# Tennessee Gas Pipeline — Pipeline Special Permit

**Citation:** PHMSA-2019-0152  
**Type / status:** permit / current  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** 2023-03-30  
**Published:** 2023-03-30

PHMSA-2019-0152, issued 2023-03-30 for Tennessee Gas Pipeline's gas transmission system.

## Document text

PHMSA pipeline special permit PHMSA-2019-0152. Operator: Tennessee Gas Pipeline. System: Gas Transmission. Issue date: 2023-03-30.

## Provenance

- Official: Yes
- Source: <https://www.regulations.gov/docket/PHMSA-2019-0152>
- Source ID: `phmsa-special-permits`
- SHA-256: `b1fd9eb448c102a5a111a6c928ce58d48ec48d3afc28e5509c97217be564f0d0`
- Retrieved: 2026-08-20T01:06:17.853Z
- Exported: 2026-08-22T05:34:26.766Z
- Document slug: `phmsa-special-permit-phmsa-2019-0152`

### Source metadata

```json
{
  "materialSubtype": "pipeline_special_permit",
  "operator": "Tennessee Gas Pipeline",
  "system": "Gas Transmission",
  "issuedOn": "2023-03-30",
  "issuanceStatus": "issued",
  "renewal": null,
  "indexUrl": "https://www.phmsa.dot.gov/pipeline/special-permits-state-waivers/special-permits-issued",
  "docketUrl": "https://www.regulations.gov/docket/PHMSA-2019-0152",
  "docketDocumentCount": 16,
  "decisionDocumentCount": 0,
  "decisions": [],
  "citedSections": [],
  "caveat": "The issued-permit index establishes issuance, not current validity or applicability to facilities beyond those covered by the permit. Read the official decision and conditions.",
  "jurisdiction": "US",
  "operatorName": "Tennessee Gas Pipeline"
}
```
