# Magellan Midstream Partners — Pipeline Special Permit

**Citation:** PHMSA-2016-0072  
**Type / status:** permit / current  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** 2018-05-14  
**Published:** 2018-05-14

PHMSA-2016-0072, issued 2018-05-14 for Magellan Midstream Partners's transmission system.

## Document text

PHMSA pipeline special permit PHMSA-2016-0072. Operator: Magellan Midstream Partners. System: Transmission. Issue date: 2018-05-14.

<<<PAGE 1>>>

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, D.C. 20590
HAY 1 4 2018
Mr. Michael Pearson
Vice President Asset Integrity
Magellan Midstream Partners, L.P.
One Williams Center, OTC-9
Tulsa, OK 74172
Docket No. PHMSA-2016-0072
Dear Mr. Pearson:
On June 7, 2016, Magellan Midstream Partners, L.P. (Magellan) wrote to the Pipeline and
Hazardous Materials Safety Administration (PHMSA) requesting a special permit to waive
compliance with the pipeline safety regulations in 49 Code of Federal Regulations (CFR)
195.432 that require internal inspection intervals for in-service breakout tanks. Magellan 's
special permit request asks PHMSA to allow extended inspection intervals of 49 CFR 195.432
for Magellan ' s existing atmospheric aboveground breakout storage tanks (breakout storage tanks
or tanks).
PHMSA is granting this special permit (enclosed) to Magellan to allow extended inspection
intervals for Magellan' s existing breakout storage tanks as listed in Appendices A and B of the
special permit. This special permit provides relief from the Federal pipeline safety regulations
for Magellan 's existing breakout storage tanks, and requires Magellan to comply with certain
conditions and limitations designed to maintain pipeline safety where the tanks inspection
intervals have been extended.
The Magellan existing atmospheric aboveground breakout storage tanks and associated facilities
include 493 breakout storage tanks at 81locations in 14 states. The breakout storage tank
facilities are in industrial properties and consist of storage tanks, buildings, pump stations,
valves, facility pipe, roads, and other aboveground appurtenances. PHMSA grants this special
permit based on the permit conditions and the findings set forth in the "Analysis and Findings"
and "Final Environmental Assessment and Finding ofNo Significant Impact" documents, which
can be read in their entirety in Docket No. PHMSA-2016-0072 at www.Regulations.gov.

<<<PAGE 2>>>

My staff would be pleased to discuss this matter or any other regulatory matter with you. John
Gale, Director, Standards and Rulemaking Division, may be contacted at 202-366-0434 on
regulatory matters. Kenneth Lee, Director, Engineering and Research Division, may be
contacted at 202-366-2694 on technical matters specific to this special permit application.
Sincerely,
Enclosure: Special Permit - PHMSA-2016-0072
Special Permit: PHMSA-2016-0072- Magellan Midstream Partners, L.P. Page 2 of2

<<<PAGE 3>>>

U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
SPECIAL PERMIT
Special Permit Information:
Docket Number:
Requested By:
Operator ID#/Affiliate:
Date Requested:
Original Issuance Date:
Effective Dates:
Code Section(s):
PHMSA-20 16-0072
Magellan Midstream Partners, L.P. and its subsidiaries
39504 - Magellan Crude Oil Pipeline Company, L.P.
22610- Magellan Pipeline Company, L.P.
31579- Magellan Pipelines Holdings, L.P.
31580- Magellan Terminals Holdings, L.P.
June 7, 2016
May 14, 2018
May 14, 2018 to May 14, 2038
49 CFR 195.432
Grant of Special Permit:
By this order, subject to the terms and conditions set forth below, the Pipeline and Hazardous
Materials Safety Administration (PHMSA) Office of Pipeline Safety (OPS)1 grants a special
permit (PHMSA-2016-0072) to Magellan Midstream Partners, L.P. and its subsidiaries
(collectively "Magellan"f for extending the internal inspection schedule requirements in 49
Code ofFederal Regulations (CFR) 195.432 for Magellan' s existing atmospheric above ground
breakout storage tanks (breakout storage tanks or tanks). This special permit requires Magellan
to implement inspection intervals based on the evaluation of an established minimum safe floor
thickness, previous inspection results, corrosion rates, and defined likelihood and consequence
factors for existing atmospheric above ground breakout storage tanks, as described in this special
permit.
1 Throughout this special permit the usage of "PHMSA" or "PHMSA OPS" means the U.S. Department of
Transportation's Pipeline and Hazardous Materials Safety Administration Office of Pipeline Safety.
2 Magellan Midstream Partners, L.P. and its subsidiaries include the following wholly owned and operated
companies: Magellan Crude Oil Pipeline Company, L.P. (MCOP), Magellan Pipeline Company, L.P. (MPL),
Magellan Pipelines Holdings, L.P. (MPH), and Magellan Terminals Holdings, L.P. (MTH).
Special Permit: PHMSA-2016 - 0072- Magellan Midstream Partners, L.P. Page 1 of22

<<<PAGE 4>>>

The Magellan above ground breakout storage tanks and associated facilities are at 81 locations in
14 states. These facilities are industrial properties consisting of storage tanks, buildings, pump
stations, valves, facility pipe, roads, and other above ground appurtenances.
Based on the determination in the Special Permit Analysis and Findings (available in the docket)
that this special permit, with conditions, will maintain pipeline safety, PHMSA OPS hereby
grants special permit PHMSA-2016-0072 as follows:
I. Special Permit Tanks:
493 tanks located in the States of Colorado, Connecticut, Illinois, Iowa, Kansas, Minnesota,
Missouri, Nebraska, North Dakota, Oklahoma, South Dakota, Texas, Wisconsin, and
Wyoming
On the condition that Magellan complies with the terms and conditions set forth below, this
special permit waives compliance from 49 CFR 195.432 for the inspection intervals of 493
existing atmospheric above ground breakout storage tank as described below and in Appendix A
-Magellan Breakout Storage Tanks: Location- State, Facility Name, County, and Number of
Tanks and Appendix B- Secondary Dike Containment of this special permit.
• Special permit tanks- are defined as any of the 493-existing atmospheric above ground
breakout storage tank described in Appendix A of this special permit.
PHMSA hereby grants this special permit for the Magellan special permit tanks based on the
findings set forth in the "Special Permit Analysis and Findings" and the "Final Environmental
Assessment and Findings of No Significant Impact" documents, which both can be read in their
entirety in Docket No. PHMSA-2016-0072 in the Federal Docket Management System (FDMS)
located on the internet at www.Regulations.gov.
II. Conditions:
PHMSA OPS grants this special permit for the special permit tanks subject to implementation of
the following conditions:
Special Permit: PHMSA-2016- 0072 - Magellan Midstream Partners, L.P. Page 2 of22

<<<PAGE 5>>>

1. Internal Inspection Schedule: For the atmospheric above ground breakout storage tanks
(special permit tanks), Magellan must conduct a transitional staged internal inspection
schedule as follows:
a. Special Permit Tanks Last Inspected Before 1995: Inspect within 30 years of the
previous internal inspection date (25 tanks remain to be inspected as of May 20 17).
b. Special Permit Tanks Last Inspected Between 1995 and 2009: Inspect within 28
years of the previous internal inspection date (333 tanks remain to be inspected as of
May 2017).
c. Special Permit Tanks Last Inspected Between 2010 and 2013: Inspect within 25
years of the previous internal inspection date ( 13 5 tanks remain to be inspected as of
May 2017).
2. Special Permit Tank Inspections and Monitoring: Magellan must develop procedures,
conduct, document, and maintain:
a. Internal inspections of the described existing special permit tanks that are consistent
with the special permit and as required by 49 CFR 195.432;3'4
b. Visual inspections of the special permit tanks and their secondary containment dikes
are required once per manned shift and at least weekly for unmanned locations.
Magellan personnel must inspect the tank farm (including tanks and containment) for
the integrity of the containment dikes or secondary containment, evidence of product
releases, trash and debris, uncontrolled erosion, unusual sounds from operating
equipment, damage, vibration, misalignment, and security;
3 If PHMSA adopts a revised edition of API Standard 653 other than the 3rd edition into 49 CFR Part 195, Magellan
must notify PHMSA within 60 days of the effective date of the adopted revised standard regarding the option to
continue compliance under this special permit with the existing API Standard 653 3rd edition or comply with the
updated edition under 49 CFR Section 195.3. However, if the revised adopted edition of API Standard 653
continues to exclude alternate inspection intervals, the conditions of the special permit will remain in effect for the
determination of inspection intervals.
4 Industry standards "incorporated by reference" are listed in 49 CFR 195.3. If PHMSA adopts a revised edition of
a referenced standard such as API, NACE International (NACE) or ASME standards into 49 CFR Part 195, the
referenced requirements of those revised standards are automatically incorporated into these special permit
conditions unless noted otherwise, except as noted in Footnote 3 above.
Special Permit: PHMSA-2016- 0072 - Magellan Midstream Partners, L.P. Page 3 of22

<<<PAGE 6>>>

c. Continuous monitoring of the special permit tank levels through the supervisory
control and data acquisition (SCADA) system; and
d. Semi-annual, not to exceed 7 lh months, static tank trending for 12 continuous hours
to verify the integrity of the special permit tanks. Magellan must isolate the special
permit tanks from inbound or outbound products movements. The special permit
tank level must be at least half full . Once isolated, the breakout storage tank must sit
idle for a minimum of 12 continuous hours. During the static 12 hours, the special
permit tank product level must be reviewed for product level discrepancies.
3. Re-evaluation Inspection Intervals: Magellan must develop procedures and conduct
transitional staged internal inspections of the special permit tanks and must readjust
inspection schedules of future special permit tank inspections as follows:
a. Inspection schedules of future special permit tank inspections must be based upon
past inspection findings at a special permit tank site location or similar vintage
construction types at other tank locations in this proposed special permit;
b. Re-evaluation intervals must be shortened when special permit tank inspection
findings demonstrate inspection intervals were not sufficiently conservative to
maintain established minimum safe floor and wall thicknesses, and material corrosion
rates;
c. Transitional staged internal special permit tank inspection intervals must be modified
if a breakout storage tank of similar service indicates a more conservative internal
inspection interval should apply; and
d. Special permit tanks of similar service must be identified by having been constructed
during, or within six (6) months of, the same year, under the same conditions, with
similar foundations and store similar products.
Special Permit: PHMSA-2016- 0072 - Magellan Midstream Partners, L.P. Page 4 of22

<<<PAGE 7>>>

4. 5. Annual Report to PHMSA: Annually,
5 after issuance of this special permit, Magellan must
submit an annual special permit tank integrity report6 to the PHMSA Central, Eastern,
Southwest and Western Region Directors with copies to the Deputy Associate Administrator,
PHMSA Field Operations; Deputy Associate Administrator, PHMSA Policy and Programs;
Director, PHMSA Engineering and Research Division; and Director, PHMSA Standards and
Rulemaking Division.
7 The annual integrity report must summarize for the special permit
tanks the following and any other significant integrity threats as follows :
a. Any leakage of special permit tanks including location, leakage amount, repairs
taken, and impact of any other tanks inspection schedule or integrity;
b. Any inspection findings that caused a readjustment of inspection schedules and the
special permit tanks involved in the reschedule of inspection interval;
c. Any secondary containment integrity issues found or remediated that would have
impacted containment in the case of a leak or failure of the special permit tank;
d. Any leaks or failures found through the continuous monitoring of tank levels through
the SCAD A system (Condition 2.c) or the semi-annual static tank trending for 12
continuous hours (Condition 2.d); and
e. Identification of special permit tanks inspected during the past year and planned
inspections for the next two (2) years.
Tank Integrity Program: Under the proposed special permit, Magellan must continue use
of its existing documented Tank Integrity Program (Magellan procedure 7.1 0-ADM-001 Tank
5 Annual reports must be received by PHMSA by the last day of the month in which the special permit is dated.
For example, the annual report for a special permit dated January 2018, must be received by PHMSA no later than
January 31 , each year beginning in 2019.
6 Magellan must submit a copy of each Magellan annual pipeline integrity report on the PHMSA docket, PHMSA-
20 16-0072, at regulations.gov.
7 Magellan must also send a copy to the PHMSA Director of State Programs and the appropriate state authorities of
the states that have interstate or intrastate agent agreements with PHMSA in states where the breakout storage
tanks are located.
Special Permit: PHMSA-2016- 0072 - Magellan Midstream Partners, L.P. Page 5 of22
I

<<<PAGE 8>>>

6. Integrity Program, revision date 01 /01118)8 during the transitional staged internal special
permit tank inspection period (Condition 1 ).
Certification: A Magellan senior executive officer, vice president or higher must certify in
writing the following:
a. Magellan has developed a written manual of operating and maintenance (O&M)
procedures required by 49 CFR 195.402 and 195.432, and all requirements ofthis
special permit for the special permit tanks; and
b. Magellan has implemented all special permit conditions, 49 CFR 195.402 and
195.432, as required by this specia\ permit for the special permit tanks.
Magellan must send the certifications required in Condition 6.a and 6.b with completion
date, compliance documentation summary, and the required senior executive signature and
date of signature to the PHMSA Associate Administrator for Pipeline Safety with copies to
the Deputy Associate Administrator, PHMSA Field Operations; Deputy Associate
Administrator, PHMSA Policy and Programs; PHMSA Central, Eastern, Southwest, and
Western Region Directors; Director, PHMSA Standards and Rulemaking Division; Director,
PHMSA Engineering and Research Division9
; and to the Federal Register Docket (PHMSA-
2016-0072) at www.Regulations.gov within one (1) year ofthe effective date ofthis special
permit.
III. Limitations:
PHMSA issues this special permit subject to the following limitations:
1) PHMSA has the sole authority to make all determinations on whether Magellan has complied
with the specified conditions of this special permit.
8 Any updates to Magellan procedure 7.10-ADM-001 Tank Integrity Program, revision dated 01 /01/18, that affect
the inspections, remediation and monitoring of the special permit tanks must be submitted by Magellan to
PHMSA 's Deputy Associate Administrator, PHMSA Field Operations, for review. Magellan must receive a "no
objection" letter from PHMSA prior to any updated procedure implementation on the special permit tanks.
9 Magellan must also send a copy to the PHMSA Director of State Programs and the appropriate state authorities of
the states that have interstate or intrastate agent agreements with PHMSA in states where the breakout storage
tanks are located.
Special Permit: PHMSA-2016 - 0072- Magellan Midstream Partners, L.P. Page 6 of22

<<<PAGE 9>>>

2) Failure to submit the certifications required by Condition 6 within the time frames specified
may result in revocation of this special permit.
3) PHMSA may revoke, suspend, or modify this special permit based on any finding listed in 49
CFR 190.341 (h)(l) and require Magellan to comply with the regulatory requirements in 49
CFR 195.432 and an amended Condition !-Internal Inspection Schedule. As provided in 49
U.S.C. Chapter 601 and 49 CFR Part 190, PHMSA may also issue an enforcement action for
failure to comply with this special permit. Any work plans and associated schedules will be
automatically incorporated into this special permit and are enforceable in the same manner.
4) Should PHMSA revoke, suspend, or modify this special permit based on any finding listed in
49 CFR 190.341 (h)(l ), PHMSA will notify Magellan in writing of the proposed action and
provide Magellan an opportunity to show cause why the action should not be taken. In
accordance with 49 CFR 190.341 (h)(2)(i), Magellan may provide a written response within
30 days of the notice showing why the proposed action should not be taken. However, if
necessary to avoid the risk of significant harm to persons, property, or the environment,
PHMSA will declare the proposed action (revocation, suspension, or modification)
immediately effective, in accordance with 49 CFR 190.341 (h)(3).
5) The terms and conditions of any corrective action order, compliance order, or other order
applicable to a pipeline facility covered by this special permit will take precedence over the
terms ofthis special permit in accordance with 49 CFR 190.341(h)(4).
6) Magellan may seek reconsideration of a decision made pursuant to 49 CFR 190.341 (h) by
submitting a petition to the Associate Administrator of Pipeline Safety, in accordance with 49
CFR 190.341 (i). The Associate Administrator's decision made pursuant to 49 CFR
190.341 (i) constitutes final administrative action. All final administrative actions are subject
to juridical review under 49 U.S.C. 60119.
7) If Magellan sells, merges, transfers, or otherwise disposes of the assets known as the special
permit tanks, Magellan must provide PHMSA with written notice of the change within 30
days of the consummation date. In the event of such transfer, PHMSA reserves the right to
revoke, suspend, or modify the special permit if the transfer constitutes a material change in
Special Permit: PHMSA-2016- 0072 - Magellan Midstream Partners, L.P. Page 7 of22

<<<PAGE 10>>>

conditions or circumstances pursuant to 49 CFR 190.341 (h)(l )(ii) or any other circumstances
listed under 49 CFR 190.341(h)(l) .
•
8) PHMSA grants this special permit to a term of no more than 20 years from the issuance date.
AUTHORITY: 49 U.S.C. 60118 (c)(1) and 49 CFR 1.97.
Issued in Washington, DC on May 14, 2018
A~t~
Associate Administrator for Pipeline Safety
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P. Page 8 of22

<<<PAGE 11>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504,22610,31579, or 31580
Appendix A
Magellan Breakout Storage Tanks:
Location - State, Facility Name, County, and Number of Tanks
Number of
Breakout Located in a Located in
State Facility County Storage Tanks High a Could
Name(s): Included in the Consequence Affect
Special Permit Area? HCA?
Request
Colorado Aurora Adams 8 Yes Yes
Dupont Adams 9 Yes Yes
Fountain El Paso 1 Yes Yes
Connecticut Hamden New Haven 8 Yes Yes
New Haven New Haven 9 Yes Yes
Illinois Heyworth Mclean 1 No Yes
Menard Menard 1 No No
Iowa Bettendorf Scott 2 Yes Yes
Des Moines Polk 23 Yes Yes
Ft Dodge Webster 1 No No
Iowa City Johnson 13 Yes Yes
Mason City Cerro Gordo 8 Yes Yes
Milford Dickinson 1 No No
Sioux City Woodbury 22 Yes Yes
W.Pterloo Black Hawk 1 Yes Yes
Kansas Boyer Butler 1 No No
El Dorado East Butler 5 Yes Yes
El Dorado West Butler 5 No Yes
Great Bend Barton 1 No Yes
Kansas City Wyandotte 15 Yes Yes
Olathe Johnson 5 Yes Yes
Scott City Scott 1 No Yes
Topeka Shawnee 1 No Yes
Wichita Sedgwick 1 Yes Yes
Minnesota Alexandria Douglas 27 Yes Yes
Duluth StLouis 1 No Yes
Mankato Blue Earth 1 No Yes
Marshall Lyon 10 No Yes
Minneapolis Ramsey 23 Yes Yes
Rochester Olmsted 1 No Yes
Rosemount Dakota 8 Yes Yes
St Paul Park Washington 1 Yes Yes
Willmar Kandiyohi 1 No Yes
Wrenshall Carlton 1 Yes Yes
Special Permit: PHMSA-2016- 0072- Magellan Midstream Partners, L.P. Page 9 of22

<<<PAGE 12>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks:
Location - State, Fac ility Name, County, and Number of Tanks
Number of
Breakout Located in a Located in
State Facility County Storage Tanks High a Could
Name(s): Included in the Consequence Affect
Special Permit Area? HCA?
Request
Missouri Carthage Jasper 5 No No
Columbia Boone 4 Yes Yes
Mt Vernon Jet Lawrence 4 No No
Mt Vernon Terminal Lawrence 1 No No
Palmyra Marion 1 No Yes
Riverside Platte 6 Yes Yes
Springfield Greene 1 Yes Yes
Nebraska Capehart Sarpy 2 Yes Yes
Doniphan Hall 1 No No
Irvington Douglas 1 Yes Yes
Lincoln Lancaster 3 No Yes
Nebraska City Otoe 8 No Yes
Omaha Douglas 2 Yes Yes
North Dakota Fargo Cass 17 Yes Yes ·
Grand Forks Grand Forks 1 Yes Yes
Oklahoma Allen Pontotoc 8 Yes Yes
Barnsdall Osage 6 No Yes
Central Cushing Payne 8 No No
Cushing Payne 1 No Yes
Drumright Creek 7 Yes Yes
Drumright Crude Creek 2 Yes Yes
Enid Garfield 4 Yes Yes
Glenpool (East) Tulsa 6 Yes Yes
Glenpool (West) Tulsa 7 Yes Yes
Oklahoma City Oklahoma 8 Yes Yes
(High St)
Oklahoma City Oklahoma 6 Yes Yes
(Reno Ave)
Shinn Pence Payne 21 No Yes
West Tulsa Tulsa 14 Yes Yes
Wynnewood Garvin 2 No Yes
South Dakota Rapid City Pennington 1 Yes Yes
Sioux Falls Minnehaha 22 Yes Yes
Special Permit: PHMSA-2016 - 0072- Magellan Midstream Partners, L.P. Page 10 of22

<<<PAGE 13>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks:
Location - State, Facility Name, County, and Number of Tanks
Number of
Breakout Located in a Located in a
State Facility County Storage Tanks High Could
Name(s): Included in the Consequence Affect
Special Permit Area? HCA?
Request
Texas Corpus Christi Nueces 2 Yes Yes
Crane Crane 3 No No
Dallas Dallas 3 Yes Yes
East Houston Harris 12 Yes Yes
EIPaso EIPaso 1 8 No Yes
Frost Navarro 2 No No
Galena Park Harris 1 4 Yes Yes
Hearne Roberts 11 Yes Yes
Odessa Ector 13 Yes Yes
Reagan Falls 1 No No
Speed Jet Harris 1 Yes Yes
Tye Taylor 1 No Yes
Wisconsin Bateman Chippewa 1 No No
Cadott Chippewa 4 No No
Chippewa Falls Chippewa 1 Yes Yes
Wyoming Cheyenne Laramie 9 Yes Yes
Total Breakout Tanks included in Special Permit: 493
Special Permit: PHMSA-2016- 0072 - Magellan Midstream Partners, L.P. Page 11 of22

<<<PAGE 14>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610,31579, or 31580
Appendix B
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
FACILITY NAME(S):
DUE DATE
NEXT
DATE LAST INTERNAL
STATE COUNTY TANK# INTERNAL INSPECTION
INSPECTION TRANS I-
TIONAL
SCHEDULE
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
ALLEN
ALLEN
ALLEN
ALLEN
ALLEN
ALLEN
ALLEN
ALLEN
AURORA
AURORA
AURORA
AURORA
AURORA
AURORA
AURORA
AURORA
BARNSDALL
BARNSDALL
BARNSDALL
BARNSDALL
BARNSDALL
BARNSDALL
BATEMAN
Minnesota Douglas 157 2000 2028
Minnesota Douglas 429 2012 2037
Minnesota Douglas 552 1998 2026
Minnesota Douglas 554 2001 2029
Minnesota Douglas 555 1999 2027
Minnesota Douglas 556 1999 2027
Minnesota Douglas 557 1999 2027
Minnesota Douglas 558 2010 2035
Minnesota Douglas 559 1998 2026
Minnesota Douglas 560 1999 2027
Minnesota Douglas 561 1999 2027
Minnesota Douglas 682 2001 2029
Minnesota Douglas 683 2002 2030
Minnesota Douglas 685 1998 2025
Minnesota Douglas 686 2000 2028
Minnesota Douglas 687 2001 2029
Minnesota Douglas 688 2001 2029
Minnesota Douglas 761 2001 2029
Minnesota Douglas 762 2002 2030
Minnesota Douglas 763 2002 2030
Minnesota Douglas 1343 2010 2035
Minnesota Douglas 1344 1999 2027
Minnesota Douglas 1346 2002 2030
Minnesota Douglas 1347 1999 2023
Minnesota Douglas 1348 2002 2030
Minnesota Douglas 1441 2004 2032
Minnesota Douglas 4010 1998 2025
Oklahoma Pontotoc 864 2007 2031
Oklahoma Pontotoc 865 2011 2036
Oklahoma Pontotoc 866 2006 2024
Oklahoma Pontotoc 867 2013 2037
Oklahoma Pontotoc 875 1998 2026
Oklahoma Ponlotoc 876 2008 2036
Oklahoma Pontotoc 877 2009 2031
Oklahoma Pontotoc 880 2005 2029
Colorado Adams 107 2013 2038
Colorado Adams 110 2009 2037
Colorado Adams 207 2003 2026
Colorado Adams 213 2008 2036
Colorado Adams 401 2009 2037
Colorado Adams 402 2008 2036
Colorado Adams 405 2009 2037
Colorado Adams 406 2007 2035
Oklahoma Osage 416 2001 2029
Oklahoma Osage 729 2008 2036
Oklahoma Osage 730 1997 2025
Oklahoma Osage 1002 1994 2024
Oklahoma Osage 1003 2011 2036
Oklahoma Osage 1213 2011 2036
Wisconsin Chippewa 42 2007 2035
Special Permit: PHMSA-2016- 0072 - Magellan Midstream Partners, L.P. SECONDARY
DIKE
TANK
CONTAIN-
MENT CAPACITY
VOLUME (BBLS)
(BBLS)
25,049 2,186
29,602 2,279
50,055 10,913
50,055 10,913
50,055 10,911
29,602 10,914
25,049 10,913
25,049 10,912
29,602 10,077
25,049 10,914
25,049 10,913
72,870 19,406
72,870 19,399
72,870 18,087
35,844 18,631
75,305 17,675
75,305 19,403
35,844 28,682
75,305 28,688
75,305 28,692
94,454 36,230
94,454 37,407
69,277 38,901
83,884 37,404
83,884 37,401
94,454 52,502
69,277 39,098
111 ,531 53,177
61 ,772 44,697
111 ,531 51 ,398
61 ,772 47,875
114,540 48,882
119,752 70,990
110,547 70,274
114,540 69,277
87,189 70,927
152,667 68,318
87,189 68,632
84,525 48,016
87,189 77,441
152,667 77,439
84,525 75,601
84,525 48,355
5,681 3,020
27,181 25,605
29,804 25,212
33,342 29,621
21 ,023 29,950
85,966 114,130
426 93
Page 12 of22

<<<PAGE 15>>>

FACILITY NAME(S):
BETTENDORF
BETTENDORF
BOYER TERMINAL
PRODUCTS
CADOTT
CADOTT
CADOTT
CADOTT
CAPEHART
CAPEHART
CARTHAGE
CARTHAGE
CARTHAGE
CARTHAGE
CARTHAGE
CENTRAL CUSHING
CENTRAL CUSHING
CENTRAL CUSHING
CENTRAL CUSHING
CENTRAL GUSHING
CENTRAL CUSHING
CENTRAL CUSHING
CENTRAL CUSHING
CHEYENNE
CHEYENNE
CHEYENNE
CHEYENNE
CHEYENNE
CHEYENNE
CHEYENNE
CHEYENNE
CHEYENNE
CHIPPEWA FALLS
COLUMBIA
COLUMBIA
COLUMBIA
COLUMBIA
CORPUS CHRISTl
CORPUS CHRISTl
CRANE CRUDE
CRANE CRUDE
CRANE CRUDE
CUSHING
DALLAS
(SINGLETON BLVD.)
DALLAS
{SINGLETON BLVD.)
DALLAS
{SINGLETON BLVD.)
DES MOINES
DES MOINES
DES MOINES
DES MOINES
Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE SECONDARY
NEXT
DATE LAST INTERNAL DIKE TANK
CONTAIN-
STATE COUNTY TANK# INTERNAL INSPECTION MENT CAPACITY
INSPECTION TRANSI- VOLUME (BBLS)
TIONAL (BBLS)
SCHEDULE
Iowa Scott 9 2000 2024 103,285 354
Iowa Scott 20 2004 2032 595 504
Kansas Butler 29 1999 2018 616,556 6,475
Wisconsin Chippewa 1442 1997 2025 108,605 50,888
Wisconsin ChiQpewa 4011 1996 2024 108,605 39,921
Wisconsin Chippewa 7007 2007 2035 108,605 25,657
Wisconsin Chippewa 7008 1994 2024 108,605 31 ,203
Nebraska Sarpy 1433 2000 2018 42,714 36,360
Nebraska Sarpy 1435 2000 2022 42,717 36,360
Missouri Jasper 345 2004 2032 63,368 267
Missouri Jasper 797 2009 2037 63,368 28,524
Missouri Jasper 1427 2009 2037 63,368 51 ,347
Missouri Jasper 6018 2001 2028 63,368 18,852
Missouri Jasper 6019 2010 2035 63,368 19,340
Oklahoma Payne 2521 2013 2038 464,223 215,835
Oklahoma Payne 2522 2005 2030 464,223 216,428
Oklahoma Payne 2524 2006 2024 464,223 216,430
Oklahoma Payne 3001 2010 2035 467,905 261 ,207
Oklahoma Payne 3601 2013 2035 454,433 310,212
Oklahoma Payne 5003 2007 2024 1,009,730 428,100
Oklahoma Payne 5004 2010 2027 1,009,730 440,850
Oklahoma Payne 5005 2008 2024 1,009,730 438,688
Wyoming Laramie 17-2 2012 2037 19,106 14,246
Wyoming Laramie 17-3 2010 2035 19,371 15,095
Wyoming Laramie 17-4 2011 2036 18,973 14,206
Wyoming Laramie 17-5 2009 2037 19,355 15,095
Wyoming Laramie 17-6 2011 2036 19,761 15,094
Wyoming Laramie 17-8 2012 2037 19,987 15,093
Wyoming Laramie 33-4 2010 2035 40,454 29,050
Wyoming Laramie 43-1 2009 2037 42,211 37,910
Wyoming Laramie 65-3 2009 2035 80,510 63,267
Wisconsin Chippewa 27 2007 2035 374 373
Missouri Boone 785 2001 2022 105,078 28,555
Missouri Boone 843 1998 2018 105,078 74,689
Missouri Boone 1421 2013 2038 105,078 49,813
Missouri Boone 6028 1996 2024 105,078 19,379
Texas Nueces 116* 2011 2036 139,831 74,692
Texas Nueces 130* 2007 2035 587,735 138,301
Texas Crane 51 2012 2037 124,960 49,389
Texas Crane 52 2008 2035 124,960 45,002
Texas Crane 53 2008 2035 124,960 49,728
Oklahoma Payne 950-2 2010 2035 943 302
Texas Dallas 3169* 2012 2037 134,161 98,208
Texas Dallas 3170* 2012 2037 134,161 98,202
Texas Dallas 4280 2002 2020 134,161 6,397
Iowa Polk 419 2009 2037 11 ,945 5,519
Iowa Polk 420 2011 2036 11 ,945 4,530
Iowa Polk 747 2005 2033 42,579 33,537
Iowa Polk 771 2001 2029 138,703 32,390
Special Permit: PHMSA-2016 - 0072- Magellan Midstream Partners, L.P. Page 13 of22

<<<PAGE 16>>>

FACILITY NAME(S):
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DES MOINES
DONIPHAN
DRUMRIGHT
DRUMRIGHT
DRUMRIGHT
DRUMRIGHT
DRUMRIGHT
DRUMRIGHT
DRUMRIGHT
DRUMRIGHT CRUDE
DRUMRIGHT CRUDE
DULUTH
DUPONT
DUPONT
DUPONT
DUPONT
DUPONT
DUPONT
DUPONT
DUPONT
DUPONT
EAST HOUSTON
EAST HOUSTON
EAST HOUSTON
EAST HOUSTON
EAST HOUSTON
CRUDE
EAST HOUSTON
CRUDE
EAST HOUSTON
CRUDE
EAST HOUSTON
CRUDE
EAST HOUSTON
CRUDE
Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE SECONDARY
NEXT DIKE
DATE LAST INTERNAL CONTAIN-
TANK
STATE COUNTY TANK# INTERNAL INSPECTION MENT CAP.ACITY
INSPECTION TRANSI-
VOLUME (BBLS)
TIONAL (BBLS)
SCHEDULE
Iowa Polk 774 2004 2032 153,470 34,512
Iowa Polk 775 2005 2033 138,703 34,516
Iowa Polk 776 2000 2019 153,470 34,516
Iowa Polk 778 2007 2035 153,470 34,504
Iowa Polk 780 2001 2029 153,470 34,508
Iowa Polk 803 2001 2024 545,734 70,174
Iowa Polk 804 2013 2038 545,734 70,737
Iowa Polk 836 2005 2033 187,121 73,982
Iowa Polk 837 2010 2035 187,121 71 ,970
Iowa Polk 838 2001 2029 187,121 71 ,199
Iowa Polk 839 1995 2023 187,121 77,643
Iowa Polk 902 2003 2031 58,763 4,893
Iowa Polk 1004 2011 2035 32,596 28,603
Iowa Polk 1140 2003 2031 545,734 127,207
Iowa Polk 1151 2008 2026 121 ,142 78,409
Iowa Polk 1152 2009 2037 121 ,142 78,400
Iowa Polk 1308 2007 2035 246,699 33,906
Iowa Polk 1311 2012 2035 246,699 38,374
Iowa Polk 1507 2008 2036 187,121 147,084
Nebraska Hall 16 2010 2035 237 237
Oklahoma Creek 855 2008 2036 69,490 47,033
Oklahoma Creek 856 2007 2035 483,626 46,646
Oklahoma Creek 857 2005 2033 476,691 47,492
Oklahoma Creek 858 2007 2035 120,386 47,874
Oklahoma Creek 859 2009 2037 120,386 46,023
Oklahoma Creek 860 2009 2033 120,386 46,328
Oklahoma Creek 970-2 2007 2035 2,096 322
Oklahoma Creek 751 2012 2037 94,482 71 ,416
Oklahoma Creek 1101 2012 2037 170,031 99,888
Minnesota StLouis LPMR 2007 2035 609 440
Colorado Adams 2-62 2009 2037 8,899 671
Colorado Adams 17-9 2012 2037 30,663 12,765
Colorado Adams 25-4 2009 2037 31 ,858 20,784
Colorado Adams 25-5 2011 2036 38,428 22,410
Colorado Adams 25-6 2012 2037 26,698 19,758
Colorado Adams 43-2 2010 2035 63,326 35,147
Colorado Adams 55-1 8 2010 2035 64,290 48,136
Colorado Adams 55-20 2010 2035 68,919 47,660
Colorado Adams 65-5 2008 2030 74,318 55,579
Texas Harris 1222 2009 2037 578,498 103,005
Texas Harris 1225 2008 2036 275,140 108,295
Texas Harris 1388 2006 2034 365,844 110,991
Texas Harris 1423 2008 2021 578,498 107,877
Texas Harris 1221 2007 2031 578,498 112,362
Texas Harris 1223 2006 2027 578,498 113,905
Texas Harris 1224 2006 2034 275,140 113,624
Texas Harris 1227 2008 2027 578,498 109,777
Texas Harris 1228 2005 2033 578,498 112,581
Special Permit: PHMSA-2016- 0072- Magellan Midstream Partners, L.P. Page 14 of22

<<<PAGE 17>>>

FACILITY NAME(S):
Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE SECONDARY
NEXT DIKE
DATE LAST INTERNAL CONTAIN-
TANK
STATE COUNTY TANK# INTERNAL INSPECTION MENT CAPACITY
INSPECTION TRANS I-
VOLUME (BBLS)
TIONAL (BBLS)
SCHEDULE
Texas Harris 1229 2009 2037 365,844 112,511
EAST HOUSTON
CRUDE
EAST HOUSTON
CRUDE
EAST HOUSTON
CRUDE
Texas Harris 1230 2005 2033 365,844 111 ,994
Texas Harris 1427 2006 2028 275,140 112,909
EL DORADO EAST
EL DORADO EAST
EL DORADO EAST
ELDORADO EAST
ELDORADO EAST
EL DORADO WEST
EL DORADO WEST
EL DORADO WEST
ELDORADO WEST
EL DORADO WEST
EL PASO
EL PASO
EL PASO
EL PASO
EL PASO
EL PASO
EL PASO
EL PASO
EL PASO
EL PASO
EL PASO
EL PASO
EL PASO
EL PASO
EL PASO
EL PASO
EL PASO
EL PASO
ENID
ENID
ENID
ENID
FARGO
FARGO
FARGO
FARGO
FARGO
FARGO
FARGO
FARGO
FARGO
FARGO
FARGO
FARGO
FARGO
FARGO
FARGO
Kansas Butler 434 2013 2038 4,949 5,483
Kansas Butler 1209 2009 2036 147,676 114,414
Kansas Butler 1210 2013 2038 147,676 108,200
Kansas Butler 1211 1993 2020 147,676 112,162
Kansas Butler 1212 2009 2037 147,676 111 ,002
Kansas Butler 208 2008 2036 96,104 25,061
Kansas Butler 209 1997 2025 87,713 8,210
Kansas Butler 304 2000 2028 101 ,726 7,972
Kansas Butler 403 1999 2027 86,497 62,188
Kansas Butler 404 1999 2027 115,302 73,294
Texas EIPaso 1 2010 2035 131 ,049 104,574
Texas EIPaso 2 2009 2037 131 ,049 108,284
Texas EIPaso 3 2009 2037 131 ,049 79,349
Texas EIPaso 4 2009 2037 126,655 82,151
Texas EIPaso 5 2010 2035 126,655 82,409
Texas EIPaso 6 2010 2035 126,655 66,652
Texas EIPaso 7 2010 2035 126,655 64,259
Texas EIPaso 8 2008 2036 131 ,049 64,203
Texas EIPaso 9 2009 2037 131 ,049 64,170
Texas EIPaso 10 2009 2037 q9,128 43,866
Texas EIPaso 11 2009 2035 139,128 43,955
Texas EIPaso 12 2010 2035 139,128 45,393
Texas EIPaso 13 2008 2036 139,128 45,387
Texas EIPaso 14 2008 2036 139,128 33,872
Texas EIPaso 15 2010 2035 139,128 33,851
Texas EIPaso 16 2008 2036 126,655 13,486
Texas EIPaso 17 2009 2037 126,655 13,476
Texas EIPaso 19 2009 2037 131 ,049 455
Oklahoma Garfield 1231 2011 2036 74,166 48,383
Oklahoma Garfield 1233 2008 2031 87,913 50,191
Oklahoma Garfield 1238 2006 2034 83,951 46,382
Oklahoma Garfield 1239 2005 2023 65,767 47,930
North Dakota Cass 135 2013 2038 2,560 237
North Dakota Cass 563 2005 2033 35,358 10,794
North Dakota Cass 564 1994 2024 50,668 10,921
North Dakota Cass 566 2003 2031 38,698 10,907
North Dakota Cass 677 2005 2033 60,393 16,709
North Dakota Cass 689 2008 2030 60,393 16,811
North Dakota Cass 690 2004 2032 38,698 16,889
North Dakota Cass 693 1994 2024 50,668 16,894
North Dakota Cass 694 2004 2032 52,163 16,756
North Dakota Cass 695 2004 2032 38,698 16,880
North Dakota Cass 764 1994 2024 35,358 29,047
North Dakota Cass 1349 2012 2037 128,167 36,621
North Dakota Cass 1350 2003 2031 128,167 37,143
North Dakota Cass 1351 2011 2036 128,167 39,045
North Dakota Cass 1353 2000 2028 128,167 39,078
Special Permit: PHMSA-2016 - 0072- Magellan Midstream Partners, L.P. Page 15 of22

<<<PAGE 18>>>

Norn Dakota
4009
990
LUZU
Colorado
33-8
2011
2036
Texas
511
2006
2034
Texas
525
2010
2031
lowa
129
2005
2033
984
Texas
291*
2004
2032
893
Texas
308*
2013
2029
Texas
311*
2007
2035
Texas
312*
2007
2027
Texas
373*
2011
2033
Texas
374*
2007
2021
Texas
382*
2006
2030
Texas
383*
2002
2020
Texas
385*
2005
2021
Texas
386*
2003
2031
Texas
387*
2012
2034
Texas
388*
2011
2021
Texas
391*
2007
2026
Texas
393*
2002
2021
Oklahoma
120
2007
2035
548
Oklahoma
1204
2011
2036
Oklahoma
1217
1998
2019
Oklahoma
1219
1998
2019
Oklahoma
1438
1998
2019
Oklahoma
1439
2004
2022
Oklahoma
301
2007
2035
Oklahoma
302
1999
2024
Oklahoma
303
2005
2033
Oklahoma
304
2007
2035
Oklahoma
305
2001
2017
Oklahoma
307
2007
2035
Oklahoma
309
2007
2035
North Dakota
180
2013
2038
Kansas
sas
302
2008
2036
538
Connecticut
10H*
2008
2035
Connecticut
11H*
2010
2035
Connecticut
1H*
2010
2029
Connecticut
2H*
2008
2036
Connecticut
3H*
2012
2037
Connecticut
4H*
2000
2027
Connecticut
5H*
2000
2018
Connecticut
7H*
2000
2022
Texas
1247
1999
2025
Texas
1248
1998
2026
Texas
1252
2000
2028
Texas
1253
2005
2033
Texas
1254
2002
2030
Texas
1255
2002
2030
Texas
1256
2012
2037
Texas
1258
2003
2031
Texas
1259
2005
2033
PHMS:
A-201
-
0072
-
Ma
ellan
Midstr
ea
m
Pa
irtn
ers,
L.P.

<<<PAGE 19>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
FACILITY NAME(S):
DUE DATE SECONDARY
NEXT DIKE
DATE LAST INTERNAL CONTAIN-
TANK
STATE COUNTY TANK# INTERNAL INSPECTION MENT CAPACITY
INSPECTION TRANS I-
VOLUME (BBLS)
TIONAL (BBLS)
SCHEDULE
HEARNE
HEARNE
HEYWORTH
IOWA CITY
IOWA CITY
IOWA CITY
IOWA CITY
IOWA CITY
IOWA CITY
IOWA CITY
IOWA CITY
IOWA CITY
IOWA CITY
IOWA CITY
IOWA CITY
IOWA CITY
IRVINGTON
KANSAS CITY
KANSAS <;;ITY
KANSAS CITY
KANSAS CITY
KANSAS CITY
KANSAS CITY
KANSAS CITY
KANSAS CITY
KANSAS CITY
KANSAS CITY
KANSAS CITY
KANSAS CITY
KANSAS CITY
KANSAS CITY
KANSAS CITY
LINCOLN
LINCOLN
LINCOLN
MANKATO
MARSHALL
MARSHALL
MARSHALL
MARSHALL
MARSHALL
MARSHALL
MARSHALL
MARSHALL
MARSHALL
MARSHALL
MASON CITY
MASON CITY
MASON CITY
MASON CITY
MASON CITY
MASON CITY
Texas Roberts 1424 2006 2034 118,391 69,379
Texas Roberts 1470 2004 2032 118,391 68,831
Illinois Mclean 149 2000 2024 32,205 1,513
Iowa Johnson 642 2010 2035 88,010 14,662
Iowa Johnson 645 2008 2036 28,362 14,747
Iowa Johnson 1358 1999 2027 43,099 37,403
Iowa Johnson 1360 2012 2037 47,260 36,760
Iowa Johnson 1362 2012 2037 64,245 38,318
Iowa Johnson 1363 2003 2031 49,907 37,408
Iowa Johnson 1364 2003 2031 64,245 37,406
Iowa Johnson 1365 2012 2037 55,665 38,436
Iowa Johnson 1366 2003 2030 51 ,254 36,771
Iowa Johnson 1389 2004 2029 58,485 38,440
Iowa Johnson 1390 2012 2029 46,481 36,353
Iowa Johnson 1436 2004 2032 64,828 51,427
Iowa Johnson LPMR 2004 2032 49,907 705
Nebraska Douglas 120 2007 2035 5,594 756
Kansas Wyandotte 432 2005 2033 236,223 3,515
Kansas Wyandotte 433 2005 2033 236,223 3,509
Kansas Wyandotte 613 2003 2023 236,223 13,915
Kansas Wyandotte 801 2003 2024 250,547 70,108
Kansas Wyandotte 802 2003 2022 236,223 67,155
Kansas Wyandotte 821 2008 2036 236,223 68,481
Kansas Wyandotte 1202 2011 2036 64,917 49,951
Kansas Wyandotte 1203 2009 2037 236,223 46,472
Kansas Wyandotte 1302 2012 2037 67,305 32,321
Kansas Wyandotte 1303 1999 2024 67,305 34,676
Kansas Wyandotte 1304 2012 2037 236,223 32,029
Kansas Wyandotte 1355 1995 2023 250,547 34,838
Kansas Wyandotte 1357 2009 2037 52,808 34,816
Kansas Wyandotte 1432 2008 2036 62,672 53,521
Kansas Wyandotte 1506 2011 2036 236,223 145,815
Nebraska Lancaster 17 2005 2033 461 237
Nebraska Lancaster 705 2001 2026 39,293 27,708
Nebraska Lancaster 706 1988 2018 36,271 27,653
Minnesota Blue Earth 186 2004 2032 36,017 2,098
Minnesota Lyon 670 1998 2024 83,797 16,861
Minnesota Lyon 671 1998 2026 42,681 16,866
Minnesota Lyon 672 2003 2024 83,797 16,860
Minnesota Lyon 673 2010 2035 83,797 19,224
Minnesota Lyon 674 2002 2030 42,681 16,857
Minnesota Lyon 675 2001 2028 74,736 16,864
Minnesota Lyon 676 2001 2028 42,681 16,869
Minnesota Lyon 758 1999 2027 83,797 27,968
Minnesota Lyon 759 2010 2035 74,736 27,888
Minnesota Lyon 214-1 2004 2032 345 237
Iowa Cerro Gordo 1312 1988 2018 58,809 38,928
Iowa Cerro Gordo 1313 2012 2037 78,757 38,300
Iowa Cerro Gordo 1314 1990 2020 78,757 38,942
Iowa Cerro Gordo 1315 1990 2020 79,259 36,891
Iowa Cerro Gordo 1316 1990 2020 79,259 38,936
Iowa Cerro Gordo 1317 1990 2020 11 0,187 38,926
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P. Page 17 of22

<<<PAGE 20>>>

FACILITY NAME(S):
MASON CITY
MASON CITY
MENARD
MILFORD
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
MT VERNON JCT
MT VERNON JCT
MT VERNON JCT
MT VERNON JCT
MTVERNON
TERMINAL
NEBRASKA CITY
NEBRASKA CITY
NEBRASKA CITY
NEBRASKA CITY
NEBRASKA CITY
NEBRASKA CITY
NEBRASKA CITY
NEBRASKA CITY
NEW HAVEN (85
EAST STREET)
NEW HAVEN (85
EAST STREET)
NEW HAVEN (85
EAST STREET)
NEW HAVEN (85
EAST STREET)
NEW HAVEN (85
EAST STREET)
NEW HAVEN (85
EAST STREET)
Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE SECONDARY
NEXT DIKE
DATE LAST INTERNAL CONTAIN-
TANK
STATE COUNTY TANK# INTERNAL INSPECTION MENT CAPACITY
INSPECTION TRANS I-
VOLUME (BBLS)
TIONAL (BBLS)
SCHEDULE
Iowa Cerro Gordo 1319 2005 2033 110,187 38,756
Iowa Cerro Gordo 1321 1999 2027 69,323 38,931
Illinois Menard 148 1995 2020 335,300 1,678
Iowa Dickinson 125 1994 2020 65,710 917
Minnesota Ramsey 425 2006 2034 38,872 4,441
Minnesota Ramsey 510 2002 2030 26,678 9,333
Minnesota Ramsey 649 1999 2027 38,872 18,382
Minnesota Ramsey 650 2000 2028 38,873 17,970
Minnesota Ramsey 717 2009 2037 40,258 26,547
Minnesota Ramsey 718 2000 2019 31 ,774 26,438
Minnesota Ramsey 720 2008 2036 139,120 24,969
Minnesota Ramsey 805 2009 2037 91 ,91 1 71 '111
Minnesota Ramsey 806 2002 2025 90,958 72,771
Minnesota Ramsey 807 2013 2038 102,993 72,759
Minnesota Ramsey 808 2000 2028 91 ,909 51 ,755
Minnesota Ramsey 815 1998 2026 139,120 76,539
Minnesota Ramsey 816 2000 2028 139,120 76,552
Minnesota Ramsey 817 2010 2035 95,007 76,248
Minnesota Ramsey 818 2001 2022 95,007 76,649
Minnesota Ramsey 819 2001 2019 227,990 76,649
Minnesota Ramsey 820 1999 2027 139,120 64,701
Minnesota Ramsey 822 2010 2035 102,396 70,389
Minnesota Ramsey 824 1998 2026 139,120 74,299
Minnesota Ramsey 825 2000 2028 227,990 76,655
Minnesota Ramsey 826 1999 2027 95,007 61 ,000
Minnesota Ramsey . 827 2005 2033 95,007 71 ,050
Minnesota Ramsey 828 2001 2029 227,990 76,522
Missouri Lawrence 1218 2006 2034 172,401 104,061
Missouri Lawrence 1434 2005 2033 172,401 55,988
Missouri Lawrence 2003 2005 2033 172,401 150,491
Missouri Lawrence 604-1 2006 2034 172,401 403
Missouri Lawrence 112 2006 2034 312 403
Nebraska Otoe 408 2005 2033 4,868 5,911
Nebraska Otoe 794 2009 2037 21 ,684 26,874
Nebraska Otoe 795 2009 2037 17,713 26,529
Nebraska Otoe 831 2012 2037 29,278 71,439
Nebraska Otoe 832 2003 2029 115,802 72,124
Nebraska Otoe 1425 1998 2019 36,478 48,388
Nebraska Otoe 1426 2009 2037 33,924 47,808
Nebraska Otoe 2002 2005 2033 115,802 185,257
Connecticut New Haven 10A* 2001 2029 110,143 47,862
Connecticut New Haven 11A* 2005 2025 110,143 90,508
Connecticut New Haven 15A* 2003 2024 128,000 86,755
Connecticut New Haven 17A* 2010 2027 128,000 91 ,450
Connecticut New Haven 18A* 2011 2033 128,000 90,810
Connecticut New Haven 1A* 201 2 2037 110,143 46,309
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P. Page 18 of22

<<<PAGE 21>>>

FACILITY NAME(S):
NEW HAVEN (85
EAST STREET)
NEW HAVEN (85
EAST STREET)
NEW HAVEN (85
EAST STREET)
ODESSA
ODESSA
ODESSA
ODESSA
ODESSA
ODESSA
ODESSA
ODESSA
ODESSA
ODESSA
ODESSA
ODESSA
ODESSA
OKLAHOMA CITY
(HIGH ST)
OKLAHOMA CITY
(HIGH ST)
OKLAHOMA CITY
(H IGH ST)
OKLAHOMA CITY
(HIGH ST)
OKLAHOMA CITY
(HIGH ST)
OKLAHOMA CITY
(HIGH ST)
OKLAHOMA CITY
(HIGH ST)
OKLAHOMA CITY
(HIGH ST)
OKLAHOMA CITY
(RENO AVE)
OKLAHOMA CITY
(RENO AVE)
OKLAHOMA CITY
(RENO AVE)
OKLAHOMA CITY
(RENO AVE)
OKLAHOMA CITY
(RENO AVE)
OKLAHOMA CITY
(RENO AVE)
OLATHE
OLATHE
OLATHE
OLATHE
OLATHE
OMAHA
OMAHA
PALMYRA
Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE SECONDARY
NEXT
DATE LAST INTERNAL DIKE TANK
CONTAIN-
STATE COUNTY TANK# INTERNAL INSPECTION MENT CAPACITY
INSPECTION TRANS I- VOLUME (BBLS)
TIONAL (BBLS)
SCHEDULE
Connecticut New Haven 2A* 2009 2031 110,143 65,307
Connecticut New Haven 4A* 2000 2028 110,143 66,665
Connecticut New Haven 8A* 2003 2026 110,143 90,959
Texas Ector 101 2011 2036 144,200 74,990
Texas Ector 225 2009 2037 77,600 47,867
Texas Ector 229 2006 2031 73,500 57,031
Texas Ector 338 2011 2036 32,000 16,588
Texas Ector 339 2010 2035 32,000 16,629
Texas Ector 570 1999 2022 33,400 20,577
Texas Ector 572 2005 2033 35,300 20,838
Texas Ector 573 1999 2027 35,300 17,572
Texas Ector 586 2004 2032 39,200 18,056
Texas Ector 590 2011 2036 42,300 21 ,827
Texas Ector 591 2000 2019 42,300 22,563
Texas Ector 598 2004 2023 33,400 20,671
Texas Ector 600 2009 2037 22,800 20,251
Oklahoma Oklahoma 450 2007 2035 21 ,092 4,337
Oklahoma Oklahoma 451 2006 2034 21 ,092 4,563
Oklahoma Oklahoma 1222 2004 2025 106,530 50,440
Oklahoma Oklahoma 1223 2003 2028 106,530 44,971
Oklahoma Oklahoma 6042 2004 2032 38,690 18,565
Oklahoma Oklahoma 6043 2003 2031 38,690 18,448
Oklahoma Oklahoma 6044 2003 2031 35,976 17,658
Oklahoma Oklahoma 6045 2002 2030 35,976 17,574
Oklahoma Oklahoma 533 2003 2031 17,297 550
Oklahoma Oklahoma 535 1994 2024 17,297 8,264
Oklahoma Oklahoma 868 2004 2026 167,549 68,264
Oklahoma Oklahoma 869 2009 2035 167,549 72,959
Oklahoma Oklahoma 1005 2009 2037 167,549 82,468
Oklahoma Oklahoma 1391 2008 2036 167,549 32,324
Kansas Johnson 782 1995 2022 92,832 26,344
Kansas Johnson 1423 1993 2023 112,404 48,763
Kansas Johnson 1424 2006 2034 112,404 47,989
Kansas Johnson 1440 2010 2035 68,061 52,412
Kansas Johnson 222-1 2005 2033 92,832 2,098
Nebraska Douglas 422 2006 2034 25,584 4,459
Nebraska Douglas 1401 2010 2035 125,155 53,879
Missouri Marion 194 1999 2027 80,200 791
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P. Page 19 of 22

<<<PAGE 22>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
FACILITY NAME(S):
DUE DATE SECONDARY
NEXT DIKE
DATE LAST INTERNAL CONTAIN- TANK
STATE COUNTY TANK# INTERNAL INSPECTION MENT CAPACITY
INSPECTION TRANS I-
VOLUME (BBLS)
TIONAL (BBLS)
SCHEDULE
RAPID CITY
REAGAN
RIVERSIDE
RIVERSIDE
RIVERSIDE
RIVERSIDE
RIVERSIDE
RIVERSIDE
ROCHESTER
ROSEMOUNT
ROSEMOUNT
ROSEMOUNT
ROSEMOUNT
ROSEMOUNT
ROSEMOUNT
ROSEMOUNT
ROSEMOUNT
SCOTT CITY
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SHINN PENCE
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
South Dakota Pennington 10-53 2009 2037 36,350 8,368
Texas Falls 4233 2001 2029 29,454 34,909
Missouri Platte 1 2011 2036 232,073 88,817
Missouri Platte 2 2011 2036 232,073 88,415
Missouri Platte 3 201 1 2036 283,323 89,785
Missouri Platte 4 201 1 2036 133,861 89,607
Missouri Platte 5 2011 2036 283,323 89,360
Missouri Platte 10 2011 2036 283,323 27,302
Minnesota Olmsted 196 2007 2035 44,357 224
Minnesota Dakota 829 1996 2022 152,037 69,301
Minnesota Dakota 830 2012 2037 152,037 75,207
Minnesota Dakota 842 2008 2036 205,613 72,361
Minnesota Dakota 1385 2006 2034 205,613 32,676
Minnesota Dakota 1388 2009 2037 205,613 35,929
Minnesota Dakota 1428 2008 2036 205,613 51 ,791
Minnesota Dakota 1429 2005 2028 205,613 52,725
Minnesota Dakota LPMR 2013 2038 205,61 3 645
Kansas Scott 305 2010 2035 65,632 6,907
Oklahoma Payne 823 2012 2036 128,970 67,777
Oklahoma Payne 824 2012 2037 111 ,693 68,309
Oklahoma Payne 825 2013 2038 101 ,839 67,560
Oklahoma Payne 826 2012 2036 145,081 67,618
Oklahoma Payne 833 2013 2038 120,401 68,031
Oklahoma Payne 834 2013 2030 81,475 67,212
Oklahoma Payne 838 2013 2038 106,525 68,211
Oklahoma Payne 839 2013 2038 80,338 67,531
Oklahoma Payne 842 2013 2038 138,291 67,260
Oklahoma Payne 843 2013 2029 111 ,393 67,966
Oklahoma Payne 844 2013 2038 115,930 67,160
Oklahoma Payne 845 2013 2038 128,382 67,436
Oklahoma Payne 846 2013 2038 109,089 67,382
Oklahoma Payne 848 2013 2037 151 ,357 66,780
Oklahoma Payne 852 2011 2036 122,972 66,812
Oklahoma Payne 861 2012 2037 93,319 68,010
Oklahoma Payne 863 2013 2029 92,221 68,193
Oklahoma Payne 873 2012 2037 114,629 67,027
Oklahoma Payne 874 2012 2028 137,059 68,781
Oklahoma Payne 875 2011 2036 133,555 68,481
Oklahoma Payne 876 2012 2037 129,770 67,774
Iowa Woodbury 105 2007 2035 211 ,203 1,749
Iowa Woodbury 503 1989 2019 182,970 10,912
Iowa Woodbury 504 2010 2035 182,970 10,071
Iowa Woodbury 505 2010 2035 211 ,203 10,206
Iowa Woodbury 514 2010 2035 211 ,203 10,157
Iowa Woodbury 516 201 1 2036 211 ,203 10,170
Iowa Woodbury 517 2010 2035 182,970 10,039
Iowa Woodbury 518 2011 2036 211,203 10,140
Iowa Woodbury 656 1990 2020 83,450 19,412
Iowa Woodbury 657 2006 2034 211 ,203 18,940
Iowa Woodbury 658 2011 2036 83,450 17,348
Iowa Woodbury 659 2003 2022 211 ,203 18,640
Iowa Woodbury 661 1989 201 9 211 ,203 18,637
Special Permit: PHMSA-2016 - 0072- Magellan Midstream Partners, L.P. Page 20 of22

<<<PAGE 23>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
FACILITY NAME(S):
DUE DATE SECONDARY
NEXT
D'ATE LAST INTERNAL DIKE TANK
CONTAIN-
STATE COUNTY TANK# INTERNAL INSPECTION MENT CAPACITY
INSPECTION TRANS I-
VOLUME (BBLS)
TIONAL (BBLS)
SCHEDULE
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX CITY
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SIOUX FALLS
SPEED JCT
SPRINGFIELD
ST PAUL PARK
TOPEKA
TYE
WATERLOO
WEST TULSA
WEST TULSA
WEST TULSA
WEST TULSA
WEST TULSA
WEST TULSA
WEST TULSA
WEST TULSA
WEST TULSA
WEST TULSA
WEST TULSA
WEST TULSA
WEST TULSA
WEST TULSA
WICHITA
Iowa Woodbury 752 1988 2018 83,450 28,672
Iowa Woodbury 753 200.1 2029 211 ,203 28,679
Iowa Woodbury 757 1988 2018 211 ,203 28,667
Iowa Woodbury 1331 2001 2028 182,970 38,446
Iowa Woodbury 1332 1999 2027 99,885 38,448
Iowa Woodbury 1333 1989 2019 182,970 37,396
Iowa Woodbury 1334 1990 2020 99,885 37,404
Iowa Woodbury 1335 2006 2034 182,970 39,263
Iowa Woodbury 1336 1990 2020 99,885 37,400
South Dakota Minnehaha 521 2001 2029 68,318 10,900
South Dakota Minnehaha 522 2003 2031 102,486 10,901
South Dakota Minnehaha 523 2001 2029 68,318 10,899
South Dakota Minnehaha 524 2003 2031 102,486 10,894
South Dakota Minnehaha 525 2001 2029 68,318 10,898
South Dakota Minnehaha 526 2010 2035 102,486 10,902
South Dakota Minnehaha 528 2007 2035 102,486 10,898
South Dakota Minnehaha 663 2001 2027 52,738 18,345
South Dakota Minnehaha 664 2010 2035 94,795 19,365
South Dakota Minnehaha 666 2002 2030 94,795 18,340
South Dakota Minnehaha 667 2013 2038 52,738 18,346
South Dakota Minnehaha 668 2000 2028 102,485 18,340
South Dakota Minnehaha 754 2010 2035 94,795 28,895
South Dakota Minnehaha 755 2000 2027 52,738 28,597
South Dakota Minnehaha 756 2003 2020 68,318 26,384
South Dakota Minnehaha 1337 2006 2034 100,310 38,545
South Dakota Minnehaha 1338 2006 2031 87,027 38,671
South Dakota Minnehaha 1339 2006 2034 100,310 35,939
South Dakota Minnehaha 1340 2006 2033 87,027 35,751
South Dakota Minnehaha 1341 2005 2033 100,310 36,768
South Dakota Minnehaha 1342 2002 2030 87,027 36,764
South Dakota Minnehaha 4007 2007 2035 94,795 40,256
Texas Harris 457* 2013 2038 30,288 8,505
Missouri Greene 122 2001 2029 77,938 284
Minnesota Washington LPMR 2007 2035 356 57
Kansas Shawnee LPMR 2004 2032 48,724 705
Texas Taylor 4421 2009 2037 5,980 4,292
Iowa Black Hawk 335 2007 2035 91 ,674 254
Oklahoma Tulsa 590 2005 2033 113,903 14,142
Oklahoma Tulsa 591 2004 2023 113,903 14,141
Oklahoma Tulsa 601 2010 2035 19,028 12,186
Oklahoma Tulsa 833 1994 2021 353,418 66,613
Oklahoma Tulsa 834 1996 2022 353,418 66,841
Oklahoma Tulsa 835 2013 2038 353,418 68,980
Oklahoma Tulsa 1009 2012 2037 353,418 80,754
Oklahoma Tulsa 1205 2002 2021 353,418 109,615
Oklahoma Tulsa 1206 1996 2024 353,418 108,932
Oklahoma Tulsa 1207 2004 2032 353,418 108,335
Oklahoma Tulsa 1208 2004 2032 353,418 116,372
Oklahoma Tulsa 1327 2008 2036 49,591 33,086
Oklahoma Tulsa 1504 1998 2017 353,418 134,799
Oklahoma Tulsa 1505 1999 2021 353,418 137,278
Kansas SedQwick 5 2006 2034 167,855 1,592
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P. Page 21 of22

<<<PAGE 24>>>

FACILITY NAME(S):
WILLMAR
WRENSHALL
WYNNEWOOD
WYNNEWOOD
Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE SECONDARY
NEXT DIKE
DATE LAST INTERNAL CONTAIN-
TANK
STATE COUNTY TANK# INTERNAL INSPECTION MENT CAPACITY
INSPECTION TRANSI-
VOLUME (BBLS)
TIONAL (BBLS)
SCHEDULE
Minnesota Kandiyohi MSR 2007 2035 7,528 483
Minnesota Carlton LPMR 2007 2035 645 242
Oklahoma Garvin 1514 2013 2030 222,530 144,104
Oklahoma Garvin 1515 2013 2030 222,530 159,639
Total Breakout Tanks included in Special Permit: 493
Note: * notes Magellan breakout tanks that are intrastate facilities in Connecticut (17 breakout tanks)
and Texas ( 19 breakout tanks), all other Magellan breakout tanks in the special permit are interstate
facilities.
PHMSA received approval from the Railroad Commission of Texas pipeline office, Director-
Stephanie Weidman on January 26, 2018 to include the Magellan intrastate hazardous pipeline facility
breakout tanks noted in Appendix B above as part of the special permit. Magellan intrastate hazardous
liquid pipeline facility breakout tanks in the state of Connecticut are inspected by PHMSA and are a part
of this special permit as noted in Appendix B above.
Special Permit: PHMSA-2016- 0072 - Magellan Midstream Partners, L.P. Page 22 of22

<<<PAGE 1>>>

U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
Special Permit Analysis and Findings
Special Permit Information:
Docket Number:
PHMSA-2016-0072
Requested By:
Magellan Midstream Partners, L.P. and its subsidiaries
Operator ID#/Affiliate:
39504 - Magellan Crude Oil Pipeline Company, L.P.
22610 - Magellan Pipeline Company, L.P.
31579 - Magellan Pipelines Holdings, L.P.
31580 - Magellan Terminals Holdings, L.P.
Date Requested:
June 7, 2016
Original Issuance Date:
May 14, 2018
Effective Dates:
May 14, 2018 to May 14, 2038
Code Section(s):
49 CFR 195.432
Purpose:
The Pipeline and Hazardous Materials Safety Administration (PHMSA) Office of Pipeline
Safety (OPS)' provides this information to describe the facts of the subject special permit
application submitted by Magellan Midstream Partners, L.P. and its subsidiaries (collectively
"Magellan")? to discuss any relevant public comments received with respect to the application, to
present the engineering/safety analysis of the special permit application, and to make findings
regarding whether the requested special permit should be granted and if so under what
conditions. Magellan requested that PHMSA waive compliance from 49 Code of Federal
Regulations (CFR) 195.432 by extending the internal inspection schedule requirements for 493
of Magellan's existing atmospheric above ground breakout storage tanks (breakout storage tanks
or tanks).
' Throughout this special permit the usage of "PHMSA" or "PHMSA OPS" means the U.S. Department of
Transportation's Pipeline and Hazardous Materials Safety Administration Office of Pipeline Safety.
" Magellan Midstream Partners, L.P. and its subsidiaries include the following wholly owned and operated
Magellan Pipelines Holdings, L.P. (MPH), and Magellan Terminals Holdings, L.P. (MTH).
companies: Magellan Crude Oil Pipeline Company, L.P. (MCOP), Magellan Pipeline Company, L.P. (MPL),
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 1 of 20

<<<PAGE 2>>>

Pipeline System Affected:
Magellan's special permit request applies to 493 tanks and associated facilities at 81 sites located
in the states of Colorado, Connecticut, Illinois, Iowa, Kansas, Minnesota, Missouri, Nebraska,
North Dakota, Oklahoma, South Dakota, Texas, Wisconsin, and Wyoming. The facilities are
industrial properties consisting of storage tanks, buildings, pump stations, valves, facility pipe,
roads, and other above ground appurtenances.
Special Permit Request:
Magellan submitted an application to PHMSA on June 7, 2016, for a special permit seeking
relief from the Federal pipeline safety regulations in 49 CFR 195.432 for extended inspection
intervals of 493 existing atmospheric above ground breakout storage tank as described below and
in Appendix A - Magellan Breakout Storage Tanks: Location - State, Facility Name, County,
and Number of Tanks.
• Special permit tanks - are defined as any of the 493 existing atmospheric above ground
breakout storage tank described in Appendix A of this special permit.
The special permit requires Magellan to implement inspection intervals based on the evaluation
of an established minimum safe floor thickness, previous inspection results, corrosion rates, and
defined likelihood and consequence factors for existing atmospheric above ground breakout
storage tanks, as described in this special permit.
Public Notice:
On August 15, 2017, PHMSA published the special permit request in the Federal Register (82
FR 38758) and the public comment period ended on October 16, 2017. The special permit
application from Magellan, environmental assessment, and special permit conditions are
available in Docket No. PHMSA-2016-0072 at: www.regulations.gov.
PHMSA received no stakeholder comments on the proposed Magellan special permit.
Analysis:
PHMSA developed the special conditions to achieve safety by decreasing the likelihood of a
release of hazardous liquid by the special permit tanks and that migrates outside the containment
dikes.
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 2 of 20

<<<PAGE 3>>>

The special permit conditions include:
• Inspection Schedule:
• Special Permit Tanks Last Inspected Before 1995: Inspect within 30 years of the
previous internal inspection date (25 tanks remain to be inspected as of May 2017);
• Special Permit Tanks Last Inspected Between 1995 and 2009: Inspect within 28
years of the previous internal inspection date (333 tanks remain to be inspected as
of May 2017); and
• Special Permit Tanks Last Inspected Between 2010 and 2013: Inspect within 25
years of the previous internal inspection date (135 tanks remain to be inspected as
of May 2017).
• Develop and Implement Procedures and Conduct and Document;
• Internal inspections of the special permit tanks;
• Visual inspections of the special permit tanks and their secondary containment
dikes;
• Continuous monitoring of the special permit tank levels through the supervisory
control and data acquisition (SCADA) system; and
• Semi-annual, not to exceed 7 ½ months, static tank trending for 12 continuous
hours to verify the integrity of the special permit tanks.
• Re-evaluation Inspection Intervals:
Inspection schedules of future special permit tank inspections must be based upon
past inspection findings at a special permit tank site location or similar vintage
construction types at other tank locations in this proposed special permit;
Re-evaluation intervals must be shortened when special permit tank inspection
findings demonstrate inspection intervals were not sufficiently conservative to
maintain established minimum safe floor and wall thicknesses, and material
corrosion rates;
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 3 of 20

<<<PAGE 4>>>

• Transitional staged internal special permit tank inspection intervals must be
modified if a breakout storage tank of similar service indicates a more conservative
internal inspection interval should apply; and
• Special permit tanks of similar service must be identified by having been
constructed during, or within six (6) months of, the same year, under the same
conditions, with similar foundations and store similar products.
• Annual Report to PHMSA:
• Any leakage of special permit tanks including location, leakage amount, repairs
taken, and impact of any other tanks inspection schedule or integrity;
• Any inspection findings that caused a readjustment of inspection schedules and the
special permit tanks involved in the reschedule of inspection interval;
• Any secondary containment integrity issues found or remediated that would have
impacted containment in the case of a leak or failure of the special permit tank;
• Any leaks or failures found through the continuous monitoring of tank levels
through the SCADA system or the semi-annual static tank trending for 12
continuous hours; and
• Identification of special permit tanks inspected during the past year and planned
inspections for the next two (2) years.
• Tank Integrity Program:
• Continue use of its existing documented Tank Integrity Program (Magellan
procedure 7.10-ADM-001 Tank Integrity Program, revision date 01/01/18) during
the transitional staged internal special permit tank inspection period.
• Certification: A Magellan senior executive officer, vice president or higher must certify
in writing the following:
Magellan has developed a written manual of operating and maintenance (O&M)
procedures required by 49 CFR 195.402 and 195.432, and all requirements of this
special permit for the special permit tanks; and
Magellan has implemented all special permit conditions, 49 CFR 195.402 and
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 4 of 20

<<<PAGE 5>>>

195.432, as required by this special permit for the special permit tanks.
• Limitations:
• The special permit is for an interval of 20 years;
• PHMSA may revoke, suspend or modify the Magellan special permit based on
any finding listed in 49 CFR 190.341(h)(1) and require Magellan to comply with
the regulatory requirements in 49 CFR 195.432;
• As provided in 49 U.S.C. Chapter 601 and 49 CFR Part 190, PHMSA may also
issue an enforcement action for failure to comply with the special permit; and
• Any work plans and associated schedules must be automatically incorporated into
the Magellan special permit and are enforceable in the same manner.
Operational Enforcement History - 2007 through December 31, 2017:
Since the beginning of 2007 through December 31, 2017, Magellan was cited in 40 enforcement
cases with a total of $1,067,680 in collected penalties. PHMSA initiated eight (8) Notices of
Amendments, ten (10) Notices of Probable Violations, nineteen (19) Warning Letters, and three
(3) Corrective Action Orders against Magellan and subsidiaries.
Below is a table of PHMSA enforcement matters and penalties of all types in all PHMSA
Regions for Magellan (OPID #39504, 22610, 31579, and 31580) from 2007 through December
31, 2017:
• 39504 - Magellan Crude Oil Pipeline Company, L.P.
• 22610 - Magellan Pipeline Company, L.P.
31579 - Magellan Pipelines Holdings, L.P.
•
31580 - Magellan Terminals Holdings, L.P.
Magellan - Enforcement Cases - 2007 through 12/31/2017
Corrective
Status
Action
Notice of
Notice of
Order
Amendment
Probable
Safety
Warning
Violation
Order
Letter
Total
CLOSED
8
9
0
19
38
OPEN
1
1
0
2
Total
3
8
10
0
19
40
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P. Page 5 of 20

<<<PAGE 6>>>

Magellan - Civil Penalty Status - 2007 through 12/31/2018
Proposed
Awaiting Order
Assessed
Withdrawn/Reduced
Collected
$1,307,000
$28,600
$1,067,680
$210,720
$1,067,680
PHMSA finds there are no current enforcement cases that impede going forward with the
granting of this special permit request by Magellan.
The special permit application from Magellan, environmental assessment, and special permit are
available in Docket No. PHMSA-2016-0072 at: www.regulations.gov.
PHMSA has determined that imposing the conditions and limitations summarized in this
document and detailed in the special permit will ensure that granting the special permit for an
extended inspection interval for the special permit tanks will be consistent with safety.
Findings:
Based on the information submitted by Magellan and PHMSA's analysis of technical,
operational and safety issues, and given the conditions that will be imposed in the special permit,
PHMSA finds that granting this special permit to Magellan to operate 493 special permit tanks
located at 81 sites in the states of Colorado, Connecticut, Illinois, Iowa, Kansas, Minnesota,
Missouri, Nebraska, North Dakota, Oklahoma, South Dakota, Texas, Wisconsin, and Wyoming
with an extended inspection interval for 20-years would not be inconsistent with pipeline safety.
Completed in Washington DC on: May 14, 2018
Prepared By: PHMSA - Engineering and Research Division
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 6 of 20

<<<PAGE 7>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Appendix A
Magellan Breakout Storage Tanks:
Located in a
Located in
Consequence
a Could
Affect
HCA?
Colorado
Aurora
Adams
8
Yes
Yes
Fountain
Dupont
Adams
9
Yes
Yes
El Paso
Yes
Yes
Connecticut
Hamden
New Haven
Yes
Yes
New Haven
New Haven
Illinois
Heyworth
Mclean
Menard
Menard
lowa
Bettendorf
Scott
Des Moines
Polk
Ft Dodge
Webster
lowa City
Johnson
Mason City
Cerro Gordo
Milford
Dickinson
Sioux City
Waterloo
Woodbury
Black Hawk
Kansas
Boyer
Butler
El Dorado East
El Dorado West
Butler
Great Bend
Butler
Barton
Kansas City
Wyandotte
Olathe
Johnson
Scott City
Scott
Topeka
Wichita
Shawnee
Sedgwick
Minnesota
Alexandria
Douglas
Duluth
St Louis
1
No
Yes
Mankato™
Blue Earth
1
No
Yes
Marshall
Lyon
No
Yes
Minneapolis
Ramsey
Yes
Olmsted
1
Yes
Rochester
No
Yes
Rosemount
Dakota
8
Yes
Yes
St Paul Park
Washington
1
Yes
Yes
Willmar
Kandiyohi
Carlton
1
1
No
Yes
Wrenshall
Yes
Yes
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 7 of 20

<<<PAGE 8>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks:
Location - State, Facility Name, County, and Number of Tanks
Number of
Breakout
Located in a
State
Facility
Located in
Name(s):
County
Included in the Consequence
Storage Tanks
High
a Could
Special Permit
Area?
Affect
HCA?
Request
Missouri
Carthage
Jasper
5
No
No
Columbia
Boone
4
Yes
Yes
Mt Vernon Jct
Lawrence
4
No
No
Mt Vernon Terminal
Lawrence
No
No
Palmyra
Marion
No
Yes
Riverside
Platte
Yes
Yes
Springfield
Greene
Yes
Nebraska
Capehart
Sarpy
Yes
Doniphan
Hall
No
No
Irvington
Lincoln
Douglas
Yes
Yes
Lancaster
No
Yes
Nebraska City
Otoe
No
Omaha
Yes
Douglas
Yes
Yes
North Dakota
Fargo
Cass
Yes
Yes
Grand Forks
Grand Forks
Yes
Yes
Oklahoma
Allen
Pontotoc
Yes
Yes
Barnsdall
Osage
No
Yes
Central Cushing
Payne
No
No
Cushing
Payne
No
Yes
Drumright
Creek
Yes
Yes
Drumright Crude
Creek
Yes
Enid
Garfield
Yes
Glenpool (East)
Tulsa
Yes
Yes
Glenpool (West)
Tulsa
Yes
Yes
Oklahoma City
(High St)
Oklahoma
8
Yes
Yes
Oklahoma City
(Reno Ave)
Oklahoma
6
Yes
Yes
Shinn Pence
Payne
No
Yes
West Tulsa
Tulsa
14
Yes
Yes
Wynnewood
Garvin
No
Yes
South Dakota
Rapid City
Pennington
1
Yes
Yes
Sioux Falls
Minnehaha
22
Yes
Yes
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 8 of 20

<<<PAGE 9>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks:
Location - State, Facility Name, County, and Number of Tanks
Number of
Breakout
State
Name(s):
Facility
County
Included in the
Storage Tanks
High
Special Permit
Consequence
Area?
HCA?
Affect
Request
Texas
Corpus Christi
Nueces
Yes
Yes
Dallas
Crane
Crane
No
Dallas
No
East Houston
Harris
12
3
Yes
Yes
Yes
El Paso
El Paso
Yes
Frost
Navarro
No
Yes
No
Galena Park
Harris
No
Yes
Yes
Hearne
Roberts
11
Yes
Yes
Odessa
Ector
Yes
Speed Jct
Reagan
Falls
Yes
=---
No
Harris
No
Tye
Yes
Yes
Taylor
No
Yes
Wisconsin
Bateman
Cadott
Chippewa
4
1
No
Chippewa
No
Chippewa Falls
Chippewa
No
No
1
Yes
Yes
Wyoming
Cheyenne
Laramie
Yes
Yes
Total Breakout Tanks included in Special Permit:
493
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 9 of 20

<<<PAGE 10>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Appendix B
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
DATE LAST
INTERNAL
NEXT
SECONDARY
CONTAIN-
DIKE
FACILITY NAME(S):
STATE
COUNTY
TANK #
INSPECTION
INTERNAL INSPECTION
CAPACITY
TANK
TRANSI-
VOLUME
MENT
SCHEDULE
TIONAL
(BBLS)
(BBLS)
ALEXANDRIA
ALEXANDRIA
Minnesota
Douglas
157
2000
2028
ALEXANDRIA
Minnesota
Minnesota
Douglas
429
2012
2037
25,049
29,602
2,186
ALEXANDRIA
Douglas
552
1998
2026
2,279
ALEXANDRIA
Minnesota
Minnesota
Douglas
554
2001
2029
50,055
50,055
50,055
10,913
ALEXANDRIA
Minnesota
Douglas
Douglas
555
1999
2027
10,913
ALEXANDRIA
Douglas
557
556
1999
2027
25,049
29,602
10,914
10,911
ALEXANDRIA
Minnesota
Minnesota
Douglas
1999
2027
ALEXANDRIA
Minnesota
558
2010
2035
25,049
10,913
Douglas
559
1998
ALEXANDRIA
Minnesota
2026
29,602
10,077
10,912
ALEXANDRIA
Minnesota
Douglas
Douglas
561
560
1999
1999
2027
2027
25,049
25,049
10,914
ALEXANDRIA
ALEXANDRIA
Minnesota
Minnesota
Douglas
682
2001
2029
72,870
72,870
19,406
10,913
Douglas
683
2002
2030
ALEXANDRIA
Minnesota
Douglas
685
1998
2025
35,844
72,870
18.087
19,399
ALEXANDRIA
ALEXANDRIA
Minnesota
Minnesota
Douglas
Douglas
686
687
2001
2000
2029
2028
75.305
18,631
ALEXANDRIA
Minnesota
Douglas
688
2001
ALEXANDRIA
Minnesota
2029
75,305
19,403
17,675
ALEXANDRIA
Minnesota
Douglas
761
2001
2029
ALEXANDRIA
Minnesota
Douglas
762
2002
2030
75,305
35,844
28,688
28,682
Douglas
763
2002
2030
ALEXANDRIA
Minnesota
Douglas
1343
ALEXANDRIA
Minnesota
2010
2035
75,305
94.454
28,692
Douglas
1344
1999
2027
36,230
ALEXANDRIA
Minnesota
Douglas
1346
ALEXANDRIA
2002
2030
69,277
94,454
38,901
37,407
ALEXANDRIA
Minnesota
Minnesota
1347
1999
Douglas
Douglas
1348
2002
2023
ALEXANDRIA
Minnesota
2030
83,884
83,884
37,401
37,404
Douglas
1441
2004
2032
ALEXANDRIA
ALLEN
Minnesota
Oklahoma
Douglas
4010
1998
2025
94,454
111,531
69,277
39,098
52,502
ALLEN
Oklahoma
Pontotoc
Pontotoc
864
865
2011
2007
2036
2031
111,531
61,772
53,177
ALLEN
Oklahoma
Pontotoc
866
2006
2024
44,697
ALLEN
Oklahoma
Pontotoc
ALLEN
Oklahoma
Pontotoc
867
875
2013
1998
2026
2037
47,875
51,398
114,540
61,772
ALLEN
Pontotoc
2036
ALLEN
Oklahoma
Oklahoma
Pontotoc
876
2008
110,547
119,752
70,990
48,882
ALLEN
877
2009
Oklahoma
Pontotoc
880
2031
AURORA
Colorado
107
2005
2029
114,540
70,274
AURORA
Colorado
Adams
110
2009
2013
2038
152,667
87,189
69,277
AURORA
Colorado
Adams
207
2003
2037
70,927
AURORA
Colorado
Adams
213
2008
2036
2026
84,525
87,189
68,632
68,318
AURORA
AURORA
Colorado
Colorado
Adams
Adams
401
402
2009
2037
152,667
87,189
48,016
AURORA
Adams
405
2008
2009
2036
77,441
AURORA
Adams
406
2007
2037
84,525
75,601
77,439
BARNSDALL
Osage
416
2001
2035
BARNSDALL
Osage
729
2029
84,525
27,181
5,681
48,355
BARNSDALL
Osage
730
2008
1997
2036
25,605
3,020
BARNSDALL
Osage
1002
1994
2025
BARNSDALL
Osage
1003
2011
2024
33,342
29,804
29,621
25,212
BARNSDALL
Osage
1213
2011
2036
2036
21,023
85,966
114,130
29,950
BATEMAN
Chippewa
42
2007
2035
426
93
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 10 of 20

<<<PAGE 11>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
DATE LAST
INTERNAL
NEXT
SECONDARY
CONTAIN-
DIKE
FACILITY NAME(S):
STATE
COUNTY
TANK #5
INSPECTION
INTERNAL INSPECTION
CAPACITY
TANK
TRANSI-
VOLUME
MENT
TIONAL
(BBLS)
(BBLS)
BETTENDORF
BETTENDORF
lowa
lowa
Scott
9
103,285
BOYER TERMINAL
PRODUCTS
Kansas
Butler
Scott
616,556
595
504
354
6,475
CADOTT
CADOTT
Wisconsin
CADOTT
Wisconsin
Wisconsin
Chippewa
108,605
108,605
108,605
50,888
Chippewa
25,657
39,921
CAPEHART
CADOTT
Wisconsin
Chippewa
Chippewa
108,605
42,717
42,714
31,203
CAPEHART
Nebraska
CARTHAGE
Nebraska
Sarpy
36,360
36,360
CARTHAGE
Missouri
Jasper
Sarpy
CARTHAGE
Missouri
63,368
63.368
63,368
28,524
267
CARTHAGE
Missouri
Jasper
CARTHAGE
Missouri
Missouri
Jasper
63,368
63,368
18,852
51,347
Jasper
Jasper
CENTRAL CUSHING
CENTRAL CUSHING
Oklahoma
Oklahoma
464,223
464,223
215,835
19,340
Payne
CENTRAL CUSHING
CENTRAL CUSHING
Oklahoma
Oklahoma
Payne
Payne
Payne
464,223
216,428
467,905
261,207
216,430
CENTRAL CUSHING
CENTRAL CUSHING
Oklahoma
Oklahoma
Payne
Payne
1,009,730
454,433
310,212
440,850
428,100
CENTRAL CUSHING
CENTRAL CUSHING
Oklahoma
CHEYENNE
Oklahoma
Payne
Laramie
Payne
1,009,730
1,009,730
438,688
CHEYENNE
Wyoming
Laramie
19,371
19,106
14,246
CHEYENNE
Wyoming
Wyoming
Laramie
Laramie
18,973
14,206
15,095
CHEYENNE
CHEYENNE
Wyoming
19,355
Laramie
19,987
19,761
15,094
15,095
CHEYENNE
Wyoming
CHEYENNE •
Wyoming
Wyoming
Laramie
Laramie
Laramie
40,454
29,050
15,093
CHEYENNE
CHEYENNE
Wyoming
42,211
CHIPPEWA FALLS
Wisconsin
Wyoming
Laramie
80,510
37,910
Chippewa
Boone
Boone
105,078
374
63,267
COLUMBIA
COLUMBIA
Missouri
Missouri
28,555
373
COLUMBIA
Missouri
Boone
105,078
105,078
74,689
CORPUS CHRISTI
COLUMBIA
Missouri
Nueces
Boone
105,078
19,379
49,813
CORPUS CHRISTI
Texas
Texas
Nueces
139,831
124,960
587,735
138,301
74,692
CRANE CRUDE
CRANE CRUDE
Texas
Texas
Crane
Crane
124,960
124,960
49,389
CRANE CRUDE
CUSHING
Oklahoma
Texas
Payne
Crane
49,728
45,002
(SINGLETON BLVD.)
DALLAS
Texas
Dallas
134,161
943
98,208
302
(SINGLETON BLVD.)
DALLAS
Texas
Dallas
134,161
98,202
(SINGLETON BLVD.)|
DALLAS
Texas
Dallas
134,161
6,397
DES MOINES
DES MOINES
lowa
DES MOINES
lowa
Polk
Polk
11,945
42,579
11,945
4,530
5,519
DES MOINES
lowa
lowa
Polk
138,703
33,537
Polk
32,390
Special
ermit:
PHMS,
A-2
01
Midstream
L.I

<<<PAGE 12>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
NEXT
SECONDARY
FACILITY NAME(S):
STATE
COUNTY
DATE LAST
TANK #
INSPECTION
INTERNAL
INSPECTION
INTERNAL
CONTAIN-
DIKE
TANK
TRANSI-
VOLUME
MENT
CAPACITY
TIONAL
(BBLS)
(BBLS)
DES MOINES
DES MOINES
lowa
Polk
SCHEDULE
DES MOINES
lowa
Polk
Polk
2032
2033
138,703
153,470
34,512
DES MOINES
lowa
2035
2019
34,516
DES MOINES
DES MOINES
lowa
lowa
Polk
Polk
153,470
153,470
34,516
DES MOINES
DES MOINES
lowa
Polk
2029
153,470
lowa
Polk
Polk
2035
2033
2038
2024
545,734
DES MOINES
lowa
187,121
545,734
DES MOINES
DES MOINES
lowa
lowa
Polk
Polk
Polk
2029
187,121
187,121
DES MOINES
lowa
lowa
Polk
2031
2023
187,121
DES MOINES
DES MOINES
lowa
lowa
Polk
Polk
2031
2035
32,596
58,763
DES MOINES
DES MOINES
DES MOINES
lowa
lowa
Polk
Polk
2026
121,142
545,734
DES MOINES
lowa
lowa
Polk
2037
246.699
121,142
DES MOINES
DRUMRIGHT
DONIPHAN
Nebraska
lowa
Polk
Polk
246,699
Creek
Hall
187,121
DRUMRIGHT
Oklahoma
69,490
237
DRUMRIGHT
Oklahoma
DRUMRIGHT
Oklahoma
Oklahoma
Creek
Creek
Creek
483,626
120,386
476,691
DRUMRIGHT
DRUMRIGHT
DRUMRIGHT
Oklahoma
Oklahoma
Oklahoma
Creek
Creek
Creek
120,386
120,386
DRUMRIGHT CRUDE
DRUMRIGHT CRUDE
Oklahoma
Creek
Creek
94.482
2,096
DUPONT
DULUTH
Minnesota
Oklahoma
St Louis
170,031
DUPONT
DUPONT
Colorado
Adams
8,899
609
Colorado
DUPONT
Colorado
Colorado
Adams
Adams
31,858
30,663
Adams
Adams
DUPONT
DUPONT
Colorado
Colorado
38,428
Adams
26,698
DUPONT
DUPONT
DUPONT
Colorado
Colorado
Adams
64,290
63,326
EAST HOUSTON
Colorado
Adams
Adams
68,919
EAST HOUSTON
EAST HOUSTON
Texas
Texas
Harris
Harris
578,498
74,318
EAST HOUSTON
Texas
Harris
275,140
EAST HOUSTON
Texas
Texas
Harris
578,498
365,844
EAST HOUSTON
CRUDE
Harris
578,498
EAST HOUSTON
CRUDE
Texas
Harris
578,498
113,905
EAST HOUSTON
CRUDE
Texas
Harris
2034
275,140
113,624
EAST HOUSTON
CRUDE
Texas
Harris
2027
578,498
109,777
CRUDE
Texas
Harris
1228
2005
2033
578,498
112,581
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 12 of 20

<<<PAGE 13>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
NEXT
SECONDARY
DATE LAST
INTERNAL
DIKE
FACILITY NAME(S):
STATE
COUNTY
TANK #
INTERNAL
INSPECTION
CONTAIN-
TANK
INSPECTION
MENT
CAPACITY
TRANSI-
TIONAL
VOLUME
(BBLS)
EAST HOUSTON
SCHEDULE
(BBLS)
EAST HOUSTON
CRUDE
Texas
Harris
1229
2037
365,844
112,511
CRUDE
Texas
Harris
1230
365,844
111,994
EAST HOUSTON
CRUDE
Texas
Harris
1427
275,140
112,909
EL DORADO EAST
EL DORADO EAST
Kansas
Kansas
Butler
Butler
1209
434
4,949
EL DORADO EAST
EL DORADO EAST
Kansas
Kansas
Butler
Butler
1210
Kansas
Butler
1211
EL DORADO WEST
EL DORADO EAST
Kansas
Butler
1212
EL DORADO WEST
208
EL DORADO WEST
Kansas
Butler
209
EL DORADO WEST
Kansas
Kansas
Butler
304
EL DORADO WEST
Kansas
Butler
Butler
404
403
EL PASO
EL PASO
Texas
Texas
El Paso
El Paso
EL PASO
EL PASO
Texas
EL PASO
Texas
Texas
El Paso
El Paso
El Paso
4
EL PASO
EL PASO
Texas
Texas
El Paso
El Paso
EL PASO
EL PASO
Texas
El Paso
8
EL PASO
Texas
Texas
El Paso
El Paso
10
9
EL PASO
EL PASO
Texas
El Paso
11
EL PASO
EL PASO
Texas
Texas
El Paso
12
El Paso
13
EL PASO
Texas
Texas
El Paso
El Paso
14
15
2036
EL PASO
Texas
El Paso
16
2036
2035
EL PASO
EL PASO
Texas
Texas
EI Paso
El Paso
19
17
2037
2037
ENID
ENID
Oklahoma
Oklahoma
Garfield
Garfield
1233
1231
2031
2036
ENID
ENID
Oklahoma
Garfield
Oklahoma
Garfield
1238
1239
2034
FARGO
North Dakota
Cass
2023
FARGO
North Dakota
Cass
135
2038
FARGO
North Dakota
Cass
564
563
2024
2033
FARGO
FARGO
North Dakota
North Dakota
Cass
Cass
566
2031
FARGO
North Dakota
Cass
677
2033
FARGO
North Dakota
Cass
689
690
2032
2030
FARGO
FARGO
North Dakota
North Dakota
Cass
Cass
693
694
2032
2024
FARGO
FARGO
North Dakota
North Dakota
Cass
Cass
764
695
2024
2032
FARGO
FARGO
North Dakota
North Dakota
Cass
Cass
1350
1349
2031
2037
FARGO
FARGO
North Dakota
North Dakota
Cass
Cass
1353
1351
2028
2036
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 13 of 20

<<<PAGE 14>>>

Special Permit Docket: PHMSA-2016-0072
Magellan Breakout Storage Tanks
OPID 39504, 22610, 31579, or 31580
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
NEXT
SECONDARY
FACILITY NAME(S):
STATE
COUNTY
DATE LAST
INTERNAL
DIKE
TANK #
INTERNAL
INSPECTION
CONTAIN-
TANK
INSPECTION
TRANSI-
MENT
CAPACITY
TIONAL
VOLUME
(BBLS)
FARGO
North Dakota
SCHEDULE
(BBLS)
FARGO
North Dakota
Cass
1354
1994
2024
FOUNTAIN
4009
128,167
Colorado
1998
2020
61,126
37,024
FROST
Texas
33-8
2011
2036
40,866
FROST
29,178
Texas
511
2034
FT DODGE
525
2010
2006
292,573
74,811
36,759
lowa
2031
GALENA PARK
129
292,573
Texas
2005
2033
197,059
GALENA PARK
291*
64,363
Texas
2004
2032
607,020
893
984
GALENA PARK
Texas
308*
2013
GALENA PARK
Texas
311*
2007
2029
2035
126,229
111,544
GALENA PARK
312*
481,186
Texas
2007
2027
481,186
290,504
GALENA PARK
Texas
374*
373*
2011
2033
GALENA PARK
1,053,764
Texas
600,882
290,420
382*
2007
2021
GALENA PARK
2006
1,049,002
Texas
2030
203,800
610,203
GALENA PARK
Texas
383*
2002
106,074
385*
2005
2020
GALENA PARK
2021
188,363
203,800
50,821
GALENA PARK
Texas
Texas
386*
50,767
387*
2012
2003
2031
GALENA PARK
237,530
Texas
2034
233,050
139,383
GALENA PARK
Texas
388*
2011
2021
285,073
136,456
152,281
GALENA PARK
Texas
391*
2007
2026
607,020
GLENPOOL (EAST)
Oklahoma
393*
2002
2021
607,020
297,995
GLENPOOL (EAST)
120
2007
2035
269,126
GLENPOOL (EAST)
Oklahoma
1204
2011
129,913
Oklahoma
2036
129,913
108,254
548
GLENPOOL (EAST)
Oklahoma
1217
1998
2019
GLENPOOL (EAST)
1219
1998
129,913
Oklahoma
2019
129,913
99,098
GLENPOOL (EAST)
Oklahoma
1438
1998
2019
129,913
77,844
GLENPOOL (WEST)
Oklahoma
1439
2022
129 913
GLENPOOL (WEST)
Oklahoma
301
2004
2007
2035
168,790
49,481
46,721
GLENPOOL (WEST)
Oklahoma
302
1999
2024
168,790
83,349
GLENPOOL (WEST)
Oklahoma
303
2005
2033
168,790
83,454
GLENPOOL (WEST)
Oklahoma
304
2007
2035
168,790
83,430
GLENPOOL (WEST)
305
2001
82,913
Oklahoma
2017
168,790
GLENPOOL (WEST)
307
2007
82,967
Oklahoma
2035
GRAND FORKS
309
168,790
North Dakota
2013
2007
2035
168,790
2,545
GREAT BEND
2,552
Kansas
Grand Forks
Barton
302
180
2008
2038
HAMDEN
76,800
1,925
Connecticut
New Haven
2036
HAMDEN
10H*
2008
33,201
538
Connecticut
New Haven
2035
HAMDEN
11H*
248,976
Connecticut
2010
98,757
New Haven
2035
HAMDEN
1H*
248,976
Connecticut
2010
96,880
New Haven
2H*
2029
HAMDEN
248,976
Connecticut
2008
93,734
New Haven
3H*
2036
HAMDEN
2012
64,025
New Haven
4H*
2000
2037
248,976
HAMDEN
248,976
Connecticut
Connecticut
2027
94,207
HAMDEN
New Haven
5H*
248,976
14,399
Connecticut
New Haven
7H*
2000
2018
HEARNE
248,976
91,069
HEARNE
Texas
Roberts
1247
1999
2000
2022
248,976
Texas
93,736
Roberts
2025
HEARNE
1248
118,391
30,533
Texas
1998
2026
HEARNE
Roberts
1252
2000
118,391
30,315
HEARNE
Texas
Roberts
1253
2005
2028
30,296
HEARNE
Texas
Roberts
1254
2033
118,391
118,391
Texas
30,390
Roberts
2002
2030
118,391
HEARNE
Texas
1255
2002
2030
30,397
HEARNE
Roberts
1256
2012
118,391
30,570
Texas
Roberts
2037
HEARNE
1258
118,391
30,754
Texas
Roberts
1259
2005
2003
2033
2031
118,391
118,391
82,727
39,861
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 14 of 20

<<<PAGE 15>>>

Special Permit Docket: PHMSA-2016-0072
Magellan Breakout Storage Tanks
OPID 39504, 22610, 31579, or 31580
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
NEXT
FACILITY NAME(S):
STATE
COUNTY
DATE LAST
SECONDARY
TANK#
INTERNAL
INSPECTION
INTERNAL
CONTAIN-
DIKE
CAPACITY
TANK
INSPECTION
TRANSI-
VOLUME
MENT
TIONAL
(BBLS)
HEARNE
HEARNE
Texas
Texas
Roberts
SCHEDULE
(BBLS)
McLean
Roberts
2006
HEYWORTH
IOWA CITY
IOWA CITY
Illinois
2000
2004
2034
2024
2032
118,391
118,391
68,831
69,379
lowa
lowa
Johnson
Johnson
2008
2010
2036
2035
32,205
28,362
88,010
14,662
1,513
IOWA CITY
IOWA CITY
lowa
lowa
Johnson
Johnson
Johnson
1999
2037
2027
43,099
37,403
14,747
IOWA CITY
IOWA CITY
IOWA CITY
lowa
2012
2012
2031
2037
64,245
47,260
lowa
lowa
38,318
36,760
Johnson
Johnson
2003
2003
IOWA CITY
IOWA CITY
2037
2031
64,245
49,907
37,406
37,408
lowa
IOWA CITY
IOWA CITY
lowa
Johnson
Johnson
Johnson
2003
2012
2029
2030
55,665
51,254
36,771
38,436
lowa
lowa
Johnson
Johnson
2012
2004
IOWA CITY
2032
2029
46,481
58,485
36,353
38,440
IRVINGTON
IOWA CITY
lowa
lowa
Douglas
Johnson
2004
2004
2035
2032
49,907
64,828
KANSAS CITY
KANSAS CITY
Nebraska
51,427
Kansas
Wyandotte
Wyandotte
2005
2007
236,223
5,594
756
705
KANSAS CITY
KANSAS CITY
Kansas
Kansas
Wyandotte
Wyandotte
2005
2033
2033
236,223
236,223
3,509
3,515
KANSAS CITY
Kansas
2003
2003
2024
2023
236,223
250,547
70,108
13,915
KANSAS CITY
Kansas
Kansas
Wyandotte
Wyandotte
2008
2003
2036
2022
KANSAS CITY
KANSAS CITY
236.223
68,481
67,155
Kansas
KANSAS CITY
KANSAS CITY
Kansas
Kansas
Wyandotte
Wyandotte
2011
2009
2037
2036
236,223
64,917
46,472
49,951
KANSAS CITY
Kansas
Wyandotte
Wyandotte
Wyandotte
Wyandotte
Wyandotte
1999
2012
2037
1995
2012
2037
2024
67,305
67,305
32,321
KANSAS CITY
KANSAS CITY
Kansas
Kansas
250,547
236,223
34,676
2008
2009
2023
34,838
32,029
KANSAS CITY
Kansas
KANSAS CITY
Nebraska
Kansas
Kansas
Wyandotte
Wyandotte
2036
2037
62,672
52,808
53,521
34,816
LINCOLN
MARSHALL
MARSHALL
MARSHALL
MARSHALL
MANKATO
LINCOLN
LINCOLN
Nebraska
Nebraska
Lancaster
Lancaster
2005
2011
2033
2036
236,223
39,293
461
145,815
2001
2004
1988
2026
27,708
237
Minnesota
Lancaster
2032
2018
36,017
36,271
27,653
Minnesota
Minnesota
1998
1998
2026
2024
83,797
16,861
2,098
Minnesota
Minnesota
Lyon
Lyon
2010
2003
2035
2024
83,797
42,681
16,860
16,866
MARSHALL
MARSHALL
Minnesota
Minnesota
Lyon
2001
2002
2030
42,681
83,797
16,857
19,224
MARSHALL
Minnesota
Minnesota
Lyon
Lyon
2001
2028
2028
MARSHALL
74,736
83,797
42,681
16,869
16,864
MARSHALL
MARSHALL
Minnesota
Minnesota
Lyon
Lyon
Lyon
2010
1999
2035
2027
74,736
27,888
27,968
MASON CITY
MASON CITY
MASON CITY
lowa
lowa
Cerro Gordo
1988
2004
2032
2012
2037
2018
58,809
345
38,928
237
lowa
lowa
Cerro Gordo
MASON CITY
Cerro Gordo
Cerro Gordo
1990
1990
2020
2020
78,757
78,757
38,300
MASON CITY
MASON CITY
lowa
lowa
79,259
38,942
Cerro Gordo
Cerro Gordo
1317
1990
1990
2020
2020
110,187
79,259
38,936
36,891
38,926
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 15 of 20

<<<PAGE 16>>>

Special Permit Docket: PHMSA-2016-0072
Magellan Breakout Storage Tanks
OPID 39504, 22610, 31579, or 31580
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
DATE LAST
NEXT
SECONDARY
FACILITY NAME(S):
STATE
COUNTY
TANK #
INTERNAL
INSPECTION
INTERNAL
CONTAIN-
DIKE
CAPACITY
TANK
INSPECTION
TRANSI-
VOLUME
MENT
TIONAL
(BBLS)
MASON CITY
MASON CITY
lowa
lowa
Cerro Gordo
SCHEDULE
(BBLS)
MILFORD
MENARD
Cerro Gordo
2027
2033
110,187
lowa
Illinois
38,931
38,756
Dickinson
Menard
2020
2020
335,300
69,323
MINNEAPOLIS
MINNEAPOLIS
Minnesota
Minnesota
1,678
Ramsey
Ramsey
Ramsey
2034
38,872
65,710
4,441
917
MINNEAPOLIS
MINNEAPOLIS
Minnesota
Minnesota
2027
2030
38,872
26,678
18,382
9,333
MINNEAPOLIS
MINNEAPOLIS
Minnesota
Minnesota
Ramsey
Ramsey
2037
2028
38,873
17,970
MINNEAPOLIS
Ramsey
Ramsey
2019
31,774
40,258
26,547
MINNEAPOLIS
MINNEAPOLIS
Minnesota
Minnesota
Ramsey
Ramsey
2037
2036
139,120
24,969
26,438
MINNEAPOLIS
Minnesota
Minnesota
Ramsey
Ramsey
2025
90,958
91,911
71,111
MINNEAPOLIS
MINNEAPOLIS
MINNEAPOLIS
Minnesota
2028
2038
102,993
72,771
Minnesota
Minnesota
51,755
72,759
Ramsey
Ramsey
2026
139,120
91,909
MINNEAPOLIS
MINNEAPOLIS
Minnesota
Minnesota
Ramsey
Ramsey
2028
76,552
76,539
2022
2035
139,120
MINNEAPOLIS
MINNEAPOLIS
95,007
76,248
Minnesota
Minnesota
Ramsey
Ramsey
Ramsey
2027
2019
227,990
95,007
76,649
MINNEAPOLIS
MINNEAPOLIS
76,649
Minnesota
Minnesota
Ramsey
Ramsey
2035
102,396
139,120
70,389
64,701
MINNEAPOLIS
MINNEAPOLIS
Minnesota
Minnesota
2028
2026
227,990
139,120
74,299
MINNEAPOLIS
MINNEAPOLIS
Minnesota
Minnesota
Ramsey
Ramsey
2033
2027
95,007
95,007
61,000
76,655
MT VERNON JCT
MT VERNON JCT
Lawrence
Ramsey
2029
76,522
71,050
Missouri
Missouri
Lawrence
2034
172,401
227,990
MT VERNON JCT
MT VERNON JCT
Missouri
Missouri
Lawrence
Lawrence
2033
2033
172,401
172,401
104,061
150,491
55,988
MT VERNON
NEBRASKA CITY
TERMINAL
Missouri
Lawrence
2034
2034
172,401
Nebraska
Nebraska
312
403
403
NEBRASKA CITY
NEBRASKA CITY
Otoe
Otoe
Otoe
2037
2033
21,684
4,868
26,874
5,911
NEBRASKA CITY
NEBRASKA CITY
Nebraska
Nebraska
Nebraska
2037
Otoe
Otoe
Otoe
Otoe
2029
2037
29,278
17,713
26,529
NEBRASKA CITY
NEBRASKA CITY
Nebraska
115,802
72,124
71,439
NEBRASKA CITY
Nebraska
Nebraska
2019
New Haven
Otoe
2033
2037
36,478
NEW HAVEN (85
33,924
47,808
48,388
NEW HAVEN (85
EAST STREET)
Connecticut
2029
115,802
110,143
185,257
NEW HAVEN (85
EAST STREET)
Connecticut
New Haven
47,862
11A*
2025
110,143
NEW HAVEN (85
EAST STREET)
Connecticut
90,508
New Haven
15A*
2024
128,000
NEW HAVEN (85
EAST STREET)
Connecticut
New Haven
86,755
17A*
2010
2027
128,000
NEW HAVEN (85
EAST STREET)
Connecticut
91,450
New Haven
18A*
2011
2033
128,000
EAST STREET)
Connecticut
90,810
New Haven
1A*
2012
2037
110,143
46,309
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P. Page 16 of 20

<<<PAGE 17>>>

Special Permit Docket: PHMSA-2016-0072
Magellan Breakout Storage Tanks
OPID 39504, 22610, 31579, or 31580
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
NEXT
SECONDARY
FACILITY NAME(S):
STATE
COUNTY
DATE LAST
INTERNAL
DIKE
TANK#
INTERNAL
INSPECTION
CONTAIN-
TANK
INSPECTION
TRANSI-
MENT
CAPACITY
TIONAL
VOLUME
(BBLS)
NEW HAVEN (85
Connecticut
New Haven
SCHEDULE
(BBLS)
NEW HAVEN (85
EAST STREET)
2A*
2031
110,143
65,307
NEW HAVEN (85
EAST STREET
Connecticut
New Haven
4A*
2028
110,143
EAST STREET
Connecticut
New Haven
66,665
2026
ODESSA
110,143
ODESSA
ODESSA
Texas
Texas
90,959
Ector
Ector
Ector
Ector
144,200
73,500
77,600
74,990
ODESSA
ODESSA
Texas
47,867
Texas
Ector
32,000
57,031
ODESSA
Texas
Ector
Ector
33,400
32,000
16,588
ODESSA
Texas
20,577
16,629
ODESSA
ODESSA
Texas
Texas
Ector
35,300
Ector
Ector
35,300
20,838
ODESSA
Texas
Texas
39,200
18,056
17,572
ODESSA
ODESSA
Texas
Texas
Ector
Ector
42,300
42,300
21,827
ODESSA
Oklahoma
Ector
22,800
33,400
20,671
22,563
OKLAHOMA CITY
Oklahoma
Texas
21,092
20,251
OKLAHOMA CITY
4,337
OKLAHOMA CITY
(HIGH.ST)
Oklahoma
Oklahoma
21,092
4,563
Oklahoma
Oklahoma
OKLAHOMA CITY
106,530
Oklahoma
50,440
Oklahoma
OKLAHOMA CITY
106,530
44,971
Oklahoma
Oklahoma
OKLAHOMA CITY
38,690
18,565
Oklahoma
Oklahoma
OKLAHOMA CITY
38,690
18,448
Oklahoma
Oklahoma
OKLAHOMA CITY
35,976
OKLAHOMA CITY
(HIGH ST)
Oklahoma
17,658
Oklahoma
35,976
17,574
Oklahoma
Oklahoma
OKLAHOMA CITY
17,297
OKLAHOMA CITY
(RENO AVE)
Oklahoma
550
Oklahoma
17,297
OKLAHOMA CITY
(RENO AVE)
Oklahoma
8,264
Oklahoma
167,549
Oklahoma
68,264
Oklahoma
OKLAHOMA CITY
167,549
OKLAHOMA CITY
(RENO AVE)
Oklahoma
72,959
Oklahoma
167,549
Oklahoma
82,468
Oklahoma
167,549
Kansas
Kansas
32,324
Johnson
Johnson
112,404
92,832
OLATHE
Kansas
26,344
OLATHE
Kansas
Johnson
112,404
48,763
OMAHA
OMAHA
Nebraska
Kansas
Johnson
Johnson
92,832
68,061
PALMYRA
Nebraska
Douglas
Douglas
125,155
25,584
Missouri
Marion
80,200
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P. Page 17 of 20

<<<PAGE 18>>>

Special Permit Docket: PHMSA-2016-0072
Magellan Breakout Storage Tanks
OPID 39504, 22610, 31579, or 31580
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
NEXT
SECONDARY
FACILITY NAME(S):
STATE
COUNTY
DATE LAST
INTERNAL
DIKE
TANK#
INTERNAL
INSPECTION
CONTAIN-
TANK
INSPECTION
TRANS!-
MENT
CAPACITY
TIONAL
VOLUME
(BBLS)
RAPID CITY
REAGAN
South Dakota
Pennington
10-53
SCHEDULE
(BBLS)
Texas
Falls
4233
2009
RIVERSIDE
2037
36,350
Missouri
2001
8,368
RIVERSIDE
Platte
1
2029
2036
29,454
RIVERSIDE
Missouri
Platte
2
2011
2011
232,073
Missouri
Platte
2036
88,817
34,909
RIVERSIDE
Missouri
Platte
3
2011
2036
283,323
232,073
88,415
RIVERSIDE
Missouri
Platte
2011
2036
89,785
RIVERSIDE
5
133,861
Missouri
2011
89,607
ROCHESTER
Platte
2036
283,323
Minnesota
2011
2036
283,323
89,360
ROSEMOUNT
Minnesota
Olmsted
2007
27,302
ROSEMOUNT
Dakota
1996
2035
Minnesota
224
Dakota
2022
ROSEMOUNT
2012
152,037
44,357
Minnesota
2037
69,301
ROSEMOUNT
Dakota
152,037
Minnesota
2008
2036
75,207
ROSEMOUNT
Dakota
2006
205,613
Minnesota
2034
72,361
ROSEMOUNT
Dakota
2009
205,613
32,676
ROSEMOUNT
Minnesota
Dakota
2008
2037
205,613
35,929
ROSEMOUNT
Minnesota
Dakota
2005
2036
205,613
Minnesota
2028
51,791
SHINN PENCE
SCOTT CITY
Kansas
Dakota
Scott
2010
2013
2038
205,613
205,613
52,725
645
Oklahoma
Payne
2035
SHINN PENCE
65,632
Oklahoma
Payne
2012
2036
128,970
67,777
6,907
SHINN PENCE
Oklahoma
Payne
2012
2037
SHINN PENCE
Oklahoma
2013
2038
111,693
68,309
SHINN PENCE
Payne
2012
101,839
Oklahoma
2036
67,560
SHINN PENCE
Payne
145,081
Oklahoma
2013
2038
67,618
SHINN PENCE
Payne
Payne
2013
2030
120,401
SHINN PENCE
Oklahoma
Oklahoma
2013
2038
81,475
67,212
68,031
SHINN PENCE
Payne
2013
106,525
Oklahoma
2038
68,211
SHINN PENCE
Payne
80,338
Oklahoma
2013
67,531
SHINN PENCE
Payne
2013
2038
Oklahoma
2029
138,291
67,260
SHINN PENCE
PayneR
2013
111,393
67,966
SHINN PENCE
Oklahoma
Oklahoma
Payne
2013
2038
2038
115,930
67,160
SHINN PENCE
Payne
2013
128,382
SHINN PENCE
Payne
2013
109,089
Oklahoma
Oklahoma
2037
2038
67,382
67,436
SHINN PENCE
Oklahoma
Payne
2011
2036
122,972
151,357
66,780
SHINN PENCE
Oklahoma
Payne
2012
66,812
Payne
2037
SHINN PENCE
93,319
68,010
SHINN PENCE
Oklahoma
Payne
2013
2029
92,221
Oklahoma
Payne
2012
2037
114,629
67,027
68,193
SHINN PENCE
Oklahoma
2012
SHINN PENCE
Payne
2028
Oklahoma
2011
2036
137,059
68,781
SIOUX CITY
133,555
lowa
68,481
Woodbury
Payne
2012
SIOUX CITY
lowa
2007
2037
129,770
67,774
SIOUX CITY
lowa
Woodbury
Woodbury
1989
2019
2035
211,203
1,749
SIOUX CITY
lowa
182,970
10,912
SIOUX CITY
Woodbury
2010
2035
lowa
2010
182,970
10,071
SIOUX CITY
lowa
Woodbury
2010
2035
211,203
10,206
Woodbury
2035
SIOUX CITY
211,203
lowa
2011
2036
10,157
SIOUX CITY
lowa
Woodbury
2010
10,170
SIOUX CITY
Woodbury
2035
182,970
211,203
lowa
2011
10,039
Woodbury
2036
SIOUX CITY
lowa
1990
211,203
10,140
SIOUX CITY
Woodbury
2020
83,450
lowa
2006
2034
211,203
19,412
SIOUX CITY
lowa
Woodbury
2011
2036
18,940
SIOUX CITY
Woodbury
2003
83,450
lowa
17,348
Woodbury
1989
2019
2022
211,203
211,203
18,640
18,637
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 18 of 20

<<<PAGE 19>>>

Special Permit Docket: PHMSA-2016-0072
Magellan Breakout Storage Tanks
OPID 39504, 22610, 31579, or 31580
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
NEXT
SECONDARY
FACILITY NAME(S):
STATE
COUNTY
TANK#
DATE LAST
INTERNAL INSPECTION
INTERNAL
CONTAIN-
DIKE
CAPACITY
TANK
INSPECTION
TRANSI-
VOLUME
MENT
TIONAL
(BBLS)
SIOUX CITY
SIOUX CITY
lowa
lowa
Woodbury
SCHEDULE
(BBLS)
Woodbury
2001
1988
2029
2018
SIOUX CITY
211,203
83,450
28,679
28,672
SIOUX CITY
SIOUX CITY
lowa
lowa
Woodbury
Woodbury
2001
1988
2018
2027
2028
211,203
182,970
38,446
28,667
SIOUX CITY
SIOUX CITY
lowa
lowa
Woodbury
Woodbury
1989
1999
2019
182,970
99,885
SIOUX CITY
SIOUX CITY
lowa
38,448
lowa
lowa
Woodbury
Woodbury
Woodbury
1990
2034
2020
182,970
99,885
37,404
37,396
1990
2006
SIOUX FALLS
SIOUX FALLS
South Dakota
South Dakota
2020
2029
68,318
99,885
39,263
Minnehaha
Minnehaha
2003
2001
10,900
37,400
SIOUX FALLS
SIOUX FALLS
South Dakota
SIOUX FALLS
SIOUX FALLS
South Dakota
South Dakota
Minnehaha
Minnehaha
2001
2029
2031
102,486
2031
102,486
68,318
10,901
Minnehaha
2001
2003
10,899
2035
2029
102,486
68,318
10,898
10,894
SIOUX FALLS
SIOUX FALLS
South Dakota
South Dakota
South Dakota
Minnehaha
Minnehaha
2010
Minnehaha
Minnehaha
2001
2007
2027
2035
102,486
10,898
10,902
SIOUX FALLS
SIOUX FALLS
South Dakota
SIOUX FALLS
SIOUX FALLS
South Dakota
South Dakota
Minnehaha
Minnehaha
2002
2010
2035
52,738
102,485
52,738
94,795
94,795
19,365
18,345
SIOUX FALLS
SIOUX FALLS
South Dakota
South Dakota
Minnehaha
2013
2038
2030
18,340
Minnehaha
2010
2000
2028
18,346
2027
2035
94,795
28,895
18,340
SIOUX FALLS
SIOUX FALLS
South Dakota
South Dakota
Minnehaha
Minnehaha
2003
2000
2020
68,318
52,738
26,384
28,597
SIOUX FALLS
South Dakota
SIOUX FALLS
SIOUX FALLS
South Dakota
Minnehaha
Minnehaha
2006
South Dakota
South Dakota
Minnehaha
Minnehaha
2006
2006
2031
2034
100,310
100.310
87,027
38,545
2005
2006
2033
2034
38,671
SIOUX FALLS
SIOUX FALLS
South Dakota
South Dakota
100,310
87,027
35,751
35,939
Minnehaha
SIOUX FALLS
SPRINGFIELDR
SPEED JCT
South Dakota
Minnehaha
Minnehaha
2007
2002
2033
2030
94,795
87,027
36,764
36,768
Missouri
Texas
Greene
Harris
2001
2013
2038
2035
77,938
30,288
40,256
ST PAUL PARK
2007
2029
8,505
TOPEKA
Minnesota
Kansas
Washington
2009
2004
2035
48,724
356
284
WEST TULSA
WATERLOO
TYE
Texas
Shawnee
2037
2032
705
57
Oklahoma
lowa
Taylor
Black Hawk
2005
2007
2033
2035
91,674
5,980
4,292
WEST TULSA
WEST TULSA
Oklahoma
Oklahoma
Tulsa
113,903
14,142
254
Tulsa
WEST TULSA
WEST TULSA
Oklahoma
Tulsa
2004
1994
2010
2035
2023
113,903
353.418
19,028
14,141
Oklahoma
Oklahoma
Tulsa
Tulsa
2013
1996
2021
12,186
WEST TULSA
2038
2022
353,418
353,418
66,841
66,613
WEST TULSA
WEST TULSA
Oklahoma
Oklahoma
Tulsa
Tulsa
2002
2012
2037
353,418
353,418
80,754
68,980
WEST TULSA
WEST TULSA
Oklahoma
Oklahoma
Tulsa
Tulsa
Tulsa
2004
1996
2024
2021
353,418
353,418
108,932
109,615
WEST TULSA
WEST TULSA
WEST TULSA
Oklahoma
Oklahoma
Tulsa
Tulsa
2004
2032
2032
353,418
108,335
WEST TULSA
Oklahoma
2008
1999
1998
2017
2036
353,418
49,591
116,372
Oklahoma
Tulsa
Tulsa
134,799
33,086
WICHITA
Kansas
Sedgwick
5
2006
2034
2021
353,418
167,855
137,278
1,592
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 19 of 20

<<<PAGE 20>>>

Special Permit Docket: PHMSA-2016-0072
Magellan Breakout Storage Tanks
OPID 39504, 22610, 31579, or 31580
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
SECONDARY
FACILITY NAME(S):
STATE
DATE LAST
INTERNAL
INSPECTION
INTERNAL
TANK
INSPECTION
TRANSI-
CAPACITY
TIONAL
VOLUME
(BBLS)
WRENSHALL
WILLMAR
Minnesota
Kandiyohi
SCHEDULE
(BBLS)
Minnesota
Carlton
LPMR
MSR
2007
2007
2035
WYNNEWOOD
7,528
Oklahoma
Garvin
2035
483
WYNNEWOOD
1514
645
242
Oklahoma
Garvin
1515
2013
2013
2030
2030
222,530
222,530
144,104
159,639
Total Breakout Tanks included in Special Permit:
493
Note: * notes Magellan breakout tanks that are intrastate facilities in Connecticut (17 breakout tanks)
and Texas (19 breakout tanks), all other Magellan breakout tanks in the special permit are interstate
facilities.
PHMSA received approval from the Railroad Commission of Texas pipeline office, Director -
Stephanie Weidman on January 26, 2018 to include the Magellan intrastate hazardous pipeline facility
breakout tanks noted in Appendix B above as part of the special permit. Magellan intrastate hazardous
liquid pipeline facility breakout tanks in the state of Connecticut are inspected by PHMSA and are a part
of this special permit as noted in Appendix B above.
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P. Page 20 of 20

<<<PAGE 1>>>

PIPELINE AND HAZARDOUS MATERIALS SAFETY
ADMINISTRATION
FINAL ENVIRONMENTAL ASSESSMENT
and
FINDING OF NO SIGNIFICANT IMPACT
Special Permit Information:
Docket No.:
PHMSA-2016-0072
Requested by:
Magellan Midstream Partners, L.P. and its subsidiaries
Operator ID#/Affiliate:
39504 - Magellan Crude Oil Pipeline Company, L.P.
22610 - Magellan Pipeline Company, L.P.
31579 - Magellan Pipelines Holdings, L.P.
31580 - Magellan Terminals Holdings, L.P.
Date Requested:
June 7, 2016
Original Issuance Date:
May 14, 2018
Effective Dates:
May 14, 2018 to May 14, 2038
Code Section(s):
49 CFR 195.432
I.
Background
The National Environmental Policy Act (NEPA), 42 United States Code (USC) §§ 4321 -
4375, Council on Environmental Quality regulations, 40 Code of Federal Regulations
(C.F.R. or CFR) §§ 1500-1508, and U.S. Department of Transportation (DOT) Order
5610.1C, requires the Pipeline and Hazardous Materials Safety Administration (PHMSA)
Office of Pipeline Safety (OPS)' analyze a proposed action to determine whether the action
will have a significant impact on the human environment. PHMSA analyzes special permit
requests for potential risks to public safety and the environment that could result from our
decision to grant, grant with additional conditions, or deny the request. As part of this
" References to PHMSA in this document means PHMSA OPS.
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 1 of 22

<<<PAGE 2>>>

analysis, PHMSA evaluates whether a special permit would impact the likelihood or
consequence of a pipeline system failure when compared to operation of the pipeline
system in full compliance with the Pipeline Safety Regulations.
The purpose of this final environmental assessment is to comply with the National
Environmental Policy Act for Magellan Midstream Partners, L.P. and its subsidiaries'
(collectively "Magellan")? application of a special permit to lengthen the inspection
interval of breakout tanks as required in 49 CFR 195.432. This final environmental
assessment is intended to specifically analyze any environmental impact associated with
the proposed waiver of certain Pipeline Safety Regulations found in 49 CFR 195.432. This
final environmental assessment is prepared by the U.S. Department of Transportation,
Pipeline and Hazardous Materials Safety Administration to analyze the special permit
request in accordance with 49 CFR 190.341.
PHMSA may grant the special permit request with additional conditions or deny the
request. PHMSA developed this environmental assessment to determine the effects of our
decision, if any, on the environment.
Pursuant to 49 USC § 60118(c) and 49 CFR 190.341, PHMSA may only grant special
permit requests that are not inconsistent with pipeline safety. PHMSA will impose
conditions in the special permit if we conclude they are necessary for safety or to prevent
the release of hazardous liquids. If PHMSA determines that a special permit would be
inconsistent with pipeline safety or is not justified, the application will be denied.
Applicable Acronyms
American Petroleum Institute (API)
Code of Federal Regulations (C.F.R. or CFR)
High Consequence Areas (HCA)
2 Magellan Midstream Partners, L.P. and its subsidiaries include the following wholly owned and
operated companies: Magellan Crude Oil Pipeline Company, L.P.., Magellan Pipeline Company, L.P.,
Magellan Pipelines Holdings, L.P., and Magellan Terminals Holdings, L.P.
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 2 of 22

<<<PAGE 3>>>

Pipeline Hazardous Materials Safety Administration (PHMSA)
Office of Pipeline Safety (OPS)
This "Final Environmental Assessment and Finding of No Significant Impact" includes the
following sections:
• Section I - Background
•
Section II - Site Description
• Section III - Purpose and Need
• Section IV - Alternatives
• Section V - Affected Resources and Environmental Consequences
• Section VI - Consultation and Coordination
• Section VII - Attachments
• Section VIII - Response to Public Comments Placed on Docket PHMSA-2016-0072
• Section IX - Finding of No Significant Impact
• Section XV - List of Appendices
II.
Site Description
The assets subject to the special permit are existing atmospheric aboveground breakout
storage tanks located inside secondary containment dikes within active, maintained
facilities. Aerial photos (Attachment 1: Aerial View of the Tank Locations) have been
provided to depict the environment near each facility where existing active atmospheric
aboveground breakout storage tanks are located
The activity associated with this special permit relates to maintenance. This special permit
does not apply to the expansion of the existing facilities beyond their current dimensions.
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 3 of 22

<<<PAGE 4>>>

A list of the atmospheric aboveground breakout storage tanks with the location, county,
and state of each tank included in the special permit request are described in Attachment
2: Magellan Breakout Storage Tanks Included in the Special Permit Request, Number of
Tanks, Facility Name, County and State.
The pipeline facilities included in the special permit are limited to existing atmospheric
breakout storage tanks that are currently operated and maintained aboveground within
secondary containment dikes at active, maintained Magellan storage facilities. The
existing Magellan atmospheric aboveground breakout storage tanks are used to facilitate
the storage and distribution of crude oil and refined products such as gasoline, diesel fuel,
and aviation fuel. A list of the atmospheric aboveground breakout storage tanks with each
tank's size, secondary containment capacity, location, county, and state of each tank
included in the special permit request are described in Attachment 2.
Attachment 1 includes maps of the existing atmospheric aboveground storage tank
facilities relative to the local surroundings. The atmospheric aboveground breakout storage
tanks included in the special permit are regulated under 49 CFR 195.432.
These facilities are industrial properties consisting of storage tanks, buildings, pump
stations, valves, facility pipe, roads, and other aboveground appurtenances.
The special permit will apply to existing atmospheric aboveground breakout tank storage
facilities located at 81 locations in 14 states (Colorado, Connecticut, Illinois, Iowa, Kansas,
Minnesota, Missouri, Nebraska, North Dakota, Oklahoma, South Dakota, Texas, Wisconsin, and
Wyoming). There are 67 facilities located in a high consequence area ("HCA") or a
location that could affect an HCA in accordance to 49 CFR 195.450 and therefore are
included in the Magellan Integrity Management Program. Attachment 2 describes the
3 The atmospheric aboveground breakout storage tanks are in the States of Colorado, Connecticut,
Wisconsin, and Wyoming.
Illinois, Iowa, Kansas, Minnesota, Missouri, Nebraska, North Dakota, Oklahoma, South Dakota, Texas,
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 4 of 22

<<<PAGE 5>>>

specific existing atmospheric aboveground breakout tank storage facilities that are in a
HCA or could affect a HCA
Ill.
Purpose and Need
The purpose of the special permit is to lengthen the interval between internal inspections of
Magellan's existing atmospheric aboveground breakout storage tanks.* The special permit
will not authorize the expansion or construction of new pipeline infrastructure, and any
new tanks constructed would be outside the scope of this special permit. On January 5,
2015, PHMSA issued the rulemaking, "Periodic Updates of Regulatory References to
Technical Standards and Miscellaneous Amendments" (2015 Standards Update Rule)
(January 5, 2015 80 FR 168). This rulemaking included the amendment to 49 CFR
195.432 to eliminate incorporation by reference Section 6.4.3 of the Third Edition of
American Petroleum Institute (API") Standard 653, "Tank Inspection, Repair, Alteration,
and Reconstruction", which allowed operators to set risk-based internal inspection
intervals. The updated version of 49 CFR § 195.432 adopts Section 6.4.2 of API Standard
653, 3" Edition.
The Magellan Tank Integrity Program establishes subsequent inspection intervals through
the evaluation of an established minimum safe floor thickness, previous inspection results,
corrosion rates, and defined likelihood and consequence factors.
Describe the purpose of the requested special permit. What will it allow the
operator to do that it could not do under the existing regulations?
The special permit provides a variance from the requirements of 49 CFR 195.432 for the
atmospheric aboveground breakout storage tanks (breakout tanks) and allows Magellan to
use of the following transitional, staged breakout tank internal inspection schedule:
• Breakout Tanks Last Inspected Before 1995: Inspect within 30 years of the
previous internal inspection date (25 tanks to be inspected as of May 2017).
* The proposed special permit would apply exclusively to Magellan. Given that the first compliance date
PHMSA to consider any similar special permit requests.
of the updated version of 49 CFR 195.432 has already passed, it would no longer be appropriate for
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 5 of 22

<<<PAGE 6>>>

Breakout Tanks Last Inspected Between 1995 and 2009: Inspect within 28
years of the previous internal inspection date (333 tanks to be inspected as of May
2017).
Breakout Tanks Last Inspected Between 2010 and 2013: Inspect within 25
years of the previous internal inspection date (135 tanks to be inspected as of May
2017).
Magellan must conduct subsequent internal inspections of the atmospheric above ground
breakout storage tanks described above as required by 49 CFR 195.432. The special
permit granted to Magellan does not give relief from the requirements of 49 CFR 195.432
for its breakout tanks inspected in 2014 to present, which will be within 20 years of the
previous internal inspection date as required by the January 5, 2015, amended
requirements of 49 CFR 195.432. Under the special permit, Magellan must continue use
of its existing documented Tank Integrity Program during the transitional staged internal
inspection period.
List the pipeline safety regulations) for which the operator seeks relief from.
Magellan requested relief from the requirements of 49 CFR 195.432(b) which requires
internal inspection of the physical integrity of breakout tanks according to API Standard
653.
Describe the need for the requested special permit. Why can't the applicant operate
the pipeline under existing regulations? How would a special permit benefit the
operator? Would a special permit benefit the public? If so, please explain how.
The need for the requested special permit is based on the 2015 Standards Update Rule
which removed Section 6.4.3 of API Standard 653 and replaced it with Section 6.4.2. of
API Standard 653. At the time the rulemaking was published, compliance with this
standard significantly accelerated the internal inspection intervals of over 550 of
Magellan's 800 breakout tanks. Additionally, the 2015 Standards Update Rule revised
49 CFR 195.432 and required Magellan to perform internal inspections of approximately
100 tanks by January 5, 2017.
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 6 of 22

<<<PAGE 7>>>

Due to the number of atmospheric aboveground breakout storage tanks impacted under the
existing regulations, Magellan expects it would experience significant logistical challenges
in securing additional project personnel, qualified contractors, and reputable inspection
services to oversee the accelerated tank internal inspections.
Compliance with 49 CFR 195.432 effectively requires a significant shift in resources from
Magellan's elective higher risk reduction programs due to reprioritization of limited
specialized resources towards accelerated breakout tank internal inspections.
PHMSA's approval of the special permit allows Magellan to perform internal breakout
tank inspections using a transitional staged internal inspection schedule which would
minimize reprioritization of resources away from elective high risk reduction programs.
Granting this special permit avoids possible service disruptions of oil and petroleum
products in the markets serviced by Magellan terminals.
IV.
Alternatives
• Alternative 1: "No Action" Alternative
In this alternative, the special permit would be denied, and Magellan would be required to
fully comply with the current version of 49 CFR 195.432.
Based on the number of tanks involved, Magellan expects significant logistical
challenges to secure additional project personnel, qualified contractors, and reputable
inspection services to oversee the accelerated tank internal inspections.
Compliance with 49 CFR 195.432 would effectively require a significant shift in
resources from Magellan's elective higher risk reduction programs due to reprioritization
of resources.
Alternative 2: Selected Alternative
PHMSA will issue a special permit to provide a variance from the requirements of
49 CFR 195.432 to Magellan to perform breakout tank internal inspections through the
use of the following transitional staged internal inspection schedule:
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 7 of 22

<<<PAGE 8>>>

Breakout Tanks Last Inspected Before 1995: Inspect within 30 years of the previous
internal inspection date (25 tanks remain to be inspected as of May, 2017).
•
Breakout Tanks Last Inspected Between 1995 and 2009: Inspect within 28 years of
the previous internal inspection date (333 tanks remain to be inspected as of May,
2017).
Breakout Tanks Last Inspected Between 2010 and 2013: Inspect within 25 years of
the previous internal inspection date (135 tanks remain to be inspected as of May,
2017).
Magellan must conduct subsequent internal inspections of the atmospheric aboveground
breakout storage tanks described above as required by 49 CFR 195.432. Magellan did
not seek relief from the requirements of 49 CFR 195.432 for its breakout tanks inspected
in 2014 to present, which must be within 20 years of the previous internal inspection date
as required by the January 5, 2015 amended requirements of 49 CFR 195.432.
Under the proposed special permit, Magellan must continue use of its existing
documented Tank Integrity Program during the transitional staged internal inspection
period.
Magellan's Tank Integrity Program incorporates the use of daily shift visual inspections 5
of the break out tanks and their secondary containment dikes, continuous monitoring of
tank levels through the Supervisory Control and Data Acquisition (SCADA) system, and
semi-annual static tank trending for 12 continuous hours.
5 Magellan procedure 9.01-ADM-034 is required once per manned shift (at least weekly for unmanned
locations). Per procedure, Magellan personnel inspect the tank farm (including tanks and containment)
for the integrity of dikes or secondary containment, evidence of releases, trash and debris, uncontrolled
erosion, unusual sounds from operating equipment, damage, vibration, misalignment, and security.
• Magellan procedure 9.01-ADM-022 is a static tank check performed semi-annually, not to exceed 7½
months to verify the integrity of the tank. Magellan isolates the tank from inbound or outbound
products movements. The target tank level is at least half full. Once isolated, the tank will sit idle for a
minimum of 12 continuous hours. During the static 12 hours the tank product level is reviewed for
product level discrepancies.
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 8 of 22

<<<PAGE 9>>>

• Below are the Special Permit Conditions:
Magellan requested that PHMSA issue a special permit that would provide a variance
from the requirements of 49 CFR 195.432 for the inspection intervals of the atmospheric
aboveground breakout storage tanks. The special permit is subject to Magellan
implementing of the following conditions:
Internal Inspection Schedule: For the atmospheric aboveground breakout storage tanks
(special permit tanks), Magellan must conduct a transitional staged internal inspection
schedule as follows:
a. Special Permit Tanks Last Inspected Before 1995: Inspect within 30 years of the
previous internal inspection date (25 tanks remain to be inspected as of May 2017).
b. Special Permit Tanks Last Inspected Between 1995 and 2009: Inspect within 28
years of the previous internal inspection date (333 tanks remain to be inspected as of
May 2017).
c. Special Permit Tanks Last Inspected Between 2010 and 2013: Inspect within 25
years of the previous internal inspection date (135 tanks remain to be inspected as of
May 2017).
2. Special Permit Tank Inspections and Monitoring: Magellan must develop procedures,
conduct, document, and maintain:
Internal inspections of the described existing special permit tanks that are consistent
with the special permit and as required by 49 CFR 195.432; 7,8
> If PHMSA adopts a revised edition of API Standard 653 other than the 3rd edition into 49 CFR Part 195,
Magellan must notify PHMSA regarding the option to continue compliance under this special permit
with the existing API Standard 653 3rd edition or comply under the updated edition of 49 CFR Section
195.3. If the revised adopted edition of API Standard 653 continued to exclude alternate inspection
intervals.
intervals, the conditions of the special permit will remain in effect for the determination of inspection
8 Industry standards "incorporated by reference" are listed in 49 CFR 195.3. If PHMSA adopts a revised
edition of a referenced standard such as API, NACE International (NACE) or ASME standards into 49
CFR Part 195, the referenced requirements of those revised standards are automatically incorporated
into these special permit conditions unless noted otherwise except as noted in Footnote 3 above.
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 9 of 22

<<<PAGE 10>>>

b.
Visual inspections of the special permit tanks and their secondary containment dikes
are required once per manned shift and at least weekly for unmanned locations.
Magellan personnel must inspect the tank farm (including tanks and containment) for
the integrity of the containment dikes or secondary containment, evidence of product
releases, trash and debris, uncontrolled erosion, unusual sounds from operating
equipment, damage, vibration, misalignment, and security;
c. Continuous monitoring of the special permit tank levels through the supervisory
control and data acquisition (SCADA) system; and
Semi-annual, not to exceed 7 ½ months, static tank trending for 12 continuous hours
to verify the integrity of the special permit tanks. Magellan must isolate the special
permit tanks from inbound or outbound products movements. The special permit
tank level must be at least half full. Once isolated, the breakout storage tank must sit
idle for a minimum of 12 continuous hours. During the static 12 hours, the special
permit tank product level must be reviewed for product level discrepancies.
3. Re-evaluation Inspection Intervals: Magellan must develop procedures and conduct
transitional staged internal inspections of the special permit tanks and must readjust
inspection schedules of future special permit tank inspections as follows:
a. Inspection schedules of future special permit tank inspections must be based upon
past inspection findings at a special permit tank site location or similar vintage
construction types at other tank locations in this proposed special permit;
b. Re-evaluation intervals must be shortened when special permit tank inspection
findings demonstrate inspection intervals were not sufficiently conservative to
maintain established minimum safe floor and wall thicknesses, and material corrosion
rates;
Transitional staged internal special permit tank inspection intervals must be modified
if a breakout storage tank of similar service indicates a more conservative internal
inspection interval should apply; and
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 10 of 22

<<<PAGE 11>>>

d. Special permit tanks of similar service must be identified by having been constructed
during, or within six (6) months of, the same year, under the same conditions, with
similar foundations and store similar products.
4. Annual Report to PHMSA: Annually,' after issuance of this special permit, Magellan
must submit an annual special permit tank integrity report'° to the PHMSA Central,
Eastern, Southwest and Western Region Directors with copies to the Deputy Associate
Administrator, PHMSA Field Operations; Deputy Associate Administrator, PHMSA
Policy and Programs; Director, PHMSA Engineering and Research Division; and
Director, PHIMSA Standards and Rulemaking Division.! The annual integrity report
must summarize for the special permit tanks the following and any other significant
integrity threats as follows:
a. Any leakage of special permit tanks including location, leakage amount, repairs
taken, and impact of any other tanks inspection schedule or integrity;
b. Any inspection findings that caused a readjustment of inspection schedules and the
special permit tanks involved in the reschedule of inspection interval;
c. Any secondary containment integrity issues found or remediated that would have
impacted containment in the case of a leak or failure of the special permit tank;
d. Any leaks or failures found through the continuous monitoring of tank levels through
the SCADA system (Condition 2.c) or the semi-annual static tank trending for 12
continuous hours (Condition 2.d); and
e. Identification of special permit tanks inspected during the past year and planned
inspections for the next two (2) years.
• Annual reports must be received by PHMSA by the last day of the month in which the special permit is
dated. For example, the annual report for a special permit dated January 2018, must be received by
PHMSA no later than January 31, each year beginning in 2019.
10 Magellan must submit a copy of each Magellan annual pipeline integrity report on the PHMSA docket,
PHMSA-2016-0072, at regulations.gov.
" Magellan must also send a copy to the PHMSA Director of State Programs and the appropriate state
authorities of the states that have interstate agent agreements with PHMSA in states where the breakout
storage tanks are located.
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 11 of 22

<<<PAGE 12>>>

5. Tank Integrity Program: Under the proposed special permit, Magellan must continue
use of its existing documented Tank Integrity Program (Magellan procedure 7.10-ADM-
001 Tank Integrity Program, revision date 01/01/18)12 during the transitional staged
internal special permit tank inspection period (Condition 1).
6. Certification: A Magellan senior executive officer, vice president or higher must certify
in writing the following:
a. Magellan has developed a written manual of operating and maintenance (O&M)
procedures required by 49 CFR 195.402 and 195.432, and all requirements of this
special permit for the special permit tanks; and
b. Magellan has implemented all special permit conditions, 49 CFR 195.402 and
195.432, as required by this special permit for the special permit tanks.
Magellan must send the certifications required in Condition 6.a and 6.b with
completion date, compliance documentation summary, and the required senior
executive signature and date of signature to the PHMSA Associate Administrator for
Pipeline Safety with copies to the Deputy Associate Administrator, PHMSA Field
Operations; Deputy Associate Administrator, PHMSA Policy and Programs; PHMSA
Central, Eastern, Southwest, and Western Region Directors; Director, PHMSA
Standards and Rulemaking Division; Director, PHMSA Engineering and Research
Division'; and to the Federal Register Docket (PHMSA-2016-0072) at
www.Regulations.gov within one (1) year of the effective date of this special permit.
12 Any updates to Magellan procedure 7.10-ADM-001 Tank Integrity Program, revision dated 01/01/18,
by Magellan to PHMSA's Deputy Associate Administrator, PHMSA Field Operations, for review.
that affect the inspections, remediation and monitoring of the special permit tanks must be submitted
implementation on the special permit tanks.
Magellan must receive a "no objection" letter from PHMSA prior to any updated procedure
13 Magellan must also send a copy to the PHMSA Director of State Programs and the appropriate state
authorities of the states that have interstate agent agreements with PHMSA in states where the breakout
storage tanks are located.
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 12 of 22

<<<PAGE 13>>>

• Alternative 3: Modified Preferred Alternative
Alternatives Considered but Eliminated:
Based on the extensive history of safely managing over 800 breakout tanks through the
use of Magellan's existing documented and rigorous Tank Integrity Program, an
alternative considered but eliminated was a permanent special permit that would have
proposed that Magellan's program that was allowed by 49 CFR 195.432 prior to the
January 5, 2015 rulemaking regarding "Periodic Update of Regulatory References to
Technical Standards and Miscellaneous Amendments". This alternative was eliminated
in favor of the transitional staged breakout tank internal inspection schedule (Alternative
2 above) to ultimately achieve full and sustained compliance with the amended 49 CFR
195.432.
V.
Affected Resources and Environmental Consequences
The environmental resources and issues listed here evaluate the potential for significant
effect in comparison to the "no action" alternative. These resources are required to be
analyzed by federal laws, regulations, executive orders, and departmental policy.
Aesthetics:
The special permit request will not change the visual character/aesthetics since the
atmospheric aboveground breakout storage tanks included in the special permit
request are pre-existing and are located inside Magellan's current storage tank
facilities.
Agricultural Resources
The special permit is unlikely to impact agricultural resources. The atmospheric
aboveground breakout storage tanks included in the special permit request are
pre-existing and are located inside Magellan's current storage tank facilities.
Approval of the special permit request will allow for the uninterrupted supply of
refined fuels needed for farming and agricultural needs. Should the special permit
not be approved, supply interruption of refined fuels needed for farming and
agriculture will occur when atmospheric aboveground storage tanks are removed
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 13 of 22

<<<PAGE 14>>>

from service based on the accelerated inspections interval mandated by the
amended regulations included in 49 CFR 195.432.
The purpose of the shorter inspection intervals required in 49 CFR 195.432(b) is
to better ensure the integrity of breakout tanks based upon API 653 criteria.
Failure of breakout tanks can be caused by defects caused by corrosion or
cracking, which more frequent inspections are intended to prevent. Therefore, it
is possible that maintaining the superseded longer interval period would slightly
increase the risk of failure than if the applicant was in full compliance with the
current requirements of 49 CFR 195.432(b). However, the conditions attached to
the proposed special permit, such as added visual inspections of the break out
tanks and their secondary containment dikes, continuous monitoring of tank levels
through the SCADA system, semi-annual static tank trending for 12 continuous
hours, annual reporting, and increased oversight by PHMSA, exceed current
requirements in 49 CFR Part 195, and are intended to further reduce the
likelihood of a release. Also, the vast majority of the tanks included in the
proposed special permit have containment dikes, which are not required by 49
CFR Part 195 and would prevent the release of hazardous liquids to the
environment, including surrounding farmland. A breakout tank leak or failure
could seriously damage or impact agricultural land if the hazardous liquids
reached it.
Air Quality
The special permit request will have no impact on air quality since the
atmospheric aboveground breakout storage tanks are pre-existing and are located
inside Magellan's current storage tank facilities. Air emissions related to
operation of the existing atmospheric aboveground breakout storage tanks are
authorized as required by the appropriate state air quality rules. The special
permit request impacts the timing of out-of-service inspections to be completed
but does not significantly increase or decrease the amount of activity conducted
during the out-of-service inspections. As a result, any impact the special permit
Consideration of Breakout Tank Inspection Intervals for Magellan
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Page 14 of 22

<<<PAGE 15>>>

request might have on air quality would be an improvement based on the impact
associated with the frequency that opening, degassing, and cleaning tanks can
have on short term increased emissions. There is no new construction or
expansion of existing facilities associated with this special permit request.
4.
Biological Resources
The purpose of the shorter inspection intervals required in 49 CFR 195.432(b) is
to better ensure the integrity of breakout tanks based upon API 653 criteria.
Failure of breakout tanks can be caused by defects caused by corrosion or
cracking, which more frequent inspections are intended to prevent. Therefore, it
is possible that maintaining the superseded longer interval period would slightly
increase the risk of failure than if the applicant was in full compliance with the
current requirements of 49 CFR 195.432(b). However, the conditions attached to
the proposed special permit, such as added visual inspections of the break out
tanks and their secondary containment dikes, continuous monitoring of tank levels
through the SCADA system, semi-annual static tank trending for 12 continuous
hours, annual reporting and increased oversight by PHMSA, exceed current
requirements in 49 CFR Part 195, and are intended to further reduce the
likelihood of a release. Also, the majority of the tanks included in the proposed
special permit have containment dikes that would prevent the release of hazardous
liquids to the environment, including surrounding biological resources. A
breakout tank leak or failure could seriously damage or destroy biological
resources if the hazardous liquids reached them.
PHMSA expects that the special permit is unlikely to impact biological resources.
The atmospheric aboveground breakout storage tanks are pre-existing and are
located inside Magellan's current storage tank facilities. These facilities would be
considered industrial land inside maintained facilities consisting of existing roads,
storage tanks, buildings, pump stations, valves, facility piping, and other
aboveground appurtenances. Magellan facilities include maintained grass
vegetation, cement foundations, cement and asphalt roads, and gravel pads.
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 15 of 22

<<<PAGE 16>>>

Climate Change
The special permit request will have no impact on global climate change since the
atmospheric aboveground breakout storage tanks are pre-existing.
Cultural Resources
The special permit request will have no impact on cultural, archaeological, or
paleontological resources since the atmospheric aboveground breakout storage
tanks are pre-existing and are located inside Magellan's current storage tank
facilities. Under the special permit request, the frequency of potential ground
disturbing activities conducted during internal tank inspections will be less
frequent until Magellan achieves compliance with the revision to 49 CFR 195.432
using a transitional staged internal inspection schedule.
7.
Environmental Justice
The special permit request will have no disparate impact on low-income, minority
or non-English language populations since the atmospheric aboveground breakout
storage tanks are pre-existing and are located inside Magellan's current storage
tank facilities.
Geology, Soils, and Mineral Resources
While the issuance of this special permit could result in a small increase in the
likelihood of release of hazardous liquid, PHMSA believes that the risk is remote.
A release of hazardous liquids could impact soils near a tank farm. The special
permit request does not include the construction of new facilities that impacts a
disturbance of the soils. Existing Magellan facilities include maintained grass
vegetation, cement foundations, asphalt and cement roads, and gravel pads that
mitigate the potential for erosion to occur. The atmospheric aboveground
breakout storage tanks included in the special permit request are within secondary
containment areas consisting of compacted native soils, compacted native soils
with clay amendments, or an engineered material such as pavement or concrete.
The extensive history of operating the existing Magellan atmospheric
aboveground breakout storage tanks facilities does not include incidence or
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 16 of 22

<<<PAGE 17>>>

susceptibility to landslides. Atmospheric aboveground breakout storage tanks
built to API 650 include the consideration of seismic activity in the design and
construction of the storage tanks.
Indian Trust Assets
The special permit request will have no impact on Indian Trust Assets since the
atmospheric aboveground breakout storage tanks are pre-existing and are located
inside Magellan's current storage tank facilities, therefore no Tribal coordination
has occurred.
10.
Land Use
The special permit request will have no impact on the land use since the
atmospheric aboveground breakout storage tanks are pre-existing and are located
inside Magellan's current storage tank facilities. The land use category would be
described as industrial property consisting of storage tanks, buildings, pump
stations, valves, facility pipe, roads, and other aboveground appurtenances.
However, lands directly outside Magellan's facilities are used for commercial,
industrial, residential, and recreational purposes. These lands have the remote
possibility of facing impacts in the event of a tank failure. If granted, the special
permit request will not require permits from local government.
11.
Noise
The special permit request will have no impact on the noise levels since the
atmospheric aboveground breakout storage tanks are pre-existing and are located
inside Magellan's current storage tank facilities. The special permit request does
not impact the day-to-day operations of the assets, only the timing associated with
out-of-service inspections. The special permit will not impact the noise level
during out-of-service inspections.
12.
Recreation
The special permit request is unlikely to impact recreational resources because the
atmospheric aboveground breakout storage tanks are pre-existing and are located
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 17 of 22

<<<PAGE 18>>>

inside Magellan's current storage tank facilities. All Magellan storage tank
facilities are in secure fenced locations that are routinely maintained to prevent
unauthorized access. There are no recreational activities that occur within
Magellan facilities. There is a remote chance that a failure of a breakout tank
within a Magellan facility could negatively impact recreational resources.
13.
Safety
The purpose of the shorter inspection intervals required in 49 CFR 195.432(b) is
to better ensure the integrity of breakout tanks. Failure of breakout tanks can be
caused by defects caused by corrosion or cracking, which more frequent
inspections are intended to prevent. Therefore, it is possible that maintaining the
superseded longer interval period would slightly increase the risk of failure than if
the applicant was in full compliance with the current requirements of 49 CFR
195.432(b). A breakout tank leak and especially a failure could negatively impact
safety if hazardous liquids escaped containment dykes. Exposure to hazardous
liquids can cause health risks, and the hazardous liquid can ignite, causing
dangerous fires or explosion.
PHMSA expects that approval of the special permit will not significantly change
the risk of failure or impact safety due to the additional proposed special permit
conditions that exceed current requirements in Part 195, such as additional
external inspections. Magellan's proven and existing Tank Integrity Program has
contributed to a history of safely managing over 800 atmospheric aboveground
breakout storage tanks. During the staged transitional internal inspection
schedule Magellan will continue to utilize its Tank Integrity Program that
incorporated the required and consistent criteria used to establish tank internal
inspection intervals utilizing the provisions previously allowed per 49 CFR
195.432. This criterion was developed in consideration of API Standards 580,
581, and 653. The Magellan Tank Integrity Program performs initial inspections
at ten (10) year intervals to establish a corrosion rate using API 653 criteria. The
Magellan Tank Integrity Program then establishes subsequent inspection intervals
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 18 of 22

<<<PAGE 19>>>

through the evaluation of an established minimum safe floor thickness, previous
inspection results, the corrosion rates, and defined likelihood and consequence
factors.
The consequence of a release and the risk of failure would not be impacted by
granting the special permit request. The atmospheric aboveground breakout
storage tanks are pre-existing and are located within secondary containment dikes
inside Magellan's current storage tank facilities.
Would operation under the special permit have an effect on pipeline
aboveground breakout tank longevity or reliability? Would there be any life
cycle or maintenance issues?
Due to longer internal inspection intervals, it is possible that corrosion or other
integrity issues could go undetected for a longer period of time under the special
permit, which could affect tank longevity or reliability. However, PHMSA
believes that this is a relatively small risk that is overcome by other monitoring
requirements in the special permit. Operation under a special permit will not have
a significant effect on the longevity or reliability of the atmospheric aboveground
breakout storage tanks. During the staged transitional internal inspection
schedule Magellan will continue to utilize its existing Tank Integrity Program for
the tanks listed in Attachments 1 through 4 that incorporates the criteria used to
establish tank internal inspection intervals utilizing the provisions previously
allowed per 49 CFR 195.432. The criteria were developed in consideration of
API Standards 580, 581, and 653.
14.
Socioeconomics
The special permit request is unlikely to impact low income populations since the
atmospheric aboveground breakout storage tanks are pre-existing and are located
inside Magellan's current storage tank facilities.
15.
Topography
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 19 of 22

<<<PAGE 20>>>

The special permit request will have no impact on the topography of the affected
area since the atmospheric aboveground breakout storage tanks are pre-existing
and are located inside Magellan's current storage tank facilities. The special
permit request is not associated with construction and does not include any
additional ground disturbing activities.
16.
Transportation
The special permit request is unlikely to impact access, traffic, or roads since the
atmospheric aboveground breakout storage tanks are pre-existing and are located
inside Magellan's current storage tank facilities.
17.
Water Resources
The purpose of the shorter inspection intervals required in 49 CFR 195.432(b) is
to better ensure the integrity of breakout tanks. Failure of breakout tanks can be
caused by unrepaired defects caused by corrosion or cracking, which more
frequent inspections are intended to prevent. Therefore, it is possible that
maintaining the superseded longer interval period would slightly increase the risk
of failure than if the applicant was in full compliance with the current
requirements of 49 CFR 195.432(b). A breakout tank leak and especially a failure
could negatively impact water resources because hazardous liquid could enter
surface waters. Oil spills to surface waters can compromise water quality for
human consumption as drinking water, agricultural use, and habitat use.
However, the likelihood of such a failure is remote, and PHMSA expects that the
special permit request is unlikely to impact surface waters, wetlands, or drinking
water aquifers since the atmospheric aboveground breakout storage tanks are pre-
existing, are located inside Magellan's current storage tank facilities, and the
majority of tanks have containment dikes capable of holding the entire contents of
a tank.
The atmospheric aboveground breakout storage tanks are located within
existing and maintained secondary containment areas designed to prevent the
overland flow migration of product outside of the facility in the event of a spill.
There are no surface waters or wetlands within the engineered secondary
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 20 of 22

<<<PAGE 21>>>

containment areas. The special permit request does not include any construction
or impact associated with clearing vegetation, soil compaction, trench excavation,
and dewatering that could affect the infiltration of water into the ground and have
an effect on ground water or nearby drinking water aquifers.
VI.
Consultation and Coordination
Jason Smith
Director Asset Integrity
Magellan Midstream Partners, L.P.
Doug Mitchell
Manager Environmental
Magellan Midstream Partners, L.P.
Amelia Samaras, PHMSA
Steve Nanney, PHMSA
VII.
Attachments
Attachment 1: Aerial View of the Tank Locations
Attachment 2: Magellan Breakout Storage Tanks Included in the Special Permit
Request, Number of Tanks, Facility Name, County and State
Attachment 3: Secondary Tank Containment Volume
Attachment 4: Aerial View of Tank Locations with GIS Identified Dwellings and 1000-
foot Buffer Circle
Attachments 1 through 4 can be reviewed in Docket No. PHMSA-2016-0072 at:
www.regulations.gov.
VIII.
Response to Public Comments Placed on Docket PHMSA-2016-0072
PHMSA published the special permit request in the Federal Register (82 FR 38758) on
August 15, 2017, and the public comment period ended on October 16, 2017, with all
comments received through November 15, 2017, being reviewed and considered. The
special permit application from Magellan, maps, public comments, environmental
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 21 of 22

<<<PAGE 22>>>

assessment, and special permit conditions are available in Docket No. PHMSA-2016-0072
at: www.regulations.gov.
PHMSA received no stakeholder comments on the Magellan special permit application.
IX.
Finding of No Significant Impact
In consideration of the safety conditions explained above, PHMSA finds that no
significant negative impact will result from the issuance of the above-described special
permit with conditions to extend the inspection intervals of storage tanks on the Magellan
pipeline system. PHMSA believes that the issuance of the special permit, which includes
safety conditions that exceed current pipeline safety requirements in 49 CFR Part 195,
will have a positive impact on the human environment because implementation of the
permit would reduce the overall risk of failure that could result in serious harm to human
health. PHMSA finds that the issuance of the above described proposed special permit
would not result in a significant impact to safety and the human environment.
Completed in Washington DC on: May 14, 2018
Prepared by: Pipeline and Hazardous Materials Safety Administration Office of Pipeline Safety
Final Environmental Assessment: PHMSA-2016-0072 -Magellan Midstream Partners, L.P.
Consideration of Breakout Tank Inspection Intervals for Magellan
Page 22 of 22

<<<PAGE 1>>>

of Transportation
U.S. Department
1200 New Jersey Avenue, SE
Materials Safety
Pipeline and Hazardous
Washington, D.C. 20590
Administration
MAY 1 4 2018
Mr. Michael Pearson
Vice President Asset Integrity
Magellan Midstream Partners, L.P.
One Williams Center, OTC-9
Tulsa, OK 74172
Dear Mr. Pearson:
Docket No. PHMSA-2016-0072
On June 7, 2016, Magellan Midstream Partners, L.P. (Magellan) wrote to the Pipeline and
Hazardous Materials Safety Administration (PHMSA) requesting a special permit to waive
compliance with the pipeline safety regulations in 49 Code of Federal Regulations (CFR)
195.432 that require internal inspection intervals for in-service breakout tanks. Magellan's
special permit request asks PHMSA to allow extended inspection intervals of 49 CFR 195.432
for Magellan's existing atmospheric aboveground breakout storage tanks (breakout storage tanks
or tanks).
PHMSA is granting this special permit (enclosed) to Magellan to allow extended inspection
intervals for Magellan's existing breakout storage tanks as listed in Appendices A and B of the
special permit. This special permit provides relief from the Federal pipeline safety regulations
for Magellan's existing breakout storage tanks, and requires Magellan to comply with certain
intervals have been extended.
conditions and limitations designed to maintain pipeline safety where the tanks inspection
The Magellan existing atmospheric aboveground breakout storage tanks and associated facilities
include 493 breakout storage tanks at 81 locations in 14 states. The breakout storage tank
facilities are in industrial properties and consist of storage tanks, buildings, pump stations,
valves, facility pipe, roads, and other aboveground appurtenances. PHMSA grants this special
permit based on the permit conditions and the findings set forth in the "Analysis and Findings"
and "Final Environmental Assessment and Finding of No Significant Impact" documents, which
can be read in their entirety in Docket No. PHMSA-2016-0072 at www.Regulations.gov.

<<<PAGE 2>>>

My staff would be pleased to discuss this matter or any other regulatory matter with you. John
Gale, Director, Standards and Rulemaking Division, may be contacted at 202-366-0434 on
regulatory matters. Kenneth Lee, Director, Engineering and Research Division, may be
contacted at 202-366-2694 on technical matters specific to this special permit application.
Associate Administrator for Pipeline Safety
Enclosure: Special Permit - PHMSA-2016-0072
Page 2 of 2
Special Permit: PHMSA-2016-0072 - Magellan Midstream Partners, LaP.

<<<PAGE 1>>>

U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
SPECIAL PERMIT
Special Permit Information:
Docket Number:
PHMSA-2016-0072
Requested By:
Magellan Midstream Partners, L. P. and its subsidiaries
Operator ID#/Affiliate:
39504 - Magellan Crude Oil Pipeline Company, L.P.
22610 - Magellan Pipeline Company, L.P.
31579 - Magellan Pipelines Holdings, L.P.
31580 - Magellan Terminals Holdings, L.P.
Date Requested:
June 7, 2016
Original Issuance Date:
May 14, 2018
Effective Dates:
May 14, 2018 to May 14, 2038
Code Section(s):
49 CFR 195.432
Grant of Special Permit:
By this order, subject to the terms and conditions set forth below, the Pipeline and Hazardous
Materials Safety Administration (PHMSA) Office of Pipeline Safety (OPS)' grants a special
permit (PHMSA-2016-0072) to Magellan Midstream Partners, L.P. and its subsidiaries
(collectively "Magellan" for extending the internal inspection schedule requirements in 49
Code of Federal Regulations (CFR) 195.432 for Magellan's existing atmospheric above ground
breakout storage tanks (breakout storage tanks or tanks). This special permit requires Magellan
to implement inspection intervals based on the evaluation of an established minimum safe floor
thickness, previous inspection results, corrosion rates, and defined likelihood and consequence
factors for existing atmospheric above ground breakout storage tanks, as described in this special
permit.
' Throughout this special permit the usage of "PHMSA" or "PHMSA OPS" means the U.S. Department of
Transportation's Pipeline and Hazardous Materials Safety Administration Office of Pipeline Safety.
Magellan Midstream Partners, L.P. and its subsidiaries include the following wholly owned and operate
ompanies: Magellan Crude Oil Pipeline Company, L.P. (MCOP), Magellan Pipeline Company, L.P. (MPL)
Magellan Pipelines Holdings, L.P. (MPH), and Magellan Terminals Holdings, L.P. (MTH).
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 1 of 22

<<<PAGE 2>>>

The Magellan above ground breakout storage tanks and associated facilities are at 81 locations in
14 states. These facilities are industrial properties consisting of storage tanks, buildings, pump
stations; valves, facility pipe, roads, and other above ground appurtenances.
Based on the determination in the Special Permit Analysis and Findings (available in the docket)
that this special permit, with conditions, will maintain pipeline safety, PHMSA OPS hereby
grants special permit PHMSA-2016-0072 as follows:
I. Special Permit Tanks:
493 tanks located in the States of Colorado, Connecticut, Illinois, Iowa, Kansas, Minnesota,
Missouri, Nebraska, North Dakota, Oklahoma, South Dakota, Texas, Wisconsin, and
Wyoming
On the condition that Magellan complies with the terms and conditions set forth below, this
special permit waives compliance from 49 CFR 195.432 for the inspection intervals of 493
existing atmospheric above ground breakout storage tank as described below and in Appendix A
- Magellan Breakout Storage Tanks: Location - State, Facility Name, County, and Number of
Tanks and Appendix B - Secondary Dike Containment of this special permit.
• Special permit tanks - are defined as any of the 493-existing atmospheric above ground
breakout storage tank described in Appendix A of this special permit.
PHMSA hereby grants this special permit for the Magellan special permit tanks based on the
findings set forth in the "Special Permit Analysis and Findings" and the "Final Environmental
Assessment and Findings of No Significant Impact documents, which both can be read in their
entirety in Docket No. PHMSA-2016-0072 in the Federal Docket Management System (FDMS)
located on the internet at www.Regulations.gov.
II. Conditions:
PHMSA OPS grants this special permit for the special permit tanks subject to implementation of
the following conditions:
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 2 of 22

<<<PAGE 3>>>

1. Internal Inspection Schedule: For the atmospheric above ground breakout storage tanks
(special permit tanks), Magellan must conduct a transitional staged internal inspection
schedule as follows:
a. Special Permit Tanks Last Inspected Before 1995: Inspect within 30 years of the
previous internal inspection date (25 tanks remain to be inspected as of May 2017).
b. Special Permit Tanks Last Inspected Between 1995 and 2009: Inspect within 28
years of the previous internal inspection date (333 tanks remain to be inspected as of
May 2017).
c. Special Permit Tanks Last Inspected Between 2010 and 2013: Inspect within 25
years of the previous internal inspection date (135 tanks remain to be inspected as of
May 2017).
2. Special Permit Tank Inspections and Monitoring: Magellan must develop procedures,
conduct, document, and maintain:
Internal inspections of the described existing special permit tanks that are consistent
with the special permit and as required by 49 CFR 195.432,3,4
b. Visual inspections of the special permit tanks and their secondary containment dikes
are required once per manned shift and at least weekly for unmanned locations.
Magellan personnel must inspect the tank farm (including tanks and containment) for
the integrity of the containment dikes or secondary containment, evidence of product
releases, trash and debris, uncontrolled erosion, unusual sounds from operating
equipment, damage, vibration, misalignment, and security;
3 If PHMSA adopts a revised edition of API Standard 653 other than the 3rd edition into 49 CFR Part 195, Magellan
nust notify PHMSA within 60 days of the effective date of the adopted revised standard regarding the option to
updated edition under 49 CFR Section 195.3. However, if the revised adopted edition of API Standard 653
ontinue compliance under this special permit with the existing API Standard 653 3rd edition or comply with th
determination of inspection intervals.
continues to exclude alternate inspection intervals, the conditions of the special permit will remain in effect for the
4 Industry standards "incorporated by reference" are listed in 49 CFR 195.3. If PHMSA adopts a revised edition of
referenced requirements of those revised standards are automatically incorporated into these special permit
a referenced standard such as API, NACE International (NACE) or ASME standards into 49 CFR Part 195, the
conditions unless noted otherwise, except as noted in Footnote 3 above.
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 3 of 22

<<<PAGE 4>>>

c. Continuous monitoring of the special permit tank levels through the supervisory
control and data acquisition (SCADA) system; and
d. Semi-annual, not to exceed 7 ½ months, static tank trending for 12 continuous hours
to verify the integrity of the special permit tanks. Magellan must isolate the special
permit tanks from inbound or outbound products movements. The special permit
tank level must be at least half full. Once isolated, the breakout storage tank must sit
idle for a minimum of 12 continuous hours. During the static 12 hours, the special
permit tank product level must be reviewed for product level discrepancies.
3. Re-evaluation Inspection Intervals: Magellan must develop procedures and conduct
transitional staged internal inspections of the special permit tanks and must readjust
inspection schedules of future special permit tank inspections as follows:
a. Inspection schedules of future special permit tank inspections must be based upon
past inspection findings at a special permit tank site location or similar vintage
construction types at other tank locations in this proposed special permit;
b. Re-evaluation intervals must be shortened when special permit tank inspection
findings demonstrate inspection intervals were not sufficiently conservative to
maintain established minimum safe floor and wall thicknesses, and material corrosion
rates;
c. Transitional staged internal special permit tank inspection intervals must be modified
if a breakout storage tank of similar service indicates a more conservative internal
inspection interval should apply; and
d. Special permit tanks of similar service must be identified by having been constructed
during, or within six (6) months of, the same year, under the same conditions, with
similar foundations and store similar products.
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 4 of 22

<<<PAGE 5>>>

4. Annual Report to PHMSA: Annually, after issuance of this special permit, Magellan must
submit an annual special permit tank integrity report to the PHMSA Central, Eastern,
Southwest and Western Region Directors with copies to the Deputy Associate Administrator,
PHMSA Field Operations; Deputy Associate Administrator, PHMSA Policy and Programs;
Director, PHMSA Engineering and Research Division; and Director, PHMSA Standards and
Rulemaking Division.? The annual integrity report must summarize for the special permit
tanks the following and any other significant integrity threats as follows:
a. Any leakage of special permit tanks including location, leakage amount, repairs
taken, and impact of any other tanks inspection schedule or integrity;
b. Any inspection findings that caused a readjustment of inspection schedules and the
special permit tanks involved in the reschedule of inspection interval;
c. Any secondary containment integrity issues found or remediated that would have
impacted containment in the case of a leak or failure of the special permit tank;
d. Any leaks or failures found through the continuous monitoring of tank levels through
the SCADA system (Condition 2.c) or the semi-annual static tank trending for 12
continuous hours (Condition 2.d); and
e. Identification of special permit tanks inspected during the past year and planned
inspections for the next two (2) years.
5. Tank Integrity Program: Under the proposed special permit, Magellan must continue use
of its existing documented Tank Integrity Program (Magellan procedure 7.10-ADM-001 Tank
5 Annual reports must be received by PHMSA by the last day of the month in which the special permit is dated.
For example, the annual report for a special permit dated January 2018, must be received by PHMSA no later than
January 31, each year beginning in 2019.
• Magellan must submit a copy of each Magellan annual pipeline integrity report on the PHMSA docket, PHMSA-
2016-0072, at regulations.gov.
" Magellan must also send a copy to the PHMSA Director of State Programs and the appropriate state authorities of
tanks are located.
the states that have interstate or intrastate agent agreements with PHMSA in states where the breakout storage
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
• Page 5 of 22

<<<PAGE 6>>>

Integrity Program, revision date 01/01/18) during the transitional staged internal special
permit tank inspection period (Condition 1).
6. Certification: A Magellan senior executive officer, vice president or higher must certify in
writing the following:
a. Magellan has developed a written manual of operating and maintenance (O&M)
procedures required by 49 CFR 195.402 and 195.432, and all requirements of this
special permit for the special permit tanks; and
b. Magellan has implemented all special permit conditions, 49 CFR 195.402 and
195.432, as required by this special permit for the special permit tanks.
Magellan must send the certifications required in Condition 6.a and 6.b with completion
date, compliance documentation summary, and the required senior executive signature and
date of signature to the PHMSA Associate Administrator for Pipeline Safety with copies to
the Deputy Associate Administrator, PHMSA Field Operations; Deputy Associate
Administrator, PHMSA Policy and Programs; PHMSA Central, Eastern, Southwest, and
Western Region Directors; Director, PHMSA Standards and Rulemaking Division; Director,
PHMSA Engineering and Research Division'; and to the Federal Register Docket (PHMSA-
2016-0072) at www.Regulations.gov within one (1) year of the effective date of this special
permit.
II. Limitations:
PHMSA issues this special permit subject to the following limitations:
1) PHMSA has the sole authority to make all determinations on whether Magellan has complied
with the specified conditions of this special permit.
8 Any updates to Magellan procedure 7.10-ADM-001 Tank Integrity Program, revision dated 01/01/18, that affect
PHMSA's Deputy Associate Administrator, PHMSA Field Opérations, for review. Magellan must receive a "no
he inspections, remediation and monitoring of the special permit tanks must be submitted by Magellan to
objection" letter from PHMSA prior to any updated procedure implementation on the special permit tanks.
• Magellan must also send a copy to the PHMSA Director of State Programs and the appropriate state authorities of
the states that have interstate or intrastate agent agreements with PHMSA in states where the breakout storage
tanks are located.
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 6 of 22

<<<PAGE 7>>>

2) Failure to submit the certifications required by Condition 6 within the time frames specified
may result in revocation of this special permit.
3) PHMSA may revoke, suspend, or modify this special permit based on any finding listed in 49
CFR 190.341(b)(1) and require Magellan to comply with the regulatory requirements in 49
CFR 195.432 and an amended Condition 1-Internal Inspection Schedule. As provided in 49
U.S.C. Chapter 601 and 49 CFR Part 190, PHMSA may also issue an enforcement action for
failure to comply with this special permit. Any work plans and associated schedules will be
automatically incorporated into this special permit and are enforceable in the same manner.
4) Should PHMSA revoke, suspend, or modify this special permit based on any finding listed in
49 CFR 190.341(h)(1), PHMSA will notify Magellan in writing of the proposed action and
provide Magellan an opportunity to show cause why the action should not be taken. In
accordance with 49 CFR 190.341(h)(2)(i), Magellan may provide a written response within
30 days of the notice showing why the proposed action should not be taken. However, if
necessary to avoid the risk of significant harm to persons, property, or the environment,
PHMSA will declare the proposed action (revocation, suspension, or modification)
immediately effective, in accordance with 49 CFR 190.341(h)(3).
5) The terms and conditions of any corrective action order, compliance order, or other order
applicable to a pipeline facility covered by this special permit will take precedence over the
terms of this special permit in accordance with 49 CFR 190.341(h)(4).
6) Magellan may seek reconsideration of a decision made pursuant to 49 CFR 190.341(h) by
submitting a petition to the Associate Administrator of Pipeline Safety, in accordance with 49
CFR 190.341(i). The Associate Administrator's decision made pursuant to 49 CFR
190.341(i) constitutes final administrative action. All final administrative actions are subject
to juridical review under 49 U.S.C. 60119.
7) If Magellan sells, merges, transfers, or otherwise disposes of the assets known as the special
permit tanks, Magellan must provide PHMSA with written notice of the change within 30
days of the consummation date. In the event of such transfer, PHMSA reserves the right to
revoke, suspend, or modify the special permit if the transfer constitutes a material change in
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 7 of 22

<<<PAGE 8>>>

conditions or circumstances pursuant to 49 CFR 190.341(h)(1)(ii) or any other circumstances
listed under 49 CFR 190.341(b)(1).
8) PHMSA grants this special permit to a term of no more than 20 years from the issuance date.
AUTHORITY: 49 U.S.C. 60118 (c)(1) and 49 CFR 1.97.
Issued in Washington, DC on May 14, 2018
Alan K. Mayberry
Associate Administrator for Pipeline Safety
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 8 of 22

<<<PAGE 9>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Appendix A
Magellan Breakout Storage Tanks:
Location - State, Facility Name, County, and Number of Tanks
Number of
Breakout
State
Facility
Located in a
Located in
Name(s):
County
Included in the
Storage Tanks
High
Consequence
a Could
Special Permit
Area?
Affect
HCA?
Colorado
Aurora
Request
Adams
Dupont
8
Adams
g
Yes
Yes
Yes
Fountain
Yes
Connecticut
El Paso
Hamden
1
Yes
• New Haven
Yes
New Haven
New Haven
8
Yes
Yes
Illinois
Heyworth
Mclean
Menard
Menard
lowa
Bettendorf
Scott
Des Moines
Polk
Ft Dodge
Webster
lowa City
Johnson
Mason City
Mitford
Cerro Gordo
Dickinson
Sioux City
Waterloo
Woodbury
• Kansas
Black Hawk
Boyer
Butler
El Dorado East
El Dorado West
Butler
Butler
Great Bend
Barton
Kansas City
Olathe
Wyandotte
15
Scott City
Johnson
Topeka
Scott
Wichita
Shawnee
Minnesota
Alexandria
Sedgwick
Duluth
Douglas
Mankato
St Louis
Blue Earth
Marshall
Lyon
Minneapolis
Ramsey
Rochester
Olmsted
Rosemount
Dakota
St Paul Park
Washington
Willmar
Wrenshall
Kandiyohi
Carlton
1
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 9 of 22

<<<PAGE 10>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks:
Location - State, Facility Name, County, and Number of Tanks
Number of
Breakout
Located in a
Located in
State
Facility
Name(s):
County
Included in the
Storage Tanks
High
a Could
Special Permit
Consequence
Affect
Area?
HCA?
Request
Missouri
Carthage
Jasper
5
No
Columbia
Boone
4
Yes
Mt Vernon Jot
Lawrence
4
No
Mt Vernon Terminal
Lawrence
No
Palmyra
Marion
1
Yes
Riverside
Platte
Yes
Springfield
Greene
Nebraska
Capehart
Sarpy
Yes
Doniphan
Hall
Irvington
Douglas
Yes
Lincoln
Lancaster
Nebraska City
Otoe
Yes
Omaha
Douglas
•ON:
Yes
North Dakota
Grand Forks
Fargo
Cass
Yes •
Grand Forks
Yes
Oklahoma
Allen
Pontotoc
Barnsdall
Osage
6
Central Cushing
Payne
8
Cushing
Payne
1
Drumright
Creek
Drumright Crude
Creek
Enid
Garfield
Yes
Glenpool (East)
Tulsa
Yes
Glenpool (West)
Tulsa
Yes
Oklahoma City
. Oklahoma
8
Yes
Yes
(High St)
Oklahoma City.
Oklahoma
6
Yes
Yes
(Reno Ave)
Shinn Pence
Payne
21
No
Yes
West Tulsa
Tulsa
14
Yes
Yes
Wynnewood
Garvin
No
Yes
South Dakota
Rapid City
Pennington
Yes
Yes
Sioux Falls
Minnehaha
Yes
Yes
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 10 of 22

<<<PAGE 11>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks:
Location - State, Facility Name, County, and Number of Tanks
Number of
State
Name(s):
Facility
Breakout
Located in a
County
Included in the
Storage Tanks
High
Located in a
Could
Special Permit
Consequence
Area?
HCA?
Affect
Texas
Request
Corpus Christi
Nueces
Crane
Crạne
Yes
3
Yes
Dallas
Dallas
No
3
Yes
No
East Houston
Harris
12
Yes
El Paso
Frost
El Paso
18
Yes
No
Yes
Galena Park
Navarro
Yes
Heare
Harris
No
No
14
Odessa
Roberts
Yes
Yes
Reagan
Ector
11.
Yes
13
Yes
Yes
Speed Jct
Falls
Yes
Harris
No
No
Tye
1
Yes
Wisconsin
Bateman
Taylor
Yes
No
Yes
Cadott
Chippewa
Chippewa Falls
Chippewa
No
No
Chippewa
No
Yes
No
Wyoming
Cheyenne
Yes
Laramie
9
Yes
Yes
Total Breakout Tanks included in Special Permit:
493
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 11 of 22

<<<PAGE 12>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Appendix B
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
NEXT
SECONDARY
DATE LAST
INTERNAL
CONTAIN-
DIKE
CAPACITY
TANK
FACILITY NAME(S):
STATE
COUNTY
TANK#
INSPECTION
INTERNAL
INSPECTION
TRANSI-
VOLUME
MENT
(BBLS)
SCHEDULE
TIONAL
(BBLS)
ALEXANDRIA
Minnesota
Douglas
2012
2000
• 29,602
25,049
2,186
ALEXANDRIA
Minnesota
ALEXANDRIA
Minnesota
Douglas
2001
1998
50,055
50,055
10,913
2,279
ALEXANDRIA
Minnesota
Douglas
Douglas
10,911
10,913
ALEXANDRIA
ALEXANDRIA
Minnesota
Minnesota
Douglas
1999
1999
29,602
50,055
Douglas
10,913
10,914
ALEXANDRIA
ALEXANDRIA
Minnesota
Minnesota
Douglas
2010
1999
25,049
25,049
Douglas
10,912
ALEXANDRIA
ALEXANDRIA
Minnesota
Douglas
Douglas
1998
29,602
10,914
10,077
Minnesota
1999
25,049
25,049
ALEXANDRIA
Minnesota
ALEXANDRIA
ALEXANDRIA
Minnesota
Douglas
2001
1999
10,913
Minnesota
Douglas
72,870
72,870
19,406
ALEXANDRIA
Minnesota
Douglas
2002
1998
72,870
18,087
19,399
Douglas
ALEXANDRIA
ALEXANDRIA
Minnesota
Minnesota
Douglas
Douglas
2000
75,305
35,844
18.631
2001
2001
75,305
19,403
17,675
ALEXANDRIA
ALEXANDRIA
Minnesota
Minnesota
Douglas
ALEXANDRIA
Minnesota
Douglas
Douglas
2001
35,844
28,688
28,682
2002
75,305
ALEXANDRIA
ALEXANDRIA
Minnesota
Minnesota
Douglas
Douglas
2002
75,305
2010
94,454
36,230
28,692
ALEXANDRIA
Minnesota
ALEXANDRIA
ALEXANDRIA
Minnesota
Minnesota
Douglas
2002
1999
69,277
94,454
37,407
Douglas
Douglas
1999
83,884
83,884
38,901
37,401
37,404
ALEXANDRIA
Minnesota
Douglas
2002
ALEXANDRIA
ALEXANDRIA
Minnesota
Minnesota
Douglas
Douglas
1998
2004
94,454
52,502
111,531
69,277
39,098
ALLEN
ALLEN
Oklahoma
Pontotoc
Pontotoc
2011
2007
44,697
53,177
Oklahoma
111,531
61,772
ALLEN
Oklahoma
Pontotoc
Pontotoc
2013
2006
114,540
61,772
51,398
ALLEN
Oklahoma
48,882
47,875
ALLEN
ALLEN
Oklahoma
Oklahoma
Pontotoc
1998
Pontotoc
2009
2008
110,547
119,752
70,274
70,990
ALLEN
Oklahoma
Pontotoc
ALLEN
Oklahoma
Pontotoc
2005
114,540
69,277
AURORA
Colorado
2013
152,667
87,189
70,927
AURORA
Colorado
Adams
2003
2009
87,189
68,632
68,318
AURORA•
Colorado
Adams
AURORA
Colorado
Adams
2009
2008
84,525
48,016
AURORA
Colorado
Adams
152,667
87,189
77,439
77,441
AURORA
Colorado
Adams
2008
AURORA
Colorado
Adams
2001
2007
2009
84,525
84,525
75,601
AURORA
Colorado
Adams
27,181
5,681
48,355
BARNSDALL
BARNSDALL
Oklahoma
Oklahome
Osage
25,605
3,020
Osage
1997
2008
BARNSDALL
Oklahoma
Osage
29,804
25,212
BARNSDALL
Oklahoma
Osage
1994
21,023
33,342
29,950
29,621
BARNSDALL
Oklahoma
Osage
2011
2011
BARNSDALL
Oklahoma
Osage
85,966
114,130
BATEMAN
Wisconsin
Chippewa
2007
426
93
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 12 of 22

<<<PAGE 13>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
NEXT
SECONDARY
DATE LAST
INTERNAL
DIKE
COUNTY
TANK #
INTERNAL
INSPECTION
CONTAIN-
TANK
FACILITY NAME(S):
STATE
INSPECTION
TRANS!-
MENT
CAPACITY
TIONAL
VOLUME
(BBLS)
388
(BBLS)
BETTENDORF
BOYER TERMINAL
BETTENDORF
lowa
lowa
Scott
Scott
103,285
595
354
CADOTT
PRODUCTS
Kansas
Butler
616,556
6,475
504
CADOTT
Wisconsin
CADOTT
Wisconsin
Chippewa
CAPEHART
CADOTT
Wisconsin
Wisconsin
Chippewa
Chippewa
CARTHAGE
CAPEHART
Nebraska
Chippewa
Nebraska
Sarpy
CARTHAGE
CARTHAGE
Missouri
Sarpy
Missouri
Jasper
Jasper
CARTHAGE
Missouri
CENTRAL CUSHING
CARTHAGE
Missouri
Missouri
Jasper
Jasper
Oklahoma
Jasper
CENTRAL CUSHING
CENTRAL CUSHING
CENTRAL CUSHING
Oklahoma
Oklahoma
Payne
Payne
2030
2038
CENTRAL CUSHING
Oklahoma
Oklahoma
Payne
Payne
2024
2035
CENTRAL CUSHING
CENTRAL CUSHING
Oklahoma
Oklahoma
Payne
2035
Payne
Payne
2024
CENTRAL CUSHING
CHEYENNE
Wyoming
Oklahoma
2024
2027
Laramie
Payne
CHEYENNE
CHEYENNE
Laramie
- 2035
2037
Wyoming
CHEYENNE
Wyoming
Wyoming
Laramie
Laramie
2036
CHEYENNE
CHEYENNE
CHEYENNE
Wyoming
Wyoming
Laramie
2036
2037
CHEYENNE
CHEYENNE
Wyoming
Laramie
Laramie
Laramie
2037
2035
• Wyoming
Wyoming
2037
CHIPPEWA FALLS
COLUMBIA
Wisconsin
2035
Chippewa
Laramie
COLUMBIA
Missouri
Boone
Boone
2022
2035
COLUMBIA
Missouri
CORPUS CHRISTI
COLUMBIA
Missouri
Boone
Boone
2038
2018
Missouri
2024
CORPUS CHRISTI
Texas
Nueces
Nueces
2035
2036.
CRANE CRUDE
Texas
Texas
CRANE CRUDE
CRANE CRUDE
Texas
Crane
CUSHING
Oklahoma
Texas
Crane
Payne
Crane
(SINGLETON BLVD.)
DALLAS
Texas
Dallas
(SINGLETON BLVD.)
DALLAS
Texas
Dallas •
(SINGLETON BLVD.)
DALLAS
Texas
Dallas
134,161
DES MOINES
DES MOINES
lowa
DES MOINES
lowa
Polk
Polk
11,945
DES MOINES
lowa
Polk
11,945
lowa
Polk
138,703
42,579
Sp
ecial
ermit:
PHMS
A-201
00
72-
Magellan
Mi
dstream
L.P.
Pag

<<<PAGE 14>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
DATE LAST
NEXT
SECONDARY
STATE
COUNTY
TANK #
INSPECTION
INTERNAL
INSPECTION
INTERNAL
CONTAIN-
DIKE
• TANK
FACILITY NAME(S):
TRANSI-
VOLUME
MENT
CAPACITY
TIONAL
(BBLS)
SCHEDULE
(BBLS)
DES MOINES
DES MOINES
lowa
2032
138,703
153,470
34,512
DES MOINES
lowa
lowa
34,516
34,516
153,470
DES MOINES
DES MOINES
lowa
153,470
153,470
34,504
DES MOINES
lowa
545,734
545,734
70,174
34,508
lowa
lowa
DES MOINES
DES MOINES
70,737
DES MOINES
DES MOINES
lowa
187,121
71,970
73,982
lowa
lowa
187,121
187,121
187,121
77,643
71,199
DES MOINES
DES MOINES
lowa
DES MOINES
lowa
lowa
32,596
58,763
28,603
4,893
DES MOINES
DES MOINES
lowa
lowa
545,734
121.142
121.142
127,207
78,400
78,409
DES MOINES
DES MOINES
lowa
lowa
246,699
246,699
33,906
DES MOINES
DES MOINES
lowa
147,084
38,374
DRUMRIGHT
DONIPHAN
Nebraska
lowa
187,121
47,033
237
DRUMRIGHT
Oklahoma
Oklahoma
47,492
46,646
DRUMRIGHT
DRUMRIGHT
Oklahoma
DRUMRIGHT
DRUMRIGHT
Oklahoma
Oklahoma
47,874
46,328
46,023
DRUMRIGHT CRUDE
DRUMRIGHT
Oklahoma
Oklahoma
71,416
322
DRUMRIGHT CRUDE
Oklahoma
Minnesota
Oklahoma
99,888
DULUTH
671
440
DUPONT
Colorado
DUPONT
Colorado
Colorado
12,765
DUPONT
22,410
20,784
DUPONT
DUPONT
Colorado
Colorado
19,758
DUPONT
DUPONT
Colorado
Colorado
48,136
35,147
DUPONT
Colorado
55,579
47,660
EAST HOUSTON
DUPONT
Colorado
Texas
108,295
103,005
EAST HOUSTON
EAST HOUSTON
Texas
Texas
Texas
110,991
EAST HOUSTON
112,362
107,877
EAST HOUSTON
EAST HOUSTON
CRUDE
Texas
Texas
578,498
113,905
EAST HOUSTON
CRUDE
Texas
275,140
113,624
EAST HOUSTON
CRUDE
Texas
578,498
109,777
EAST HOUSTON
CRUDE
Texas
Harris
578,498
112,581
CRUDE
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P. Page 14 of 22

<<<PAGE 15>>>

Special Permit Docket: PHMSA-2016-0072
Magellan Breakout Storage Tanks
OPID 39504, 22610, 31579, or 31580
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
NEXT
SECONDARY
DATE LAST
INTERNAL
DIKE
FACILITY NAME(S):
STATE
COUNTY
TANK#
INTERNAL
INSPECTION
CONTAIN-
TANK
INSPECTION
TRANSI-
MENT
CAPACITY
TIONAL
VOLUME
(BBLS)
SCHEDULE
(BBLS)
EAST HOUSTON
CRUDE
Texas
Harris
1229
2009
2037
365,844
112,511
EAST HOUSTON
CRUDE
Texas
Harris
2033
365,844
111,994
EAST HOUSTON
CRUDE
Texas
Harris.
2028
275,140
112,909
EL DORADO EAST
EL DORADO EAST
Kansas
Kansas
Butler
Butler
2036
2038
114,414
5,483
EL DORADO EAST
EL DORADO EAST
Kansas
Kansas
Butler
2038
108,200
EL DORADO EAST
Kansas
Butler
Butler
2020
EL DORADO WEST
Kansas
2037
2036
111,002
112,162
EL DORADO WEST
Kansas
Butler
25,061
EL DORADO WEST
Kansas
Butler
Butler
2025
2028
8,210
EL DORADO WEST
EL DORADO WEST
Kansas
Kansas
Butler
Butler
2027
62,188
7,972
• EL PASO
Texas
El Paso
2027
73,294
EL PASO
Texas
El Paso
2035
104,574
EL PASO
Texas
El Paso
3
2037
108,284
EL PASO
Texas
El Paso
2037
82,151
79,349
EL PASO
Texas
El Paso
5
2037
EL PASO
Texas
El Paso
2035
2035
66,652
82,409
EL PASO
EL PASO
Texas
Texas
El Paso
El Paso
8
2035
2036
64,203
64,259
EL PASO
EL PASO
EL PASO
Texas
Texas
El Paso
El Paso
10
9
2037
Texas
El Paso
2035
2037
64,170
43,955
43,866
EL PASO
EL PASO
Texas
Texas
El Paso
El Paso
2036
2035
45,393
EL PASO
Texas
El Paso
2036
33,872
45,387
EL PASO
EL PASO
Texas
Texas
El Paso
El Paso
2035
2036
33,851
Texas
El Paso
2037
13,476
13,486
EL PASO
EL PASO
ENID
Oklahoma
Texas
Garfield
El Paso
2036
2037
455
ENID
Oklahoma
Garfield
2031
50,191
48,383
ENID
ENID
Oklahoma
Oklahoma
Garfield
Garfield
2023
2034
47,930
46,382
FARGO
FARGO
North Dakota
FARGO
North Dakota
North Dakota
Cass
Cass
Cass
2033
2038
2024
10,794
237
FARGO
North Dakota
Cass
10,921
FARGO
North Dakota
Cass
2031
10,907
FARGO
North Dakota
Cass
2033
2030
16,811
16,709
FARGO
FARGO
North Dakota
North Dakota
Cass
Cass
2032
16,889
FARGO
North Dakota
North Dakota
Cass
Cass
2032
2032
2024
16,894
16,880
16,756
FARGO
FARGO
FARGO
North Dakota
North Dakota
Cass
Cass
2024
29,047
FARGO
North Dakota
Cass
2037
36,621
FARGO
North Dakota
Cass
2031
2036
39,045
37,143
FARGO
North Dakota
Cass
2028
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
39,078
15
of
22

<<<PAGE 16>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
DATE LAST
NEXT
SECONDARY
FACILITY NAME(S):
STATE
COUNTY
TANK #
INSPECTION
INTERNAL
INSPECTION
INTERNAL
CONTAIN-
DIKE
CAPACITY
TANK
TRANSI-
VOLUME
.MENT
(BBLS)
SCHEDULE
TIONAL
(BBLS)
FARGO
FARGO
North Dakota
128,167
37,024
North Dakota
61,126
40,866
FOUNTAIN
FROST
Colorado
292,573
74,811
29,178
FT DODGE
FROST
Texas
292,573
197,059
36,759
Texas
GALENA PARK
GALENA PARK
Texas
lowa
607,020
64,363
893
984
GALENA PARK
GALENA PARK
Texas
481,186
126,229
290,504
111,544
Texas
GALENA PARK
GALENA PARK
Texas
1,053,764
481,186
290,420
Texas
600,882
Texas
1,049,002
203,800
106,074
610,203
GALENA PARK
Texas
Texas
GALENA PARK
203,800
50,767
50,821
GALENA PARK
GALENA PARK
Texas
188,363
Texas
237,530
139,383
GALENA PARK
GALENA PARK
Texas
Texas
233,050
285,073
152,281
607,020
607,020
136,456
GALENA PARK
GLENPOOL (EAST)
GALENA PARK
Texas
269,126
297,995
Oklahoma
Texas
129,913
108,254
548
GLENPOOL (EAST)
Oklahoma
Oklahoma
129,913
129,913
GLENPOOL (EAST)
GLENPOOL (EAST)
129,913
99,098
Oklahoma
129,913
46,721
77,844
GLENPOOL (EAST)
Oklahoma
Oklahoma
GLENPOOL (WEST)
GLENPOOL (EAST)
*168,790
129,913
83,349
49,481
Oklahoma
GLENPOOL (WEST)
Oklahoma
Oklahoma
168,790
168,790
83,430
83,454
GLENPOOL (WEST)
GLENPOOL (WEST)
Oklahoma
168,790
82,967
82,913
GLENPOOL (WEST)
GLENPOOL (WEST)
Oklahoma
168,790
Oklahoma
168,790
168,790
2,545
GLENPOOL (WEST)
North Dakota
Oklahoma
2,552
GRAND FORKS
76,800
1,925
GREAT BEND
HAMDEN
Connecticut
Kansas
248,976
33,201
98,757
538
HAMDEN
Connecticut
aven
248,976
248,976
96,880
HAMDEN
HAMDEN
Connecticut
Connecticut
New Haven
New Haven
93,734
248,976
64,025
HAMDEN
HAMDEN
Connecticut
Connecticut
New Haven
248,976
94,207
New Haven
New Haven •
248,976
248,976
• 91,069
14,399
HAMDEN
HAMDEN
Connecticut
Connecticut
New Haven
248,976
Roberts
Roberts
118,391
30,533
93,736
HEARNE
HEARNE
Texas
Texas
118,391
30,315
HEARNE
Texas
Roberts
118,391
118,391
118,391
30,390
30,296
HEARNE
HEARNE
Texas
Texas
Roberts
Roberts
30,397
HEARNE
HEARNE
Texas
Roberts
Roberts
118,391
30,570
Texas
118,391
118,391
30,754
HEARNE
HEARNE
Texas
Roberts
39,861
Texas
Roberts
118,391
82,727
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 16 of 22

<<<PAGE 17>>>

Special Permit Docket: PHMSA-2016-0072
Magellan Breakout Storage Tanks
OPID 39504, 22610, 31579, or 31580
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
NEXT
SECONDARY
DATE LAST
INTERNAL
DIKE
FACILITY NAME(S):
STATE
COUNTY
TANK #
INTERNAL
INSPECTION
CONTAIN-
TANK
INSPECTION
TRANSI-
MENT
CAPACITY
TIONAL
VOLUME
(BBLS)
SCHEDULE
(BBLS)
HEARNE
HEARNE
Texas
HEYWORTH
Illinois
Texas
Roberts
Roberts
2032
2034
IOWA CITY
IOWA CITY
lowa
Johnson
McLean
2035
2024
IOWA CITY
lowa
lowa
Johnson
Johnson
2027
2036
IOWA CITY
IOWA CITY
lowa
lowa
Johnson
Johnson
• 2037
IOWA CITY
IOWA CITY
lowa
lowa
Johnson
2037
Johnson
2031
2031
IOWA CITY
IOWA CITY
• lowa
lowa
Johnson
Johnson
Johnson
2037
IOWA CITY
IOWA CITY
lowa
lowa
2029
2030
IOWA CITY
IRVINGTON
IOWA CITY
lowa
lowa
Johnson
Johnson
2029
Johnson
2032
2032
KANSAS ÇITY
KANSAS CITY
Nebraska
Kansas
Wyandotte
Douglas
KANSAS CITY
Kansas
Kansas
Wyandotte
KANSAS CITY
KANSAS CITY
Kansas
Kansas
Wyandotte
Wyandotte
KANSAS CITY
KANSAS CITY
Kansas
Wyandotte
KANSAS CITY
Kansas
Kansas
Wyandotte
Wyandotte
KANSAS CITY
KANSAS CITY
KANSAS CITY
Kansas
Wyandotte
Kansas
Kansas
Wyandotte
Wyandotte
KANSAS CITY
KANSAS CITY
Kansas
Kansas
Wyandotte
Wyandotte
KANSAS CITY
KANSAS CITY
Kansas
Wyandotte
Wyandotte
LINCOLN
Kansas
LINCOLN
LINCOLN
Nebraska
Nebraska
Wyandotte
Lancaster
Lancaster
MARSHALL
MANKATO
Minnesota
Nebraska
Lancaster
MARSHALL
Minnesota
Minnesota
Blue Earth
• Lyon
Lyon
MARSHALL
MARSHALL
Minnesota
Minnesota
Lyon
Lyon
MARSHALL
MARSHALL
Minnesota
MARSHALL
Minnesota
Lyon
MARSHALL
MARSHALL
Minnesota
Lyon
Lyon
Minnesota
Minnesota
Lyon
MASON CITY
MARSHALL
Minnesota
Lyon
Lyon
MASON CITY
lowa
lowa
Cerro Gordo
MASON CITY
MASON CITY
lowa
Cerro Gordo
lowa
lowa
Cerro Gordo
MASON CITY
MASON CITY
Cerro Gordo
lowa
Cerro Gordo
Cerro Gordo
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 17 of 22

<<<PAGE 18>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
NEXT
SECONDARY
DATE LAST
INTERNAL
CONTAIN-
DIKE
TANK
FACILITY NAME(S):
STATE
COUNTY
TANK #
INTERNAL
INSPECTION
MENT
CAPACITY
INSPECTION
TRANSI-
VOLUME
(BBLS)
TIONAL
(BBLS)
MASON CITY
lowa
Cerro Gordo
110,187
38,756
MASON CITY
lowa
Cerro Gordo
69,323
38,931
MENARD
Illinois
Menard
335,300
1,678
MILFORD
lowa
Dickinson
65,710
917
MINNEAPOLIS
Minnesota
Ramsey
38,872
4,441
MINNEAPOLIS
Minnesota
Ramsey
26,678
9,333
MINNEAPOLIS
Minnesota
Ramsey
38,872
18,382
MINNEAPOLIS
Minnesota
Ramsey
38,873
17,970
MINNEAPOLIS
Minnesota
Ramsey
40,258
26,547
MINNEAPOLIS
Minnesota
MINNEAPOLIS
Minnesota
Ramsey
139,120
31,774
26,438
Ramsey
24,969
MINNEAPOLIS
Minnesota
Ramsey
91,911
71,111
MINNEAPOLIS
Minnesota
Ramsey
90,958
72,771
MINNEAPOLIS
Minnesota
Ramsey
102,993
72,759
MINNEAPOLIS
Minnesota
Minnesota
Ramsey
Ramsey
139,120
91,909
51,755
76,539
MINNEAPOLIS
MINNEAPOLIS
Minnesota
Ramsey
139,120
95,007
76,248
76,552
MINNEAPOLIS
Minnesota
Ramsey
MINNEAPOLIS
Minnesota
Ramsey
95,007
76,649
MINNEAPOLIS
Minnesota
Ramsey
139,120
227,990
76,649
MINNEAPOLIS
Minnesota
Ramsey
64,701
MINNEAPOLIS
Minnesota
Ramsey
MINNEAPOLIS
Minnesota
Ramsey
139,120
102;396
227,990
74,299
70,389
MINNEAPOLIS
Minnesota
Ramsey
95,007
76,655
MINNEAPOLIS
Minnesota
Ramsey
61,000
MINNEAPOLIS
Minnesota
Ramsey
95,007
71,050
MINNEAPOLIS
Minnesota
Ramsey
227,990
76,522
MT VERNON JCT
Missouri
Lawrence
172,401
104,061
55,988
MT VERNON JCT
MT VERNON JCT
Missouri
Missouri
Lawrence
Lawrence
172,401
172,401
150,491
MT VERNON JCT
Missouri
Lawrence
172,401
403
MT VERNON
Missouri
Lawrence
312
403
NEBRASKA CITY
TERMINAL
Nebraska
Otoe
4,868
5,911
NEBRASKA CITY
Nebraska
Otoe
17,713
21,684
26,874
NEBRASKA CITY
Otoe
26,529
NEBRASKA CITY
Nebraska
Nebraska
Otoe
29,278
71,439
NEBRASKA CITY
Nebraska
Otoe
115,802
72,124
NEBRASKA CITY
Nebraska
Otoe
36,478
47,808
48,388
NEBRASKA CITY
Nebraska
Otoe
33,924
NEBRASKA CITY
Nebraska
Otoe
115,802
185,257
NEW HAVEN (85
Connecticut
New Haven
110,143
47,862
NEW HAVEN (85
EAST STREET)
Connecticut
New Haven
110,143
90,508
NEW HAVEN (85
EAST STREET)
Connecticut
New Haven
128,000
86,755
NEW HAVEN (85
EAST STREET)
Connecticut
New Haven
128,000
91,450
NEW HAVEN (85
EAST STREET)
Connecticut
New Haven
18A*
2033
128,000
90,810
NEW HAVEN (85
EAST STREET)
Connecticut
New Haven
1A*
2037
110,143
46,309
EAST STREET
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P. Page 18 of 22

<<<PAGE 19>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
DATE LAST
INTERNAL
NEXT
SECONDARY
CONTAIN-
DIKE
TANK
FACILITY NAME(S):
STATE
•COUNTY
TANK#
INSPECTION
INTERNAL INSPECTION
TRANSI-
VOLUME
MENT
CAPACITY
TIONAL
(BBLS)
SCHEDULE
(BBLS)
• EAST STREET)
NEW HAVEN (85
Connecticut
New Haven
2A*
2008
2031
110,143
65,307
NEW HAVEN (85
EAST STREET
Connecticut
New Haven
4A*
2028
110,143
66,665
NEW HAVEN (85
EAST STREET
Connecticut
New Haven
8A*
2026
110,143
90,959
ODESSA
ODESSA
Texas
144,200
77,600
47,867
74,990
ODESSA
Texas
ODESSA
Texas
ODESSA
Texas
Texas
32,000
73,500
16,588
57,031
ODESSA
ODESSA
Texas
Texas
32,000
35,300
33,400
20,577
16,629
ODESSA
ODESSA
Texas
35,300
20,838
ODESSA
Texas
39,200
18,056
17,572
ODESSA
Texas
Texas
42,300
42,300
21,827
ODESSA
33,400
22,563
ODESSA
Texas
OKLAHOMA CITY
Oklahoma
Texas
21,092
22,800
20,251
20,671
4,337
OKLAHOMA CITY
Oklahoma
Oklahoma
21,092
4,563
OKLAHOMA CITY
Oklahoma
Oklahoma
106,530
50,440
OKLAHOMA CITY
Oklahoma
Oklahoma
106,530
44,971
OKLAHOMA CITY
Oklahoma
Oklahoma
38,690
18,565
OKLAHOMA CITY
Oklahoma
Oklahoma
38,690
18,448
Oklahoma
Oklahoma
35,976
17,658
OKLAHOMA CITY
Oklahoma
Oklahoma
35,976
17,574
OKLAHOMA CITY
(RENO AVE)
Oklahoma
Oklahoma
17,297
550
Oklahoma
Oklahoma
535
17,297
8,264
OKLAHOMA CITY
Oklahoma
Oklahoma
167,549
68,264
OKLAHOMA CITY
Oklahoma
Oklahoma
167,549
72,959
OKLAHOMA CITY
Oklahoma
Oklahoma
167,549
82,468
OKLAHOMA CITY
Oklahoma
Oklahoma
. 1391
167,549
32,324
Kansas
OLATHE
Kansas
Johnson
Johnson
1423
782
92,832
. 112,404
112,404
26,344
OLATHE
OLATHE
Kansas
Kansas
Johnson
1424
48,763
Nebraska
Kansas
Johnson
Johnson
222-1
1440
68,061
47,989
92,832
52,412
• OMAHA
OMAHA
Nebraska
Douglas
422
125,155
25,584
2,098
Missouri
Douglas
Marion
1401
4,459
194
80,200
53,879
PALMYRA
791
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 19 of 22

<<<PAGE 20>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
NEXT
SECONDARY
DATE LAST
INTERNAL
DIKE
TANK
FACILITY NAME(S):
STATE
COUNTY
TANK#
INTERNAL
INSPECTION
CONTAIN.
INSPECTION
TRANSI-
MENT
CAPACITY
TIONAL
VOLUME
(BBLS)
SCHEDULE
(BBLS)
RAPID CITY
South Dakota
Pennington
REAGAN
Texas
Falls
10-53
2009
2037
36,350
8,368
4233
RIVERSIDE
Missouri
2001
2029
29,454
34,909
Platte
1
2011
2036
232,073
88,817
2011
2036
232,073
88,415
RIVERSIDE
RIVERSIDE
RIVERSIDE
Missouri
Missouri
Platte
Platte
2011
2036
283,323
89,785
Missouri
Platte
2011
2036
133,861
89,607
RIVERSIDE
RIVERSIDE
Missouri
Missouri
Platte
2011
2036
283,323
89,360
Platte
2011
2036
283,323
27,302
ROCHESTER
Minnesota
Olmsted
2007
2035
44,357
224
ROSEMOUNT
Minnesota
1996
2022
152,037
69,301
ROSEMOUNT
Minnesota
Dakota
Dakota
2012
2037
152,037
75,207
ROSEMOUNT
Minnesota
Dakota
2008
2036
205,613
72,361
ROSEMOUNT
Minnesota
Dakota
2006
2034
205,613
32,676
ROSEMOUNT
Minnesota
Dakota
2009
2037
205,613
35,929
ROSEMOUNT
Minnesota
Dakota
2008
2036
205,613
51,791
ROSEMOUNT
Minnesota
Dakota
2005
2028
205,613
52,725
ROSEMOUNT
Minnesota
Kansas
Dakota
Scott
2010
2013
2035
2038
205,613
65,632
6,907
645
SHINN PENCE
SCOTT CITY
Oklahoma
Payne
•2012
2036
128,970
67,777
SHINN PENCE
Oklahoma
Payne
2012
2037
111,693
68,309
SHINN PENCE
Oklahoma
•Payne
2013
2038
101,839
67,560
SHINN PENCE
Oklahoma
Payne
2012
2036
145,081
67,618
SHINN PENCE
Oklahoma
Payne
2013
2038
120:401
68,031
SHINN PENCE
SHINN PENCE
Oklahoma
Oklahoma
Payne
2013
Payne
2013
2030
2038
106,525
81,475
68,211
67,212
SHINN PENCE
Oklahoma
•Payne
2013
2038
80,338
67,531
SHINN PENCE
Oklahoma
Payne
2013
2038
138,291
67,260
SHINN PENCE
SHINN PENCE
Oklahoma
Раупе
2013
2029
111,393
67,966
Oklahoma
Payne
2013
2038
115,930
67,160
SHINN PENCE
Oklahoma
Payne
2013
2038
128,382
67,436
SHINN PENCE
Oklahoma
Payne
2013
2013
2038
2037
151,357
109,089
67,382
SHINN PENCE
Oklahoma
Payne
66,780
SHINN PENCE
Oklahoma
Payne
2011
2036
122,972
66,812
SHINN PENCE
Oklahoma
Payne
2012
2037
93,319
68,010
SHINN PENCE
Oklahoma
Payne
2013
2029
92,221
68,193
SHINN PENCE
Oklahoma
Payne
2012
2037
114,629
67,027
SHINN PENCE
Oklahoma
Payne
2012
2028
137.059
68,781
SHINN PENCE
Oklahoma
Payne
2011
2036
133,555
68,481
SHINN PENCE
Oklahoma
Payne
2012
2037
129,770
67,774
SIOUX CITY
lowa
Woodbury
2007
2035
211,203
1,749
SIOUX CITY
lowa
Woodbury
1989
2019
182,970
10,912
SIOUX CITY
lowa
Woodbury
2010
2035
182,970
10,071
SIOUX CITY
lowa
Woodbury
2010
2035
211,203
10,206
SIOUX CITY
lowa
Woodbury
2010
2035
211,203
10,157
SIOUX CITY
lowa
Woodbury
2011
2036
211,203
10,170
SIOUX CITY
SIOUX CITY
lowa
lowa
Woodbury
2010
2035
182,970
10,039
Woodbury
2011
2036
211,203
10,140
SIOUX CITY
lowa
Woodbury
1990
2020
83,450
19,412
SIOUX CITY
lowa
Woodbury
2006
2034
211,203
18,940
SIOUX CITY
lowa
Woodbury
2011
2036
83,450
17,348
SIOUX CITY
SIOUX CITY
lowa
lowa
Woodbury
2003
2022
211,203
18,640
Woodbury
1989
2019
211,203
18,637
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P. Page 20 of 22

<<<PAGE 21>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
NEXT
SECONDARY
DATE LAST
INTERNAL
CONTAIN-
DIKE
TANK
FACILITY NAME(S):
STATE
COUNTY
TANK#
INSPECTION
INTERNAL
INSPECTION
TRANSI-
MENT
CAPACITY
TIONAL
VOLUME
(BBLS)
SCHEDULE
(BBLS)
SIOUX CITY
SIOUX CITY
lowa
lowa
Woodbury
1988
2018
Woodbury
83,450
28,672
SIOUX CITY
lowa
Woodbury
2001
2029
211,203
28,679
SIOUX CITY
SIOUX CITY
lowa
Woodbury
Woodbury
2001
1988
1999
2028
2018
2027
182,970
211,203
28,667
99,885
38,446
SIOUX CITY
lowa
lowa
Woodbury
1989
38,448
SIOUX CITY
lowa
Woodbury
1990
2020
2019
182,970
99,885
37,404
37,396
SIOUX CITY
lowa
Woodbury
2006
2034
182,970
SIOUX CITY
lowa
39,263
SIOUX FALLS
South Dakota
Minnehaha
Woodbury
2001
1990
2029
2020
68,318
99,885
10,900
37,400
SIOUX FALLS
SIOUX FALLS
South Dakota
Minnehaha
2003
2031
102,486
10,901
SIOUX FALLS
South Dakota
South Dakota
Minnehaha
Minnehaha
2001
2003
2029
2031
68,318
102,486
10,894
10,899
SIOUX FALLS
SIOUX FALLS
South Dakota
South Dakota
Minnehaha
Minnehaha
2010
2001
2035
2029
102,486
68,318
10,898
SIOUX FALLS
South Dakota
Minnehaha
2007
2035
102,486
10,898
10,902
SIOUX FALLS
SIOUX FALLS
South Dakota
South Dakota
Minnehaha
Minnehaha
2001
2010
2035
2027
94,795
52,738
18,345
SIOUX FALLS
South Dakota
Minnehaha
2002
2030
94,795
19,365
18,340
SIOUX FALLS
South Dakota
Minnehaha
2013
2038
SIOUX FALLS
South Dakota
Minnehaha
2000
2028
102,485
52,738
18,346
SIOUX FALLS
South Dakota
Minnehaha
2010
2035
94,795
28,895
18,340
SIOUX FALLS
SIOUX FALLS
South Dakota
South Dakota
Minnehaha
Minnehaha
2003
2000
2027
2020
68,318
52,738
26,384
28,597
SIOUX FALLS
SIOUX FALLS
South Dakota
South Dakota
Minnehaha
Minnehaha
2006
2006
2031
2034
100,310
87,027
38,671
38,545
SIOUX FALLS
South Dakota
Minnehaha
2006
2034
SIOUX FALLS
South Dakota
Minnehaha
2006
2033
100,310
87,027
35,939
SIOUX FALLS
South Dakota
Minnehaha
2005
2033
100,310
36,768
35,751
SIOUX FALLS
South Dakota
Minnehaha
2002
2030
SIOUX FALLS
South Dakota
Minnehaha' •
2007
2035
87,027
94,795
40,256
36,764
SPEED JCT
8,505
ST PAUL PARK
SPRINGFIELD
Minnesota
Missouri
Texas
Greene
Harris
2013
2001
2038
2029
30,288
Washington
2007
2035
77,938
356
284
TOPEKA
Kansas
Shawnee
2004
2032
57
TYE
Texas
Taylor
2009
2037
48,724
705
WATERLOO
lowa
Black Hawk
2007
2035
91,674
5,980
4,292
WEST TULSA
Oklahoma
Tulsa
2005
2033
113,903
254
WEST TULSA
Oklahoma
Tulsa
2004
2023
113,903
14;141
14,142
WEST TULSA
WEST TULSA
Oklahoma
Oklahoma
Tulsa
Tulsa
1994
2010
2035
2021
353,418
19,028
12,186
WEST TULSA
Oklahoma
Tulsa
66,613
WEST TULSA
Oklahoma
Tulsa
1996
2013
2038
2022
353,418
353,418
68,980
66,841
WEST TULSA
WEST TULSA
Oklahoma
Oklahoma
Tulsa
Tulsa
2002
2012
2037
2021
353,418
353,418
109,615
80,754
WEST TULSA
WEST TULSA
Oklahoma
WEST TULSA
Oklahoma
Oklahoma
Tulsa
Tulsa
1996
Tulsa
2004
2024
2004
2032
2032
353,418
108,932
353,418
353,418
116,372
108,335
WEST TULSA
WEST TULSA
Oklahoma
Oklahoma
Tulsa
Tulsa
2008
49,591
33,086
Oklahoma
1998
2036
WEST TULSA
Tulsa
1999
2021
2017
353,418
353,418
134,799
WICHITA
Kansas
Sedgwick
5
2006
2034
137,278
167,855
1,592
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 21 of 22

<<<PAGE 22>>>

Special Permit Docket: PHMSA-2016-0072
OPID 39504, 22610, 31579, or 31580
Magellan Breakout Storage Tanks
SECONDARY DIKE CONTAINMENT VOLUME
DUE DATE
NEXT
SECONDARY
DATE LAST INTERNAL
DIKE
FACILITY NAME(S):
STATE
COUNTY
TANK#
INTERNAL
INSPECTION
CONTAIN-
TANK
INSPECTION
TRANSI.
MENT
CAPACITY
TIONAL
VOLUME
(BBLS)
SCHEDULE
(BBLS).
WRENSHALL
WILLMAR
Minnesota
WYNNEWOOD
Minnesota
Kandiyohi
Carlton
MSR
Garvin
Garvin
LPMR
2007
2007
2035
7,528
1515
1514
2013
2013
2035
2030
222,530
645
242
483
Oklahoma
WYNNEWOOD
Oklahoma
2030
222,530
144,104
159,639
Total Breakout Tanks included in Special Permit:
493
Note: * notes Magellan breakout tanks that are intrastate facilities in Connecticut (17 breakout tanks)
and Texas (19 breakout tanks), all other Magellan breakout tanks in the special permit are interstate
facilities.
PHMSA received approval from the Railroad Commission of Texas pipeline office, Director -
Stephanie Weidman on January 26, 2018 to include the Magellan intrastate hazardous pipeline facility
breakout tanks noted in Appendix B above as part of the special permit. Magellan intrastate hazardous
liquid pipeline facility breakout tanks in the state of Connecticut are inspected by PHMSA and are a part
of this special permit as noted in Appendix B above.
Special Permit: PHMSA-2016 - 0072 - Magellan Midstream Partners, L.P.
Page 22 of 22

## Provenance

- Official: Yes
- Source: <https://www.regulations.gov/docket/PHMSA-2016-0072>
- Source ID: `phmsa-special-permits`
- SHA-256: `e47292a9e5b1f89df529530bb27c3207a560aa7ed6a497c233ea6243ee9ed2d7`
- Retrieved: 2026-08-20T01:06:17.853Z
- Exported: 2026-08-24T10:59:54.175Z
- Document slug: `phmsa-special-permit-phmsa-2016-0072`

### Source metadata

```json
{
  "materialSubtype": "pipeline_special_permit",
  "operator": "Magellan Midstream Partners",
  "system": "Transmission",
  "issuedOn": "2018-05-14",
  "issuanceStatus": "issued",
  "renewal": null,
  "indexUrl": "https://www.phmsa.dot.gov/pipeline/special-permits-state-waivers/special-permits-issued",
  "docketUrl": "https://www.regulations.gov/docket/PHMSA-2016-0072",
  "docketDocumentCount": 15,
  "decisionDocumentCount": 5,
  "decisions": [
    {
      "id": "PHMSA-2016-0072-0094-090000648326cb5f",
      "regulationsGovDocumentId": "PHMSA-2016-0072-0094",
      "title": "Grant of Special Permit",
      "postedDate": "2018-05-15",
      "documentUrl": "https://www.regulations.gov/document/PHMSA-2016-0072-0094",
      "pdfUrl": "https://downloads.regulations.gov/PHMSA-2016-0072-0094/attachment_1.pdf",
      "pdfArtifactPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0072/phmsa-2016-0072-0094.pdf",
      "pdfArtifactSha256": "cf06b74129d7dad93b8f506841b2ca926e0e5e74919bd5c58e39fc2d69de2e65",
      "extractedTextPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0072/phmsa-2016-0072-0094.txt",
      "extractedTextSha256": "261a6fdd36bf66a4e7715ca713d2014418472dcece99cdbf3928711e20fdc2a3",
      "pageCount": 24,
      "extractionVersion": 2
    },
    {
      "id": "PHMSA-2016-0072-0099-09000064849dba11",
      "regulationsGovDocumentId": "PHMSA-2016-0072-0099",
      "title": "Magellan Midstream Partner  Special Permit Analysis and Findings",
      "postedDate": "2021-01-04",
      "documentUrl": "https://www.regulations.gov/document/PHMSA-2016-0072-0099",
      "pdfUrl": "https://downloads.regulations.gov/PHMSA-2016-0072-0099/attachment_1.pdf",
      "pdfArtifactPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0072/phmsa-2016-0072-0099-09000064849dba11.pdf",
      "pdfArtifactSha256": "9207dcc64db75a126e82838be6449885a21c47eda1d0ca61ccd904f47a05c16b",
      "extractedTextPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0072/phmsa-2016-0072-0099-09000064849dba11.txt",
      "extractedTextSha256": "f4e3fa343a1d362269ba93ad0ac43d5986e6563084de03d15d26ee021e6a69d1",
      "pageCount": 20,
      "extractionVersion": 2
    },
    {
      "id": "PHMSA-2016-0072-0099-09000064849dba12",
      "regulationsGovDocumentId": "PHMSA-2016-0072-0099",
      "title": "2016-0072 Magellan Midstream Partners EA FONSI",
      "postedDate": "2021-01-04",
      "documentUrl": "https://www.regulations.gov/document/PHMSA-2016-0072-0099",
      "pdfUrl": "https://downloads.regulations.gov/PHMSA-2016-0072-0099/attachment_2.pdf",
      "pdfArtifactPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0072/phmsa-2016-0072-0099-09000064849dba12.pdf",
      "pdfArtifactSha256": "b864327ffc30984320723ea65e9e01d67c453aa9cd57ebc393e586f49ed7fa36",
      "extractedTextPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0072/phmsa-2016-0072-0099-09000064849dba12.txt",
      "extractedTextSha256": "9ed4bb9e4cdf67450ed1de829e13f4b42acaf83c0b8bb45799703d6bb44aa7ed",
      "pageCount": 22,
      "extractionVersion": 2
    },
    {
      "id": "PHMSA-2016-0072-0099-09000064849dba13",
      "regulationsGovDocumentId": "PHMSA-2016-0072-0099",
      "title": "Letter of Decision  - Magellan",
      "postedDate": "2021-01-04",
      "documentUrl": "https://www.regulations.gov/document/PHMSA-2016-0072-0099",
      "pdfUrl": "https://downloads.regulations.gov/PHMSA-2016-0072-0099/attachment_3.pdf",
      "pdfArtifactPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0072/phmsa-2016-0072-0099-09000064849dba13.pdf",
      "pdfArtifactSha256": "18aaa327afb82c3fbecb8ca482d8ac65b44cb83472265b8e70c6a2162a7f99e0",
      "extractedTextPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0072/phmsa-2016-0072-0099-09000064849dba13.txt",
      "extractedTextSha256": "7181df5570cd5ae182c8def8e8d44d90f57a99bc3a9a10f5c78557529908ef4d",
      "pageCount": 2,
      "extractionVersion": 2
    },
    {
      "id": "PHMSA-2016-0072-0099-09000064849dba14",
      "regulationsGovDocumentId": "PHMSA-2016-0072-0099",
      "title": "Special Permit  - Magellan",
      "postedDate": "2021-01-04",
      "documentUrl": "https://www.regulations.gov/document/PHMSA-2016-0072-0099",
      "pdfUrl": "https://downloads.regulations.gov/PHMSA-2016-0072-0099/attachment_4.pdf",
      "pdfArtifactPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0072/phmsa-2016-0072-0099.pdf",
      "pdfArtifactSha256": "5c1449257fa8cc66fbd82d2e286f4a65a47e6bfd45585f5c9a1757c357f04288",
      "extractedTextPath": "data/sources/phmsa-special-permits/artifacts/phmsa-2016-0072/phmsa-2016-0072-0099.txt",
      "extractedTextSha256": "bcfc02d9868a216cb5eff625033639f88b48b30623a4686ce0c3e311f20e3e39",
      "pageCount": 22,
      "extractionVersion": 2
    }
  ],
  "citedSections": [
    "195.432",
    "195.3",
    "195.402",
    "190.341",
    "195.450"
  ],
  "caveat": "The issued-permit index establishes issuance, not current validity or applicability to facilities beyond those covered by the permit. Read the official decision and conditions.",
  "jurisdiction": "US",
  "operatorName": "Magellan Midstream Partners"
}
```