline segments.
• Would operation under a special permit change the risk of rupture
or failure?
Operation under the special permit would not be expected to have
an impact on the risk of failure or rupture as the operating
conditions of the pipeline segments have not changed. Segments
in the special permit would have inspections at intervals similar to
IM program intervals, which would maintain the integrity of the
pipe segments over the life of the special permit.
• If a failure occurred, would consequences and spill or release
volumes be different if PHMSA granted the permit? Increase risk,
decrease risk no change?
The consequences of any spill or release would not be impacted as
a result of the special permit and the potential for such an event is
expected to be less likely with the added safety programs noted
above.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. 
FONSI Page 12 of 31

<<<PAGE 13>>>

a Would the Potential Impact Radius (PIR) of a rupture change
under the special permit? Would more people be affected by a
failure ifwe granted the permit?
The PIR as calculated in accordance with 49 CFR § 192.903 would
not change under the special permit since maximum operating
pressure and pipe diameter will not change, thus there would be no
additional impact on the public.
• Would operation under the special permit have an effect on
pipeline longevity or reliability? Would there be any life cycle or
maintenance issues?
Operation under the Special Permit Conditions that provide an
additional level of safety is expected to have a positive impact on
pipeline longevity and reliability. TGP does not anticipate any
deleterious life cycle or maintenance issues related to operation of
the pipeline with the special permit and conditions based upon IM
type procedures.
Implementation of the proposed conditions in the special permit provides
an equivalent level of safety for the public and environment; and imposes
no additional safety risks as a result of the waived regulation.
As already noted, all of the pipeline segments included under the special
permit would be replaced with new pipe (Type A) or treated as HCAs with
the additional risk analysis and remedial activities associated with this
designation (Type B). The special permit also includes a number of
proposed Special Permit Conditions that would address potential safety
risks. Among these are incorporation of these segments into the Kinder
Morgan Integrity Management Program, additional close interval
corrosion surveys, implementation of a cathodic protection reliability
improvement plan, a more comprehensive stress corrosion cracking direct
assessment program, an in-line inspection (ILI) program with intervals not
to exceed seven years, anomaly evaluation and repair meeting more
stringent criteria, additional testing and remediation of interference
currents caused by induced alternating current sources, pipe seam
evaluations, criteria for the identification of pipe properties, installation of
line-of-sight markers and the integration of all inspection and remediation
data. This comprehensive list of additional risk related conditions
incorporated in the special permit is intended to provide for a significant
added level of safety for the existing pipeline segments.
• Environmental Impacts: Explain how operation under the special
permit would impact the environment as compared to the status quo in the
absence of a special permit. either positively, negatively, or not at all.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C.  FONSI Page 13 of 31

<<<PAGE 14>>>

Approval of the special permit would have a positive impact for those
units that do not require pressure testing or replacement, since TGP's
activities would have negligible, if any, environmental impact. TGP
would avoid disturbing the right of way of property owners except for the
additional inspections that may be required to satisfy the conditions of the
special permit such those related to the Integrity Management Program for
HCAs, additional SCCDA verification digs, and potential anomaly
evaluations/repairs.
While the special permit would avoid the full replacement of affected
pipe, the proposed special permit conditions require monitoring and
maintenance that could lead to excavations and repair or replacement of
some pipe. TGF will evaluate the potential environmental consequences
and affected resources of land disturbances and water body crossings
caused by construction activities (including adding, modifying, replacing
or removing any facility) for the related environmental permits associated
with any TGP activity. This evaluation is outlined in Kinder Morgan's
Operating and Maintenance Procedure (O&M) 1205: Land Disturbance,
Construction, and Environmental Permits, and referenced forms and
procedures, which requires obtaining the required permits prior to
conducting any construction activity. These procedures ensure that all
activities resulting in land disturbances or construction of new or modified
facilities comply with the requirement to obtain all applicable
environmental permits and other applicable environmental authorizations.
These procedures contain information required to identify activities
subject to Federal, State, and Local environmental authorizations related
to the work and to obtain those authorizations. The procedures require a
review by TGP Environmental Services staff prior to the start of work,
incorporation of environmental requirements into the project
implementation, and ensuring outstanding (environmental) requirements
are incorporated into facility operation.
If the activities do not qualify under the requirements of the Federal
Energy Regulatory Commission (FERC) "General Rules and Regulations"
Section 2.55(a) or 2.55(b) facilities or the blanket certificate, TGP will
pursue authorization in accordance with Section 7 of the Natural Gas Act.
• Explain whether and how operation under the special permit
would impact each of the environmental resources set out in the
Site Description portion of this document: land use planning,
surface waters (including wetlands), drinking water, soils and
vegetation, wildlife habitats (including fisheries), cultural
resources, socioeconomics, Native Americans, etc. ? Focus on
environmental aspects that are impacted Are there any geologic
hazards? Would any of these impacts be significant?
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. 
FONSI Page 14 of 31

<<<PAGE 15>>>

As already noted, this special permit involves pipeline facilities at
various locations. Each of the environmental resources potentially
impacted that are listed would be addressed in accordance with the
applicable Kinder Morgan procedures and FERC requirements.
Although the environmental impacts are not expected to be
significant it must be kept in mind that for those units requiring
pressure testing or pipe replacements (Type A) there will be
excavation related activities, along with water sourcing and water
disposal issues at a minimum. These impacts will occur whether
or not the Special Permit is granted. For the Type B segments,
approval of the special permit request would avoid disturbance to
the environment, public roadways, businesses and homes since
pipe replacement would not be required at this time. PHMSA may
require pipe replacement at a later date if integrity issues are found
with the pipe or if the segment grows to over 10 dwellings for
human occupancy in the sliding mile length that is outside the
upgraded Cluster area.
• Discuss direct, indirect and cumulative impacts.
The majority of the pipeline segments addressed by this special
permit have been buried and undisturbed for many years. The
current pipeline cover has therefore returned to its original state in
most cases. Any activity related to pressure testing or pipe
replacement will be temporary in nature and the pipeline right of
way would be restored in accordance with required environmental
regulations. Direct, indirect, or cumulative impacts associated
with activities related to the special permit would not be
significant.
• Briefly summarize environmental aspects that will not be impacted.
Explain why these resources won't be impacted.
As already noted, those pipeline segments that do not require
pressure testing or pipe replacements will be operated in nearly the
same manner as they are currently. The special permit would
allow approximately 37.78 miles of Type B7 Special Permit
Segments to remain in their current state and not require
excavation or disruption of landowner activities. Unless localized
excavations are needed, right of way activities (such as additional
pipeline markers) may increase in frequency due to the special
permit conditions, but it is anticipated that there would be a very
minimal added environmental impact related to those activities.
7 Type B special permit segments total 37,78 miles of pipe of which 3.84 miles will require pressure
testing.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. FONSI Page 15 of 31

<<<PAGE 16>>>

All ILI Tool inspections to determine any pipeline integrity issues
due to corrosion or third party damage would be propelled down
the pipeline by gas flow volumes pushing ILI tools through the
pipeline segment. Other IM inspections would be performed along
the pipeline segment right of way.
a  Special Permit Conditions: [Describe the additional safety measures
you propose to implement in lieu of compliance with the regulations. You
may reference information already provided in your special permit
request, as relevant.]
The Conditions related to this special permit are described in detail in the
special permit.
• [Explain whether and how each of these safely measures addresses
the safety risks and environmental impacts, i f any, of granting the
permit.]
Each of the special permit conditions have been included and
designed to address the anticipated safety risks and environmental
impacts of the TGP pipeline segments covered by the proposed
special permit.
• [Explain whether, even with the safety measures you propose,
there would be any safety risks or environmental impacts beyond
those that would exist in the absence of a special permit.]
There are currently no known safety risks or environmental
impacts that are not addressed by the special permit conditions.
The pipeline segments included in the proposed special permit are
currently operating safely and are expected to continue to perform
in that same manner.
• [Would implementation of the safe0) measures themselves have any
environmental impacts? If so, would they be significant? Discuss
direct, indirect and cumulative impacts.]
The additional safety measures provided by the proposed special
permit conditions are not expected to have any significant
environmental impacts other than the potential issues already noted
that are related to the required pressure tests and/or pipe
replacements. Please see Section III, Site Description, which
outlines the environmental review process followed by TGP prior
to any excavation being implemented. TGP follows a rigorous
procedural process as dictated by federal, state and local entities to
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C.  FONSI Page 16 of 31

<<<PAGE 17>>>

assure compliance with all environmental regulations and
requirements as outlined in this prior section.
PHMSA has reviewed the Part 192 requirements for replacing the
pipeline and the conditions of the special permit including integrity
management practices and considers both to have similar
environmental and right-of-way impacts. These impacts will be
mitigated by following the FERC procedures outlined in Section
V.
• Alternative 2: Denying the Special Permit Request and Requiring Full
Compliance with 49 CFR Part 192.
• Describe Alternative: Applicant would be required to comply with 49
CFR §§ 192.5, 192.611(a) and (d), and 192.619(a). TGP would be
required to replace existing pipe with heavier walled pipe.
Denial of the permit and full adherence to the Code would afford the
protections described above that are associated with either: a lower
MAOP, new pressure test, or heavier walled or higher grade pipe. Denial
of the special permit would mean for most of these pipeline segments that
the enhanced integrity management portions of a special permit conditions
would probably not be implemented.
Denial of the special permit would require excavation to remove existing
pipe, acquiring environmental permits where necessary, and pressure
testing of the replacement pipeline segments. This action would create an
impact to vegetation, soils and possibly waterways due to the excavation,
use of public roadways, and the impacted right of way during
construction.
TGP will evaluate the potential environmental consequences and affected
resources of land disturbances and water body crossings caused by
construction activities (including adding, modifying, replacing or
removing any facility) for the related environmental permits associated
with any TGP activity. This evaluation is outlined in Kinder Morgan's
Operating and Maintenance Procedure (O&M) 1205: Land Disturbance,
Construction, and Environmental Permits, and referenced forms and
procedures, which requires obtaining the required permits prior to
conducting any construction activity. These procedures ensure that all
activities resulting in land disturbances or construction of new or modified
facilities comply with the requirement to obtain all applicable
environmental permits and other applicable environmental authorizations.
These procedures contain information required to identify activities
subject to Federal, State, and Local environmental authorizations related
to the work and to obtain those authorizations. The procedures require a
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C.  FONSI Page 17 of 31

<<<PAGE 18>>>

review by TGP Environmental Services staff prior to the start of work,
incorporation of environmental requirements into the project
implementation, and ensuring outstanding (environmental) requirements
are incorporated into facility operation.
If the activities do not qualify under the requirements of 2.55(a) or 2.55(b)
facilities or the blanket certificate, TGP will pursue authorization in
accordance with Section 7 of the Natural Gas Act.
VI.  Public Comments
In this section, PHMSA is summarizing public comments received for this
proposed special permit.
• PHMSA received one public comment letter in response to the draft EA and draft
special permit from "Pipeline Safety Trusr dated March 24, 2016, concerning
this proposed special permit. Questions asked by Pipeline Safety Trust are
answered throughout this document and the letter can be reviewed on the docket
(PHMSA-2016-0004) at www.regulations.gov. A summary of the questions
asked by Pipeline Safety Trust are below:
• Only PHMSA announcement of the perrnit noted the fact that the
operators previous class locations had been in error. (FONSI Review:
Section II)
▪ The 5-year waiver to accomplish this seems unreasonably long. (FONSI
Review: Section II, Footnote 2)
• The Pipeline Safety Trust had several concerns with the information
presented in the application and the environmental assessment.
• Claimed environmental and safety benefit of the permit would
occur from the elimination of the methane emissions from pipeline
blowdowns; (FONSI Review: Section VIII)
• Application fails in a couple of cases to provide a complete
comparison of the effects of granting or denying the permit
including the impact on adjacent right-of-way owners by allowing
the existing pipe to remain in-service; (FONSI Review: Section V)
• In the section of Safety Risks the operator indicates that the
consequence of a failure would be no different if the permit is
granted or is denied, without an indication of whether denying the
permit would result in a reduction of pressure or pipe replacement;
( FONSI Review: Section V)
• There appears to be many segments included in the application which
have never been tested in that their MAOP was determined by the
Grandfather Clause (§ 192.619(c)). (FONSI Review: The special permit
conditions would require as a minimum pressure tests for any segments
that had not been pressure tested. Four segments have never been pressure
tested and are listed on Attachment A as KM segments 103, 181, 310, and
311. These segments will be either pressure tested or replaced.)
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C.  FONSI Page 18 of 31

<<<PAGE 19>>>

• The application fails to give a complete useful response to
§ 190.341(c)(4). (FONSI Review: Section II)
• Rather than use the special permit process in a situation like this, PHMSA
should consider entering a consent agreement with the operator with both
acknowledging the operator is out of compliance. PHMSA risks
regulating many individual operators by special permit, without any
justification for why the regulations should not be met, in effect negating
the safety factors in place under § 192.611 or other regulations. (FONSI
Review: Section II - The special permit requires replacement or pressure
testing of segments with over 10 dwelling. The special permit has
conditions and integrity management procedures for the special permit
inspection area, 433.71 miles of pipeline.)
VII.  Reporting
In this section, you must describe the different reporting activities to other
agencies and reporting basis (such as quarterly or annually) of right-of-way
activities that require permits for this proposed special permit.
• TGP will submit an annual report to the FERC pursuant to Section 2.55(b)
concerning replacement activities performed in the prior calendar year that were
exempt from the advance notification requirements as specified in Section
2.55(b)(2). The following items are provided to FERC:
• (i) A brief description of the pipeline facilities to be replaced (including
pipeline size and length, compression horsepower, design capacity, and
cost of construction);
• (ii) Current U.S. Geological Survey 7.5-minute series topographic maps
showing the location of the facilities to be replaced; and
• (iii) A description of the procedures to be used for erosion control,
revegetation and maintenance, and stream and wetland crossings.
• TGP will submit an annual report of Blanket Certificate Activities performed
pursuant to Sections 157.208, and 385.2011 of the FERC regulations. The
following information will be provided pursuant to the applicable blanket
certificate regulation:
• Section 157.208 (Construction, acquisition, operation, replacement, and
miscellaneous rearrangement of facilities):
• (1) A description of the facilities installed pursuant to this section,
including a description of the length and size of pipelines,
compressor horsepower, metering facilities, taps, valves, and any
other facilities constructed;
• (2) The specific purpose, location, and beginning and completion
date of construction of the facilities installed, the date service
commenced, and, if applicable, a statement indicating the extent to
which the facilities were jointly constructed;
PHMSA-2016-000-I Tennessee Gas Pipeline, L.L.C.  FONSI Page 19 of 31

<<<PAGE 20>>>

• (3) The actual installed cost of each facility item listed pursuant to
paragraph (e)(1), separately stating the cost of materials and labor
as well as other costs allocable to the facilities;
• (4)(i) A description of the contacts made, reports produced, and
results of consultations which took place to ensure compliance
with the Endangered Species Act, the National Historic
Preservation Act and the Coastal Zone Management Act;
• (ii) Documentation, including images, that restoration of work
areas is progressing appropriately;
• (iii) A discussion of problems or unusual construction issues,
including those identified by affected landowners, and corrective
actions taken or planned; and
• (5) For acquisitions of facilities:
• (i) A statement referencing the date of issuance, docket number
and title of the proceeding for any certificate issued by the
Commission authorizing the facilities acquired; and
• (ii) The amounts recorded in the accounts of the vendor (seller
or lessor) that apply to the facilities acquired and the accumulated
provisions for depreciation, depletion, and amortization.
VIII.  Finding of No Significant Impact (FONSI)
PHMSA has carefully analyzed the safety and environmental risks associated with the
above alternatives.
PHMSA believes there are minimal differences in environmental benefits from
Alternative 1 (Granting the Special Permit Request With Conditions) or Alternative 2
(Denial) in eliminating methane emissions. Some methane emissions will occur from
blowdowns in anticipation of hydrotesting or pipe replacement for either alternative.
TGP must use operating practices to minimize gas volumes in the pipe prior to segment
blowdown for either Alternative 1 or 2.
PHMSA will require Type A special permit segments8 to be replaced with new upgraded
pipe in accordance with 49 CFR §§ 192.611(a) and 192.619(a) requirements for a Class 3
location or pressure tested so that the MAOP is commensurate with the present class
location. Type B special permit segments9 will be required to implement IM procedures
and the conditions in the special permit.
g Type A special permit segments include those special permit segments where there is a cluster, as
described in 49 CFR § 192.5(c), of more than 10 buiklings intended for human occupancy in a "class
location unit" and for which the MAOP has not been confirmed in accordance with 49 CFR
§ 192.61(a).
9 Type B special permit segments include those special permit segments where there is a cluster, as
described in 49 CFR § 192.5(c), of 10 or fewer buildings intended for human occupancy in a "class
location unit" and for which the MAOP has not been confirmed in accordance with 49 CFR § 192.611.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C.  FONSI Page 20 of 31

<<<PAGE 21>>>

PHMSA will grant TGP a special permit with conditions as outlined in Alternative
1 and Reporting sections above. TGP will implement additional special permit
conditions to maintain safety and will follow the FERC and any other applicable
Federal, state, and local regulations for evaluating and mitigating the potential
environmental consequences and affected resources of land disturbances and water
body crossings caused by construction activities (including adding, modifying,
replacing or removing any facility) for the related environmental permits associated
with any TGP activity.
PHMSA has imposed conditions on this special permit designed to protect the
public, property, and the environment from the risk of a pipeline leak or failure.
These conditions are designed to ensure that the likelihood of a leak or failure is not
greater than it would be in the absence of the special permit. Therefore, we believe
there are no significant environrnental impacts associated with the issuance of a
special permit to TGP.
The TGP special permit conditions will maintain safety and the environment for the
49.00 miles of pipe in the special permit segments until replaced with upgraded
pipe or pressure tested and will require integrity management concepts to be
implemented for 433.71 miles of special permit inspection areas.
IX. List of Preparers
Amelia Samaras, PHMSA, US DOT, amelia.samaras@dot.gov
Steve Nanney, PHMSA, USDOT, steve.nanney@dot.gov
X. Agencies and Persons Consulted
No other agencies were consulted, but PHMSA considered environmental information,
special permit conditions, and documents submitted by TGP.
Attachments:
Attachment A — Listing of TGP Special Permit Segments
Attachment B — Guidance of Repairs to Interstate Natural Gas Pipelines Pursuant to
FERC Regulations (July 2005)
Location Map: A map showing the geographic location of the Special Permit Segments
can be reviewed at: regulations.gov at Docket: PHMSA-2016-0004.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C.  FONSI Page 21 of 31

<<<PAGE 22>>>

Attachment D — Section 3, ASME B31.8S, 2004
MAPAAGIW, SYS-KM INTEGRITY O F GAS PIPLUItES
AWL B S1.85 2064
k. 
the FtibiliC 1.1110C MAN/ at..ut thekr tatc-ritt. manage-
mem eifort-. ThL. plan ?than prinide inforrnauivt to be
Mmuill,r390,1 to each saakeholder about the utte.,..zrin
plan and the re...ult- achiet.ed Paragra;th l
turth,r crt1 1311.311,-r, 
:.•rtvirturikratlorv , r11.11 ,
2.4..4 Management of Change Plan. Pipeline
and the emtforatiera ul ,refate ate -.Adorn
-taw. A 
-hall t. ued to ensure that
vwfiv tmpl,..m,ntattill change, to the pipeltne .0.stem
vtritt,ri ,tr main tenance are 0. al ua ted hi' their
poteritial rt,-k anpach, and to ory,ute Uut changes t. the
envirtmmtni in iyhtch the r Tome ,Terat.21- are evalu-
ated After Ule,e chAne,i, are made, the., t-hall be u.t,.vr-
pnrated.apprOpriate. alto luture
OrISun. that the rtsi._ a,se..tnent 
the
currenth configured, oretated, and Main-
tamed The re-.ults ot thc plan i tristtgatwe acttvitte,
-hould t
-ed at. 3

 Lht,i, tor ...vstemi and fat:ante,
d.a•ltril .111d operation. Paragraph 11 the tmp.r-
tan astito:t.. ot st13.-13L;Ing. changes 3., they relate to trueg-
nn manae.emont
2.4.5 Quality Contnal Plan. Paragraph 12 di,cu..-t-
the evaluation of tho intet4riìv. management pri,,graiin tor
qualin ,"ontrol purpo,,--- That paragraph outhnes the
document-anon for the tntegrin management
pri-oam. The paragraph ali-c dt,cus,e, auditing of the
program, including the pruces..i.e. minga-
thni .krtlyttle, arid pre% itntton acto. ttwt-
3 CONSEQUENCES
3.1 General
Rt..k r. the in.ath,..matical product of the ltkelthooki
lpritabtlitt. i and the COlbeLlueflios of evea- it. itivat re,ult
from a failure Rt-k mat K. decrea.ed bv reducing tither
the likelihood er ttt iOtbequeli.:,L, of a ia,lun. r both
The- paragraph .reitticalI, the con...-oquence
p:Ttion di the tLk equation rh, op..ra tor ..tuu con,ider
ot potonnal failure when pnoritinng
irtspectiort- and Illitl.aation act:\ the,.
The li11 ittse managt.t. risk to INF...line imegntv
adtusting de..agn and ‘atett, factors, and Irt-recholl an.1
MaLmenance InNue4ci..1....ts the potential
of a failure trlirea!-,• :In:. ha, hoen done on an empirical
wtthou t qualltit1 [rig the con.-..equence- of a failure
Paragraph 1.2 det-,:rtbii, how tv determme the area
that r. atti.ctoti hy a pirehne failure T.otenttal attract
area: n't order to evaluate the rOtenhal ...- ..trt-equerwes it
aft event. The ino3 irraraiticl v• a function of the
prthrie dial:toter and rw—urv.
3.2 Potential impact Area
The refined radiw or impact tor natural ga, zalcu-
laied uing the formula
• .1,— r 
where
JIAMOrt'r ef the pip.ilute. tn
r =  maximum 
orteratint; Lireteturi i,, F-1:4
r =
of the trapai_t 
tt
rit
able
lc a- . d_vi-,1r, rirc m..1%,rra_rn
F••••: 1--r•  ,
arpr
r  I  • ,
. 111 Kul- :7,
= 
rt
el:, equation ...hoi . that failure dr a -mallet
diameter. lower pipieltne 'will affect a smaller
area titan a larger diameter, higher pre,-ure ppeline
SiJi- c:F.1-11.1
tt.C.t.vo  nalayral
4,11.  dif,m7
1,;u311., 11  t. Jeri% 
trottl
I
•
where
= di--char4e cootticient
Ii = heat of ,zortibu.tion
= thte,hold heat flu\
= flow factor =
1
conmant
teffl Feri
• -onic veloott. 14. 
=
/Int' dialr:Wit.i .
[1101.e,:111.31' .o.eight
h1e r f tr.,11 ft?
retini.4.1 radius of unpa.t
= -pectin- heat faho ot
releae fate
taih,r
er:13,-1..Lty
la a performarva-ba2-ed ?t,-
,`41%.1CO the of4prakir trkal
cort-ider altertute model.. IVA :akulate impact area.
and ,:ert-der addittorul factor-. su.ih as depth ot burial.
th_it mal. ftclu,e unraLl area., The 
.hall
the number of hotwo• and mai% tduaI unjt tri building,
within the petential impact area 7'he poteilital
area e'elelld!.. irtim the :enter ot th, rtr,i „Arcle
the iefitof ot the  lug II
hou-ing unit ,iount can thtri  to.e.,1 to help deterffithe
the relatne con-eqt1,11,0,. 03 3 rupture dt the pipelirte
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. 
FONSI Page 22 of 31

<<<PAGE 23>>>

Attachrnent D — Section 3, ASME B31.8S, 2004
A !AAL LI 
IMMAGItel SYSTEM NTLGAITY Of GAS PIPELDIES
Pc!err. al impa.:! area
.winin dashed l nes
School
%.40k. sofil. 1 ar;  •rormr-es Il•et.1.1, r 3 , 3 11 n 3.pr wrn  VL0i). , 
Ag. 3 Potential Impact Area
va.
The ranking of these afeaoi is an important element of
risk assts.-sm.:1u Determining the likelihood inlure 1.-
the other Important element of risk assessment l,ee
naras. 4 and
3.3 Consequence Factors to Consider
11hen elaluating the cortsequerlies Of a failure tylthin
the attract tone. the elaerator shall ciansader at least th.!
rocukitsoti den.s3t
it i rroxitMl!. of the populatIon to the pipeline
inclu ding o.,rts 
Ion of manmade or natural barrier-
that max pro'. tde some let el of protectIoni
pro-umity of isr.11.1tIMS iviel knitted or impaircsi
rhohiltly  g , hospitals. schools. child,:are enters .
retirement communities. prisons. recreation areas.. par-
t,uljrlt zfl uryrotected outsade areas
!di pftaperty damage
lei environmental damage
unignited gas releas.±s
securar. of gas supph :ci impacts resultinu from
interruption of ser.- ice:
publi.: con.....nience and ram- es-it%
1:1 potential for se..7ondary failures
Note that the consequences rftn van. on ttw
rachnes- of the gas transporusi and as a result of hoo.
the gas decompresses The richer t.he gas. the more
amport.mt defects and matedal propenies are art model-
ing the characten.sfics of the failure.
4 GATHERING. REVIEWING. AND INTEGRATING
DATA
4.1 General
This paragraph pro.iides a systeinatac 
f..r
pipeline operators to and effectively utilize the
data element. riec...Issar.. iksr nsk Lompre-
hert-ne pipeline and kn.-its- lodge is an essemaal
compcanent of a perfoimance-ased integnft manage-
ment prourarn  atidatice). trli.`1111.31.1011 siì ,r .,,,.satt.wi.al
his tort . the em irmment ar..und the pop:line. nutigatii.n
techniques empl."..e.i. and pftv....s. prot- edurt- revicy.s
also nocessarc l:fata an. a /..:!‘• element in the deczston-
making process St.4,-ttrksi for pn..-gram Implement:tn.- an
When the Ore'rati'l" lack. sufficient data of ..where data
qualm is below requift.ments. the operater -hall
the prescraptivc-hased proceifses as shown in Nontrian-
datorv Ai-pendia 1.
Papehrie op..rator procedures. operanon and maiinte-
nano:. plans incident information. and other papelme
operater siskumonts specify and require collection of
data that are sultatle for mac-grit., ra.sk assessment :nti-
i.v.ation of the situ elements 8- essentaal in order h, ottlin
:orftplete and as -curate utiormationneed.sitsr ail altc'tZ•
fit% management program.
4.2 Data Requirements
The operator -hall halo a ...omprehense8.... plan tor
collecting all data sets The Cierat..r must first :Aleut
the data res4u trod 1...1 rs.frOrin d risk assys-rileilt s.c par.]
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C.  FONSI Page 23 of 31

<<<PAGE 24>>>

OPID 19160
A
liE
a
Iri
P .f.;
tg MR,$—M,M00.2MJRW.MMRUMVVMMMN!OJAHMWI
X,AAAAAMRRFAAA;IXR3ii*X%;',ISitRrn'ARRFIRRXX7.474RRRPRAgiAgRF1515i*FtRiiiRFI
------
1q8888888888898888888R. 15 ]8,VLISFIBR88§8888888888888888888_,S885
g. , 66666d666d6cid6:166666Rgid,i [4 666,1 3 6 4 66666666666666666666a,66 3 !
sgx2 53 F
egg aiRkRGWA"R!, 3
4 AOA"
r g .. ..^4 8 w
.
w254.:i0.RE8k b .
a
Org
101
zgi ge F ARPOMMg.P.7.FAg.4V'Aiggi="70gr548gOWn0%
11 11
a
alg
11.
2 
M
 ..... 0.....,.i............. . i .... . .. ............A..
w ?
S2222g9i"iggic .ii - 22.2222222222222V222222?2g2222i2M22.22
11-g aufl
mmo, mramviimmul 
PRiIn
Zvli
AL .?.
LuiA  aisra.;, i..4" 5(5
A
MM1 4, 2,MOW'IM • .,:”77-;---4 
1174'4
z „,, 5 ,
_
- ,AAA4AAAOAA1-: , n't - ii24,-4- ' 11s51 , A 5 UCW
gggHHHggiiigigiiiia'Hird;iNNEHHiHiii0Aign$504
gg g4 
DD,z66S . CT , W
11§4,E0 . iMig .14 e,e§§ M VV OP V OIV EE nnMniil g9g
§33 1"IniiW100 2 iiilaW;IglIggE122 40HPW E 6
1 
> 55
a
111""111"1'"'"H""MTP11""I'Primmm' HOMMAI„54$„„I, 
Attachment A: Listing of Tennessee Gas Pipeline (TGP) special permit segments
114
d5 
4 Xi cam < Xi .16 fp 61 CO MI in  61 El gel .1( LO et1 eel 4 L12 6 eel 61 4 16 KO :a 4 1:13 19 16 La pl eel e0 WI 6 WI et .< 
CO CO CO
m HiAnnind

<<<PAGE 25>>>

MAOP
(psig)
760
790
790
BR888222222
OPID 19160
Diameter
2 2
Dwellings in
length not
meeting
present Class
7 - 9 ~
Pressure Test
Length (ft)
0.00
39.90
0.00
154.20
79.50
0.00
2,947.18
0.00
682.08
0.00
36.00
612.00
0.00
12.00
0.00
0.00
....
Replace Length (fe)
1,581.69
1,488.68
1,439.64
2,789.70
1,505.76
1,358.93
0.00
638.34
436.50
436.76
803 33
461.62
950.24
1,229.60
1,723 32
654.33
4,04814
1,492.73
3,153.88
4,139-46
2.601.90
2.044.66
....
Special Permit
Segment Length
not meeting
present Class (ft)
581 CA
1,488.68
1,909.29
1,439.84
2.943.90
1,358.93
496 50
3,318.84
461.62
1,746.24
1.723.32
4,060.24
1,492.73
557.12
1,153.88
1,059.96
4,139.46
2,691.92
2,041.66
....!
Special Permit
Inspection Aces
Length (ft)
12141 64
12048.68
12409.29
11999.84
12145.26
11928.93
13513.04
11198.57
1
1168864
11383.33
1221 1.
117:3.88
1
1
Latest HCA Assessmen
and Data
N/A
N/A
N/A
N/A
N/A
N/A
N/A
VIFL/Caliper - 2008
N/A
N/A
N/A
N/A
MFU/Caliper - 2001
N/A
MFU/Caliper - 2014
N/A
MFL/Caliper - 2011
N/A
sile lina.
MFL/Caliper
MEL/Caliper
N/A
9992
992
(pipe)
(present)
Special Permit Inspection
Area Stationing (Ending)
Valve - Station
546-1-41850
530-2- 77307
535-2-4549:
22117
...
Page 25 of 31
324-14
324-1A
126:
136:
213-2-
Special Permit
Inspection Area
Stationing (Beginning)
Valve - Station
546-1 - 29708
530-2 - 65751
535-2 - 33024
49724
051. 1107
3544
6452
...
125-1A
326:
326-
244-
213-1-
215-1-
Permit
Segment
Special Permit
(Ending)
Valve - Station
546-1 - 36570
530-2 - 72527
64196
7119
15551
• 21827
1200.
530-3-
324-14
324-1A
326-1
243-2-
251-1-
segment Stationing Segment Stationin
Attachment A: Listing of Tennessee Gas Pipeline (TGP) special permit segments
Special Permit
(Beginning)
Valve - Station
546-1 - 34968
590-2-71038
535-2-38304
540-2 - 77710
540-2 - 83326
546-2 - 34989
630-1. 20810
324-1A - 55004
124-1A - 63558
325-1 - 16351
325-1-17148
325-1A - 38824
328-1 - 29030
- 13357
236-1-
144-1 - 21246
18683
251-1 - 34314
215-1-37377
...
2E5399
Une Name
LOWNDES
HANCOCK
CORRECT
LOWNDES
SUSSEX
SUSSEX
SUSSEX
BERGEN
ONTARIO
MADISON
ALBANY
ALBANY
922222222
....
PHMSA REGION PHMSA No. KM No. State
8
288882888888888888888233
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
EASTERN
EASTERN
EASTERN
EASTERN
EASTERN
EASTERN
EASTERN
EASTERN
EASTERN
EASTERN
EASTERN
EASTERN
ASTERN

<<<PAGE 26>>>

OPID 19160
11
KIS"
Oro 20=
mngomm. n 22 2 4.2 m rt m  m 
5MgMi5g.MMIMMMgM5gMitq.M.M,MMOM§gg5Filg.fi
222222222222222222222222222sit22222xxxaxs2 222222222222x% 7,7,22
mma a mm n m  m go m a to go m a moo mm  n a
if .i3g8"88 8880AR8 5018 *8="80888288888 • 89
^` .1. 7' ; 6 bVi'dOdoddidg.SV. 4 ,d 5 V.ddr.^,'ddd"dodiii 'do r r^1
s 4 .2 R evi R m $ $ $ A..1.aq a 132 $ 
m 288..7.12882 888282
• 8442423.4d 243"31,8.4.4,24,2d4 d  d ,nr ; r.:,n 88 . "  es;noini
4 dddi=t5l,
i!ZZ
,
• ,g9..2.g r3,22 3 3, 42  82'41 , .R882in' k g951AQ.128,88,2/R.R223.1kr‘18,E38
.gr4:7;:wAwLcrAgg:eg§.'sr'alI.?-• 'cOlgR.I. `§',525.6` 0 5.0.5 -- 05 , .
- : 055500 § ..7 ;:i .
1111
fie asi
EM56:.746,116g041010rWAMiiimvic15 0§n - 406.5gRrAMRP6
--  -
8 RR 
! v373.
" 
z
2 2
o,
it 
t  tt
g5P25222P-22.P_29H.222g229222222222P92Pi"M29°i-222.
....... -__„--- ................ 
....... ....
gm n1 In 1+1  IV, .2. 22 
m m ga m m gn  2.4 
m men en at  m  4.2 go mg m  m m m  m 
m
.g
PRI;
RiFOHLgWiknIUMM;MP.M, WWWW"3.0P WA
4 RURRg§n403MnwWigigiei:W;iZAA;iq, ,iAAAL3W---. 7 .
414t--
Attachment A: Listing of Tennessee Gas Pipeline (TGP) special perrnit segments
RilpolvPippwilvmoinoRgvoi imPul;IP!!r04
m to carnmrAcnorcnonammcarnanencnez:nconpgnmconletall30 1 .11 10 .COLO.racOPCICO 
COCPCLICP. 10.03021031..10
WMMOMiltrAMMIIMMUMA 1-PmF4014 ,07, 74
til
tryi allg
n2M1W-Nliqv , Mil,HUgrOEIPAHOMITIILI.Alfir
IIA;
rt- 0 ;1§g
ttoe
EtIgilf5HEIHEEHEIFEHIEEttIM
MAIMIIMEnvi

<<<PAGE 27>>>

Attachrnent A: Listing of Tennessee Gas Pipeline (TGP) special permit segments
PI41454 REGION IMAM No. KM No. Mate EASTERN 175 320 WA
EASTEAN 176 322 WV
EASTERN 177 323 WV
EASTERN 178 326 VAI
EASTERN 179 327 WV
EASTERN 183 328 WV
EASTERN 181 326 WV
EASTERN 182 393 WV
EASTERN 183 391 WV
S01.1114WEST 184 334 TX
SCRNHINEST 185 335 TX
SOUTHWEST 186 336 TX
EASTERN 187 340 WV
SOUTHERN 188 341 TN
SOUTHERN rea or Kr
SOIJTHERN 193 343 KY
SOuTHEAN 191 348 MS
sotnriwur 192 3E0 LA
OP1D 19160
Comte One Name
Spedel Peenslt
Segment Sraellon/ng
TENKIEwIne
Wee - Motion
Sporiol Penult
Segment MetIonIng
(8901.10
Veer. -Shod.
Medal
Permit
Segment
Type
Spedal Permit
8140.1 11.0 Mee
Stetfaving (BagInning)
Wye • Station
Medd Permit Impaction
Area Stalloning lendinw
Vie ws - 5Mtloes
ChM
Prm4071.1
Oars
WOO
HCA Uteri HCA Assessment
and Dew
Medal Pennit
Inspection Arla
Lehgth(N1
Sporiel Permit
5egnsen1 Length
not meeting
present Gm 1121
Pressure Test
Iteplece length 9111
ERROR 10)
11.61 ill nee in
length not
meeting
present Elms
Pipe
Ofarnater
(101
MAO'
(Mlle
KANAWHA 100.1 118-1 - 71E035 118, 1  78689 a 118.1 - 64775 118-1 - 75069 785 We/Caliper - 2012 11144 46 584.46 584.46 a co 1 20 910
KANAWHA tC01 121-1 - 19293 121-1. 21342 a 121-1 - rams 121-1 - 26622 1  NO N/A 1260991 2.249.91 2149.91 aco 3 75 936
WAYNE 1002 115-2- 18573 115-2- 21231 O 119-2 - 13293 115-7 - 26511 1 
NO 14/13 13211.S1 2E61.55 2E61.51 ego 4 :5 WI
PUTNAM 1002 1197 - 3970 119 2 • 5913 O 118-3 - ED933 119-2 - 11193 1 
YES ILI/Cal l per - 12503.22 1,913 22 1,413.22 0.00 5 24 938
PUTNAM 1002 119-2- 13276 1192 - 16704 A 119.2- 7996 119-2 - 21964 1  NO NIA 13988.57 3,418.57 2,671.47 557.10 16 14 938
CABELL 1C0•3 115-3- 52772 115 3 - 53741 O 1153 47492 115-3 - 59321 1 
NO N/A 11529.77 969.77 96927 0.03 2 26 991
[ABELL 1E03 117-3 - 37414 117-3 - 37852 117-3 - 32134 517-1- 43132 2  NO 10338.1 436.10 0.133 432.10 26 910
PUTNAM 103-3 118-3- 25714 118-3. 27130 O 1183 20734 118-1- 32410 O 1  NO N/A 11975.75 1,415.75 1,41975 000 2 2 10 910
PL7FIVAM 1023 118-3- 31972 118-3 • 32863 O 1182 - 29592 11& 3 - 311143 1 
NO N/A 11451.2 891_20 891.20 COO 3 30 910
WALLER 103-1 19-1- 41:666 191 44295 A 19.1 • 35564 20-1 - 572 3 1 
NO N/A 13989.29 8429.29 3,429.29 0 03 11 24 750
HARRIS 1021 19-1 - 47733 19-1. 48959 ET 191 - 42497 20-1 • 5235 3 1 
140 NIA 11241.1 1,181.70 1,1E1.10 0.01 3 74 750
HARRIS 1001 20./ - 34 20 1 • 709 a 19-1 - 43757 201 - 5969 1 
NO N/A 11235 137 675.07 661.17 13.93 3 24 930
KANAWHA 1002 1.21-2- 54382 121-2 - 15616 o 121-2 • 49102 121-2 - 0:636 5 1  FIO N/A 117917 1,233.70 1,233, 70 0.00 2 24 aro
CHEATHAM 102-4 83-48- 1141336 83-48 • 115333 O 83-48 - 109555 134-4 - 2247 5 1 
NO N/A 11057.5 497 50 497.50 0.80 6
x 750
49A01109 100-4 103-4 - 7517 103 4 - E589 O 1E0-4 -2237 1113A. 14169 1 
140 N/A 11931.39 1,147_0.9 1,30.249 6.05 AI 750
,
MADISON EX14 103-4 - 9445 103 .4 
9587 103-4 - 4165 103-4 - 14967 1 
NO N/A 111972.74 242.74 242.74 0.03 1 33 750
LALOERDA TE 530-2 541-2 - 72 541 2. 383 O 5402 - 81127 541-2- 5663 1 
NO N/A 10871.51 311.51 311.51 aco 4 36 936
CALCASIEU OW4 821-14 
76686 521 IA • 78670. A 821-14 - 71463 821-1A - 83951 1  TES egl/CalfTer - 2014 12599 69 1,913.54 1,913.54 0.12 17 30 936
/Earl/a
MAW - Double Subnlerged Arc Weld
EFW- Eletlric F upon Weld  MOTU
ERW- Electric Resistance Weld
 1. When a Segment haS multiple pipe attributes (test pressure, Seam. coating. etc2.11se attributes f or the weakest
EW Eledric Weld ISAW 0, I/54W, not ERW) Pipe nit ment Is dist/loped
FW • Flash Weld  2. The acct.! length of the special permit segment from begin station to end station may Im greater than the length
SAW - Submerged Are Weld  not meeting pre HI nt el 011 due to compliant pipe In !he segment.
SIMS- Seantless  3. Pipeline stall oni n8 subject tO Change. due la Mallon equations, centerline changes, etc
NLP Yiot Like Plpe for Leaks
NSW  N on-Su sceptfli e locator, or Pipe' To r SCC
PIR - Potential Imam/Radius
MAOP Maximum Allowable Operating Pressure
K41.9 - Mainline Valve
HCA • itigh Consequence Area
SCe - Stress Corrosion Cracking - hellhole inspection
SCC' - Stre44 Ca rosion Coding Hvdrolest Pollotn
SCe - Stress COrrosi on Crack I ng In-Scivice Failure
Sce- suešš 
PaInit 5115rrVint located ln upstream =mate tax segment tromSCC Intention lw th  mem). Selmer t deemed not susceptible to SCC
S.Sux - Se lectl ve Se ern Weld Coirosion
IAP5 - Mai I MUM Pressure In 5 Yea. Preceding 7/1/1970
2289,965.38 25823868 235,14423 2159165 FOOTAGE
433.71 4800 4453 4.47 KinsAGE
07/21/2016re, ,
Page 27 of 31

<<<PAGE 28>>>

Attachment A: Listing of Tennessee Gas Pipeline (TGP) special permit segments
PHMSA
No. KM No.
OPID 19160
___, i-
Pipe
. - I Distance to MP5ertly
Test
Pressure
11 11 4)
Design
Pressure
te 072
Pipe Wall
Thickness
(In)
PIR (III Pipe Grade 4psig) Pipe Seam
Type Pip, Coating
Pipe
Installation
Date
NILV
Upstream/
0ownstrea
Coinpregaw
Station
Spedeig (ml)
MAOP
Established per
map
Aerial Photography Material/ Pressure
Test Doostments
Le ak/SCC/SSWC (w/i 20 Inl
of segment)
Segment
Pressure Tested
atter
bealtraCC/SSWC
Irethat
Inspect.
d
Or MPS
record
(D oback
1P415)
m (m1)
uplift')
69 949 750 025 454 socca 580 tiOT APPUELIWAX 1971 1_0 89.2 (a)(1 1 2012 Y / Y Leak 41  15/1986) NLP YES N/A
70 1148 876.72 0.281 454 52000 SAW HOT APPLIED WAX 1971 2.3/ 2.2 89.2 )41(1) 2012 Y/ Y Leak 11015/19864 YES YES N/A
71 949 750 0.75 454 WOO FW HOT APPUED WAX 1971 3.4/ 1.0 89.2 (4)(1) 2012 Y/ Y Leak 111/15/19861 NLP YES N/A
72 ION 809.28 a 281 491 52000 FW COAITAR ENAMEL 3-9as 53 / 3.9 47.9 (a))31 2011 91 Y Leak (4/11/)984( YLS YES NtA
73 1029 80928 0281 491 52000 FW COAL TAR ENAMEL 1943 6.4 /26 47.9 00) 2012 Y / Y Leak 14/11/1954) 1E5 YES N/A
74 1029 809 28 0281 491 52000 FW FUSION BONDED EPDXY 1948 7.6 / 1.4 42.9 (0)3/ 2017 / Leak (4/11/1994) YES YES N/A
75 1029 809.28 0281 401 52000 FW FUSION BONDED EPDXY 1948 84/ 09 42.9 1.1134 2012 / Lral ivvvi9s4) YES YES 141A
76 1040 809.28 0.281 491 52000 FW FUSION BONDED EPDXY 1948 02/ 13.1 42.9 (a)(31 2012 r Lea k (4/11/1954) 9E5 YES N/A
77 1040 809.28 0.281 491 52000 FW HOT APPLIED WAX 1949 3.6 /9.2 42.9 (4(3) 2012 V/ Y Leak (4/11/1984) YES YES N/A
78 978 778.75 0.312 567 5507 DSAW COAL TAR ENAMEL 1950 1001a0 89.2 14)(3) 2012 / Leek 16/1/19654 YES YES N/A
79 1045 778.75 0.312 567 52000 DSAW COAL TAR ENAMEL 1950 0.4/ 7.8 89.2 14)(3) 2012 Y/ Y Leak (6/1/19651 1E5 YES N/A
Ea 1045 771175 0.312 567 52000 CANN COAL TAR ENAMEL 1950 16/ LS 89.2 (4)(3) 2012 Y/ Leak (6/1 /1965) YES YES N/A
82 1034 809 28 0281 491 521129 FM/ COAL TAR ENAMEL 1949 10.0/0.1 42.9 18)(3) 2012 Y/Y Leak (02/1995) NO YEs N/A
83 1022 809.28 0.281 491 52CO3 FW COAL TAR ENAMEL 1949 10.2 /QO 42.9 (e)19) 2012 / Leak 44/2/19981 NO YES N/A
44 1022 809.28 0.781 491 52000 TW COALTAR ENAMEL 1949 / 111 4213 (0(31 2012 9 / Leak (4/2/1 9981 NO YES I4/.4
as 1020 809.28 a 281 491 52020 FW COAL TAR ENAMEL 1949 4.6 / 7.2 42.9 (410) 2012 Y / Y Leak 12/1 5/1953) YES YES N/A
86 ION 809.28 0.281 504 52130 FW COAL yAR ENAMEL 1950 9.0/ 0.0 32.5 la1(1 / 2012 / Leak (4/30/2011) 610 YES N/A
87
1033
1309.28
0.281
504
52000
FW
COAL TAR ENAMEL
1950
00/ 3.2
32.5
(a)(1 )
2012
'I  Y
1eek (9130/2011(
110
YES
14114,
sa
993
778.75
0.312
567
52000
DSAW
COAL TAR ENAMEL
1951
3.0 / 5.9
892
(8)(3)
2012
Y/ Y
Leak (9/26/15 99/
60
YES
N/A
89 993 77835 0.312 567 52000 ELSAW COAL TAR ENAMEL 1951 3.3 / 5.6 89.2 (8((3) 2012 Y / Y Leak (9/25/1995) NO YES 10.4
29 1284 936 0.39 760 60033 DSAW HOT APPUED WAX 1959 13.2 /I 3.6 89.2 4111 1 2012 1/ Y N/A YES N/A
NO 1037 750 025 454 50000 FW COAL TAR ENAMEL 1944 8.6/ 59 81.1 WO) 2012 Y / Leak (1/1/1986( NO YES N/A
101 1037 7S0 025 654 50000 FW COAL TAR ENAMEL 1944 9.0/ 4.7 811 (4)11 1 2012 Y/ Y Leak 11/1/1986) NO YES N/A
102 1039 750 0.25 454 50000 FIN FUSION BONDED EPDXY 1944 10.9 / 13 511 1.111 1 2012 Y/ Y Leak 13/1 /1965) f Ste YES/ NSLP YES NIA
103 MPS 1012.5 0.375 454 45000 SIVN.S HOT APPLIED WAX 1944 4.6/ 0.7 78.7 le) 2012 1/ MPS leak (3/1/1965)/ SCC" NIP / NSLP YES YES
106 1037 858.62 0.344 567 52000 °SAW COAL TAR ENAMEL 1949 8.6/ 4.9 81.1 OHO 2012 9/ y Leak (1 2 /15/19691 NO YES N/A
106 1037 858.62 a 344 567 52033 3SAW COAL TAR ENAMEL 1949 9.0/ 4.7 811 (eV) 2012 1/1 Leak (12/15/1959) NO YES N/A
108 757 603.87 0.25 526 52000 MAW coAL YAR ENAMEL 1998 1119/ 13 81.1 (a)p) 2912 Y Y Leak (11/3, 2 12(110)/ SCe NO/ NSLP YES N/A
109 1114 809.28 0.281 491 52cao FW coAufAR ENAMEL 1947 17 / 5.0 87 (a)(1) 201.2 Y Leak (6/24/1993) / sce hILP 1 YES YES
110 1072 778.75 0.312 567 52C00 DSAW COAL TAR ENAMEL 1951 8.6 / 4.9 fIL 1 181(1 ) 2012 Y / V Leak (5/15/1969) NO YES N/A
111 1072 77835 0.312 567 52C00 DSAW COAL TAR ENAMEL 1951 ao/ 4.7 81.1 (4111) 2012 9/ Leak (5/1 5/1969) NO YES N/A
113 1067 778.75 0312 567 52003 DSAW FUSION BONDED Pon 1951 819/ 13 811 OHO 2012 Y / Y Leak (9/ 2712037) / SCe NO/ INSLP YES N)A
115 1249 855.62 0344 567 52000 ()SAW COAL TAR ENAMEL 1949 Lfi / 5.0 87 1 4)(3) 2012 Y/ Y Leak (6/15/1984)/ sex' YES/ YES YES N/A
116 1068 77875 0312 567 52000 DSAW COAL TAR ENAMEL 1431 1.6/4.9 87 la)(1 ) 2012 Y/ Y Leek [6/15/1959)/ SCCl YES/ YES YEs I4/A
117 1407 973.44 0312 517 52000 DSAW COAL TAR ENAMEL 1956 16/ 8.9 156.1 (a)13) 2012 Y/ Y Leak 14/15/1971) YES YES N/A
118 1407 973.44 0.312 517 52000 DSAW COAL TAR ENAMEL 1956 21/ 8.7 186.1 [A)43) 2012 1/ Y Leak (4/15/1971) YES YES N/A
114 1991 913.44 0.31.7 517 501120 OSAW COAL TAR ENAMEL 1956 3.0/ 7.4 186.1 1e1(3) 2012 1/ Y Leak (4/15/1 971) YES YES N/A
120 1407 973.44 0.312 517 52020 DSAW COAL TAR ENAMEL 1956 86/ 25 186.1 41131 2012 Y/ Y N/A YES N/A
121 1330 936 0.375 633 52020 [HAW COAL TAR ENAMEL 1955 13.2 /56 51.1 (i)(3I 2012 /1 SCC' YES YES N/A
122 1338 936 0375 633 52000 MAW COAL TAR ENAMEL 1955 195 / AB 51..1 ia)(1 4 2011 (9 SCO YES YES NIA
124 1379 936 0375 633 52000 DSAW COAL TAR ENAMEL 1954 14.8/ 1.4 141( 3) 2012 Y / Y SC& YES YES N/A
125 1329 936 0.375 633 52cca DSAW COAL TAR ENAMEL 1954 14.8 / 11 60.1 4)13( 2912 / SCC' NO YES N/A
126 1329 936 0.375 633 52000 DSAW COAL TAR ENAMEL 1954 / 16.9 al 1411 3) 2012 Y /V SCe NO YES 14/5
131 1093 758.7 0.281 454 45000 SMLS COAL TAR ENAMEL 1944 3.7 / 2.4 87 PI(3) 2012 9/ Y Leak (11/15/1953) YES YES N/A
132 1093 758.7 0.281 454 45000 SAW COAL TAR ENAMEL 1944 4.8 / 12 87 141(3) 2012 Y/ Y Leak (1015/1953) YES YES N/A
134 1178 809.28 0.281 491 52000 FW COAL TAR ENAMEL 1948 33/25 87 1 41(3) 2012 Y / Y Leak (2/28/1991) / sce NO/ NSLP YES N/A
135 1178 809.28 0.281 491 52(120 FW COAL TAR ENAMEL 1948 3.7 / 2.1 87 1e)(3) 2012 1/ Y teak (2/28/1991)/ SCC NO / NSLP YES N/A
136 1026 7713.75 0.312 567 52028 'MAW COAL TAR ENAMEL 1949 0.7/ 121 85.1 (411.3/ 2012 1/ Y Leak (2/1 5/1977) NO YES N/A
137 1027 7713.75 0.31.2 567 52030 MAW COAL TAR ENAMEL 1952 0.7/ 13.1 85.1 (4)(3) 2012 1/ 1* Leak (1/30/1553) NO YES N/A
139 1309 936 0.375 633 52000 FW COAL TAR ENAMEL 1959 13.5 / 1.1 58.7 1.1(31 2012 1/ Y Leak 19/1 5/19751 NO YES N/A
140 1324 936 0375 633 52000 FIN 1903 APP MD WAX 1959 7.3/ 90 53.1 (a)131 2012 YI y 14/A. YES NIA
141 1324 936 0.375 633 52C00 FW HOT ARMED WAX 1959 7.4/ 7.8 53.1 (401 2012 Y/ N/A YES N/A
142 1262 936 0.375 633 52000 SAW HO7APPUED WAX 143/ 14 60.2 (a)(3) 2912 1/ Y N/A. YES N/A
143 1162 936 0.375 633 52000 SAW HOT APPLIED WAX 2959 15.71 0.0 60.2 (4)13) 2012 /1 N/A YES 19/5
144 1232 936 0.375 633 631510 DSAW HOT APRIL() WAX 1959 0.0 / 154 60.2 (4)(31 2012 1/ Y N/A YES N/A
146 1332 936 Q375 633 52000 SAW HOT APPLIED WAX 1959 12.5 / 13 59.2 (4)(3) 2012 Y/ Y Leak 11 2 /15/1976( NLP YES N/A
147 1332 936 0375 633 52000 SAW HOT APPLIED WAX 1959 13.7/ 01 59.2 PP) 2012 1/ 'I Leak 41 2 /15/19761 NEP YES N/A
148 1340 936 0375 633 57000 DSAW COAL TAR ENAMEL 1959 49/ 10.7 57.5 (e)P1 2012 Y/ Y Leak 16/15/1954) NLP YES
Page 28 of 31

<<<PAGE 29>>>

11111MM-Vi111111-11111MMIlilliWill11111111MM11- ftlly
OPID 19160
2t
Zkm
“r!-IM5U51 .U.M.55MUUUUUUM.UUUMMU.UU
00
-1U11111:::222i11 - 622221122222222221MMS2n.
111
.... 
WW-Iliiii- Mi0
iirivimRAE
IIIIIIIIRaigfi
EIL7,
_122222
. ...
22
. ........ ......
Atrial Photography
MAIM MTnni
..........
m ....... m... ..... 
10
.71
Ici
;
e,
............ ..... .
...... ...... 
E
IIMAMMMfuunMgMlIAAAMAIMMAHtiMEVWia o
11
Attachment A: Listing of Tennessee Gas Pipeline (TGP) special permit segments
2 Vi—
a>  g
000
511lignw555LimIlri"It5viAE51 - Ivtlyilvilmmn'Av2wv221122
i gfm§iizigggiMigigingggi§giggEEggEggAgggLiggigggggigg
- ,( _giniVFIME.IFFIRTIMRFF,IMMIRFAII7aaaaVARMW , MWRR
a t,„„e g888u888888888u8888888Q28v888888888888388a8E,98888888
3333333333333 
3 3 3 t a 3 3 3 . (333333333 « a a a a a a< 2N 2
333
3 3 < <
Pipe Grade (psli d
5$11111111MM55111,1Eggg55g1IgggglIIIII1511111S1W1555551
i a
31s
6A ArT.F 4r 01" 1 6,616,66,66A ANA
66d0d6d'ciddc;cid666ciddd d6cid6draicidoci66666dddcidddoddcidodocid d
ma
LiU1
Kale—
e_
t a .2P
MHMMM"F"7 -g§iEME'EggIEHPgAg§giiMMRMWRFIR
LQ.U. , .-1flf.i.Qe1 7 -12`
v§V.:a'Rs8Vassf-i';',:4m344

<<<PAGE 30>>>

Attachment A: Listing of Tennessee Gas Pipeline (TGP) special permit segments 
OPID 19160
Pipe
Distarice to
MP5 ordy
Segment
Test
Design Pipe Wall Pipe
PHMSA
WV Compressor MAOP Leak/SCC/SSWC  20  I
(w/I  m
In-Eim
or MPS
KM Nn. Preuure
Pressure
Thickness
PlEi (ft) Pipe Grade (psi& Pipe Semi
Matedal/ Pressure
Pmssore Tested
No.
Type Plpe Coating lostalletkin
Upstream/
Motion
Established per
Aerial P hotography
Inspect.
mord
Test Documents
of segment) after
{Rag)
#10.72
(In)
Data
Downstrea
Spedng Ord)
192.619
d
(lobe d
teak/SCC/55WC
milml)
up`test)
(Psis)
117 235 1182 936 0.375 633 52020 DSAW COAL TAR ENAMEL 1959 185/ 02 759 (a)(1 ) 2012 Y Y
118 236 1182 936 0.375 633 52000 ()SAW COAL TAR ENAMEL 1959 188/ 50 75.9 la)(3) 2012 Y Y N/A YES N/A
119 237 11)9 936 0.375 633 52023 SAW COAL TAR ENAMEL 1959 50 / 11.9 759 I al(3) 2012 Y / Y N/A YES N/A
120 238 1179 1248 0,5 633 52000 Fw HOT APPUED WAX 1559 0.2/ 11.8 75.9 {4113) 2012 Y/ N/A YES N/A
121 239 1179 936 0 375 633 S2000 SAW COAL TAR ENAMEL 1959 10/ 106 75.9 (8))31 2012 It hi/ A YES NIA
122 240 1237 936 0375 633 520011 MAW COAL TAR ENAMEL 1959 56 / 6.9 75.9 (8)(31 2012 Y/ N/A YES
123 241 1237 936 0575 633 52010 DSAW COAL TAR ENAMEL 2959 7.9/ 4.3 75.9 (4(3) 2012 Y / Y N/A YES N/A
124 242 1252 936 0.375 633 520810 DSAW COAL TAR ENAMEL 1959 27 / 10.1 75.9 (8)(3) 2012 Y/ Y N/A YES N/A
125 243 1252 936 0.375 633 520:0 DSAW COAL TAR ENAMEL 1959 59/ 8.8 75.9 181(3) 2012 9/ Y N/A YES N/A
116 244 1.2811 974.4 0400 YEA 03000 05501 C.CIALTAR ENAMEL 1%4 51/ 89 612 1.41(1 1 2012 Y/ Y Leak (11/15/1972) YES YES N/A
127 245 1262 974.4 0.4C6 760 60202 MAW COAL TAR ENAMEL 1964 6.1 / 7.9 61.2 (4)11) 2012 / Y Leak (11/15/1972) YES YES N/A
128 250 1284 936 0.39 160 60200 ERW COAL TAR ENAMEL 1968 7.0 / 116 75.9 (a)( 1) 2012 Y N/A YES N/A
129 251 1284 936 039 160 60202 ERvii COAL TAR ENAMEL 1968 8,3 / 10.5 75.9 (4{1) 2012 5/ N/A YES N/A
130 252 1203 936 0.39 160 14550) ERW COAL TAR ENAMEL 1968 16.7 /0.0 75.9 (a{{1) 2012 / N/A YES N/A
131 253 1224 974,4 0.406 160 MOOD DSAW COAL TAR ENAMEL 1963 0.1 ) 1 119 25.9 11.1( 3) 2012 / NIA YES N/A
132 254 1224 11.256 0.469 760 60000 DSAW HOT APR) ED WAX 1%3 a 2 / 118 759 (.1(31 2012 Y/ Y N/A YES N/A
133 755 1224 974.4 0.406 760 60030 DSAW 190 COAL TAR ENAMEL 1963 / las 75.9 (8)(1) 2012 yrir N/A YES N/A
134 256 1401 974.4 0.406 760 63000 DSAW COAL TAR ENAMEL 1965 5.6 / 7.2 75.9 1031” 2012 Y / Y Leak (2/) 5/1 986) NO YES N/A
135 257 1401 974.4 a4a5 760 60030 DSAW COAL TAR ENAMEL 1965 5.8/ 6,9 75.9 (.)111 2012 9 /9 Leak (2/1 5/1 965) NO YES N/A
136 258 1401 9744 0408 760 62020 DSAW COAL TAR ENAMEL 1%5 7.9/ 49 75.9 {ON 2012 0/9 Leak 12/15/1986) NO YES N/A
137 255 1401 974-4 a4os 760 60000 DSAW COAL TAR ENAMEL 19E6 ao/ 4_3 75.9 (41.1) 2012 Leak 0/15/14861 YES kl(7 1 ,
138 260 1321 936 539 760 66000 OŠAW COAL TAR ENAMEL 1965 27/ 10.1 75.9 (a)(1) 2012 Y./ Y Leak {2/1 5/1 9861 NO YES N/A
129 261 1321 936 539 760 66000 DSAW COAL TAR ENAMEL 1365 39/ 9.2 75.9 (0(1) 2012 v/y Leak (2/15/1986) NO YES N/A
140 262 1321 936 0.39 760 60000 °SAW COAL TAR ENAMEL 1965 4.0/ 8.8 75.9 Ian) 2012 5/ Leak (2/15/1966) NO YES N/A
141 271 1190 936 0.375 633 520x) EW COAL TAR ENAMEL 1954 8.3 / 156 75.9 (o1(3) 2012 Y / Y N/A YES N/A
142 272 1.161 936 11.375 633 52002 EW COAL TAR ENAMEL 1954 / ao 75.9 (a)(3) 2012 Y/ Y N/A YES N/A
143 273 1174 936 0.375 633 52000 EW ci2AL TAR ENAMEL 1954 50/ 119 75.9 (81(3) 2012 Y/ N/A YES N/A
144 275 1174 936 0.375 613 52000 EW COAL TAR ENAMEL 1954 11/ 10.7 75.9 (4)(31 2012 Y Y N/A YES N/A
145 276 1242 936 0.325 633 52000 EW COAL TAR ENAMEL 1954 5.6/ 7.2 75.9 11.1( 3) 2012 Y Y N/A YES N/A
146 277 1242 936 0.375 633 52020 EW COAL TAR ENAMEL 1954 5.8/69 75.9 2012 Y Y N/A YES N/A
147 278 1296 936 0.375 633 52000 EW COAL TAR ENAMEL 1954 7.9/ 42 759 la113) 2012 Y/ N/A YES N/A
148 279 1282 936 0.375 633 52007 EW COAL TAR ENAMEL 1964 27/ 1 1 1 1 75.9 (a)(3) 21112 71 N/A YES NIA
149 280 1282 936 0.375 633 52002 EW COAL TAR ENAMEL 1954 39 /813 75.9 (a)(3) 2012 N/A YES N/A
150 289 1091 750 0.25 454 50000 FW COAL TAR ENAMEL 1944 6.1 / 4.0 86.2 0)11) 2012 v.!? Leak {12/5/1995)/ sce N LP / YES YES N/A
151 290 1051 750 0.25 454 50000 FW COAL TAR ENAMEL 1944 4.4/ 0.1 80.5 (4)13) 2012 Y Y Leak (4/5/2012) / sce NO / YES YES N/A
152 291 1054 750 0.75 454 50000 FW COAL TAR ENAMEL 1944 &a/ a 80.5 (4)13) 2012 Y/ Y Leak (3/10/1988) / sce YES / NS LP YES N/A
153 292 1028 750 5.20 454 SEM10 FW COAL TAR ENAMEL 1944 2.5 / 112 81.1 491 1 ) 2012 / Leak (12/15/19444 YES YES NM.
154 21 33 1028 973.44 0312 45.4 52003 DSAW COAL TAR ENAMEL 1964 3.5 
10. 1 81.1 (8)11 ) 2012 YlY Leak {12/15/1944) YES YES N/A
155 294 1023 973.44 0.312 454 52000 CiSAW COAL TAR ENAMEL 1%4 3.8 /9.9 81.1 (ail( 1) 2012 Y Y Leak (12/15/1514) YES YES N/A
156 295 1110 77&75 0312 567 52030 (MAW COAL TAR ENAMEL 1948 4.4 /53 80.5 (a)(31 2012 / Leak (2/1 7/2 007) / SCC' N LP / YES YES N/A
157 297 1115 778,75 0312 567 52000 ()SAW COM. TAR ENAMEL 1948 4.3 /51) 80.5 1013( 2012 Leak (2/17/21707) / 5CC' N LP ir YES YES N/A
558 298 1063 72825 0.312 567 52000 DSAW ODAL TAR ENAMEL 1948 0.0 / 7.3 130,5 (.)(31 2012 9/ Leak (2/17/21707) / SCe NIP / NS LP YE5 N/A
159 299 1035 )35662 0.344 557 52000 SAW coAL TAR ENAMEL 1949 3.2 / 10.1 811 M(1) 2012 y/ Leak (6/15/1969) NLP YES N/A
160 362 1041 77E175 0332 567 52000 EFW COAL TAR ENAMEL 1952 4.4 / 52 925 1.((1 ) 2012 /V SCe YES YES N/A
151
301
1041
778.75
5312
567
52000
EFW
COAL TAR ENAMEL
1952
3.1/ 12
80.5
(8)(1 )
2012
9/ Y
SCe
YES
YES
N/A
162
302
1041
778.75
5312
567
52000
EFW
COAL TAR ENAMEL
1952
4.4/ 00
80.5
(Al(a)
2012
/Y
sce
YES
YES
N/A
163 303 1082 778.75 11312 567 52000 DSAW COAL TAR ENAMEL 1952 0.0/ 7.3 80.5 (41( 2012 1 1/. KC' NSW YES N/A
164 304 1082 778.75 0.312 567 52002 MAY, / COAL TAR ENAMEL 1952 0.1/ 7.1 80.5 II41{1 ) 2012 Y / Y SCe NSLP YES N/A
165 308 1082 778.75 0.312 567 52000 MAW COAL TAR ENAMEL 1952 6.9/ 03 93.5 (4101 2012 Y SCe NSLP YES N/A
166 307 1071 936 0.375 567 52000 DsAssi COAL TAR ENAMEL 1964 3.4/ 10.1 011 (4)(1 ) 2012 y/y Leak (5/15/1 969) NLP YES N/A
167 310 MPS 896.56 0312 526 52000 DSAW COAL TAR ENAMEL 1953 4.5 / 52 96.8 (F) 2012 /MP5 Leak (9/15/1962) / sce YES / NSLP YES YES
168 311 DAPS 898.56 0.312 526 52002 DSAW COAL TAR ENAMEL 1953 63 / 3.4 98.8 2012 / MPS Leak (9/15/1962) / sce YES / NSLP YES YES
169 312 1414 97344 0.312 505 529Egi FW COAL TAR ENAME1 1950 106.1 )44(31 ,
2312 Y I Y Leak {10/15{1.9513 YES 91.5 NIA
170 313 1414 97344 0.312 506 52000 FW COAL TAR ENAMEL 1950 25 /4.4 20 10131 2012 Y / Y Leak (10/15/1951) YES YES N/A
171 316 1.4116 973.44 0312 506 5200D FW COAL TAR ENAMEL 1950 19 /69 20 {a)(3) 2012 Y/ Leak (3/15/1958) YES YES N/A
172 317 1406 973.44 0.312 906 520% FW OLIAL TAR ENAMEL 1950 6.7 j 2.1 20 (03) 2012 Y/ Leak (3/15/1958) YES YES N/A
173 318 1180 936 a 25 426 52003 DSAW FUSION BONDED EPOKY 1984 9.5 / 1.0 87.8 (a){ 1) 2012 9/ Y Leak 111/1/1983) YES YES N/A
174 31.9 1162 936 5.75 41.6 52003 DSAW FUSION BONDEUEPOKY 1984 10.1/ 0.3 87.8 (C11 2012 9/ Y Leak {111 1 /1 9831 YES YES N/A
Page 30 of 31

<<<PAGE 31>>>

Attachment A: Listing of Tennessee Gas Pipeline (TGP) special permit segments
OPID 19160
Pipe Distance to MPS only
T. Design Pipe Wall Pipe MLV
Compressor MAOP Segment
PNMSA
--
No. PM No. Pressure
{Oil
PIIINIUND
Thidtne ss
PIR (ft) Pipe Grade (psig) Pipe S4.11TI
Type Pipe Cooties Installation
Upstream/
Station
Established per
Aerial Photography Material/ Pressure
Leak/SCC/S5WC (w/i 20 rni
Pressure Tested
Inspect.
OO MPS record
Test Documents
of segment)
alter
00.72
(1.)
Date
DoemsPea
Spadng (rni)
192.619
d
(to bads
Leak/SCCISSWC
(OW
rn (rid)
up 'test)
175 320 1320 936 025 416 52000 DSAW USION BC N DE 0 EPDXY 1984 2.4 / 7.1 87.8 la)(1) 2012 Leak (11/1/1983) YES YES N/A
176 322 1209 936 025 422 520581 OSAW FUSION BO N E D EPDXY 1984 3.8/ L1 87.8 (4)11) 201.2 Y/Y Leak (11/1/1583) YES YES N/A
177 323 1222 973.44 0312 517 52000 FW COAL TAR ENAMEL 1944 3.5/ 8.2 87.7 (4)(3) 2012 Y/ Y Leak (5/15/1978) YES YES N/A
178 326 1222 973.44 0.312 507 52002 FW COAL TAR ENAMEL 1948 0.8/9.2 87.7 1.113) 2012 Y/ Y Leak (5/1 5/1 693) YES YES N/A
179 327 1222 973.44 0312 507 521100 FW COAL TAR ENAMEL 1948 2.5/ 7.3 87.7 1.113) 2012 / Y Leah (5/15/1958) YES YES N/A
180 328 1244 990.72 0344 565 52000 FW TAPE- UNKNOWN BACKING 1959 10.0 / 7.5 89.1 1.)13) 2012 9/ Y Leak (12/15/1966) 905 YES N/A
181 329 1269 1246.15 0375 541 60001 FW COAL TAR ENAMEL 19E6 7.0/ 3.5 89.1 1.0(2) 2012 Y/ Y Leak (12/15/1966) YES YES N/A
182 330 1151 910 08 0.316 624 60000 DSAW FUSION BONDED EPDXY 1972 4.8/ 7.5 89.1 (a)(1) 2011 Y/ V N/A YES N/A
183 331 1151 91008 0316 624 60Z00 [MAW FUSION BONDED EPDXY 1972 6.0/ 6.5 89.1 1.0) 2012 V/ N/A YES N/A
184 334 1054 350 025 454 50000 FW COAL TAR ENAMEL 1944 1.61 01.8 (OM 1012 8(9 Leak (4(5/7012) SCe NO /YES YES N/A
185 335 1054 750 025 454 50000 FW COAL TAR ENAMEL 1944 4.3 / 00 80.8 (4)131 2012 V /9 Leak (4/5/2012)/ sce NO /YES YES N/A
186 336 1044 750 0.25 454 50000 FW COAL TAR ENAMEL 1966 0.0/ 7.3 80.8 (4)(31 2012 Y/ Y Leak (4/5/2012)/ sce NIP / NSLP YES N/A
187 340 1228 973.44 0.312 500 52000 FW COAL TAR ENAMEL 1948 10.2 / 10 87.7 (4)(3) 2012 Y/ Y Leak (2/15/1969) YES YES N/A
188 341 1024 778.75 0.312 567 52030 OSAW COAL TAR ENAMEL 1952 8.8/115 91.7 ())1( 2012 Y/Y Leak (7/1 5/1 581) NO YES N/A
189 342 993 778.75 0312 567 52000 DSAW FUSION BONDED EPDXY 1951 14 / 7.5 88.7 (4(31 2012 Y/ Y Leak (90 5/1 995) NO YES N/A
190 343 993 778.75 0.312 567 52000 DSAW COAL TAR ENAMEL 1951 1.6/ 7.2 88.7 (.)131 2012 9/ Y Leak (9/2 5/1 99S) NO YES el/A
191 348 1302 974.88 Ol4062 760 60000 FW TAPE- UNKNOWN BACKING 1963 00/ 15.3 59.9 (.)(3) 7012 1./Y N/A YES N/A
192 360 1338 936 0.375 633 5200) DSAW COAL TAR ENAMEL 1955 15.0/46 51.1 (a)131 2012 SCe YES YES N/A
Page 31 of 31

<<<PAGE 1>>>

U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
SPECIAL PERMIT
Special Permit Information:
Docket Number: PHMSA-2016-0004
Requested By: Tennessee Gas Pipeline Company, L.L.C.
Operator ID#: 19160
Date Requested: January 11, 2016
Original Issuance Date:  September 1, 2016
Effective Dates: September 1, 2016 to September 1, 2021
Code Section(s): 49 CFR §§ 192.611(a) and (d), 192.619(a), and 192.5
Grant of Special Permit:
By this Order, subject to the terms and conditions set forth below, the Pipeline and Hazardous
Materials Safety Administration (PHMSA) Office of Pipeline Safety (OPS) grants a special
permit (PHMSA-2016-004) from September 1, 2016 to September 1, 2021, to Tennessee Gas
Pipeline Company( (TGP) waiving compliance from 49 Code of Federal Regulations (CFR)
§§ 192.611(a) and (d), 192.619(a), and 192.5 for 192 special permit segments and 49.00 miles
of natural gas transmission pipeline as described in Appendix A2 of this special permit.
I. Special Permit Segment and Special Permit Inspection Area:
States of Kentucky, Louisiana, Mississippi, New Jersey, New York, Ohio, Pennsylvania,
Tennessee, Texas and West Virginia
On the condition that TGP complies with the terms and conditions set forth below, this special
permit waives compliance from 49 CFR § 192.611(a) for 192 special permit segments and 49.00
I TGP is owned by Kinder Morgan, Inc.
2 Appendix A of this special permit lists the pipeline special permit segment location (County and State), MAOP,
class location, diameter, wall thickness, grade, seam type, boundaries, and other attributes.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 1 of 33

<<<PAGE 2>>>

miles of natural gas transmission pipeline as described in Appendix A. This special permit
allows TGP to continue to operate each special permit segment listed in Appendix A at its
current listed maximum allowable operating pressure (MAOP). The Federal pipeline safety
regulations in 49 CFR § 192.611(a) require natural gas pipeline operators to confirm or revise the
MAOP of a pipeline segment after a change in class location.
This special permit applies to the special permit segments listed in Appendix A. Special permit
segments shall be divided into two (2) categories: Type A special permit segments and Type B
special permit segments.
Type A special permit segments include those special permit segments where there is a cluster,
as described in 49 CFR § 192.5(c), of more than 10 buildings intended for human occupancy in a
"class location unif and for which the MAOP has not been confirmed in accordance with 49
CFR § 192.611(a). Type A special permit segments must be replaced so that the MAOP is
commensurate with the present class location within five (5) years of issuance of this special
permit. Type A special permit segments3 total 11.22 miles of pipe as described in Attachment A.
Type A special permit segments with pipe with integrity issues as determined by Conditions
6(c) and 14 or that have not been pressure tested in accordance with 49 CFR Part 192, Subpart J
to 1.25 times MAOP of this special permit must be replaced within two and one-half (21/4) years
of the grant of this special permit or within two (2) years of assessment finding.
Type B special permit segments include those special permit segments where there is a cluster,
as described in 49 CFR § 192.5(c), of 10 or fewer buildings intended for human occupancy in a
"class location unit" and for which the MAOP has not been confirmed in accordance with 49
CFR § 192.611. Type B special permit segments4 total 37.78 miles of pipe as described in
Attachment A.
3 There are 11.22 miles of Type A special permit segments and of this total 10.59 miles must be replaced and 0.63
miles must be pressure tested as listed on Attachment A, see Condition 16 for pressure test requirements.
4 There are 37.78 miles of Type B special permit segments and 3.84 miles of this total must be pressure tested as
listed on Attachment A, see Condition 16 for pressure test requirements. Four (4) Type B special permit
segments (KM segment number 103, 181, 310, and 311) are § 192.619(c) Grandfathered segments and will
require pressure testing.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 2 of 33

<<<PAGE 3>>>

Subsequent to the issuance of this special permit, those special permit segments that have been
pressure tested or replaced such that the MAOP has been made commensurate with the present
class location as defined in 49 CFR § 192.611 would no longer be included in this special permit.
Special permit inspection area5 — is defined as a one (1) mile continuous segment on both sides
of the special permit segment (Type A and Type B) plus the footage in the special permit
segment. Appendix A lists the boundaries for the special permit inspection area associated with
each special permit segment. The TGP special permit inspection area totals 433.71 miles of
pipe as described in Attachment A.
PHMSA hereby grants this special permit for the pipeline special permit segments listed in
Appendix A based on the findings set forth in the "Special Permit Analysis and Findings"
document, which can be read in its entirety in Docket No. PHMSA-2016-0004 in the Federal
Docket Management System (FDMS) located on the internet at www.Regulations.gov.
II. Conditions:
PHMSA OPS grants this special permit subject to the following conditions:
1) Maximum Allowable Operating Pressure: TGP must continue to operate the special
permit segments at or below their existing MAOP as noted in Appendix A.
2) Integrity Management Program: TGP must incorporate the special permit inspection
areas into its written integrity management program (IMP) as a "covered segment" in a
"high consequence area (HCA)" in accordance with 49 CFR § 192.9036.
3 ) Close Inten. al Surveys: TGP must perform a close interval survey (CIS) along the entire
5 Special permit inspection areas throughout these conditions include special pertnit segments unless specifically
defined as not applicable or if the special permit segment has more stringent conditions.
6 TGP is not required to report the mileage included as part of this special permit in its annual report per the
requirements of 49 CFR § 191.17, unless it is in a high consequence area.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 3 of 33

<<<PAGE 4>>>

length of all special permit inspection areas7 and remediate any areas of inadequate cathodic
protection no later than three (3) years after the issuance of this special permit. However, a
CIS need not be performed if TGP has performed a CIS and completed remediation8
including damaged coating repair along the entire length of all special permit inspection
areas less than seven (7) years9 prior to the issuance of this special permit. If environmental
permitting or right-of-way factors beyond TGP control should prevent the completion of the
CIS within three (3) years from the issuance of this special permit, a CIS and subsequent
remediation including coating repair must be completed as soon as practicable and a letter
justifying the delay and providing the anticipated date of completion must be submitted to the
appropriate PHMSA OPS Region Director no later than three (3) months prior to the end of
three (3) years after the issuance of this special permit and must receive a "no objection"
from the PHMSA OPS Region Director for a delay. CIS remediation activities must be
completed within one (1) year of the finding. Any extended evaluation and remediation
schedules submitted to PHMSA from TGP must receive a "no objection" from the
appropriate PHMSA OPS Region Director to implement an extended CIS and remediation
interval.
4) Close Interval Sur% evs — Reassessment Interval: TGP must perform a periodic close
interval survey (CIS) of the special permit inspection areas at the applicable reassessment
interval(s) for a "covered segment" in accordance with 49 CFR Part 192, Subpart 0, for
reassessment intervals as contained in 49 CFR §§ 192.937(a) and (b) and 192.939, not to
exceed a seven (7) year reassessment interval I°. CIS data shall be integrated with in-line
inspection (ILI) data. Condition 15(b) — Data Integration — gives a complete description of
7 Each condition that requires TGP to perform an action with respect to the special permit inspection areas shall
also require TGP to perform that action on all special permit segments within such areas. Type A special permit
segments that will be replaced within three (3) years of this special permit issuance do not require a CIS.
8 The terms "remediate" or "remediatior of pipe coating shall include repair of damaged external pipe coating,
where required to maintain cathodic protection of the pipeline in accordance with 49 CFR §192.463.
9 If 49 CFR § 192.939(a) integrity management reassessment interval should change from seven (7) years to some
other reassessment interval under eight (8) years, TGP may use that reassessment interval instead of seven (7)
years.
1° If 49 CFR § 192.939(a) integrity management reassessment interval should change from seven (7) years to some
other reassessment interval under eight (8) years, TGP may use that reassessment interval instead of seven (7)
years.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 4 of 33

<<<PAGE 5>>>

data integration information that an operator must maintain for a special permit in the special
permit inspection areas which includes CIS and ILI data. CIS assessments within the
reassessment interval are not required to be performed in the same year as ILI reassessments.
5) Cathodic Protection Reliability Improvement Plan: TGP shall implement a plan to
improve cathodic protection reliability and perform inspections for stress corrosion cracking
(SCC).
a) Cathodic Protection Reliability Improvement Plan
i) TGP must perform a periodic CIS of special permit inspection areas as part
of Condition 4, Close Interval Surveys, with reassessment intervals at an
increased frequency, not to exceed a seven (7) year reassessment interval
with CIS data integrated with the most-recent in-line inspection data' I ;
ii) TGP must integrate the most current CIS data with in-line inspection results
in the special permit inspection area in accordance with Condition 15(b)
timing requirements;
iii) Within 90 days of the issuance of this special permit, TGP must amend
applicable sections of its operations and maintenance (O&M) manual(s) to
prohibit future use of coating that is known to shield cathodic protection
along the entire length of the special permit inspection areas; and
iv) TGP must perform a run comparison analysis of in-line inspection results
subsequent to the baseline inspection in the special permit inspection areas
to identify areas of external corrosion growth after each new tool run when
the same in-line inspection vendor is used for consecutive inspections.
Areas with corrosion growth over 30% in depth must be remediated within
one (1) year of the finding or direct current voltage gradient (DCVG) survey
run to locate problem coating areas within six (6) months of the finding with
remediation completed within six (6) months of the DCVG survey.
I I 1f 49 CFR § 192.939(a) integrity management reassessment interval should change from seven (7) years to some
other reassessment interval under eight (8) years, TGP may use that reassessment interval instead of seven (7)
years.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 5 of 33

<<<PAGE 6>>>

v) Within one (1) year of the issuance of this special permit, TGP must install
cathodic protection remote monitoring units (RMUs) at all impressed
current sources directly influencing the special permit segments;
vi) TGP must configure the RMUs in the special permit segments with alarms
to notify TGP immediately in the event of any interruption in cathodic
protection current output; and
vii) TGP must respond and correct any interruption in cathodic protection
current output immediately (within two (2) working days). If a systemic
issue is present, then TGP must investigate and remediate the problem
within one (1) month or less or TGP must receive a "no objection" from the
appropriate PHMSA OPS Region Director for issues that require longer to
remediate.
b) Stress Corrosion Cracking Inspections
i) TGP must review historical records to determine if SCC inspections have
been performed in the special permit segments and from these inspections
evaluate the threat of stress-corrosion cracking as part of the SCCDA Pre-
Assessment Step in Condition 6(a).
ii) TGP must perform magnetic particle inspection on any pipe (with the
exception of pipe coated with fusion-bonded or liquid-applied epoxy
coatings, which are not at risk for SCC) excavated in the special permit
inspection areas to evaluate the pipe for SCC where disbonded coating is
removed in order to perform the inspection.
6) Stress Corrosion Cracking_ Direct Assessment: TGP must evaluate pipelines along the
entire length of the special permit inspection areas for SCC as follows:
a) TGP must perform a stress corrosion cracking direct assessment (SCCDA) or other
appropriate assessment method for SCC [such as pressure test or in-line inspection
(ILI) with a crack detection tool] of pipelines along the entire length of all special
permit inspection areas according to the requirements of 49 CFR § 192.929 and
NACE SP 0204-2008 no later than three (3) years after of the issuance of this special
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 6 of 33

<<<PAGE 7>>>

permit. The SCCDA or other approved method must address high pH SCC and near
neutral pH SCC. The SCCDA Pre-Assessment Step will include the results of all
close-interval surveys and coating surveys required in Conditions 3, 4, and 5.
i) If environmental permitting or right-of-way factors beyond TGP control
prevent the completion of the SCCDA survey and remediation within three
(3) years from the issuance of this special permit, a SCCDA and remediation
must be performed as soon as practicable and a letter justifying the delay
and providing the anticipated date of completion must be submitted to the
appropriate PHMSA OPS Region Director no later than three (3) months
prior to the end of three (3) years after the issuance of this special permit
and must receive a "no objection" from the PHMSA OPS Region Director
for a delay.
ii) TGP may eliminate this Condition 6(a), provided TGP provides an
engineering assessment showing that the pipeline does not meet the criteria
for either near neutral or high pH SCC in accordance with the applicable
edition of the American Society of Mechanical Engineers Standard B31.8S,
"Managing System Integrity of Gas Pipelines" (ASME B31.8S), Appendix
A3, or NACE SP 0204-2008, "Stress Corrosion Cracking (SCC) Direct
Assessment Methodology", Section 1.2.1.1 and 1.2.2.
iii) A SCCDA need not be performed if TGP has performed a SCCDA of
pipelines along the entire length of the special permit inspection areas
within the timeframe for SCCDA re-assessments specified in 49 CFR Part
192, Subpart 0, not to exceed seven (7) years12 prior to the issuance of this
special permit.
b) If the SCCDA required in Condition 6(a) demonstrates SCC, TGP must directly
examine pipe in the special permit inspection areas for SCC using an accepted
industry detection practice, such as dry or wet magnetic particle tests, anytime the
pipelines are exposed for any reason, including damage prevention activities. Poor
coating is coating losing adhesion to the pipe which is shown by falling off the pipe,
12 If 49 CFR § I 92.939(a) integrity management reassessment interval should change from seven (7) years to some
other reassessrnent interval under eight (8) years, TGP may use that reassessment interval instead of seven (7)
years.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 7 of 33

<<<PAGE 8>>>

and/or shields the cathodic protection. TGP must keep coating records' 3 of all
excavation locations for the special permit inspection areas to demonstrate the
coating condition.
c)  If SCC14 activity is discovered by any means within the special permit inspection
area in similar pipe and pipe coating vintage [in accordance with 49 CFR
§ 192.917(e)], or has had an in service or hydrostatic test SCC failure or leak; the
special permit segment must be further assessed and mitigated, using one of the
following methods, within one (1) year of finding SCC:
i) Hydrostatic test program
A. The SCC hydrostatic test program must be performed at a
reassessment interval no greater than seven (7) calendar years (but
may be at a lesser interval in accordance with the results of an
engineering critical assessment) in the special permit segment.
B. If pipe in the special permit segment leaks or ruptures during a
hydrostatic test due to SCC, all pipe in the special permit segment
must be replaced with new pipe within 18 months of the completion of
a successful SCC hydrostatic test. A successful SCC hydrostatic test
must be completed prior to returning the special permit segment to
operational service.
ii) Crack detection tool assessment
A. SCC detection tool must be run in the special permit inspection area,
B. All SCCI5 cracking found in the special permit segment must be
replaced with new pipe within one (1) year of finding SCC,
iii) Operating pressure lowered to 60% of the specified minimum yield strength
(SMYS),
iv) Replace all affected pipe to meet 49 CFR § 192.611 in the special permit
segment.
" The records must include, at a minimum, a description of the TGP's detection procedures, records of finding, and
mitigation procedures implemented for the excavation.
" "SCC" activity shall be defined as over both 10 percent wall thickness depth and 2-inches in length.
15 "SCC" activity shall be defined as over both 10 percent wall thickness depth and 2-inches in length.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 8 of 33

<<<PAGE 9>>>

d) If any SCC activity is discovered in the special permit inspection area, TGP must
submit a SCC remediation plan to the appropriate PHMSA OPS Region Director with
a copy to the Director, PHMSA OPS Engineering and Research Division no later than
60 days after the finding of SCC:
i) That meets Condition 6(c), including a SCC remediation/repair plan with
SCC characterization and timing, or
ii) Technical justification that shows that the threat for SCC in the special
permit segment is being addressed.
7) O&M Manual — In-line Inspections, Close Interval Survey Inspections, and
Reassessment Intervals: TGP must amend applicable sections of its operations and
maintenance (O&M) manual(s) to incorporate the in-line inspection (ILI), close interval
inspections (CIS), and reassessment intervals by the appropriate integrity assessment method
including both high resolution metal loss and deformation/geometry tools along the entire
length of the special permit inspection areas at a frequency consistent with 49 CFR Part 192,
Subpart 0, but not to exceed a seven (7) year reassessment intervali6.
8) In-Line Inspection Initial Assessment: TGP must perform integrity assessments along the
entire length of the special permit inspection areas using appropriate assessment methods
based on threats identified during the risk assessment process including both high resolution
magnetic flux leakage (HR-MFL) and either HR-geometry or HR-deformation tools. If
integrity assessments have not been performed within seven (7) years prior to the issuance of
this special permit, TGP must complete initial integrity assessments along the entire length of
the special permit inspection areas within three (3) years of the issuance of this special
permit. Subsequent integrity assessments along the entire length of the special permit
inspection areas must conform to the required maximum reassessment intervals specified in
49 CFR § 192.939, but may not exceed a seven (7) year reassessment interval".
16 lf 49 CFR § 192.939(a) integrity management reassessment interval should change from seven (7) years to some
other reassessment interval under eight (8) years, TGP may use that reassessment interval instead of seven (7)
years.
17 lf 49 CFR § 192.939(a) integrity management reassessment interval should change from seven (7) years to some
other reassessment interval under eight (8) years, TGP may use that reassessment interval instead of seven (7)
years.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 9 of 33

<<<PAGE 10>>>

9) Integrity Reassessment Intervals: TGP must schedule integrity reassessment dates for the
entire length of the special permit inspection areas according to 49 CFR § 192.939 by
adding the required time interval to the previous assessment date, but may not exceed a seven
(7) year reassessment interval 18.
10) High Consequence Area Assessments: TGP must not let this special permit be a basis for
deferring any of its assessments for HCAs in accordance with 49 CFR Part 192, Subpart O.
11) Annual Reports to PHMSA: Within three (3) months following the issuance of this special
permit and annuallyt9 thereafter, TGP must report the following to the appropriate PHMSA
OPS Region Director with copies to the Deputy Associate Administrator, PHMSA Field
Operations; Deputy Associate Administrator, PHMSA Policy and Programs; Director,
PHMSA Engineering and Research Division; and Director, PHMSA Standards and
Rulemaking Division:
a) The number of new residences, other structures intended for human occupancy and
public gathering areas built within the special permit segment and also within one (1)
mile on either end of the special permit segment.
b) Any new integrity threats identified during the previous year and the results of any
ILI or direct assessments performed (including any un-remediated anomalies over
30% wall loss, cracking found in the pipe body, weld seam or girth welds, and dents
with metal loss, cracking or stress riser) during the previous year in the special permit
c) inspection segment.
Any reportable incident or any leak normally indicated on the DOT Annual Report,
and all repairs on the pipeline that occurred during the previous year in the special
permit inspection areas.
18 If 49 CFR § 192.939(a) integrity management reassessment interval should change from seven (7) years to some
other reassessment interval under eight (8) years, TGP may use that reassessment interval instead of seven (7)
years.
19 Annual reports must be received by PHMSA by the last day of the month in which the Special Permit is dated.
For example, the annual report for a modified Special Permit dated November, 2012, must be received by
PHMSA no later than November 30, each year beginning in 2013.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 10 of 33

<<<PAGE 11>>>

d) e) f) g) h) i) Summary report of any fatigue analysis performed on all in-service, non-remediated
dents over 6% and with total strain < 5%, as required in Condition 13(b).
Annual data integration information, as required in Condition 15(b) - Data Integration
must be submitted beginning with the 2nd annual report that includes an annual
overview of any new threats, or if requested by PHMSA a full information package.
Any mergers, acquisitions, transfer of assets, or other events affecting the regulatory
responsibility of the company operating the pipeline.
An updated Appendix A reflecting changes in Special Permit Segment boundaries
including extensions, deletions, or modifications.
In the first annual report, TGP must describe the estimated economic benefits of the
special permit including both the capital and operational costs avoided from not
replacing the pipe and the estimated incremental operational costs of any inspection
program requirements of the special permit for the 5-year grant period that are not
already being conducted by TGP through their operational procedures.
In the first annual report, TGP must describe whether the public benefits from enemy
availability. This should address the benefits of any avoided disruptions as a
consequence of pipe replacement and the benefits of maintaining system capacity.
12) Interference Currents Control: TGP must address induced alternating current (AC) from
parallel electric transmission lines and other interference issues such as direct current (DC) in
the special permit inspection areas that may affect the pipeline. An induced AC or DC
program and remediation plan to protect the pipeline from corrosion caused by stray currents
must be in place within one (1) year of the date of this special permit.
a) At least once every seven (7) years not exceeding 90 months, TGP must perform an
engineering analysis on the effectiveness of the AC and DC mitigation measures and
must evaluate any AC interference between 20 and 50 Amps per meter squared. In
evaluating such interference, TGP must integrate AC interference data with the most
recent ILI results to determine remediation measures. Any AC interference between
20 and 50 Amps per meter squared must be remediated within six (6) months of the
finding. If TGP does not remediate AC interference between 20 and 50 Amps per
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 11 of 33

<<<PAGE 12>>>

b) c) d) meter squared, TGP must provide an engineering justification for not remediating
such interference to the appropriate PHMSA OPS Region Director, who may accept
or reject the justification and require remediation.
In special permit inspection areas with co-located high voltage alternating current
(HVAC) power lines, TGP must take interference readings (continuous 24-hour
recordings) during the calendar quarter of the known or anticipated highest voltage
reading. If there are any significant increases to the amount of electricity/current
flowing in any co-located high voltage altemating current (HVAC) power lines, such
as from additional generation, a voltage up-rating, additional lines, or new or enlarged
substations, TGP must perform an AC mitigation survey along the entire co-located
pipeline special permit inspection area right of way within six (6) months of any
such change.
Within six (6) months of the engineering analysis, TGP must remediate any AC
interference greater than 50 Amps per meter squared. Remediation means the
implementation of performance measures including, but not limited to, additional
grounding along the pipeline to reduce interference currents. Any DC interference
that results in CP levels that do not meet the requirements of 49 CFR Part 192,
Subpart I, must be remediated within six (6) months of this evaluation.
If environmental permitting or right-of-way factors beyond TGP control prevent the
completion of rernediation within six (6) months of the interference evaluation,
remediation must be completed as soon as practicable and a letter justifying the delay
and providing the anticipated date of completion must be submitted to the appropriate
PHMSA OPS Region Director no later than one (1) month prior to the end of the six
(6) months completion date. Any extended evaluation and remediation schedules
submitted to PIIMSA from TGP must receive a "no objection" from the appropriate
PHMSA OPS Region Director.
13) Anomaly Evaluation and Repair:
a) General: TGP must account for ILI tool tolerance and corrosion growth rates in
scheduled response times and repairs and document and justify the values used. TGP
must demonstrate ILI Tool tolerance accuracy for each ILI Tool run by usage of
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 12 of 33

<<<PAGE 13>>>

calibration excavations and unity plots that demonstrate ILI Tool accuracy to meet
the tool accuracy specification provided by the vendor (typical for depth within
+10% accuracy for 80% of the time). The unity plots must show: a) actual anomaly
depth versus predicted depth and b) actual failure pressure/MAOP versus predicted
failure pressure/MAOP. Discovery date must be within 120 days of an ILI Tool run
for each type ILI Tool (HR-geometry, HR-deformation, or HR-MFL).
i) ILI tool evaluations for metal loss must use "6t x 6t" interaction criteria (or
more conservative criteria) for determining anomaly failure pressures and
remediation response timing with "6t" being pipe wall thickness times six.
b) Dents: TGP must repair dents in the special permit segment and special permit
inspection area in accordance with 49 CFR § 192.933 if it is located in a HCA and in
accordance with 49 CFR §§ 192.933(a)-(c) repair criteria and "Table 1 — Special
Requirements for Scheduling Remediation of Dents" if it is not located in an HCA.
Table 1 — Special Requirements for Scheduling Remediation of Dents
Defect Type Orientation
Required Response
Special Permit
Segment
Required Response
Special Permit
Inspection Area
-
Dent Associated with
Cracks or Stress Risers Top or Bottom Immediate Immediate
Dent Associated with
Metal Loss Top or Bottom 1 Year Scheduled 2 Year Scheduled
Plain Dent > 6 % OD
Deep or that exhibits
Top 1 Year Scheduled 2 Year Scheduled
total strain > 5 %
Plain Dent > 2% OD
Deep Associated with
Top or Bottom 1 Year Scheduled 2 Year Scheduled
Girth or Seam Weld
Plain Dent > 6 % OD
Deep and that exhibits
Top or Bottom Monitored Monitored
total strain < 5 %
Plain Dent < 2% OD
Deep Associated with
Top or Bottom Monitored Monitored
Girth or Seam Weld
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 13 of 33

<<<PAGE 14>>>

Definitions
1. Plain Dent — Dent without metal loss, crack or stress riser.
2. Immediate Response — Reduce pressure to 80% of recent maximum pressure. hmnediate
dents require an immediate pressure reduction and / or restriction and examination and
remediation as required in conformance with TGP requirements within five (5) calendar
days from the date of discovery. If the remediation cannot be met according to the
response schedule, a technical justification must be prepared that explains the reasons why
the remediation cannot be met according to the schedule and indicate how the changed
schedule will not jeopardize public safety. Any extended response schedules must be
submitted to PHMSA from TGP within 14 days of pressure reduction after discovery and
must receive a "no objection" from the appropriate PHMSA OPS Region Director.
3. Scheduled Response — Schedule excavation within an appropriate time frame based on the
opinion of the TGP SME (not to exceed 365 days for special permit segments and 730
days for special permit inspection areas).
4. 5. 6. Monitored — Catalog data for future monitoring.
Top — located between 8 o'clock and 4 o'clock positions (upper 2/3 of the pipe).
Bottom — located between 4 o'clock and 8 o'clock positions (bottom 1/3 of pipe).
•
Special permit segments and special permit inspection areas must have a HR-
geometry or HR-deformation tool inspection as part of the initial ILI or these ILI
inspections must be completed within two (2) years after issuance of this special
permit. All dent repairs must be made in accordance with 49 CFR §§ 192.933(a)
through (c) repair criteria and "Table 1 — Special Requirements for Scheduling
Remediation of Dents" on page 13 of 24. TGP must conduct the following fatigue
analysis of dents in special permit segments and special permit inspection areas:
i) TGP must conduct a fatigue analysis of all in-service, non-remediated dents
above 6% and with total strain ~ 5% after each high resolution MFL and
high resolution caliper or deformation ILI evaluations. Dent fatigue analysis
must include as a minimum the following: gross geometry of dent;
orientation of dent; soil cover and type; pressure and temperature; including
cycles; and stress and strains caused by terrain. The fatigue analysis must
be completed within the time frames in "Table 1 — Special Requirements for
Scheduling Remediation of Dents" of this special permit.
ii) The overall remaining fatigue life of all in-service, non-remediated dents
over 6% and with total strain 5% must be either twice the designated
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 14 of 33

<<<PAGE 15>>>

remaining life of the pipeline or at least 500 years.
c) Investigation and Repair Criteria: In-line inspection anomalies in the special
permit inspection areas with a safe pressure less than MAOP (e.g. Failure Pressure
Ratio (FPR) < 1.39) or an anomaly depth greater than 80% of pipe wall thickness
require an immediate pressure reduction and/or restriction and continuous action until
the anomaly is examined, evaluated, and remediated.
d) Response Time for ILI Results: TGP will follow Kinder Morgan O&M Procedure
916 (In-Line Inspections)2° for excavating, investigating, and remediating anomalies
based on ILI data results in accordance with 49 CFR §§ 192.485 and 192.933. TGP
must evaluate ILI data by using either the ASME Standard B31G, -Manual for
Determining the Remaining Strength of Corroded Pipelines" (ASME B31G), the
modified B31G (0.85dL), or R-STRENG for calculating the predicted FPR to
determine anomaly responses.
• Special permit seements and special permit inspection areas:
Immediate response: Any anomaly within a special permit segment and
special permit inspection areas operating up to 72% SMYS that meets either:
(1) an FPR equal to or less than 1.1; or (2) an anomaly depth equal to or
greater than 80% wall thickness loss.
One-year response: Any anomaly within a special permit segment and
special permit inspection areas with original Class 1 location pipe in a Class
3 location (cluster area) operating up to 72% SMYS that meets either: (1) an
FPR less than 1.39; or (2) an anomaly depth greater than 40% wall thickness
loss.
Monitored response: Any anomaly within a special permit segment and
special permit inspection areas with original Class 1 location pipe in a Class
3 location (cluster area) operating up to 72% SMYS that meets both: (1) an
FPR equal to or greater than 1.39; or (2) an anomaly depth equal to or less
than 40% wall thickness loss.
e) Special permit seements and special permit inspection areas: Upon issuance of this
20 The requirements of this Special Permit and 49 CFR § 192.485 and 192.933 supersedes Kinder Morgan O&M
Procedure 916 (1n-Line Inspections).
21 The tinting intervals for dent remediation in non-HCAs are in Condition 6(b).
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 15 of 33

<<<PAGE 16>>>

special permit, TGP must implement the repair and remediation of any pipe
anomalies or dents that are not in compliance with Condition 13 based upon existing
ILI assessment results from the high resolution MFL and geometry/deformation tools
used to previously assess pipelines in the special permit segments and special permit
inspection areas. TGP must review existing ILI assessment results within 18 months
from the issuance of this special permit according to the following schedule: 30% of
pipelines in the special permit segments and special permit inspection areas must be
reviewed within six (6) months of the issuance of this Special Permit, 65% of
pipelines in the special permit segments and special permit inspection areas must be
reviewed within 12 months of the issuance this special permit, and 100% of pipelines
in the special pennit segments and special permit inspection areas must be reviewed
within 18 months of the issuance of this Special permit. Anomalies and dents
discovered during this review must be remediated in accordance with Condition 13
timing requirements.
14) Pipe Seam Evaluations:
a) TGP must identify any pipe in the specia 1 permit segmentthat may be susceptible to
pipe seam issues (e.g., due to the vintage of the pipe, the manufacturing process of the
pipe, or other issues). If TGP identifies a pipe seam issue, TGP must complete
Condition 14(a). If the engineering analysis required in Condition 14(a) reveals that
there is a threat to the pipeline, then TGP must complete all of the applicable
condition requirements in Condition 14(a)(ii), (a)(iii), (a)(iv), (a)(v), (a)(vi), (a)(vii),
and (a)(viii):
i)  TGP must perform an engineering analysis to determine if there are any pipe
seam threats on pipelines located in the special perntit segment. This
analysis must include the documentation that the processes in 'M Charts in
"Evaluating the Stability of Manufacturing and Construction Defects in
Natural Gas Pipelines" by Kiefner and Associates updated April 26, 2007,
under PIIMSA Contract DTFAA-COSP02120 and Figure 4.2, 'Framework
for Evaluation with Path for the Segment Analyzed Highlighted' from TTO-
5 "Low Frequency ERW and Lap Welded Longitudinal Seam Evaluation" by
PRMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 16 of 33

<<<PAGE 17>>>

Michael Baker Jr., and Kiefner and Associates, et. al. under PHMSA
Contract DTRS56-02-D-70036 were utilized along with other relevant
materials. If the engineering analysis shows that the pipe seam issues on
pipelines located in the special permit segment are not a threat to the
integrity of the pipeline, TGP does not have to complete Conditions 14(a)
(ii) through (vii), but must complete Conditions 14(a)(viii) and (ix).
ii) If a 49 CFR Part 192, Subpart J hydrostatic test has not been perforrned, the
special permit segments rnust be hydrostatically tested to a minimum
pressure of 100 percent SMYS, in accordance with 49 CFR Part 192,
Subpart J requirements for eight (8) continuous hours, within two and one-
half (21/2) years of issuance of this special permit. The hydrostatic test must
confirm no systemic issues with the weld seam or pipe. A root cause
analysis, including metallurgical examination of the failed pipe, must be
performed for any failure22 experienced to verify that it is not indicative of a
systemic issue. The results of this root cause analysis must be reported to
the appropriate PHMSA Region Director with a copy to the Director,
PHMSA Engineering and Research Division, within 60 days of the failure;
iii) Special permit segments with low frequency electric resistance welded (LF-
ERW) pipe with a history of leaks or failures without a "spike test" within
the special permit inspection area must be pressure tested23 with a "spike
test" within two and one-half (21/2) years of the issuance of this special
permit.
iv) Special permit segments24 with pressure tests less than 1.25 times MAOP
that may be susceptible to pipe seam issues must be tested with a Subpart J
pressure test within two and one-half (21/2) years of issuance of this special
22 A root cause analysis, including metallurgical examination of the pipe, must be performed for any leaks that are
removed from the special permit segment.
23 A root cause analysis, including metallurgical examination of the pipe, must be performed for any pressure test
failures or leaks from the special permit segment.
24 TGP must implement the replacement of all Type A special permit segments as defined on page 2 of this special
permit as noted: "Type A special permit segments with pipe with integrity issues as determined by Conditions 6
and 14 or that have not been pressure tested in accordance with 49 CFR Part 192, Subpart J to 1.25 times MAOP
of this special permit must be replaced within two and one-half (2!/2) years of the grant of this special permit or
within two (2) years of assessment finding."
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 17 of 33

<<<PAGE 18>>>

permit or the pipe must be replaced with pipe that meets § 192.619 within
two and one-half (2%2) years of issuance of this special permit. If the pipe is
then commensurate with the Class location in accordance with
§ 192.611(a)(3)(ii) the segment is no longer part of this Special Permit.
v) If the pipeline in the special permit inspection area has experienced a seam
leak or failure in the last five (5) years and no hydrostatic test meeting the
conditions of 49 CFR Part 192, Subpart J was performed after the seam leak
or failure, then a hydrostatic test must be performed within two and one-half
(2Y2) years after the issuance of this special permit on the special permit
segment pipeline25;
vi) If the pipeline in any special permit segment has pipe seam conditions as
noted below in (A), (B), or (C), such special permit segment pipeline shall
not be eligible for this special permit:
A) has unknown manufacturing processes without the greater of a 49 CFR
Part 192, Subpart J hydrostatic test or a 1.25 times MAOP pressure
test, or
B) has low fracture toughness pipe that will not ensure ductile fracture
and arrest, or
C) has known manufacturing or construction issues that are unresolved
[such as concentrated hard spots, hard heat-affected weld zones,
selective seam corrosion, pipe movement that has led to buckling, have
had past leak and rupture issues, or any other systemic issues].
vii)If the pipeline in any special permit segment has a reduced longitudinal
joint seam factor, below 1.0, as defined in 49 CFR § 192.113 the special
permit segment pipeline must be replaced.
viii) Pipe in the special permit segments must have all weld seam or girth weld
repairs that have been made by the usage of fittings such as weldolets,
threadolets, repair clamps and pipe sleeves removed and replaced with pipe
in accordance with 49 CFR Part 192 requirements.
25 A root cause analysis, including metallurgical examination of the pipe, must be performed for any pressure test
failures or leaks from the special permit segment.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 18 of 33

<<<PAGE 19>>>

b) TGP must submit a seam remediation plan for the special permit segments to the
appropriate PHMSA Region Director no later than 30 days after finding a seam leak
in the special permit segment:
i) Longitudinal weld seam remediation/repair plan that meets Condition 14(a)
and includes either replacement, hydrostatic testing, or in-line inspection
(ILI), and timing of the plan not to exceed six (6) months, or
ii) Technical justification that shows that the special permit segment is not at
risk for future longitudinal seam leaks or failures.
15) Special Permit SeRment Specific Conditions: TGP must comply with the following
requirements.
a) Line-of-Sight Markers: TGP must install and maintain line-of-sight markings on the
pipeline in the special permit inspection areas except in agricultural areas or large
water crossings such as lakes where line-of-sight signage is not practical. Line-of-
sight markers must be installed within three (3) months of issuance of this special
permit and replaced as necessary by TGP within 30 days after identification.
b) Data Integration: TGP must maintain data integration of special permit condition
findings and remediation in the special permit inspection areas. Data integration
must include the following information: Pipe diameter, wall thickness, grade, and
seam type; pipe coating; maximum allowable operating pressure (MAOP); class
location (including boundaries on aerial photography); high consequence areas
(HCAs) (including boundaries on aerial photography); hydrostatic test pressure
including any known test failures; casings; any in-service ruptures or leaks; in-line
inspection (ILI) survey results including HR-MFL, HR-geometry/caliper or
deformation tools; close interval survey (CIS) surveys — most recent; rectifier
readings; cathodic protection test point survey readings; AC/DC interference
surveys; pipe coating surveys; pipe coating and anomaly evaluations from pipe
excavations; stress corrosion cracking (SCC) excavations and findings; and pipe
exposures from encroachments. Data integration must be outlined on pipeline route
drawings with parallel sections for each integrity category and recent aerial
photography (recent photography, within three (3) years of initial filing and every
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 19 of 33

<<<PAGE 20>>>

three (3) years thereafter).
i) Data integration documentation and drawings to meet Condition 15(b) must
be completed and must be submitted, if requested by PHMSA, beginning
with the 2"d annual report of this special permit with four (4) years of prior
data.
ii) Data integration rnust be updated on an annual basis and with at least an
annual review of integrity issues to be remediated.
c)  Pipe Properties Testing: TGP must test pipe in each special permit segment that
does not meet Condition 16(b) as follows:
i) Develop and implement procedures for conducting non-destructive or destructive
tests, examinations, and assessments for special permit segments without pipe
material records within 12 months of issuance of this special permit;
ii) A minimum of two (2) destructive or non-destructive test methods must be
performed at an excavation site for each special permit segment. For each
special permit segment, TGP will conduct one (1) non-destructive yield test
assessment using TD Williamson test procedures and ball indention
methodology26, or equivalent, and secondly, confirm yield strength through
diarneter tape measurements. Should non-destructive testing of pipe material
properties show that the pipe wall thickness is not within API 5L specification
tolerances and the pipe grade is under the strength requirements of API 5L by
three (3) KSI or more, then the yield strength of that individual pipe shall be
confirmed using destructive test methods or the special permit segment pipe
must be removed within 18 months of issuance of this special permit.
Acceptance limits for the diameter tape measurements shall be in accordance
with PHMSA Advisory Bulletin ADB-09-01.
iii) Assessments must be made for each unique combination of the following
attributes with missing mill test reports (MTRs) or mill inspection reports (i.e.
Moody Engineering Reports): wall thicknesses (within 10 percent of the smallest
wall thickness in the population), grade, manufacturing process, pipe
26 Non-destructive assessment method and procedures must be submitted to PHMSA OPS Region Director and
PHMSA OPS Director of Engineering and Research Division for review and "no objection".
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 20 of 33

<<<PAGE 21>>>

d) e) manufacturing dates (within a two (2) year interval) and construction dates
(within a two (2) year interval).
iv) The material properties determined from either destructive or non-destructive
tests required by this Condition cannot be used to raise the original grade or
specification of the material, which must be based upon the applicable standard
referenced in 49 CFR § 192.7.
v) For future special permit segments with missing MTRs or mill inspection
reports, the above methodology shall be applied or TGP may elect to remove
pipe joints for destructive testing27. Such testing shall be performed within one
(1) year of identification of the new special permit segment.
Pipeline System Flow Reversals: For long term pipeline system flow reversals
exceeding 90 days where either 49 CFR § 192.619(a)(1) or § 192.611 MAOP for
class location changes are exceeded28 in a speck' I permit segment, TGP shall prepare
a written plan that corresponds to those applicable criteria identified in PHMSA
Advisory Bulletin (ADB-2014-04), "Guidance for Pipeline Flow Reversals, Product
Changes and Conversion of Service" issued on September 18, 2014 (79 FR 56121,
Docket PHMSA-2014-0400). The written flow reversal plan must be submitted to
the appropriate PHMSA OPS Regional Director with a copy of the plan submitted to
the Federal Docket for this special permit at www.regulations.gov. TGP must
receive a "no objectioe from the appropriate PHMSA OPS Region Director prior to
implementing the pipeline system flow reversal through the special permit segment.
Environmental Assessments and Permits: TGP must evaluate the potential
environmental consequences and affected resources of any land disturbances and
water body crossings needed to implement the special permit conditions for a special
permit segment or a special permit inspection area prior to the disturbance. If a
land disturbance or water body crossings is required, TGP must obtain and adhere to
all applicable (Federal, State, and Local) environmental permit requirements when
conducting the special permit conditions activity.
27 TGP must prepare a procedure in accordance with Condition 15(c) for material documentation and submit to
PHMSA's OPS Region Director for "no objection".
28 An example of exceedance of 49 CFR § 192.619(a)(1) is a Grandfathered MAOP which has a design factor above
0.72. An example of exceedance of 49 CFR § 192.611 is a Class I to 3 location change.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 21 of 33

<<<PAGE 22>>>

16) Documentation: TGP must maintain the following records for each special permit segment
and special permit inspection areas:
a) b) c) Documentation showing that each special permit segment has received a 49 CFR
§ 192.505, Subpart J, hydrostatic test for eight (8) continuous hours and at a
minimum pressure of 1.25 times MAOP (1.25 x MAOP). If TGP does not have
hydrostatic test documentation, then:
Type A special permit segments must be hydrostatically tested to meet this
requirement within two and one-half (2 Y2) years of the issuance of this special
permit, and
Type B special permit segments must be hydrostatically tested to meet this
requirement within five (5) years of the issuance of this special permit.
Documentation of mechanical and chemical properties including pipe toughness (mill
test reports) showing that the pipe in each special permit segment meets the wall
thickness, yield strength, tensile strength and chemical composition of either the
American Petroleum Institute Standard 5L, 5LX or 5LS, "specification for Line
Pipe" (API 5L) referenced in the 49 CFR Part 192 code at the time of manufacturing
or if pipe was manufactured and placed in-service prior to the inception of 49 CFR
Part 192 then the pipe meets the API 5L standard in use at that time.
Documentation of compliance with all the conditions of this special permit must be
kept for the applicable life of this special permit for the referenced special permit
segments and special permit inspection areas.
17) Extension of Special Permit Seements: PHMSA may extend each original Type B special
permit segment to include contiguous segments of pipeline on either side of the Type B
special permit segment where, following the issuance of this special permit, an increase in
population density indicates a change in class location. Type A special permit segments may
not be extended. Type B special permit segments may not be extended if the extension
would redefine the extended segment as a Type A special permit segment as described in
Section I of this special permit. TGP must:
a) Provide notice to the Director, PHMSA OPS Standards and Rulemaking Division;
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 22 of 33

<<<PAGE 23>>>

b) c) d) e) Director, PHMSA OPS Engineering and Research Division; and appropriate PHMSA
OPS Region Director of a requested special permit segment or ex1ension29 based on
actual class location change and include a schedule of inspections, of any anticipated
remedial actions and the location of the new request including survey stationing. All
requests for a special permit segment or extension must be submitted in the first nine
(9) months of the 49 CFR § 192.611(d) timing limits, and must include data
integration (see Condition 15(b)) and information on the potential environmental
impacts of the extension to determine whether an environmental assessment is
required for the special permit segment extension.
Complete all inspections and remediation of the proposed special permit segment
extension to the extent required of the original special permit segment.
Comply with all the special permit conditions and limitations included herein to all
future special permit segments or extensions.
New Type A special permit segments created following the grant date of this special
permit must be replaced or pressure tested so that the MAOP is commensurate with
the present class location as defined in 49 CFR § 192.611 within two (2) years of the
class location change.
Comply with all conditions of this special permit for the contiguous new special
permit segments or extensions required for implementation and certification in
accordance with 49 CFR § 192.611(d) timing limits, including submittal of
documents to PHMSA required in Condition 18 - Certification.
18) Certification: A senior executive officer, vice president or higher, of TGP must certify in
writing the following:
a) b) c) TGP pipeline special pertnit inspection areas and special permit segments meet the
conditions described in this special permit,
The written manual of O&M procedures (required by § 192.605) for the TGP pipeline
has been updated to include all additional requirements of this special permit; and
TGP has implemented all Conditions as required by this special permit.
29 For a new special permit segment or extension to be considered by PHMSA, TGP must notify the appropriate
PHMSA OPS Region Director to determine the need for a draft environmental assessment.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 23 of 33

<<<PAGE 24>>>

TGP must send the certifications required in Condition 18(a) through (c) with completion
date, compliance documentation summary, and the required senior executive signature and
date of signature to the PHMSA OPS Associate Administrator with copies to the Deputy
Associate Administrator, PHMSA OPS Policy and Programs; appropriate PHMSA OPS
Region Director; Director, PHMSA OPS Standards and Rulemaking Division; Director,
PHMSA OPS Engineering and Research Division; and to the Federal Register Docket
(PHMSA-2016-0004) at www.Regulations.gov within one (1) year of the issuance date of
this special permit.
HI. Limitations:
PI IMSA modifies this special permit subject to the following limitations:
1) PHMSA has the sole authority to make all determinations on whether TGP has complied
with the specified conditions of this special permit.
2) Failure to submit the certifications required by Condition 18 within the time frames specified
may result in revocation of this special permit.
3) PHMSA may revoke, suspend or modify a special permit based on any finding listed in 49
CFR § 190.341(h)(1) and require TGP to comply with the regulatory requirements in 49 CFR
§ 192.611. As provided in 49 U.S.C. Chapter 601 and 49 CFR Part 190, PHMSA may also
issue an enforcement action for failure to comply with this Order. Any work plans and
associated schedules shall be automatically incorporated into this order and are enforceable
in the same manner.
4) Should PHMSA revoke, suspend, or modify a special permit under 49 CFR § 190.341(h)(1),
PHMSA will notify TGP in writing of the proposed action and provide TGP an opportunity
to show cause why the action should not be taken. In accordance with 49 CFR
§ 190.341(h)(3), if necessary to avoid the risk of significant harm to persons, property, or the
environment, PHMSA will not give advance notice and will declare the proposed action
(revocation, suspension, or modification) immediately effective.
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 24 of 33

<<<PAGE 25>>>

5) The terms and conditions of any corrective action order, compliance order or other order
applicable to a pipeline facility covered by this special permit will take precedence over the
terms of this special permit in accordance with 49 CFR § 190.341(h)(4).
6) If TGP sells, merges, transfers, or otherwise disposes of the assets known as the special
permit segments or the special permit segment extension, TGP must provide PHMSA with
written notice of the transfer within 30 days of the consummation date. In the event of such
transfer, PHMSA reserves the right to revoke, suspend, or modify the permit if the transfer
constitutes a material change in conditions or circumstances pursuant to 49 CFR
§ 190.341(h)(1)(ii) or any other circumstances listed under 49 CFR § 190.341(h)(1).
7) PHMSA grants this special permit to limit it to a term of no more than five (5) years from the
issuance date. If TGP elects to seek renewal of this special permit, as modified. TGP must
submit its renewal request at least 180 days prior to expiration of the five (5) year period to
the PHMSA Associate Administrator with copies to the Deputy Associate Administrator,
PHMSA Policy and Programs; appropriate PHMSA OPS Region Director; Director, PHMSA
OPS Standards and Rulemaking Division; and Director, PHMSA OPS Engineering and
Research Division. PHMSA will consider requests for a special permit renewal for up to an
additional five (5) year period. All requests for a special permit renewal must include a
summary report in accordance with the requirements in Condition 11 (Annual Report) above
and must demonstrate that the special permit is still consistent with pipeline safety. PHMSA
may seek additional information from TGP prior to granting any request for special permit
renewal.
AUTHORITY: 49 U.S.C. 60118 (c)(1) and 49 CFR § 1.97.
Issued in Washington, DC on September 1, 2016.
Acting Associate Administrator for Pipeline Safety
PHMSA-2016-0004 Tennessee Gas Pipeline, L.L.C. Special Permit Page 25 of 33

<<<PAGE 26>>>

(psig)
888888888888888
750
936
088888888882888
OPID 19160
Diameter
Dwellings in
length not
meeting
present Cass
Pressure Test
Length (ft)
19.86
0.00
0,00
000
11.70
0.00
0.00
38: 20
321.90
6:0.76
Replace Length (ft)
$43.90
12.70
168.31
606.60
1,5% 9
51530
341.20
3,157.39
674.03
536.30
1,054.07
338,70
912.96
3,130 6S
655.37
49440
521.39
607.56
1,690.82
337.90
1,118.30
...
Special Permit
Segment Length
not meeting
resent Class (ft)
623.76
12.70
168.34
506.60
1,596.90
1,515.30
341.20
1,157.31
30672
338.70
912.96
3,142.35
655.37
494.40
521.39
607.56
1.090 82
1,349.64
659.80
1,118.30
610.76
.....
Special Permit
Inspection Area
Length (ft)
11183.76
10728.34
121569
10895.85
13717.39
11234.03
11366.72
11614.07
11230.87
12250.82
1240964
Latest HCA Assessment
and Date
N/A
N/A
N/A
N/A
N/A
N/A
N/A
IL - 2008
N/A
N/A
N/A
N/A
1L)/Caliper - 2009
N/A
MFL/Caliper - 2013
N/A
N/A
N/A
N/A
N/A
N/A
N/A
....
g
YES
9999999999
98892999999999999999999
Class
(pipe)
present)
pecial Permit Inspectior
Area Stationing (Ending)
Valve . Station
102-1A - 74753
102-1A - 76450
102-1A - 82454
108-2-39:56
108-2-40799
108-2-47319
109-2-6747
109-2 - 27586
103-3-5236
1011. 7733
109-3-14657
1093-4870
109-3 - 5277
:09-3 - 6665
109-3-32663
112-34 - 53705
112-3A - 54299
103-1. 21720
103-4-23141
874-2-76773
361 - 52190
36-1 - 53520
391 - 64182
41-1 - 1753
Page 26 of 33
chagali!:
Special Permit
Inspection Area
Stationing (Beginning)
Valve - Station
1C2-1A - 63569
102-1A - 65877
102-1A - 71756
1082-27990
108-2-28642
108-2-35243
108-2 - 39275
103-2. 35133
102-3-48140
(08-3-47663
1093 - 18960
112.2. 45273
112-3-43245
ARA. 10S1
03-4-11974
874-2-64522
36 1 - 39780
36-1-42300
40-10 - 20309
12-1
Special
Permit
Segment
Special Permit
(Ending)
Valve - Station
102-1A - 69473
102-1A - 71170
102-1A - 77204
106-2-33876
108-2-35519
108-2-42039
108-2-44899
1092-22306
102-3-54095
103-3-2440
1033.0177
108-3-53995
108-3-54902
1093 - 1385
109-3-27383
112-3-48425
112-34 - 49019
103-4 - 16455
103-4-17861
874-2-71493
36-1-46310
36-1-48240
39-1-58902
3010-26,200
Segment Stationing Segment Stationing
Attachment A: Listing of Tennessee Gas Pipeline (TGP) special permit segments
Special Permit
(Beginning)
Valve - Station
02.1A 20R80
102-1A - 71157
102-14 - 77036
108-2-33270
108-2-33922
108-2-40523
108-2-44555
1092 - 1131
109-2-19148
102-3-53420
103-3 - 1904
103-3-8570
106-3-52941
108-3-54035
109-3-472
109-3-24240
112-3-47754
112-34 - 48525
103-4-15933
103.4. 17154
874-2-69602
36-1 - 45060
36-1-47580
39-1-57781
НЕНАИНАИННІ
833231
Une Name
1004
100-1
MADISON
MADISON
MADISON
BATH
BATH
BATH
ROWAN
MADISON
ROWAN
ROWAN
BOYD
BOYD
MADISON
MADISON
MADISON
SABINE
NATCHTOCHES
State
5555555555555555555883588229333932
KM No
888888888888223333
PHMSA REGION |PHMSA No.
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHWEST
SOUTHWEST
SOUTHWEST

<<<PAGE 27>>>

(psig)
1170
1170
8R88888888
OPID 19160
Diameter
(in)
Dwellings in
length not
meeting
present Class
ANY ACN
Pressure Test
Length (ft)
0.00
39,90
154.20
79.50
0.00
2,947.18
0.00
682.08
0.00
796.00
612.00
12.00
557.12
0.00
..........
Replace Length (t)
1,581.69
1,488.68
1,869.39
1 410 д.
2,789.70
1,505.76
1.358.93
638.14
486.50
436.76
823.33
$61.62
950.24
1,229.60
1,723.32
654.33
4,048.14
1,492.73
1,153.88
1,059.96
4,139.46
2,691.92
!....
Special Permit
Segment Length
not meeting
present Class (ft)
1.581.69
1,488.68
1,909.29
1,439.84
2,943,90
1,585.26
2,947.18
638.34
186.50
1,118.84
823.33
461.62
1,746.24
1,541.60
1,723.32
654.33
4,060.14
1,492.73
557.12
1,059.96
4,139.45
2,691.92
...!
Special Permit
Inspection Area
Length (ft)
12141.69
12048.68
12069.29
11999.54
12145.26
13513.04
11688.64
11383.33
11021.62
12306.24
12413.5
1228332
11214.33
11117.12
11713.88
11619.96
14699.45
13251.92
nast MCA Antestment
and Dete
...
99 9
9 9 9
9988999999899922999992
ipecial Permit Inspection
Area Stationing (Ending)
Valve - Station
546-1-41850
530-2 - 77807
535-2-45494
540-2 - 84430
541-2 - 5214
546-2-41854
530-3 - 77458
324-1A - 63237
324-1A - 69176
325-1A - 22117
325- 1A - 23557
326-1 - 3531
326-1 - 18759
244-1 - 27063
S1.:. 25113
252-1 - 2901
13-1-4366
14716
1046
Page 27 of 33
213-4
2154
Special Permit
Inspection Area
ning (Beginning
546-1 - 29708
530-2 - 65758
535-2 - 33004
78046
540 2-
530-3-65539
324-14-49724
324-1A - 58278
01. 1107
325-1 - 11B68
25-1A- 11514
326-1 - 2841
326-1 - 6452
328-1 - 23750
136-1-116
9224
15-4
154
i1111ă
Special
Permit
segment
Special Permit
Segment Stationing
(Ending)
Valve - Station
546-3 - 36570
530-2 - 72527
535-2-40214
540-2 - 79150
540-2 - 86270
546-2 - 36574
530-1-72178
324-1A -57957
324-1A - 64196
325-1-16837
325-1-18277
325-14 - 39647
3261 - 8582
326-1 - 13479
328-1 - 30681
2361 - 7119
236-1-14012
243-1-15551
243-1-21827
244-1 - 21803
251-1 - 19837
251-1 - 35374
213-1-32095
213-1-38385
Attachment A: Listing of Tennessee Gas Pipeline (TGP) special permit segments
Special Permit
segment stationing
(Beginning)
Valve - Station
546-1 - 34988
530-2-71038
40-2-77730
40-2-83326
46-2-34989
530-3-70619
324-1A - 55004
24-1A - 63558
125-1-16351
21. 17135
125-1A - 38824
3261 - 8121
326-1 - 11732
128-1-29030
236-1-5396
236-1-13357
421, 11201
243-1 - 2033:
244-1-21246
251-1 - 18683
251-1-34314
213-1-27955
213-1-35693
215-1-37377
215-1-44383
TELE
46470
215-1-*
215-4-
Une Name
500-2
500-2
500-2
County
LOWNDES
HANCOCK
FORREST
LAUDERDALE
LAUDERDALE
DOWNDES
tANCOCK
¡USSEX
SUSSEX
USSEX
ALBANY
ARROLL
COLUMBIANA
COLUMBIANA
290222227
22 2
2= =
PHIMSA REGION PHMSA No. KM No. State
3 8 0
= 308088858238858888888888888838388
OUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
SOUTHERN
EASTERN
EASTERN
ASTERN
EASTERN
EASTERN
EASTERN
EASTERN
EASTERN
ASTERN

<<<PAGE 28>>>

OPID 19160
,IlleVgMMIMegiMeVgeggMMUMM.M.MRROJW,aRg?g ,
17FIRWIRRIFIFWIAA:RgIgiAAAAA*AAARSIViiPPRRSLIXIng'ARSPRSIFIRRPRWIRXXX9fil
ills • -• n  It
&Oa. Ung th (It)
ti2
113
a
5
11,
a kla la  n  n. 0., so 03 .1 6n  el= a n
8,?.t1 85;',t5 8 gEg558:323,122Uttl n,,1§.0;, ,I,
s
A ,.888,, N8 88 8 8 8 8
• 21". - A1Z7 A 603.-v 7-,,R7727g2RAFF ,V;;;44 21 ”
:71 dR g 5 - 4 P..% Fi  ggg VVA 0:14
,
5 4k6
4—
.
R,
5:58i;;!$3s
-
,7400.e.,.- 9 ,Z24,gpsEll„.“g9
,
ES5Z;i2e1Ne2;tg,s1 .
2A  7' ,..1'74,08IRQm127Rp
.
rA.S1 SASS&3887187
NNIV=1
• 1 $RidO.WAMMDOIMWMIMP ,
"5
i
ti" 
austt aa • s.
• t  55 
Z ZZ Z ZZ
gg  '
t 55 
5
i2“.22i2iMH.Ui'M2292i20222RR.P.2'igli-S—M2292iM2222P.
Me1.,,,mmmmenMOIMprIAMMMe.MMMWMMm.M.IMeOMMM,M.M,Mmmm,MOIMITTM ,n , n mln,MTM
EE
115
111ME W3vTnAstli-,g- --_:.!7§.-10;010 AgRmR1.1411Rmiw lig Es
419-0!!!, !"
A6IttltA
1
S2105H65§IiiiHMeAlfi l5rilitH511111
ial-EIOMIHOWigiFAME: 4 4101iRal'iiig3W11115522rTIE
t " gMq11,Fj-'333n51 3.222,922, 56..22"m
aaeFF amm4amgmKaPggrrggoaparggrrgr
!,UX.FI,F,R9JAZEAMMRREMM9AMMUMJ—WOMAM=
'.:.!.. ,r.PmPM%4AP.APR.%777A7&,71“77'4'777&74,7 4 ;;;;;' ,77.7 ,7SE 1 737 2,7 7G 37 RPPRgiFigge4mEiggevqtvgigEmgig ;WhinahHaRnifi nhfl
Attachment A: Listing of Tennessee Gas Pipeline (TGP) special permit segments
so as 
es  m 
co so co se as as es 
ms as as co co as a en es en al so co as  go os sses as co as as es co os so se es co 
as Gs commma as so
r g
VOMMOAkilWRIMIgliWITOR JugR1111W20,1" 1!i
11-1
Ify 5
;AT!
n!HM/M117: MOIIPM01111MHIMIMI!"qi
titv.
33!!
RIMAMMOMM
5

<<<PAGE 29>>>

Attachment A: Listing of Tennessee Gas Pipeline (TGP) special permit segments
OPID 19160
PHIMANIGION PIIPASI, IDANR. Sow COmtlY Une Wit
Spedel P.M* Special Permit Special Speciel Permit Special P.m* trispection SerrearitSbeharile g
Segment st artloolM
94holt
loo944t0 mM. K
a Ste
An tliselog (Entine(
10.10.0.41
((nding)
Segment
Stationing IlleglimMg1
Valve - Sagan
Wee -Sbtlen
Wire -Station
Type
Valve - Union
den
am
USIA HCAPaslisment
and OM.
Special Permit Special Permit Segment Length
Ine spction Area
not meeting
benign ITN
present Oen (1 t)
Pressum Test
Replace Ungth (ft)
Oweflings In Floe
length not
meeting
VW te r
(In(
present Class
MAOP
EASTERN 115 130 wi SAWA:A%
EASTERN 176 3/2 wv KANAWHA
EASTERN 177 323 sw WAYNE
EASTERN 178 326 569 PUTNAM
EASTERN 179 377 WV PLITRIAM
EASTERN 1E0 328 WV CAREL
EASTERN 1131 379 WV CABELI.
EASTERN 1E2 330 XIV PIJTNAM
EASTERN 183 331 WV PUTNAM
SOUTHWEST 181 334 13 WALLER
SOUTHWEST 195 335 HARRIS
SOUTHWEST 186 336 TS HARRIS
EASTERN 137 34E1 wv KANAWHA
SOUTHERN 186 341 144 CHEATHAM
SOUTHERN 189 342 KY MADISON
SOUTHER% 190 343 KV NA.045014
SOUTHERN 193 348 MS LAUDERDALE
5001 -MESE 192 303 LA CALCASIEU
{WPM)
i64619)
Length IN(
(Ps1 12
103-1 1151 36116 118-1 - 10533 O 1161 . 64725 118-1 - 75969 YES 4,41./Caaper - 2012 11144.46 5E4.46 584 46 000 20 910
1011 121-1 - 19193 123-1-21342 6 121-1 - 13313 1214 - 26622 1 
NO N/A 1283991 2,24991 2,24961 0.00 20 936
1012 116-2 - 18573 113-2-21231 125.2 - 13293 115-2 - 26511 1 
NO N/A 13217.51 2.657,51 2,657.51 0.03 4 24 973
100-2 119-2 - 3970 119 2  5913 118-3- 65933 119-2. 11193 1 
YES IN(Caliper. - 2019 12933.21 1,943 22 3.943.22 003 24 938
1011 119-2 - 13276 119 2  16704 A 119-2 7595 119-1 -11%4 1 
140 1333351 3,413.57 2,01 Al 537.2/1 16 24 938
1013 115-3 - 52772 115-3- 53741 El 1153-47492 115-3 - 59321 1 
NO SI/A 11529.77 969 77 sox ozo 2 26 991
1013 117-3 - 37414 117-3- 37852 217-3 32134 117-3-43132 2 
NO NIA 103961 43E1.10 COD 43610 2 26 910
160.3 118-3 - 25714 119 ,3- 27130 a 115-3 - 20434 113-3 - 33410 3 1 
NO N/A 11975.75 1,41675 1.415.75 0.00 7 30 910
1C0•3 1163 - 31972 119-3. 32863 119-3 - 2E692 118-3 - 3E143 3 1 
NO N/A 21452.2 891,20 891 20 0.011 3 30 910
110-1 19-1 4C6E6 194 - 44295 A 194 - 35535 20-1 - 572 3 1 
NO N/A 1333e.29 342929 3,429 29 0.191 11 24 79)
1011 19-1 - 47777 111 - 49959 O 19-1 • 42497 20-1 - 5235 3 1 
NO N/A 11711.7 1,181.70 1,181.70 0.00 3 24 791
1011 20-1 - 34 201 709 a 19-1 -43757 20.1 - 5969 3 1  NO N/A 1113507 675.07 681.17 13,93 3 24 750
100-2 12.1-2 54392 121-2 - 55616 121-2 -49102 121-2 - 6E896 NO N/A 11793.7 1.,233.70 1,233.70 005 2 24 910
1031 83-48 - 124E06 83-43 - 115333 O 83-48. 109556 00-4 - 3237 3 1  NO 11/A 11057.5 497 50 497.50 4300 6 30 793
11:0-4 103-4  7517 103-4 0389 O 103-4- 2237 103-4- 14169 3 1 
NO N/A 11932.39 1,312.49 1,342_49 aco 1 30 750
1C04 10.64 - 9445 103 4 9697 103-4- 4165. 103-4- 14837 3 1 
NO N/A 10E02.74 242.74 242.74 ape 1 30 790
5012 541-2 72 541-2 - 383 8 540-2 - 61127 641-2 - 5563 3 1 
NO N/A 10171.51 311.51 311.51 0.03 36 936
3001 821-1A - 76695 821-14 74074 A 8221-/A- 71463 821-IA - 839E4 1 
YES MFI/Caliper 2014 12549.64 1,913.5.4 1.91354 000 17 30 936
law
DSAW - Double Suhrnerged Arc Weld
EF W Fief-Mc Fusion Weld

EAW- Eleatic Resistance Weld
EW • (ledge Weld I SAW or CSAW. not FEW) 
FW - El ash Weld 
SAW Women/ea AlL Weld 
SISALS - Seamless  N,saBE
1. When a segment has multiple pipe alb( botes (test pressure. team, coating elf.), the WO but es for the weakest
pipe element is displayed
2. The actual length of the peci at permit segment from begin Station to end sletl on may S. greeter than the length
not meeting preienl clam dun No sump{ V.M. pipe In the segment,
3. Pipeline station l ng Subject to change due to stall on equationt centellIne changes, etc.
MP • 'NM Like Pipe' f or Leeks
MEP • Ston-Susceptibie Location or Pipe for SCC
AIR • Potentiel impact
MAO? - Maximum Allowable Operating Pressure
liALV • Mainline W foe
HCA- High Consequence Are.
SCCu - Stress Corimion Cracking - O011hole Inspect'.
SCC1 • StressCorresion Cmckin8- HYdrotest Failure
ace • StressCocrosian Cracking - In-Service Failure
sce -StreSS Comiision Cracking - Speoal Permit segment located In upstream compressor segment from SCC Indication (within 20miles), Segment deemed not susceptible to SCC
SSWC - Selective Seam Weld Corrosion
MPS - Maximum Pressure in 5 Years Preceding 7/1 /1970

3-289,940.31
251 ,730. 1 )11 
433,71. 4/.00 



234144.23

4453
23,694.65
FOOTAGE
MILEAGE
0711111016tes
Page 29 of 33

<<<PAGE 30>>>

750
876.72
750
809.28
13C9.213
809.28
809.28
809.28
809.28
778.75
778.75
77875
809.28
809.24
809.28
80928
809.28
809.28
778.75
77875
936
750
750
750
1012.5
85E162
858.62
603.87
809.28
778.75
778 75
778.75
858.62
778.75
973.44
973.44
973.44
97844
936
936
936
936
936
75E17
758.7
809 28
80928
778.75
778.75
936
936
936
936
936
936
936
936
936
0.25
0.281
0.25
0.281
0.281
0.1131.
0.281
0.281
0.281
0.312
0.312
0.312
0.281
0.281
0.281
0281
0.281
0281
0.312
031.2
0.39
075
025
025
03/5
0334
0.344
025
0.281
0.312
0.312
0312
0344
0312
0 117
am)
0312
0.313
0.375
0375
0375
0.375
0.375
0.281
0.281
0.281
0.281
0312
0312
0.375
0375
0.375
0375
0.375
0.375
0.375
0.375
0.375
454
454
434
491
491
491
491
491
491
567
567
567
491
491
491
491
504
504
567
567
760
854
454
454
454
567
567
526
491
567
567
567
567
567
517
517
517
517
633
633
633
633
633
454
454
491
491
567
567
633
633
633
633
533
633
633
633
633
511410)
52000
50010
52000
52042
52000
52001
521130
52000
52000
52000
520X)
52000
621310
5.9333
52000
52000
52000
52000
52000
60000
S0003
50020
50000
45010
52000
52000
52003
5201)
52000
52007
52000
52000
52000
52000
520011
52000
52000
52000
521300
52000
52000
52003
45000
45000
52000
52000
52000
52000
52000
52000
52000
52000
52000
52003
52000
52000
52000
FW
SAW
Fw
FW
FW
FW
FW
FW
Fw
()SAW
DSAW
DSAW
Fw
FW
FW
FW
FW
FW
MANN
DSAW
DSAW
FW
FW
FW
SNILS
DSAW
DSAW
DSAW
FW
DSAW
DSAW
OSAW
OSAW
DSAW
DSAW
DSAW
DSAW
()SAW
DSAW
DSAW
DSAW
DSAW
DSAW
SMLS
WES
FW
FW
MAW
OSAW
FW
EW
Fw
SAW
SAW
DSAW
SAW
SAW
DSAW
Attachment A: Listing of Tennessee Gas Pipeline (TGP) special permit segments 
OPID 19160
PHMSA Test
Pipe
Design Pipe Wall Pips Seem Pipe
Distance to
MLY Compressor MAOP Material/ Pressure Leali/SCC/SSWC (w/i 70 ml Onauuro Tested 10.Une
MPS only
of MPS
No.
KM No. Pressure
(Ps%)
Pressure
0 70.72
1081
Thickness
IND
PIR (11) Pipe Grade (pole PIP. Pipe Coating Installation
Data
Upstream/
Downstrea
rn Ini)
Station
Spadng (nu)
Established pee
192.619
Aerial Photography Test Documents of se ansern) Air
Leek/SCC/S5WC
d
..__
(to back
up 'DWI
..,.
1 69 
949
2 70 1148
3 71 949
4 72 1029
5 
73 3029
6 74 1029
7 75 
1029
13 76 
1040
9 77 1040
10 
la 978
11 79 
1045
12 80 1045
13 82 1034
14 83 1022
15 sa 1022
16 85 
1020
17 06 1029
18 87 1033
19 es 991
70 89 993
21 90 1284
22 100 1037
23 101 
1037
24 102 
1039
25 103 MPS
26 105 1037
27 105 1037
28 
108 757
29 109 1114
30 
110 1072
31 111 
1072
12 
113 
1067
13 115 
1149
34 
116 1068
Is 117 
1407
36 118 1407
37 119 1407
38 
720 1.407
39 
121 1338
AO 
122 1338
Al 124 1329
42 125 1328
43 126 
1329
44 131 1093
45 132 
1093
46 134 
1178
47 135 1178
48 136 
1026
49 1.37 1027
50 
139 1309
51 140 
1324
52 141 1324
53 142 1262
sa  143 1262
SS 144 1232
56 146 1332
57 147 1332
58  148 1340
FIOT APPUED WAX
NOT APPUED WAX
HOT A991.110 WAX
COAL TAR ENAMEL
COAL TAR ENAMEL
FUSION BONDED EPDXY
FUSION BONDED EPDXY
FUSION BONDED EPDXY
HOT APPUED WAX
COAL TAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
COALTAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEI
COAJ_TARENAMEL
COAL TAR ENAMEL
HOT APPUED WAX
COAL TAR ENAMEL
COAL TAR ENAMEL
FUSION RONOED EPDXY
NOT APPuED WA/I
COAL TAR ENAMEL
CCIAL TAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
FUSION BONDED EPDXY
COAL TAR ENAMEL
COAL TAR ENAMEL
COALTMENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
COALTARENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
COM TAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
COAL TAR ENAMEL
1101 APPILED WAX
HOT APPUED WAX
HOT APPUED WAX
550 ,5 APPLIEDWAX
HOT APPUED WAX
HOT APPUED WAX
HOT APPLIE0 WAX
COAL TAR ENAMEL
YES
N/A
YES
N/A
YES N/A
YES N/A
YES N/A
YES

N/A
YES
N/A
YES N/A
YES N/A
YES N/A
YES N/A
YES
YES
N/A
YES
N/A
YES
YES N/A
YES N/A
YES N/A
YES N/A
YES 
N/A
YES N/A
YES N/A
YES N/A
YES 
YES
YES 
N/A
YES 
N/A
yES N/A
YES N/A
YES N/A
YES 
N/A
YES 
N/A
YES N/A
YES N/A
YES N/A
YES N/A
YES N/A
YES 
N/A
YES 
N/A
YES N/A
YES N/A
YES N/A
YES N/A
YES N/A
YES N/A
YES N/A
YES N/A
YES 14/A
YES N/A
YES N/A
YES N/A
YES N/A
YES N/A
YES NA
YES N/A
YES N/A
YES N/A
YES N/A
1971
L8/ ZS

89.2

la111(

2012
 Y Y
1971
23/22 
89.2

(.1)1)

2012
 Y
Leak (11/15/1986)
YES
1971

S.4f 1.0

63.2

(.1(1 1

2012
 Y
Leak (11/15/1986) NI.P
1918

/ 3.0
42.9

1.1(3)

2012
 Y/ Y Leak (4/11/19841 
YES
1948
6.4/ 26 47..9

1.1131

2012
 Y/ V

Leak (4/11/1984) 
YES
1948
76/ 1.4 
42.9

411 31

2012
 Y /

Leak (4/1111984) YES
1948

8.4/0.9

42.9

1.1(3)

2012
 Y / Y Leak 14/11/1984) 
YES
1948

02/ 13.1

42.9

1.)(3)

2013
 r/y Leak (4/11/1984) YES
1948
3.6/ 9.2 
42.9

1.1(3)

2012
 r/v 
Leak (4/1 1 /1 964) 
YES
1950
10.0/ao 
139.2

(.)131

2012
 Y /

L... (6/1/1965) YES
1950

0.4 / 7.8

89.2

la/(3)

2012
 Y/ Y Leak (6/1/1965) 
YES
1950

16/ 65

89.2

1.1(31

2012
 Y/ Y Leak 16/1/19651 
YES
1949

10.0/ 0.1
42.9

(.)131

2012

Y
Leak 4472/1998) NO
1949

10.2/ 0.0 
42.9

(.)131

2012
 `I/ Y
Leak (4/2/1998) 
NO
1949

0.1/ 12.1

42.9

(0131

2012
 Y / Y Leak (4/2/1993) 
NO
1949

4.6/ 7.2

42.9

1.1131

2012
 Y
Leak )2/I5/ 198 31 
YES
1950

9.0 /0.0

325

(.1111

2012
 Y /

Leak (4/30/2011) NO
1450

0.0/ 3.2

32.5

(a)11 1

2012

/ Y
L.alI(4/3Ø/2031) NO
1951

30/ 59

69.2

(WI

3312
 Y Y Leak (9125/1995) NO
1951

33/56
892

1.1131

2012
 /9
Leak (9/25/1995)
NO
1969

13.2/ 3.6

89.2

1.111 1

2012
 N/A
1944
86/5.0 
81.1

(a)(1)

2012
 Leak (1/1/1986) NO
1944

9.0/ 4.7

81.1

WO)

2012
 rpf teak (1/7/1986) NO
1944 10.9/ 1.3 
811

1.101

2012

Y /Y 
Leak 13/1 /1 9651/ SCe 
YES / NSIP
1944

4.6/ 0.7

78.7

lc)

2012
 Y /MPS 
Leak 13/1 /19651/ srx"  NIP/ NSLP
1949

8.6 / 4.9

81.1

(a)(1)

2012
 Y/ Y Leak (12/L 5/1 969) 
NO
1949
9.0/ 4.7 
811
)ap)

2012
 Y Y
Leak (12/15/1969) NO
1918

10.9 / L3
81.1

1.1(1)

2012

1444 (11/30/2010)/ SCe 
NO / 4 /51"
1947

17/ 5.0
87

(4X1)

2012
 Y/ Y Leak (6/24/1993) / sce  Nip 1  YES
1951

86/ 4.9

11.1

)4(1)

2012
 Y/ Y Leak (5/15/1959) 
NO
1951
9.0/ 4.7

81.1

1.1(4

2012
 Y / Y
Leak (5/15/1969) NO
1951

10.9/ 13

81.1

1./111

1012
 `I /9 
Le.8 49/2112. 0711 SCe 
Ho/ HSU ,
1949

16/ S.0

87

(4)13)

2012
 V/ I' 
Leak (6/1 5/1 984)/ SCe 
YES/ YES
1951

1.6 / 4.9

87

(a)111

2012
 Y/ Y 
leak (6/1 5/1 959)/ sce 
YES/ YES
1956

1.6111.9

116.1

(.1(31

2012
 811

1 ".(4/1 5(1971 ) YES
1956
31/87  1861

(.)131

2012
 Y/ Y Leak )4/1 5/1 9711 YES
1956
3.0 / 7.4 186 1

(a)131

2011
 Y/ Y Leak (4/15/1971) YES
1956

861 25
186.1

(a)(31

2012
 V / Y  N/A
1955

13.2/ 5.6 
51.1

1.1131

2012
 Y/

SCC' 
YES
1955

14.5/ 48

51.1

(4131

2012
 Y/ Y  SCe 
YES
1954

141/ 1.4 
60.1

(4131

2012
 Y/ Y 
sCe 
YES
1954

14.8/ 1.1 
Ed 1

1.1113)

2012
 Y/ Y  SCC1 
NO
1954
0.1 / 16.9

60.1

1.113)

2012
 Y/ Y  SCO 
NO
1944
3.7/ 2.4 
87

(.113)

2012
 Y/ Y

Leak 111/1 5/1 9531 Y(S
1944

4.8/ 12

87

1.1(3)

2012

Y / Y
Leak (11/1 5/1 953) 
YES
1948

3.7/ 7_5

87

14(3)

2012

Y/ Y

Leak (2/2W1991) / KC' 
NO/ NSLP
1948

1 7/21

87

1.113)

2012
 Y/ Y Leak (2/28/1991) / SCe  No / NSLP
1949

0.7/ 13.1

85.1

1.1(3)

2012
 7/9 Leak 12/1 5/1 977) 110
1952

0.7/ 13.1

85.1

la)(3)

2012
 Y/ Y
Leak (1/30/1949) NO
1959

13.5/ 11

58.7

la)(3)

2012
 Y/
Leak (9/15/1975) NO
1959

7.3 / &D

53.1

1./131

2012
 Y

51/4
1959

7.4 / 7.8

53.1

(.1(3)

2012
 Y/Y
 N/A
1959

14.7 / 1.4

60.2

1.1(3)

2012
 Y / Y  19/A
1993

157 / 0.0

60.2

(./43)

2012
 \qv  N/A
1959

CIO/ 15.4

60.2

(.)131

2012
 /
 N/A
1959
12.5 / L3

59.2

1.1(3)

2012
 Y/ Y

Leak )12/1 5/1 976) 
NIP
1959

13.7 / 0.1

59.2

(.)(3)

2012

Y/

Leak (12/1 5/1 976) 
FILP
1959

49/10.7

57.5

(a)13)

2012
 rpt Leak 16/15/1984) 
NIP
Page 30 of 33

<<<PAGE 31>>>

Attachment A: Listing of Tennessee Gas Pipeline (TGP) special permit segrnents
OPID 19160
Pipe Distance to Segment MPS only
In One
orMPS.
Design
PliMSA
No.
KM No.
Te st
Pressum
Pressure
(Pail
0472
Pipe Well
Thieknens
(In)
Pipe
MLV
Compressor
MAOP
PIR (ft) PM* Grade (PAO
Pi pe Seam
Type Pipe Coating
installation
Upstream/
Station
Established per
Aerial Photography
Material/ Pressure
Test Documents
Le a k/SCC/55WC (w/I 20 rril
of segment)
Date
Downstm•
Spedng (mi)
192.619
Pressure Tested
after
Leak/SCC/SSWC
Inspecte
retold
d
a (to bck
(11s1g)
m (nti)
up 'test)
_
59 150 1340 936 0.375 633 52000 DSAW COAL TAR ENAIVIEL 7959 6.6/ 89 57.5 4)13 1 7312 /1 Leak16/15/19841 NIP YES N/A
68 152 1360 936 039 760 60000 FW LIQUID EPDXY 1955 13.5 / 11 58.7 (011 1 2012 1/1 Leak (3/15/1964) YES YES N/A
61 1.53 12% 936 039 760 60000 ERW TAPE. UNKNOWN BACKING 1966 7.3 / 7.8 53.1 (MO 2012 Y / Y Leak (7/15/19E6) YES YES N/A
62 154 1294 916 0.39 7671 60000 DSAW TAPE UNKNOWN BACKING 1966 14,7 / 14 602 (a)(1) 2012 1/ Y N/A YES NIA
63 155 1E24 936 0.39 760 60 ERW TAPE- UNKNOWN BACKING 1966 15.7/ 0.0 60.2 14111 ) 2017 Y/ Y N/A YES N/A
64 1.57 139) 974.88 0.4062 7E0 50 DSAW TAPE- UNKNOWN BACKING 1964 6.6 /89 57.5 14)131 2012 Y / Y N/A YES N/A
65 158 1345 938.4 0.391 760 60000 DSAW FUSION BONDED EPDXY 1972 13.4/ 11 59.7 (a)11 1 2012 9 / 1 N/A YES N/A
66 159 1471 1560 0.5 566 52000 SAILS COAL TAR ENAMEL 195S 3.6/ 7.9 38 la)(3) 2012 9 /1 19/6 YES NIA
67 160 1471 1170 0375 566 52000 WES COAL TAR ENAMEL 1956 51/6.8 38 14110 2012 Y/Y N/A YES RI/A
68 162 1467 1170 (1375 566 52000 WES COAL TAR ENAMEL 1955 3.1 / 40 304 4113) 2012 X/ 1' N/A YES N/A
63 163 1467 1170 0.375 566 52000 SMIS COALTAR ENAMEL 19% 12/0.2 30.4 (4)(3) 2012 Y/ Y N/A YES N/A
70 164 1466 1170 0.375 566 52000 56113 COAL TAR ENAMEL 1955 17/ 0.3 30.4 (41(31 2012 1/ Y Leak (12/15/2(613) NO YES N/A
71 166 1470 1170 0.375 666 52000 SMIS COAL TAR ENAMEL 1955 1.5/ 54 814 1 41(3) 2012 1/ Y Leak (12/15/2008) NO YES N/A
72 167 1478 1170 0.375 566 52000 SMLS COAL TAR ENAMEL 1955 12/ 4.5 30.4 01(31 2012 Y /1 Leak (12/15/70081 NO YES N/A
73 168 1479 1170 0.375 566 52030 DSAW COAL TAR ENAMEL 1955 5.5 / 16 30.4 0)(3) 7012 Leak 112/15/2024) NO YES 14/ A.
74 177 1174 876.72 0.281 457 52000 FW COAL TAR ENAMEL 1951 10/ 7.6 53.6 0)131 2012 y/ y Leak (7/11/20021 NLP YES N/A
75 178 1174 876.72 13.281 457 52003 FW COAL TAR ENAMEL 1951 15/6.3 53.6 (a)(3) 2012 / Y Leak (7/11/2002) NLP YES N/A
76 179 1096 87672 0.281 451 52003 OSAW COM. TAR ENAMEL 1951 22 9.7 681 01(3) 2012 Y/y Leak (8/15/1954) YES YES N/A
77 18(1 1096 876.72 0.281 457 52000 DSAW COAL TAR ENAMEL 1951 3.9/ 66 689 1.1(3) 2012 3/ y Leak (8/15/1954) YES YES N/A
76 181 64Ps 876.72 0.281 457 52000 DSAW COAL TAR ENAMEL 1951 4.0/ 115 68-8 141 2012 1/ Ws Leak (7/15/1954) YES YES YES
79 182 1158 87672 0.281 457 52000 DSAW COAI TAR ENAMEL 1951 15/3.4 65.8 (01 31 2012 Y/ Y Leak (6/15/1972) YES YES N/A
80 183 1158 876.72 0.281 457 525831 ()SAW COAL TAR ENAMEL 1951 85/05 65.8 181(3) 2012 1/ Y leak )6/15/1972) rEs YES ti/A
81 186 11)49 809.28 0.281 504 52070 FW COAL TAR ENAMEL 1991 53/ 36 62.8 1011 ) .2012 1/ Y Leak (8/15/1974) YES YES N/A
82 187 1049 809 28 0.281 504 52000 FW COAL TAR ENAMEL 1950 6.7 / 2.8 62.8 14111 ) 2012 / Leak (8/15/1974) YES YES N/A
83 188 1073 809.28 0.281 504 52000 SW COAL TAR ENAMEL 1993 7.1 / 5.11 64.4 (RIM 2012 11 Leak (6/1 5/13771 NO YE5 N/A
64 189 1073 809.28 0281 504 52000 FW COAL TAR ENAMEL 1950 8.4 / 3.9 64.4 141(1 ) 2012 Y/y Leak 16/15/1977) NO YES N/A
es 190 1073 809.28 a 281 504 52000 FW COAL TAR ENAMEL 1950 86/ 3.5 64.4 141(1 1 2012 Y/ Y Leali (5115/1977) NO YES N/A
86 191 1073 809.28 0.280 504 5E00 FW COAL TAR ENAMEL 1952 1-7/ 14.3 64.1 10(31 2012 Y/ Y Leak (5/19/2006) NO YES N/A
87 192 toss 809.28 0.2m 504 52000 FW COAL TAR ENAMEL 1952 51/4.1 626 (a)1 1 ( 11112 Y/Y N/A YES 61/6
88 193 1104 809.28 0.281 504 5200 FW FUSION BONDED EPDXY 1952 6.8/ 28 62.8 (i)(11 2012 Y/Y N/A YES N/A
89 194 1077 80128 0.281 504 521832 FW COAL TAR ENAMEL 7954 3.0/ 12.1 64.4 (4)(1 1 2012 1/ 1 , Leak (8/15/1969) NCt YES (4/A
90 195 1018 809 28 0.281 504 52000 DSAW COALTAR ENAMEL 1%6 05/ 4.7 618 W(š) 2012 1 / 9 14414 (5/20/2032) 50 YES N/A
91 196 1018 809,28 0.281 504 52000 DSAW COAL TAR ENAMEL 1956 0.8 / 4.1 62.8 )01 31 2012 Y / Y Leak (5/20/2002) NO YES N/A
92 197 1018 809.28 0.281 504 52000 MAW COAL TAR ENAMEL 1956 2.1 / 3.1 62.8 0)131 2012 Y / Y Leak (5/20/2002) NO YES N/A
93 198 1086 825.6 0.344 698 6CCOO DSAW COAL TAR ENAMEL 7963 5.3 / 3.9 62.8 (011) 2012 Y Y Leak (1 /1 0/2011) NO YES N/A
94 200 1123 825.6 0.344 698 68030 DSAW COAL TAR ENAMEL 198 6.7/ 2.8 6273 1011 ) 2012 Y/ y Leak (1110/2011) NO YEs N/A
95 201 lose 825.6 0.344 698 60000 DSAW COAL TAR ENAMEL 1963 7.1 / 5.0 648 la)(3) 2012 Y/ Y Leak 12/10/20111 NO YES PI/A
96 202 1058 8256 0.344 698 6C000 CISAW COAL TAR ENAMEL 1%3 8.4/ 31 64 4 la1131 2012 Y/ Y Leak (2/10/2011) NO YES N/A
97 203 1058 825.6 0.344 698 60000 DSAW COAL TAR ENAMEL 1963 18/ 35 64.4 lall3) 2012 I Le ak 52/ 101701.11 140 YES NIA
98 2c6 1064 809.28 0.281 504 52000 DSAW COAL TAR ENNIO. 1950 7.2/ 5.0 64.4 (a)(1) 2012 1/ Y Leak (6/15/1977) 610 YES N/A
99 206 1144 876.72 0.281 490 52000 DSAW COAL TAR ENAMEL 1953 4.3/63 70.2 1.)(1) 2012 1/ Y Le43 (V18E19571 / SCe YES / NO YES N/A
1.00 207 1144 876.72 0.261 4%1 52000 05AW COAL TAR ENAMEL 1953 5.4/ 53 70.2 M( 1 ) 2012 Y/ Leak (2/1 5/1957) / SCC1 YES / NO YES N/A
101 208 1286 898 56 0.312 613 01960 DSAW COAL TAR ENAMEL 1965 4.1 / 6.3 70.2 (0(1) 2012 Y/ Y N/A YES N/A
102 209 1286 898,56 0.312 613 6COCK) DSAW COAL TAR ENAMEL 1965 5.2/ 5.3 70.2 1 2 .1(1 .1 2012 Y / Y N/A YES N/A
103 213 1037 758.7 0.281 4)4 45000 SFALS COAL TAR ENAMEL 1944 3.5/ 14 89.8 141(1) 2012 Y / Y 1 -4. 15 (1 /1 5/1482) NO YES N/A
154 215 964 758.7 0.281 454 45000 SMLS COAL TAR ENAMEL 1944 4.0/ 6.6 89.8 (011 ) 2012 /1r '4. 1, 11 /3/192 E YES YES 1 . 06
105 216 964 758.7 0.281 454 45000 SKS COAL TAR ENAMEL 1944 7.6/ 13 89.8 4)11) 2012 Y/ Y Leak (1/3/1%13( YES YES N/A
106 217 964 758.7 0.281 454 45000 SMLS COAL TAR ENAMEL 1944 9.0/ 21 89.8 (a))1) 2012 1/ Y Leak (1/61958) YES YES N/A
100 220 964 758.7 0.281 too 45003 MALS CCIALTAREOLAMEL 1944 9.3/ 0.0 898 (A)(1 I 2012 Y / Y Leak (1/3/1888) NO YES N/A
108 221 956 758.7 0.781 454 45000 SM1.5 COAL TAR ENAMEL 1944 00/ 9.2 89.8 (031 2012 Y /1 Leak (7/3/1983) YES YES N/A
109 223 1036 809.28 0.281 491 52000 FW COAL TAR ENAMEL 1943 3.5 / 24 89.8 103( 2012 / Y Leak (10/16/1996) NO YES N/A
110 224 1036 809.28 0.281 491 52000 FW COAL TAR ENAMEL 1948 5.3 / 0.6 89.8 (0131 2012 Y/ Y Leak (10/16/1996) NO YES
111 226 1224 936 0.375 633 52903 SAW COAL TAR ENAMEL 1959 5.1/ 8.9 61.2 (0(3) 2012 Y Y Leak (6/20/2012) NIP YES N/A
112 227 1224 936 0.375 633 52000 SAW COAL TAR ENAMEL 1959 6.1 / 7.9 612 10(3) 2012 1/ Y Leak (6/20/7012) N LP YES N/A
113 228 1224 936 0375 633 52003 SAW CDAL TAR ENAMEL 1959 63/ 7.5 612 14113) 2012 Y /1 Leak (6/20/2012) NLP YES N/A
114 232 1182 936 0.375 633 52000 DSAW COAL TAR ENAMEL 1953 1.0 / 118 75.5 1683) 2012 Y 1-4.k (o/15/1966) YES YES 61/4,
115 233 1182 936 0.375 633 52000 DSAW COAL TAR ENAMEL 1959 BEI/ 10.8 75.9 103/ 2012 1/ Y Leak (6/15/1966) YES YES N/A
116 234 1182 936 0.375 633 5200D MAW COAL TAR ENAMEL 1959 82/ 106 75.9 1a03) 2012 Y/ Y Leak (W15/1%6) YES YES N/A
Page 31 of 33

<<<PAGE 32>>>

OPID 19160
tr.T1C
g28.0 2t
1 -62 gt
11115-11illi1111-11111111 4 < 4 l444 441111111i111111111U11111.1
r".4..U5M.W,L",gU-MU;UM.MUPI:UUrt.0
;41111111U1141112222222:- ;;;;';1;""i
z 1gF_
1%
gAMMM
32 StI2S2±,2:
1411411111,-uu-L,r191!!
5 
2113E.3" _,
sli
Aerial Photography
'631' 
Ri122 2MiliIIREIRREI NINNINNIN,N , INI,NN
R 49 4 RR gP4RRRR g RR AR g

M 
en

L 1110111152...agoll-551 ,11 ,11vir5555, 11 , 111-15.5vivvigr.1.5.mtg ggieigggigiggggsiEmggggLiggiggAgggiviEmgAgggggiiggggggg§§ mEmmaami..!15.1.1;maws:13:411.1,1RFluaaarsamwaa
gggi8 - qgggLqgfigilimgggggg5ggmgmgmgmgmmgggli
33333 333333 
33
.1.13.0.1”rFtW,W. 
,n2SEE68‘.•..-gg2gggssss6666666633333gggggAgggggg g"3"3"3"3gg
Attachment A: Listing of Tennessee Gas Pipeline (TGP) special permit segments
5
. 
..
IMMIIMAHROAMIMMiiMiAt;MAMMOAMMAi
Page 32 of 33
Pipe Grade (psig)
1155H111111111111111111115M1,111111155,MM155555551555
"ingii.ii5WAMMIRMEHEMiiZZZ.MiRia - RWAMM
TIM
2
3=
.
mg
000
01. 7 1 Eate.5
_
V,F,i1MiiRRAEM71"MZO;IM.F.MEMCMWRAAR1F412:

<<<PAGE 33>>>

Attachment A: Listing of Tennessee Gas Pipeline (TGP) special permit segments
OPID 19160
Pipe
Distance to
MPS only
PHMSA
No. KM No.
Test
Pressure
(psig)
Design
Pressure
Bk 0.72
Pipe Wall
Thickness
(in)
PIR (It) Pipe Grade (prig) Pipe Seam
Type Pipe Coating
Pipe
Installation
Data
MLV
Upstream/
Downstrea
Compressor
Station
Spacing (rni)
MAOP
Established per
192.619
Aerial Photography Material/ Pressure
Test Documents
Leak/SCC/SSWC (w/i 10 mi
ol segment)
Segment
Pressure Tested
atter
Leak/SCC/SSVI/C
In-Line
inspect.
d
or MPS
record
(to back
(lksik)
.1 00)
up 'test')
1320 936 0.76 416 520X1 LISAW FUSION BONDED EPDXY 1984 24/ 7.1 878 1.0) 2012 Y / Y Leak (11/1/1983) Y(S YES N/A
176 322 1209 936 422 52003 DSAW FUSION BONDED EPDXY 1984 3.8 / 11 87.8 laHll 2012 Y/Y Leak (11/1/1983) YES YES N/A
177 323 1222 973.44 0.312 517 520(3) FW COAL TAR ENAMEL 1988 3.5/ 8.2 87.7 laH31 2012 V/ Y Leak (5/15/1978) YES YES N/A
178 326 1222 973.44 0 312 507 52000 FW COAL TAR ENAMEL 1948 0.11/9• 2 87.7 1.1(3) 2012 V/ V Leak (5/15/1953) YES YES N/A
179 327 1222 973.44 a312 507 52000 FW COAL TAR ENAMEL 1948 2.5/ 23 87,7 laH31 2012 Y/ Y Leak 13/15/1958) YES YES N/A
180 328 1244 990 72 0344 565 52000 FW TAPE• UNKNOWN BACKING 1559 10.0/ 7.5 89,1 MD) 2011 914 Ltak 12/1 .5/13661 YES YES N/A
181 329 1269 1246.15 0375 541 60000 Fw COAL TAR ENAMEL 19E6 70 / 15 891 lai(2) 2012 Y/Y Leak (12/15/1966) YES YES N/A
182 330 1151 910.08 0316 624 COMO DSAW FUSION BONDED EPDXY 1972 4.6/ 7.5 89.1 IM(1) 2012 Y/Y N/A YES N/A
183 331 1151 910.08 0316 624 60300 DSAW FUSION BONDED EPDXY 1972 6.0/6.5 89.1 (a)(1) 2012 Y/Y N/A YES N/A
184 334 1054 750 025 454 50000 FW COAL TAR ENAMEL 1944 2.6/ 1.1 Dig 14(3) 2012 9/ Leak M/5/20121/ Sat NO / YES YES N/A
185 335 1054 750 0.25 454 50000 FW COAL TAR ENAMEL 1944 4.3 ao 89.8 lal(3) 2012 Y /V Leak (45/20121/ SCe NO / YES YES N/A
186 336 1044 750 1125 454 5.X.30 FW COA( TAR ENAMEL 1%6 Do/ 7.3 130.8 (4131 2012 1 /V Leak (4/5/2017) I Ste NU , / 1451P YES N/A
187 340 1228 973.44 11312 508 52003 FW COAL TAR ENAMEL 1948 10.2 / 1.0 87.7 (4)13) 2012 1/ Leak (2/15/1969) YES YES N/A
188 341 1024 778.75 0.312 567 52000 (UAW COAL TAR ENAMEL 1952 8.8/ 05 91.7 (MU 2012 Y/ Y Leak (7/1 5/1331) NO YES N/A
189 342 993 778.75 0312 567 52000 MAW FUSION BONDED EPDXY 1951 14/ 7.5 88.7 (4)13) 2012 Y/ Y Leak (3/76/1995) NO YES N/A
190 343 993 778.75 0312 567 52E03 OSAW COAL TAR ENAMEL 1951 18/ 7.2 8E17 (P)13) 2012 Y/ Y Leak (3/25/1995) NO YES N/A
191 348 1302 974.88 0.4052 760 (0003 FW TAPE- UNKNOWN BACKING 1963 0.0/ 15.3 59.9 OP/ 2012 Y/ Y N/A YES N/A
192 360 1338 936 0.375 633 52000 DIAW COAL TAR ENAMEL 1955 150/ 4.6 51.1 18)113) 2012 Y/ Y sce YES YES N/A
Page 33 of 33

<<<PAGE 1>>>

U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
Special Permit Analysis and Findings
Class 1 to 3 Location
Special Permit Information:
Docket Number: PHMSA-2016-0004
Requested By: Tennessee Gas Pipeline Company, LLC
Operator ID#: 19160
Original Date Requested: January 11, 2016
1st Renewal Issuance Date: March 17, 2023
Code Section(s): 49 CFR 192.611(a) and (d), 192.619(a), and 192.5
Purpose:
The Pipeline and Hazardous Materials Safety Administration (PHMSA) provides this
information to describe the facts of the subject special permit application submitted by
Tennessee Gas Pipeline Company LLC1 (TGP), to discuss any relevant public comments
received with respect to the application, to present the engineering/safety analysis of the special
permit application, and to make findings regarding whether the requested renewal of this existing
special permit should be granted, and if so, under what conditions. TGP requests that PHMSA
waive compliance from 49 Code of Federal Regulations (CFR) 192.611(a) and (d), 192.619(a),
and 192.5 for 162 segments and 36.901 miles of natural gas transmission pipeline segments.
Pipeline System Affected:
This special permit renewal request applies to 162 special permit segments and 36.901 miles of
natural gas transmission pipeline operated by TGP and located in the states of Kentucky,
Louisiana, Mississippi, New Jersey, New York, Ohio, Pennsylvania, Tennessee, Texas, and West
Virginia where a change has occurred from an original Class 1 location to a Class 3 location.
1 Tennessee Gas Pipeline Company LLC is owned by Kinder Morgan, Inc.
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 1 of 20

<<<PAGE 2>>>

This special permit allows TGP to continue to operate the 162 special permit segments at their
current maximum allowable operating pressure (MAOP).
Special Permit Request:
TGP submitted an application to PHMSA on March 4, 2021, for a special permit renewal
seeking relief from the Federal pipeline safety regulations in 192.611(a) and (d), 192.619(a), and
192.5 for 162 special permit segments and 36.901 miles of natural gas transmission pipeline.
The special permit segments are located in the states of Kentucky, Louisiana, Mississippi, New
Jersey, New York, Ohio, Pennsylvania, Tennessee, Texas and West Virginia.
Special permit segments are divided into two (2) categories: Type A special permit segments
and Type B special permit segments.
• Type A special permit segments include those special permit segments as described in
Attachment A - Type A Special Permit Segments and Inspection Areas, where there
is a cluster, as described in 49 CFR 192.5(c), of more than 10 buildings intended for
human occupancy in a “class location unit” and for which the MAOP has not been
confirmed in accordance with 49 CFR 192.611(a) or where the pipe installed has been
identified to have a seam type or manufacturer type that is problematic for maintaining
pipeline integrity. Type A special permit segments total approximately 10.192 miles
(53,813.09 feet) of pipe in this proposed special permit renewal. Type A special permit
segments must meet Condition 1(d) and Conditions 8(b)(i) and (c) of the Special Permit
Conditions.
• Type B special permit segments include those special permit segments where there is a
cluster, as described in 49 CFR 192.5(c), of 10 or fewer buildings intended for human
occupancy in a “class location unit” and for which the MAOP has not been confirmed in
accordance with 49 CFR 192.611. Type B special permit segments total approximately
26.348 miles (139,115.00 feet) of pipe as described in Attachment A – Type B Special
Permit Segments and Inspection Areas.
• Special permit inspection areas are defined as a one (1) mile continuous segment on both
sides of the special permit segment (Type A and Type B) plus the footage in the special
permit segment. Attachment A lists the boundaries for the special permit inspection
area associated with each special permit segment.
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 2 of 20

<<<PAGE 3>>>

Subsequent to the issuance of this special permit, those special permit segments that have been
pressure tested or replaced such that the MAOP has been made commensurate with the present
class location as defined in 49 CFR 192.611 would no longer be included in this special permit.
This special permit allows TGP to continue to operate the pipeline segments at their current
maximum allowable operating pressure (MAOP) until either replaced, hydrostatically tested, or
operated in accordance with the special permit conditions. The Federal pipeline safety
regulations in 49 CFR 192.611(a) require natural gas pipeline operators to confirm or revise the
MAOP of a pipeline segment after a change in class location. A special permit would allow TGP
to continue to operate each of the 162 special permit segments at their existing MAOP’s despite
a change in class location for the special permit specified time interval.
Public Notice:
On May 27, 2022, PHMSA posted a notice of this special permit request in the Federal Register
(87 FR 32227) with a closing date of June 27, 2022. PHMSA has reviewed all public comments
received for Docket Number PHMSA-2016-0004. PHMSA received public comments
concerning this special permit request that have been addressed in the Final Environmental
Assessment and Finding of No Significant Impact (FEA and FONSI).
The TGP special permit application letter, Federal Register notice, Final Environmental
Assessment, Finding of No Significant Impact, and all other pertinent documents are available
for review in Docket No. PHMSA-2016-0004 in the Federal Docket Management System
(FDMS) located at www.Regulations.gov.
Analysis:
Background: On June 29, 2004, PHMSA published in the Federal Register (69 FR 38948) the
criteria it uses for the consideration of class location change waivers, now being granted through
special permits. First, certain threshold requirements must be met for a pipeline section to be
further evaluated for a class location change special permit. Second, the age and manufacturing
process of the pipe; system design and construction; environmental, operating and maintenance
histories; and integrity management program elements are evaluated as significant criteria.
These significant criteria are presented in matrix form and can be reviewed in the FDMS, Docket
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 3 of 20

<<<PAGE 4>>>

Number PHMSA–RSPA-2004-17401. Third, such special permits will only then be granted
when pipe conditions and the operator’s integrity management program provides a level of safety
equal to a pipe replacement or pressure reduction.
Threshold Requirements: Each of the threshold requirements published by PHMSA in the
June 29, 2004, Federal Register notice is discussed below in regards to the TGP special permit
petition.
1) No pipeline segments in a class location changing to Class 4 location will be considered.
This special permit request is for 162 special permit segments on the TGP pipeline system
where a class location change has occurred from Class 1 to Class 3 locations as defined in49
CFR 192.5(c) for cluster locations and segments outside the cluster (and inside the sliding
mile for the class location) where an additional dwelling(s) have been identified. TGP has
met this requirement.
2) No bare pipe will be considered. These TGP special permit segments are coated with an
external protective coating. TGP has met this requirement.
3) No pipe containing wrinkle bends will be considered. There are no wrinkle bends in the
special permit segments. TGP has met this requirement.
4) No pipe segments operating above 72% of the specified minimum yield strength (SMYS)
will be considered for a Class 3 special permit. The special permit segments operate at or
below 72% SMYS. TGP has met this requirement.
5) Records must be produced that show a hydrostatic test to at least 1.25 x maximum allowable
operating pressure (MAOP). TGP will pressure test any segments that do not meet this
requirement through the special permit conditions.
6) In-line inspection (ILI) must have been performed with no significant anomalies identified
that indicate systemic problems. TGP will meet this requirement through the special permit
conditions.
7) Criteria for consideration of class location change waiver, now being granted through special
permits, published by PHMSA in the Federal Register (69 FR 38948), define a waiver
inspection area (special permit inspection area) as up to 25 miles of pipe either side of the
waiver segment (special permit segment). The special permit inspection area must be
inspected according to TGP’s integrity management program and periodically inspected with
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 4 of 20

<<<PAGE 5>>>

an in-line inspection technique. The special permit inspection area extends one-mile out
from either side of the special permit segments long. This additional length was used since
the Type B areas that are not being replaced are locations with 10 or fewer buildings intended
for human occupancy in a “class location unit” and are outside the original “cluster area”.
This special permit is contingent upon TGP’s incorporation of each of the special permit
segments in its written integrity management program as a “covered segment” in a “high
consequence area” (HCA) per 49 CFR 192.903.
Criteria Matrix: The original and supplemental data submitted by TGP for the special permit
segments have been compared to the class location change special permit criteria matrix. The
special permit segments fall in the probable acceptance column of the criteria matrix for all
criteria except for:
• Possible acceptance – pipe manufacture and pipe material
• Requires substantial justification – pipe coating, Stress Corrosion Cracking Direct
Assessment (SCCDA), and several leaks within 20-miles of the special permit segment.
The data findings below fall within the “probable acceptance” or the “requires substantial
justification” columns of the criteria matrix:
1) Pipe design and construction, including pipe manufacture, material and design stress:
• TGP pipeline special permit segments have:
o Pipe manufactured with the following pipe seams: low-frequency electric
resistance welded, flash welded, double submerged arc welded, seamless, and
electric welded pipe seams.
o Pipe coatings included: coal tar enamel, hot applied wax, fusion bonded epoxy,
and tape.
o Pipe design stress was 72% specified minimum yield strength or lower.
2) Pipe coating, SCCDA, and several leaks: TGP will be required to conduct a stress corrosion
cracking assessment (SCCDA) of the special permit segments to evaluate where the risk of
stress corrosion cracking (SCC) is present. TGP will be required to implement a plan to
improve cathodic protection reliability and perform inspections for SCC during excavations.
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 5 of 20

<<<PAGE 6>>>

• To further address pipe manufacturing, material, construction, pipe coating, SCCDA, and
possible pipe leak issues, this special permit will include conditions requiring TGP to
treat all special permit segments as “covered segments” in an HCA per 49 CFR 192.903.
• TGP will also be required to perform ILI assessments, anomaly repairs, close interval
surveys, identify any pipeline segment that may be susceptible to pipe seam issues
because of the vintage of the pipe, the manufacturing process of the pipe, or other issues
and stress corrosion cracking direct assessment (SCCDA) along the entire length of the
special permit inspection areas and special permit segments according to the
requirements of 49 CFR 192.929 after the grant of this special permit.
• This special permit will include a condition that TGP must continue to operate each
special permit segment at or below its existing MAOP.
PHMSA has determined that imposing the special permit conditions will address these concerns
and provide equivalent safety for these areas.
Operational Integrity Compliance:
To inform PHMSA’s decision about whether a special permit could provide a level of safety
greater than or equal to a pipe replacement or pressure reduction and is consistent with pipeline
safety, PHMSA reviewed this special permit request to understand the known type of integrity
threats that are in the special permit segments and special permit inspection areas. This
integrity information was used to consider special permit conditions to provide a systematic
program to review and remediate the pipeline for safety concerns. Additional operational
integrity review and remediation requirements are required by this special permit to ensure that
the operator has an ongoing program to locate and remediate safety threats. These threats to
integrity and safety include any issues with the pipe coating quality, cathodic protection
effectiveness, operations damage prevention program, pipe depth of soil cover, weld seam and
girth weld integrity, anomalies in the pipe steel and welds, and material and structures either
along or near the pipeline that could cause the cathodic protection system to be ineffective.
PHMSA has carefully designed a comprehensive set of conditions that TGP must implement to
comply with this special permit.
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 6 of 20

<<<PAGE 7>>>

Past Enforcement History – January 1, 2011 through July 31, 2022:
During January 1, 2011 through July 31, 2022, TGP was cited in 27 enforcement actions with a total
of $257,600 in assessed civil penalties. PHMSA issued four (4) Corrective Action Order, six (6)
Notice of Amendments, 10 Notice of Probable Violations, one (1) Safety Order, and six (6) Warning
Letters to TGP. Tables 1 and 2 below shows PHMSA’s enforcement actions and civil penalties for
TGP:
Table 1: TGP Enforcement Matters from
January 1, 2011 through July 31, 2022
Notice of
Status Corrective
Action Order
Notice of
Safety
Probable
Amendment
Order
Warning
Letter Total
Violation
CLOSED 3 6 10 1 6 26
OPEN 1 0 0 0 0 1
Total 4 6 10 1 6 27
Table 2: TGP Enforcement Civil Penalty Status
January 1, 2011 through July 31, 2022
Proposed Awaiting Order Assessed Withdrawn/Reduced Collected
$384,200 $257,600 $126,600 $257,600
Summary of Enforcement Findings for TGP includes:
• Atmospheric Corrosion Control: General and Monitoring; Construction: Compliance with
Standards; Control Room Management: Alarm Management, Fatigue Mitigation, and Roles
and Responsibilities; External Corrosion Control: Protective Coating and Test Stations;
Integrity Management: Continual Process Evaluation and Assessment and High
Consequence Area Identification; Maintenance: Compressor Stations-Gas Detection,
Compressor Stations-Storage of Combustible Materials, Leak Surveys, Permanent Field
Repair of Damage, Pressure Limiting and Regulating Stations Inspection and Testing, Relief
Devices, Patrolling, Record Keeping, and Valve Maintenance; OME Procedural Manual:
Emergency Plans, General, and Maintenance and Normal Operations; Operations: Continual
Surveillance, Emergency Plans, General, and MAOP; Operator Qualification: Qualification
Program; Public Awareness: General; Reporting: Incident Reports, Construction, and
Pipeline Condition Report; Welding: Limitations on Welders and Procedures.
• 49 CFR 191.15, 191.22, 191.27, 192.225, 192.229, 192.303, 192.361, 192.461, 192.469,
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 7 of 20

<<<PAGE 8>>>

192.479, 192.481, 192.603, 192.605, 192.613, 192.615, 192.616, 192.619, 192.631, 192.705,
192.706, 192.709, 192.713, 192.735, 192.736, 192.739, 192.743, 192.745, 192.805, 192.905,
192.921, and 192.937.
Table 3 below shows PHMSA’s enforcement actions and civil penalties for TGP and the specific 49
CFR Parts 191 and 192 violations:
Table 3: Summary of Enforcement Findings from TGP
January 1, 2011 to July 31, 2022
Notice of Amendment
Construction 1 Control Room Management 3 OME Procedural Manual 2
Operation and/or Maintenance 2 Reporting 2 Welding of Steel in Pipelines 1
Notice of Amendment Total: 11
Notice of Probable Violation
Control Room Management 1 Corrosion Control 3 Integrity Management 3
OME Procedural Manual 6 Operation and/or Maintenance 3 Operator Qualification 2
Public Awareness 1 Reporting 1 Welding of Steel in Pipelines 1
Notice of Probable Violation Total: 21
Warning Letter
OME Procedural Manual 3 Operation and/or Maintenance 9 Operator Qualification 1
Reporting 1
Warning Letter Total: 14
Grand Total: 46
Summary of Enforcement Findings for the Kinder Morgan Gas Pipelines Companies - CIG,
EPNG, NGPL, SNG, Tejas, and TGP:
From January 1, 2011, through July 31, 2022, Kinder Morgan, the operator of SNG, was cited in 64
enforcement actions with a total of $1,077,800 in assessed civil penalties on its Colorado Interstate
Gas Company (CIG), El Paso Natural Gas Company (EPNG), Natural Gas Pipeline of America
(NGPL), Southern Natural Gas Company (SNG), Tejas Pipeline (Tejas), and Tennessee Gas Pipeline
Company (TGP) pipeline systems. PHMSA issued seventeen (17) Notice of Amendments, twenty-two
(22) Notices of Probable Violations, twenty-two (22) Warning Letters, one (1) Safety Order, and nine
(9) Corrective Action Orders to Kinder Morgan.
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 8 of 20

<<<PAGE 9>>>

Tables 4 and 5 below show PHMSA’s enforcement actions and civil penalties for Kinder
Morgan on these pipeline systems – CIG, EPNG, NGPL, SNG, Tejas, and TGP - with operator
identification numbers (OPID#) 2564, 4280, 13120, 18516, 4900, and 19160.
Table 4: Kinder Morgan Enforcement Matters from
January 1, 2011 through July 31, 2022
Notice of
Status Corrective
Action Order
Notice of
Safety
Probable
Amendment
Order
Warning
Letter Total
Violation
CLOSED 5 17 22 1 22 67
OPEN 4 0 0 0 0 4
Total 9 17 22 1 22 71
Table 5: Kinder Morgan Enforcement Civil Penalty Status
January 1, 2011 through July 31, 2022
Proposed Awaiting Order Assessed Withdrawn/Reduced Collected
$1,461,500 $0 $1,077,800 $383,700 $1,077,800
The type of 49 CFR Part 192 enforcement violations against Kinder Morgan on these six (6)
pipeline systems from January 1, 2011 through July 31, 2022 were as follows:
Summary of Enforcement Findings for CIG, EPNG, NGPL, SNG, Tejas, and TGP
includes:
• Atmospheric Corrosion Control: General and Monitoring; Construction: Compliance with
Standards; Control Room Management: Alarm Management, Fatigue Mitigation, and Roles
and Responsibilities; Design: Compressor Station Design and Construction, Pressure
Relieving and Limiting Stations, and Supports and Anchors; External Corrosion Control:
Cathodic Protection, Examination of Buried Pipe, Maintenance and Normal Operations,
Monitoring, Protective Coating, and Test Stations; Gas Transportation: Conversion of
Service, and Underground Natural Gas Storage; Internal Corrosion Control: General,
Inspection Internal Surface, and Records; Integrity Management: Addressing Integrity
Issues, Continual Process Evaluation and Assessment, High Consequence Area
Identification, Preventative and Mitigative Measures, Program Elements, and Threat
Identification; Maintenance: Compressor Stations-Gas Detection, Compressor Stations-
Inspection and Testing of Relief Devices, Compressor Stations-Storage of Combustible
Materials, Leak Surveys, Line Markers, Permanent Field Repair of Damage, Pressure
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 9 of 20

<<<PAGE 10>>>

Limiting and Regulating Stations Inspection and Testing, Relief Devices, Patrolling, Record
Keeping, and Valve Maintenance; OME Procedural Manual: Emergency Plans, General,
Maintenance and Normal Operations, Safety Related Conditions Reporting (SRCR);
Operations: Change in Class Location, Continual Surveillance, Emergency Plans, General,
MAOP, Odorization of Gas, and Overpressure Safety Devices; Operator Qualification:
Qualification Program and Recordkeeping; Public Awareness: Develop and Implement
Public Awareness and Documentation; Reporting: Incident Reports, Immediate Reporting
Incident, Filing SRCR, Offshore Pipeline Condition Report; Welding: Limitations on
Welders, Procedures, and Qualifications.
• 49 CFR 191.3, 191.5, 191.15, 191.22, 191.23, 191.25, 191.27, 191.605, 192.3, 192.12,
192.14, 192.161, 192.163, 192.199, 192.201, 192.225, 192.227, 192.229, 192.303,
192.436, 192.459, 192.461, 192.463, 192.465, 192.469, 192.475, 192.479, 192.481,
192.491, 192.603, 192.605, 192.611, 192.613, 192.615, 192.616, 192.619, 192.625,
192.631, 192.705, 192.706, 192.707, 192.709, 192.713, 192.731, 192.735, 192.736,
192.739, 192.743, 192.745, 192.805, 192.807, 192.905, 192.911, 192.917, 192.921,
192.933, 192.935, and 192.937.
Table 6 below gives a complete summary of the findings and the specific 49 CFR Parts 191 and 192
violations:
Table 6: Summary of Enforcement Findings for
CIG, EPNG, NGPL, SNG, Tejas, and TGP
January 1, 2011 through July 31, 2022
Notice of Amendment
Construction 1 Control Room Management 4 Integrity Management 10
OME Procedural Manual 11 Operation and/or Maintenance 2 Operator Qualification 3
Public Awareness 8 Reporting 3 Transportation of Gas 5
Welding of Steel in Pipelines 3
Notice of Amendment Total: 50
Notice of Probable Violation
Control Room Management 1 Corrosion Control 13 Design 2
Integrity Management 10 OME Procedural Manual 14 Operation and/or Maintenance 26
Operator Qualification 7 Public Awareness 2 Reporting 5
Welding of Steel in Pipelines 1
Notice of Probable Violation Total: 81
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 10 of 20

<<<PAGE 11>>>

Table 6: Summary of Enforcement Findings for
CIG, EPNG, NGPL, SNG, Tejas, and TGP
January 1, 2011 through July 31, 2022
Warning Letter
Corrosion Control 11 Design 1 Integrity Management 1
OME Procedural Manual 10 Operation and/or Maintenance 31 Operator Qualification 2
Public Awareness 4 Reporting 1 Transportation of Gas 1
Warning Letter Total: 62
Grand Total: 193
Findings:
Based on the information submitted by TGP and PHMSA’s analysis of the technical, operational,
and safety issues, PHMSA finds that granting this special permit with conditions that requires
TGP to operate the 162 special permit segments on the 20-inch diameter, 24-inch diameter, 26-
inch diameter, 30-inch diameter, 31-inch diameter, and 36-inch diameter Pipelines located in
Kentucky, Louisiana, Mississippi, New Jersey, New York, Ohio, Pennsylvania, Tennessee,
Texas, and West Virginia at their current MAOP for a Class 1 to Class 3 location change
segment is not inconsistent with pipeline safety.
PHMSA has designed the special permit conditions to effectively assess and remediate threats to
the special permit segments and special permit inspection areas, including pressure testing,
obtaining pipe material records, and conducting assessments to evaluate pipe girth welds that
have not been non-destructively tested, any pipe with missing material records, and SCC. To
ensure TGP properly implements the special permit conditions, TGP will be required to give
PHMSA an annual review of their compliance with the special permit.
PHMSA finds the issuance and full implementation of this special permit that waives the
requirements of 49 CFR 192.611(a) and (d) and 192.619(a) for a class location change to a Class
3 location is not inconsistent with pipeline safety. This special permit requires TGP to
implement the special permit conditions that include safety requirements on the operations,
maintenance, and integrity management of the special permit segments and the special permit
inspection areas. TGP will be required to implement the special permit conditions along the
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 11 of 20

<<<PAGE 12>>>

special permit segments and special permit inspection areas in pipeline segments that are not
high consequence areas and would not normally be required by 49 CFR Part 192 to be assessed
on a periodic interval for threats.
Completed in Washington DC on: March 17, 2023.
Prepared By: PHMSA – Engineering and Research Division
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 12 of 20

<<<PAGE 13>>>

Attachment A – Special Permit Segments and Special Permit Inspection Areas
Type A Special Permit Segments and Inspection Areas
Special Permit
Segment
Number
Outside
Line Name Inspection
Area
Diameter
Segment
Length (feet)
Start Survey
Station
End Survey Station
(Valve - SS)
Inspection Area
Start SS
Inspection Area
End SS
County or Parish,
State
No.
Year
(inches)
(Valve - SS)
(Valve – SS)
(Valve – SS)
1 (KM 69) 24 100-1 526.27 102-1A - 68947 102-1A - 69473 102-1A - 63667 102-1A - 74753 Length
(Miles)
2.10 Dwellings
Installed
Madison, KY 3 1971 3 (KM 71) 24 100-1 168.34 102-1A - 77036 102-1A - 77204 102-1A - 71756 102-1A - 82484 2.03 Madison, KY 1 1971 4 (KM 72) 26 100-2 606.6 108-2 - 33270 108-2 - 33876 108-2 - 27990 108-2 - 39156 2.11 Bath, KY 5 1948 6 (KM 74) 26 100-2 1,515.3 108-2 - 40523 108-2 - 42039 108-2 - 35243 108-2 - 47319 2.29 Bath, KY 3 1948 7 (KM 75) 26 100-2 344.2 108-2 - 44555 108-2 - 44899 108-2 - 39275 109-2 - 597 2.07 Bath, KY 6 1948 8 (KM 76) 26 100-2 252.39 109-2 - 1131 109-2 - 1384 108-2 - 45434 109-2 - 6664 2.05 Rowan, KY 0 1948 13 (KM 82) 26 100-3 1,054.07 108-3 - 52941 108-3 - 53995 108-3 - 47661 109-3 - 4870 2.20 Rowan, KY 6 1949 14 (KM 83) 26 100-3 338.7 108-3 - 54035 108-3 - 54402 108-3 - 48755 109-3 - 5277 2.06 Rowan, KY 4 1949 15 (KM 84) 26 100-3 912.96 109-3 - 472 109-3 - 1385 108-3 - 49597 109-3 - 6665 2.17 Rowan, KY 3 1949 17 (KM 86) 26 100-3 655.37 112-3 - 47754 112-3 - 48425 112-3 - 42474 112-3A - 53705 2.12 Boyd, KY 0 1950 18 (KM 87) 26 100-3 494.4 112-3A - 48525 112-3A - 49019 112-3 - 43245 112-3A - 54299 2.09 Boyd, KY 1 1950 23 (KM 101) 24 100-1 598.4 36-1 - 47642 36-1 - 48240 36-1 - 42362 36-1 - 53520 2.11 Sabine, LA 3 1944 24 (KM 102) 24 100-1 1,118.3 39-1 - 57784 39-1 - 58902 39-1 - 52504 39-1 - 64182 2.21 Natchitoches, LA 6 1944 29 (KM 109) 26 100-2 920.8 47-2D - 10183 47-2D - 11104 47-2D - 4903 47-2D - 16384 2.17 Ouachita, LA 1 1947 46 (KM 134) 26 100-2 112.4 53-2B - 95230 53-2B - 95230 53-2B - 89950 53-2B - 100623 2.02 Washington, MS 1 1948 47 (KM 135) 26 100-2 2,073.94 53-2B - 95383 53-2B - 97457 53-2B - 90103 53-2B - 102737 2.39 Washington, MS 2 1948 50 (KM 139) 30 500-1 1,471.05 530-1 - 71188 530-1 - 72659 530-1 - 65908 530-1 - 77939 2.28 Hancock, MS 2 1959 51 (KM 140) 30 500-1 482.4 535-1 - 38349 535-1 - 38831 535-1 - 33069 535-1 - 44111 2.09 Forrest, MS 2 1959 52 (KM 141) 30 500-1 1,370.49 535-1 - 38884 535-1 - 40254 535-1 - 33604 535-1 - 45534 2.26 Forrest, MS 2 1959 60 (KM 152) 36 500-2 1,488.68 530-2 - 71038 530-2 - 72527 530-2 - 65758 530-2 - 77807 2.28 Hancock, MS 2 1965 61 (KM 153) 36 500-2 1,909.29 535-2 – 38304 535-2 – 40214 535-2 – 33024 535-2 – 45494 2.36 Forrest, MS 2 1966 75 (KM 178) 24 200-1 654.33 236-1 - 13357 236-1 - 14012 236-1 - 8077 236-1 - 19292 2.12 Ontario, NY 2 1951 82 (KM 187) 26 200-1 2,658.16 213-1 - 35693 213-1 - 38351 213-1 - 30413 213-1 - 43631 2.50 Carroll, OH 5 1950 83 (KM 188) 26 200-1 2,044.66 215-1 - 37377 215-1 - 39422 215-1 - 32097 215-1 - 44702 2.39 Columbiana, OH 8 1950 PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 13 of 20
Seam
Type
FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW LF-
ERW FW FW FW MAOP
(psig)
750
750
750
750
750
750
750
750
750
790
790
750
750
750
750
750
936
936
936
936
936
760
790
790

<<<PAGE 14>>>

Type A Special Permit Segments and Inspection Areas
Special Permit
Segment
Number
Outside
Diameter
Line Name Segment
Length (feet)
Start Survey
Station
End Survey Station
(Valve - SS)
Inspection Area
Start SS
Inspection Area
End SS
Inspection
Area
County or Parish,
State
No.
Year
Seam
MAOP
(inches)
(Valve - SS)
(Valve – SS)
(Valve – SS)
84 (KM 189) 26 200-1 1,270.1 215-1 - 44383 215-1 - 45653 215-1 - 39103 215-1 - 50933 Length
(Miles)
2.24 Dwellings
Installed
Type
(psig)
Columbiana, OH 2 1950 FW 790
85 (KM 190) 26 200-1 1,382.31 215-1 - 46382 215-1 - 47765 215-1 - 41102 215-1 - 53045 2.26 Columbiana, OH 1 1950 FW 790
86 (KM 191) 26 200-2 1,513.05 205-2 - 8795 205-2 - 10308 205-2 - 3515 205-2 - 15588 2.29 Athens, OH 3 1952 FW 790
88 (KM 193) 26 200-2 2,680.73 213-2 - 35739 213-2 - 38419 213-2 - 30459 213-2 - 43699 2.51 Carroll, OH 5 1952 FW 790
89 (KM 194) 26 200-2 1,296.36 216-2 - 15651 216-2 - 16947 216-2 - 10371 216-2 - 22227 2.25 Columbiana, OH 5 1954 FW 790
109 (KM 223) 26 100-2 554.05 82-2C - 49652 82-2C - 50206 82-2C - 44372 82-2C - 55486 2.10 Dickson, TN 1 1948 FW 750
110 (KM 224) 26 100-2 177.44 82-2C - 59530 82-2C - 59708 82-2C - 54250 83-2 - 2036 2.03 Dickson, TN 1 1948 FW 750
120 (KM 238) 30 500-1 9.9 562-1 - 1259 562-1 - 1269 560-1 - 97810 562-1 - 6549 2.00 Cheatham, TN 1 1959 FW 936
128 (KM 250) 36 500-2 1,318.68 560-2 – 37151 560-2 – 38470 560-2 – 31871 560-2 – 43750 2.25 Cheatham, TN 4 1968 LF-
ERW 936
129 (KM 251) 36 500-2 381.21 560-2 – 43790 560-2 – 44171 560-2 – 38510 560-2 – 49451 2.07 Cheatham, TN 5 1968 LF-
ERW 936
130 (KM 252) 36 500-2 420.56 560-2 – 99604 560-2 – 100024 560-2 – 94324 562-2 – 3915 2.08 Cheatham, TN 1 1968 LF-
ERW 936
151 (KM 290) 24 100-1 1,677.99 19-1 - 21876 19-1 - 24570 19-1 - 16596 19-1 - 29850 2.32 Waller, TX 5 1944 FW 750
152 (KM 291) 24 100-1 753.7 20-1 - 36048 20-1 - 36801 20-1 - 30768 20-1 - 41976 2.14 Harris, TX 2 1944 FW 750
153 (KM 292) 24 100-1 675 36-1 - 13320 36-1 - 13995 36-1 - 8040 36-1 - 19275 2.13 Sabine, TX 1 1944 FW 750
160 (KM 300) 30 100-3 1,531.99 19-3 -20924 19-3 - 23684 19-3 - 15644 19-3 - 28964 2.29 Waller, TX 4 1952 EFW 750
161 (KM 301) 30 100-3 1,727.52 19-3 - 41139 19-3 - 42867 19-3 - 35859 19-3 - 48147 2.33 Waller, TX 3 1952 EFW 750
162 (KM 302) 30 100-3 1,024.5 169 (KM 312) 24 409A-100
DONNA LINE 1,237.01 409A-101.1 - 5411 409A-101.1 - 6648 409A-101.1 -
131
171 (KM 316) 24 409A-100
DONNA LINE 1,523.74 19-3 - 49125 409A-102 - 10119 409A-102 - 4839 19-3 - 48100 19-3 - 42820 409A-102 - 11643 20-3 - 5225 2.19 Harris, TX 7 1952 EFW 750
409A-101.1 -
11928 2.23 Hidalgo, TX 76 1950 FW 933
409A-102 - 16923 2.29 Hidalgo, TX 4 1950 FW 933
172 (KM 317) 24 409A-100
DONNA LINE 1,787.31 409A-102 - 35417 409A-102 - 37204 409A-102 -
30137 409A-102 - 42484 2.34 Hidalgo, TX 9 1950 FW 933
177 (KM 323) 24 100-2 2,657.51 115-2 - 18573 115-2 - 21231 115-2 - 13293 115-2 - 26511 2.50 Wayne, WV 3 1948 FW 973
178 (KM 326) 24 100-2 1,833.55 119-2 - 3970 119-2 - 5881 118-3 - 65930 119-2 - 11161 2.35 Putnam, WV 3 1948 FW 938
181 (KM 329) 26 100-3 438.1 117-3 - 37414 117-3 - 37852 117-3 - 32134 117-3 - 43132 2.08 Cabell, WV 2 1966 FW 910
185 (KM 335) 24 100-1 1,181.7 19-1 - 47777 19-1 - 48959 19-1 - 42497 20-1 - 5235 2.22 Harris, TX 8 1944 FW 750
186 (KM 336) 24 100-1 1,351.66 20-1 - 0034 20-1 - 1386 19-1 - 43757 20-1 - 6666 2.26 Harris, TX 8 1966 FW 750
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 14 of 20

<<<PAGE 15>>>

Type A Special Permit Segments and Inspection Areas
Special Permit
Segment
Number
Outside
Diameter
Line Name Segment
Length (feet)
Start Survey
Station
End Survey Station
(Valve - SS)
Inspection Area
Start SS
Inspection Area
End SS
Inspection
Area
County or Parish,
State
No.
Year
Seam
MAOP
(inches)
(Valve - SS)
(Valve – SS)
(Valve – SS)
187 (KM 340) 24 100-2 1,233.7 121-2 - 54382 121-2 - 55616 121-2 - 49102 121-2 - 60896 Length
(Miles)
2.23 Dwellings
Installed
Type
(psig)
Kanawha, WV 1 1948 FW 910
191 (KM 348) 36 500-2 311.51 541-2 - 72 541-2 - 383 540-2 - 81127 541-2 - 5663 2.06 Lauderdale, MS 3 1963 FW 936
Note: FW is a flash welded pipe longitudinal seam.
EFW is electric flash welded pipe longitudinal seam.
LF-ERW is low frequency electric welded longitudinal seam pipe.
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 15 of 20

<<<PAGE 16>>>

Type B Special Permit Segments and Inspection Areas
Inspection
Special Permit
Outside
Start Survey
End Survey
Inspection Area
Inspection Area
Line
Length
Area
County or
No.
Year
Seam
MAOP
Segment
Diameter
Station
Station
Start SS
End SS
Name
(feet)
Length
Parish, State
Dwellings
Installed
Type
(psig)
Number
(inches)
(Valve - SS)
(Valve - SS)
(Valve – SS)
(Valve – SS)
(Miles)
2 (KM 70) 24 100-1 12.7 102-1A – 71157 102-1A – 71170 102-1A – 65877 102-1A – 76450 2.00 Madison, KY 1 1971 SAW 750
10 (KM 78) 30 100-3 824.32 102-3 – 53270 102-3 – 54095 102-3 – 47990 103-3 – 5236 2.16 Madison, KY 4 1950 DSAW 750
11 (KM 79) 30 100-3 536.3 103-3 – 1904 103-3 – 2440 102-3 – 50762 103-3 – 7720 2.10 Madison, KY 1 1950 DSAW 750
12 (KM 80) 30 100-3 806.72 103-3 – 8570 103-3 – 9377 103-3 – 3290 103-3 – 14657 2.15 Madison, KY 1 1950 DSAW 750
19 (KM 88) 30 100-4 521.39 103-4 – 15933 103-4 – 16455 103-4 – 10653 103-4 – 21735 2.10 Madison, KY 1 1951 DSAW 750
20 (KM 89) 30 100-4 607.56 103-4 – 17254 103-4 – 17861 103-4 – 11974 103-4 – 23141 2.12 Madison, KY 2 1951 DSAW 750
21 (KM 90) 36 800-2 1,690.82 874-2 – 69802 874-2 – 71493 874-2 – 64522 874-2 – 76773 2.32 Madison, KY 3 1969 DSAW 936
27 (KM 106) 30 100-2 272.2 36-2 – 47634 36-2 – 47906 36-2 – 42354 36-2 – 53186 2.05 Sabine, LA 2 1949 DSAW 750
28 (KM 108) 31 100-2 1,121.16 39-2 – 57758 39-2 – 58879 39-2 – 52478 39-2 – 64159 2.21 Natchitoches,
LA 6 1948 DSAW 604
31 (KM 111) 30 100-3 740.5 36-3 – 47480 36-3 – 48221 36-3 – 42200 36-3 – 53501 2.14 Sabine, LA 2 1951 DSAW 750
32 (KM 113) 30 100-3 1,772.33 39-3 – 57098 39-3 – 58870 39-3 – 51818 39-3 – 64150 2.34 Natchitoches, LA 6 1951 DSAW 750
33 (KM 115) 30 100-3 907.8 47-3D – 10212 47-3D – 11120 47-3D – 4932 47-3D – 16400 2.17 Ouachita, LA 1 1949 DSAW 750
34 (KM 116) 30 100-4 1,414.14 47-4D – 9988 47-4D – 11056 47-4D – 4708 47-4D – 16337 2.27 Ouachita, LA 1 1951 DSAW 750
36 (KM 118) 24 500-1 872.7 511-1 – 10843 511-1 – 11716 511-1 – 5572 511-1 – 16996 2.17 Vermillion, LA 8 1956 DSAW 973
37 (KM 119) 24 500-1 3,005.66 511-1 – 15728 511-1 – 18734 511-1 – 10448 511-1 – 24014 2.57 Vermillion, LA 10 1956 DSAW 973
38 (KM 120) 24 500-1 858.45 512-1 – 45271 512-1 – 46129 512-1 – 39991 512-1 – 51409 2.16 Iberia, LA 4 1956 DSAW 973
41 (KM 124) 30 800-1 102.57 834-1 – 77999 834-1 - 78101 834-1 – 72719 834-1 – 83381 2.02 Franklin, LA 0 1954 DSAW 936
42 (KM 125) 30 800-1 1,259.31 834-1 - 78142 834-1 - 79401 834-1 – 72862 834-1 – 84682 2.24 Franklin, LA 1 1954 DSAW 936
43 (KM 126) 30 800-1 75.63 835-1 – 694 835-1 – 797 834-1 – 80806 835-1 – 6050 2.01 Franklin, LA 1 1954 DSAW 936
44 (KM 131) 24 100-1 731.04 53-1B1 – 95339 53-1B1 – 96070 53-1B1 – 90059 53-1B1 – 101350 2.14 Washington, MS 1 1944 SMLS 750
45 (KM 132) 24 100-1 964.23 53-1B1 – 101333 53-1B1 – 102270 53-1B1 – 96053 53-1B1 – 107550 2.18 Washington, MS 1 1944 SMLS 750
48 (KM 136) 30 100-3 1,198.98 69-3 – 3436 69-3 – 4635 68-3 – 59355 69-3 – 9915 2.23 Benton, MS 2 1949 DSAW 750
49 (KM 137) 30 100-4 1,234.46 69-4 – 3494 69-4 – 4728 68-4 – 59426 69-4 – 10008 2.23 Benton, MS 2 1952 DSAW 750
53 (KM 142) 30 500-1 1,474.9 540-1 – 77758 540-1 – 79233 540-1 – 72478 540-1 – 84513 2.28 Lauderdale, MS 5 1959 SAW 936
55 (KM 144) 30 500-1 257.2 541-1 - 00042 541-1 – 00313 540-1 – 81096 541-1 – 5593 2.05 Lauderdale, MS 4 1959 DSAW 936
58 (KM 148) 30 500-1 959.21 546-1 – 26190 546-1 – 27149 546-1 – 20910 546-1 – 32429 2.18 Lowndes, MS 1 1959 DSAW 936
59 (KM 150) 30 500-1 1,581.69 546-1 – 34988 546-1 – 36570 546-1 – 29708 546-1 – 41850 2.30 Lowndes, MS 3 1959 DSAW 936
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 16 of 20

<<<PAGE 17>>>

Type B Special Permit Segments and Inspection Areas
Inspection
Special Permit
Outside
Start Survey
End Survey
Inspection Area
Inspection Area
Line
Length
Area
County or
No.
Year
Seam
MAOP
Segment
Diameter
Station
Station
Start SS
End SS
Name
(feet)
Length
Parish, State
Dwellings
Installed
Type
(psig)
Number
(inches)
(Valve - SS)
(Valve - SS)
(Valve – SS)
(Valve – SS)
(Miles)
62 (KM 154) 36 500-2 1,439.84 540-2 – 77710 540-2 – 79150 540-2 – 72430 540-2 – 84430 2.27 Lauderdale, MS 6 1966 DSAW 936
64 (KM 157) 36 500-2 1,585.26 546-2 – 34989 546-2 – 36574 546-2 – 29709 546-2 – 41854 2.30 Lowndes, MS 3 1964 DSAW 936
65 (KM 158) 36 500-3 1,347.37 530-3 – 70819 530-3 – 72167 530-3 – 65539 530-3 – 77447 2.26 Hancock, MS 2 1972 DSAW 936
66 (KM 159) 24 300-1 2,953.04 324-1A - 55004 324-1A – 57957 324-1A – 49724 324-1A - 63237 2.56 Sussex, NJ 10 1955 SMLS 1,170
67 (KM 160) 24 300-1 638.57 324-1A - 63558 324-1A – 64196 324-1A – 58278 324-1A - 69476 2.12 Sussex, NJ 1 1955 SMLS 1,170
68 (KM 162) 24 300-1 471.55 325-1 – 16365 325-1 – 16837 325-1 – 11085 325-1A - 22117 2.09 Sussex, NJ 5 1955 SMLS 1,170
69 (KM 163) 24 300-1 1,121.11 325-1 – 17148 325-1 – 18277 325-1 – 11868 325-1A - 23557 2.21 Sussex, NJ 8 1955 SMLS 1,170
70 (KM 164) 24 300-1 811.71 325-1A – 38824 325-1A – 39635 325-1A – 33544 326-1 – 3519 2.15 Sussex, NJ 2 1955 SMLS 1,170
71 (KM 166) 24 300-1 373.7 326-1 – 8209 326-1 – 8582 326-1 – 2929 326-1 – 13862 2.07 Sussex, NJ 2 1955 SMLS 1,170
72 (KM 167) 24 300-1 1,729.51 326-1 – 11749 326-1 – 13479 326-1 – 6469 326-1 – 18759 2.33 Sussex, NJ 2 1955 SMLS 1,170
77 (KM 180) 24 200-1 1,478.51 243-1 – 20348 243-1 – 21827 243-1 – 15068 243-1 – 27107 2.28 Madison, KY 3 1951 DSAW 760
79 (KM 182) 24 200-1 1,153.88 251-1 – 18683 251-1 – 19837 251-1 – 13403 251-1 – 25117 2.22 Albany, NY 1 1951 DSAW 760
80 (KM 183) 24 200-1 1,059.96 251-1 – 34314 251-1 – 35374 251-1 – 29034 252-1 – 2901 2.20 Albany, NY 1 1951 DSAW 760
90 (KM 195) 26 200-3 1,081.17 213-3 – 26889 213-3 – 27970 213-3 – 21609 213-3 – 33250 2.20 Carroll, OH 4 1956 DSAW 790
92 (KM 197) 26 200-3 974.2 213-3 – 35492 213-3 – 364478 213-3 – 30212 213-3 – 41746 2.18 Carroll, OH 5 1956 DSAW 790
94 (KM 200) 36 200-4 2,648.75 213-4 – 35689 213-4 – 38338 213-4 – 30409 213-4 – 43618 2.50 Carroll, OH 5 1963 DSAW 790
95 (KM 201) 36 200-4 1,950.62 215-4 – 37485 215-4 – 39436 215-4 – 32205 215-4 – 44716 2.37 Columbiana, OH 8 1963 DSAW 790
96 (KM 202) 36 200-4 1,248.52 215-4 – 44504 215-4 – 45753 215-4 – 39224 215-4 – 51033 2.24 Columbiana, OH 2 1963 DSAW 790
97 (KM 203) 36 200-4 1,358.28 215-4 – 46492 215-4 – 47844 215-4 – 41212 215-4 – 53124 2.26 Columbiana, OH 1 1963 DSAW 790
98 (KM 205) 26 200-1 1,935.75 217-1 – 38468 217-1 – 40404 217-1 – 33188 217-1 – 45684 2.37 Lawrence, PA 5 1950 DSAW 790
99 (KM 206) 24 300-1 839.87 219-2D – 22733 219-2D – 23573 219-2D – 17453 219-2D – 28853 2.16 Mercer, PA 2 1953 DSAW 877
100 (KM 207) 24 300-1 491.7 219-2D – 28609 219-2D – 29100 219-2D – 23329 219-2D – 34380 2.09 Mercer, PA 1 1953 DSAW 877
101 (KM 208) 30 300-2 875.56 219-3 – 22847 219-3 – 23723 219-3 – 17567 219-3 – 29003 2.17 Mercer, PA 2 1965 DSAW 877
102 (KM 209) 30 300-2 573.79 219-3 – 28627 219-3 – 29201 219-3 – 23347 219-3 – 34507 2.11 Mercer, PA 1 1965 DSAW 877
103 (KM 213) 24 100-1 533.33 82-1C – 18316 82-1C – 18849 82-1C – 13036 82-1C – 24129 2.10 Dickson, TN 2 1944 SMLS 750
104 (KM 215) 24 100-1 2,782.53 83-1A – 78304 83-1A – 81086 83-1A – 73024 83-1A – 86366 2.53 Cheatham, TN 10 1944 SMLS 750
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 17 of 20

<<<PAGE 18>>>

Type B Special Permit Segments and Inspection Areas
Inspection
Special Permit
Outside
Start Survey
End Survey
Inspection Area
Inspection Area
Line
Length
Area
County or
No.
Year
Seam
MAOP
Segment
Diameter
Station
Station
Start SS
End SS
Name
(feet)
Length
Parish, State
Dwellings
Installed
Type
(psig)
Number
(inches)
(Valve - SS)
(Valve - SS)
(Valve – SS)
(Valve – SS)
(Miles)
105 (KM 216) 24 100-1 1,490.6 83-1A – 97294 83-1A – 98785 83-1A – 92014 83-1A - 104065 2.28 Cheatham, TN 7 1944 SMLS 750
106 (KM 217) 24 100-1 28.61 83-1A – 105135 83-1A – 105164 83-1A – 99855 83-1A - 110444 2.01 Cheatham, TN 1 1944 SMLS 750
107 (KM 220) 24 100-1 668.38 84-1 – 49147 84-1 – 49815 84-1 – 438667 85-1 – 5224 2.13 Robertson, TN 5 1944 SMLS 750
108 (KM 221) 24 100-1 1,953.93 85-1 – 150 85-1 – 2103 84-1 – 44741 85-1 – 7383 2.37 Robertson, TN 10 1944 SMLS 750
111 (KM 226) 30 500-1 566.83 557-1 – 27037 557-1 – 27604 557-1 – 21757 557-1 – 32884 2.11 Lewis, TN 2 1959 SAW 936
112 (KM 227) 30 500-1 686.45 557-1 – 32179 557-1 – 32866 557-1 – 26899 557-1 – 38146 2.13 Lewis, TN 1 1959 SAW 936
113 (KM 228) 30 500-1 1,376.94 557-1 – 33305 557-1 – 34682 557-1 – 28025 557-1 – 39962 2.26 Lewis, TN 3 1959 SAW 936
114 (KM 232) 30 500-1 732.13 560-1 – 37152 560-1 – 37885 560-1 – 31872 560-1 – 43165 2.14 Cheatham, TN 1 1959 DSAW 936
115 (KM 233) 30 500-1 1006 560-1 – 42304 560-1 – 43310 560-1 – 37024 560-1 – 48590 2.19 Cheatham, TN 10 1959 DSAW 936
116 (KM 234) 30 500-1 757.26 560-1 – 43428 560-1 – 44185 560-1 – 38148 560-1 – 49465 2.14 Cheatham, TN 7 1959 DSAW 936
117 (KM 235) 30 500-1 1,332.21 560-1 - 98120 560-1 – 99452 560-1 – 92840 562-1 – 2902 2.25 Cheatham, TN 1 1959 DSAW 936
118 (KM 236) 30 500-1 633.98 560-1 – 99846 560-1 – 100480 560-1 – 94566 562-1 – 3930 2.12 Cheatham, TN 2 1959 DSAW 936
119 (KM 237) 30 500-1 994.45 562-1 – 66 562-1 – 1061 560-1 – 96617 562-1 – 6341 2.19 Cheatham, TN 5 1959 SAW 936
121 (KM 239) 30 500-1 1,339.84 562-1 – 6239 562-1 – 7579 562-1 – 959 562-1 – 12859 2.25 Cheatham, TN 1 1959 SAW 936
122 (KM 240) 30 500-1 2,474.52 563-1 – 29453 563-1 – 31925 563-1 – 24173 563-1 – 37205 2.47 Robertson, TN 6 1959 DSAW 936
123 (KM 241) 30 500-1 4,358.19 563-1 – 42160 563-1 – 46519 563-1 – 36880 563-1 – 51799 2.83 Robertson, TN 124 (KM 242) 30 500-1 1,929.95 564-1 – 14368 564-1 – 16298 564-1 – 9088 564-1 – 21578 2.37 Robertson, TN 125 (KM 243) 30 500-1 3,262.84 564-1 – 20668 564-1 – 23931 564-1 – 15388 564-1 – 29211 2.62 Robertson, TN 10 1959 10 1959 DSAW 936
4 1959 DSAW 936
DSAW 936
126 (KM 244) 36 500-2 469.38 557-2 – 27013 557-2 – 27483 557-2 – 21733 557-2 – 32763 2.09 Lewis, TN 2 1964 DSAW 936
127 (KM 245) 36 500-2 738.42 557-2 – 32134 557-2 – 32872 557-2 – 26854 557-2 – 38152 2.14 Lewis, TN 1 1964 DSAW 936
131 (KM 253) 36 500-2 502.7 562-2 – 551 562-2 – 1054 560-2 – 96661 562-2 – 6334 2.10 Cheatham, TN 6 1963 DSAW 936
132 (KM 254) 36 500-2 16.9 562-2 – 1253 562-2 – 1270 560-2 – 97362 562-2 – 6550 2.00 Cheatham, TN 1 1963 DSAW 936
133 (KM 255) 36 500-2 2,062.21 562-2 – 5535 562-2 – 7598 562-2 – 255 562-2 – 12878 2.39 Cheatham, TN 2 1963 DSAW 936
134 (KM 256) 36 500-2 1,001.81 563-2 – 29422 563-2 – 30424 563-2 – 24142 563-2 – 35704 2.19 Robertson, TN 4 1965 DSAW 936
135 (KM 257) 36 500-2 1,426.43 563-2 – 30503 563-2 – 31930 563-2 – 25223 563-2 – 37210 2.27 Robertson, TN 5 1965 DSAW 936
136 (KM 258) 36 500-2 303.7 563-2 – 42134 563-2 – 42438 563-2 – 36854 563-2 – 47718 2.06 Robertson, TN 2 1965 DSAW 936
137 (KM 259) 36 500-2 3,257.08 563-2 – 42518 563-2 – 46423 563-2 – 37238 563-2 – 51703 2.62 Robertson, TN 6 1965 DSAW 936
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 18 of 20

<<<PAGE 19>>>

Type B Special Permit Segments and Inspection Areas
Inspection
Special Permit
Outside
Start Survey
End Survey
Inspection Area
Inspection Area
Line
Length
Area
County or
No.
Year
Seam
MAOP
Segment
Diameter
Station
Station
Start SS
End SS
Name
(feet)
Length
Parish, State
Dwellings
Installed
Type
(psig)
Number
(inches)
(Valve - SS)
(Valve - SS)
(Valve – SS)
(Valve – SS)
(Miles)
138 (KM 260) 36 500-2 1,899.22 564-2 – 14427 564-2 – 16326 564-2 – 9147 564-2 – 21606 2.36 Robertson, TN 4 1965 DSAW 936
139 (KM 261) 36 500-2 219.1 564-2 – 20671 564-2 – 20890 564-2 – 15391 564-2 – 26170 2.04 Robertson, TN 4 1965 DSAW 936
140 (KM 262) 36 500-2 2,970.93 564-2 – 20965 564-2 – 23936 564-2 – 15685 564-2 – 29216 2.56 Robertson, TN 6 1965 DSAW 936
141 (KM 271) 30 800-1 384.62 861-1 – 44265 861-1 – 44649 861-1 – 38985 861-1 – 49929 2.07 Cheatham, TN 1 1954 EW 936
142 (KM 272) 30 800-1 581.5 861-1 – 99945 861-1 – 100526 861-1 – 94665 863-1 – 3910 2.11 Cheatham, TN 2 1954 EW 936
143 (KM 273) 30 800-1 1,104.3 863-1 – 94 863-1 – 1199 861-1 – 96711 863-1 – 6479 2.21 Cheatham, TN 6 1954 EW 936
144 (KM 275) 30 800-1 1,366.34 863-1 – 6197 863-1 – 7564 863-1 – 917 863-1 – 12844 2.26 Cheatham, TN 1 1954 EW 936
145 (KM 276) 30 800-1 968.97 864-1 – 29457 864-1 – 30426 864-1 – 24177 864-1 – 35706 2.18 Robertson, TN 4 1954 EW 936
146 (KM 277) 30 800-1 1,797.26 864-1 – 30649 864-1 – 32446 864-1 – 25369 864-1 – 37726 2.34 Robertson, TN 5 1954 EW 936
147 (KM 278) 30 800-1 4253 864-1 – 42177 864-1 – 46430 864-1 – 36897 864-1 – 51710 2.81 Robertson, TN 10 1954 EW 936
148 (KM 279) 30 800-1 1,978.36 865-1 – 14349 865-1 – 16327 865-1 – 9069 865-1 – 21607 2.37 Robertson, TN 4 1954 EW 936
149 (KM 280) 30 800-1 3,133.48 865-1 – 20783 865-1 – 23888 865-1 – 15503 865-1 – 29168 2.59 Robertson, TN 6 1954 EW 936
154 (KM 293) 24 100-1 1,539.3 36-1 – 18211 36-1 – 19750 36-1 – 12931 36-1 – 25030 2.29 Sabine, TX 8 1964 DSAW 750
155 (KM 294) 24 100-1 573.4 36-1 – 20133 36-1 – 20706 36-1 – 14853 36-1 – 25986 2.11 Sabine, TX 3 1964 DSAW 750
156 (KM 295) 30 100-2 1,574.15 19-2 – 20806 19-2 – 23619 19-2 – 15526 19-2 – 28898 2.30 Waller, TX 4 1948 DSAW 750
157 (KM 297) 30 100-2 1,220.9 19-2 – 47755 19-2 – 48976 19-2 – 42475 20-2 – 5205 2.23 Harris, TX 8 1948 DSAW 750
158 (KM 298) 30 100-2 1,962.45 20-2 – 0048 20-2 – 2010 19-2 – 43818 20-2 – 7290 2.37 Harris, TX 9 1948 DSAW 750
159 (KM 299) 30 100-2 2,597.7 36-2 – 17089 36-2 – 19687 36-2 – 11809 36-2 – 24967 2.49 Sabine, TX 7 1949 SAW 750
163 (KM 303) 30 100-3 217 20-3 – 61 20-3 – 278 19-3 – 43960 20-3 – 5558 2.04 Harris, TX 8 1952 DSAW 750
164 (KM 304) 30 100-3 1,733.65 20-3 – 398 20-3 – 2162 19-3 – 44297 20-3 – 7442 2.33 Harris, TX 8 1952 DSAW 750
165 (KM 306) 30 100-3 1,101.34 20-3 – 36121 20-3 – 37211 20-3 – 30841 20-3 – 42491 2.21 Harris, TX 2 1952 DSAW 750
166 (KM 307) 30 100-3 1,502.4 36-3 – 18156 36-3 – 19658 36-3 – 12876 36-3 – 24938 2.28 Sabine, TX 8 1964 DSAW 750
173 (KM 318) 20 100-1 1,349.06 118-1 – 50528 118-1 – 51883 118-1 – 45216 118-1 - 57075 2.26 Kanawha, WV 2 1984 DSAW 910
174 (KM 319) 20 100-1 1,228.73 118-1 – 54017 118-1 – 55245 118-1 – 48737 118-1 – 60525 2.23 Kanawha, WV 3 1984 DSAW 910
175 (KM 320) 20 100-1 584.46 118-1 – 70516 118-1 – 70534 118-1 – 64688 118-1 – 75964 2.11 Kanawha, WV 1 1984 DSAW 910
176 (KM 322) 20 100-1 2,249.91 121-1 – 19064 121-1 – 21305 121-1 – 13822 121-1 – 26546 2.43 Kanawha, WV 3 1984 DSAW 936
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 19 of 20

<<<PAGE 20>>>

Type B Special Permit Segments and Inspection Areas
Inspection
Special Permit
Outside
Start Survey
End Survey
Inspection Area
Inspection Area
Line
Length
Area
County or
No.
Year
Seam
MAOP
Segment
Diameter
Station
Station
Start SS
End SS
Name
(feet)
Length
Parish, State
Dwellings
Installed
Type
(psig)
Number
(inches)
(Valve - SS)
(Valve - SS)
(Valve – SS)
(Valve – SS)
(Miles)
182 (KM 330) 30 100-3 1,415.75 118-3 – 25714 118-3 – 27130 118-3 – 20434 118-3 – 32410 2.27 Putnam, WV 2 1972 DSAW 910
183 (KM 331) 30 100-3 891.2 118-3 – 31972 118-3 – 32863 118-3 – 26692 118-3 – 38143 2.17 Putnam, WV 2 1972 DSAW 910
188 (KM 341) 30 100-4 497.5 83-4B – 114836 83-4B – 115333 83-4B – 109556 84-4 – 3287 2.09 Cheatham, TN 7 1952 DSAW 750
189 (KM 342) 30 100-4 1,342.49 103-4 – 7517 103-4 – 8889 103-4 – 2237 103-4 – 14169 2.25 Madison, KY 1 1951 DSAW 750
190 (KM 343) 30 100-4 242.74 103-4 – 9445 103-4 – 9687 103-4 – 4165 103-4 – 14967 2.05 Madison, KY 1 1951 DSAW 750
Note: DSAW is double submerged arc welded pipe longitudinal seam.
EW is a submerged arc welded pipe longitudinal seam.
SAW is single submerged arc welded pipe longitudinal seam.
SMLS is seamless longitudinal seam.
PHMSA-2016-0004 – Tennessee Pipeline Gas Company, LLC Special Permit Analysis and Findings
Page 20 of 20

## Provenance

- Official: Yes
- Source: <https://www.regulations.gov/docket/PHMSA-2016-0004>
- Source ID: `phmsa-special-permits`
- SHA-256: `e1e96d8918afe0059ba0bf16fa9484cc4255a5648dd064bb57b497029edb74ac`
- Retrieved: 2026-08-20T01:06:17.853Z
- Exported: 2026-08-22T23:48:21.903Z
- Document slug: `phmsa-special-permit-phmsa-2016-0004`

### Source metadata

```json
{
  "materialSubtype": "pipeline_special_permit",
  "operator": "Tennessee Gas Pipeline Company, L.L.C.",
  "system": "Gas Transmission",
  "issuedOn": "2016-09-01",
  "issuanceStatus": "issued",
  "renewal": "Mar 17, 2023",
  "indexUrl": "https://www.phmsa.dot.gov/pipeline/special-permits-state-waivers/special-permits-issued",
  "docketUrl": "https://www.regulations.gov/docket/PHMSA-2016-0004",
  "docketDocumentCount": 34,
  "decisionDocumentCount": 5,
  "decisions": [
    {
      "id": "PHMSA-2016-0004-0013-090000648351ac61",
      "regulationsGovDocumentId": "PHMSA-2016-0004-0013",
      "title": "Tennessee Gas KM  - Special Permit -  LOD Grant",
      "postedDate": "2018-07-18",
      "documentUrl": "https://www.regulations.gov/document/PHMSA-2016-0004-0013",
      "pdfUrl": "https://downloads.regulations.gov/PHMSA-2016-0004-0013/attachment_1.pdf",
      "pdfArtifactPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0004/phmsa-2016-0004-0013-090000648351ac61.pdf",
      "pdfArtifactSha256": "eda3f5e578237ca7bcdb534558622565a6146733702323b39eae5d14c7888ca3",
      "extractedTextPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0004/phmsa-2016-0004-0013-090000648351ac61.txt",
      "extractedTextSha256": "427499bacebfa609b001c5c3dd95545fa0ca06d6f261cc3440c519efa4e15cca",
      "pageCount": 2,
      "extractionVersion": 2
    },
    {
      "id": "PHMSA-2016-0004-0013-090000648351ac67",
      "regulationsGovDocumentId": "PHMSA-2016-0004-0013",
      "title": "Tennessee Gas Pipeline, LLC -   Special Permit Analysis and Findings",
      "postedDate": "2018-07-18",
      "documentUrl": "https://www.regulations.gov/document/PHMSA-2016-0004-0013",
      "pdfUrl": "https://downloads.regulations.gov/PHMSA-2016-0004-0013/attachment_2.pdf",
      "pdfArtifactPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0004/phmsa-2016-0004-0013-090000648351ac67.pdf",
      "pdfArtifactSha256": "aba6121391e1b6baf54b9f78fadcd553117ce526c4341cbe30099e176aad1017",
      "extractedTextPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0004/phmsa-2016-0004-0013-090000648351ac67.txt",
      "extractedTextSha256": "f3aad20f1285b5c168703580d54b6558b8ddeae66156a10f193792856910d237",
      "pageCount": 10,
      "extractionVersion": 2
    },
    {
      "id": "PHMSA-2016-0004-0013-0900006483539e59",
      "regulationsGovDocumentId": "PHMSA-2016-0004-0013",
      "title": "2016-0004  Tennessee Gas Pipeline LLC  FONSI",
      "postedDate": "2018-07-18",
      "documentUrl": "https://www.regulations.gov/document/PHMSA-2016-0004-0013",
      "pdfUrl": "https://downloads.regulations.gov/PHMSA-2016-0004-0013/attachment_3.pdf",
      "pdfArtifactPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0004/phmsa-2016-0004-0013-0900006483539e59.pdf",
      "pdfArtifactSha256": "3788c53de0b687903dcf706e6b07edf314b903d36a1350830ef2e91d3123d6f6",
      "extractedTextPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0004/phmsa-2016-0004-0013-0900006483539e59.txt",
      "extractedTextSha256": "a9187e886e8fa9f9d3a80a7923432dbb762874f6f0fffefb59ff339cabddb609",
      "pageCount": 31,
      "extractionVersion": 2
    },
    {
      "id": "PHMSA-2016-0004-0013-0900006483539e5c",
      "regulationsGovDocumentId": "PHMSA-2016-0004-0013",
      "title": "2016-0004  Tennessee Gas Pipeline LLC  Special Permit",
      "postedDate": "2018-07-18",
      "documentUrl": "https://www.regulations.gov/document/PHMSA-2016-0004-0013",
      "pdfUrl": "https://downloads.regulations.gov/PHMSA-2016-0004-0013/attachment_4.pdf",
      "pdfArtifactPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0004/phmsa-2016-0004-0013.pdf",
      "pdfArtifactSha256": "4938b21c493dd69edd7838bbd14ec507bcbe4ae277059839884a6a3b9c8be8a7",
      "extractedTextPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0004/phmsa-2016-0004-0013.txt",
      "extractedTextSha256": "4539b42ccb668aba6694378991d609adb975a5e115730b420f9960f3b089b351",
      "pageCount": 33,
      "extractionVersion": 2
    },
    {
      "id": "PHMSA-2016-0004-0030-090000648587ca12",
      "regulationsGovDocumentId": "PHMSA-2016-0004-0030",
      "title": "2016-0004 - Tennessee Gas Pipeline - Class 1 to 3 SP Renewal - SPAF",
      "postedDate": "2023-04-03",
      "documentUrl": "https://www.regulations.gov/document/PHMSA-2016-0004-0030",
      "pdfUrl": "https://downloads.regulations.gov/PHMSA-2016-0004-0030/attachment_1.pdf",
      "pdfArtifactPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0004/phmsa-2016-0004-0030.pdf",
      "pdfArtifactSha256": "bc8a1eef2e402e173d751619d5d52f3c29572da021b69ef741b8f90973aac9db",
      "extractedTextPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0004/phmsa-2016-0004-0030.txt",
      "extractedTextSha256": "c7702c943ade5efd7e48c7a8d402f5801086413f9387979ddd20560a7b3b02dc",
      "pageCount": 20,
      "extractionVersion": 2
    }
  ],
  "citedSections": [
    "192.6",
    "192.619",
    "192.5",
    "192.611",
    "192.61",
    "190.341",
    "192.903",
    "192.929",
    "192.105",
    "192.939",
    "192.505",
    "192.9036",
    "191.17",
    "192.937",
    "192.463",
    "192.917",
    "192.933",
    "192.485",
    "192.113",
    "192.7",
    "192.605",
    "191.15",
    "191.22",
    "191.27",
    "192.225",
    "192.229",
    "192.303",
    "192.361",
    "192.461",
    "192.469",
    "192.479",
    "192.481",
    "192.603",
    "192.613",
    "192.615",
    "192.616",
    "192.631",
    "192.705",
    "192.706",
    "192.709",
    "192.713",
    "192.735",
    "192.736",
    "192.739",
    "192.743",
    "192.745",
    "192.805",
    "192.905",
    "192.921",
    "191.3",
    "191.5",
    "191.23",
    "191.25",
    "191.605",
    "192.3",
    "192.12",
    "192.14",
    "192.161",
    "192.163",
    "192.199",
    "192.201",
    "192.227",
    "192.436",
    "192.459",
    "192.465",
    "192.475",
    "192.491",
    "192.625",
    "192.707",
    "192.731",
    "192.807",
    "192.911",
    "192.935",
    "177.44",
    "198.98"
  ],
  "caveat": "The issued-permit index establishes issuance, not current validity or applicability to facilities beyond those covered by the permit. Read the official decision and conditions.",
  "jurisdiction": "US",
  "operatorName": "Tennessee Gas Pipeline Company, L.L.C."
}
```