_______________________________________ DRAFT Regulatory Assessment Notice of Proposed Rulemaking Pipeline Integrity Management: Program Modifications and Clarifications [Docket No. RSPA-04-18938] October 2005 Prepared by Economic and Industry Analysis Division Volpe National Transportation Systems Center and Office of Pipeline Safety Department of Transportation 1 governments. In accordance with the regulatory philosophy and principles provided in Sections 1(a) and (b) and Section 6(a)(3)(C) of Executive Order 12866, an economic analysis of the proposed regulatory changes must be conducted. Furthermore, the Regulatory Flexibility Act of 1980, as amended, requires Federal...

## Document text

<<<PAGE 1>>>

_______________________________________
DRAFT Regulatory Assessment
Notice of Proposed Rulemaking
Pipeline Integrity Management:
Program Modifications and Clarifications
[Docket No. RSPA-04-18938]
October 2005
Prepared by
Economic and Industry Analysis Division
Volpe National Transportation Systems Center
and
Office of Pipeline Safety
Department of Transportation
1

<<<PAGE 2>>>

Regulatory Analysis
Introduction
The Office of Pipeline Safety (OPS) in the Pipeline and Hazardous Materials Safety
Administration (PHMSA) proposes modifications to the current Pipeline Safety Regulations for
Pipeline Integrity Management (IMP) in High Consequence Areas. The modifications would
affect Title 49 of the Code of Federal Regulations (CFR) part 192 (Gas Transmission Pipelines)
and part 195 (Hazardous Liquid Operators). The proposed rule would (1) allow more flexibility
in the reassessment interval for hazardous liquid pipelines by adding an eight-month window to
the five-year time frame for operators to complete the reassessment; and (2) (a) require both
hazardous liquid and natural gas operators to notify OPS whenever they reduce pipeline pressure
to make a repair; (b) require hazardous liquid and natural gas operators to provide OPS with the
reason for the pressure reduction; and (c) correct the existing provision for calculating a pressure
reduction on hazardous liquid pipelines to allow operators the use of another acceptable method
for calculating reduced operating pressure (when the specified formula is not applicable, or
results in a calculated pressure higher than the operating pressure).
Background
The Nation’s existing pipeline infrastructure, much of which is over 50 years old, requires
regular safety and environmental reviews to ensure its reliability. To address several statutory
mandates and National Transportation Safety Board (NTSB) recommendations, OPS issued rules
for the regulation of the Integrity Management Program (IMP). Regulations for hazardous liquid
pipeline operators are found in 49 CRF 195.452. Rules found in 49 CFR Subpart O address
regulations of the IMP for gas transmission pipelines. Both the hazardous liquid and natural gas
IMP regulations require operators to continually assess, evaluate, repair, and validate through
comprehensive analysis the integrity of pipeline segments in locales where a leak or rupture
would do the most damage, such as populated and environmentally sensitive areas, otherwise
known as High Consequence Areas (HCAs).
2

<<<PAGE 3>>>

The liquid pipeline IMP rules require operators to establish intervals not to exceed five years for
reassessing the integrity of pipeline infrastructure. Each operator is to have a schedule for the
evaluation and remediation of any anomalous conditions that are discovered. For certain
conditions, the regulations prescribe the timeframes in which an operator must complete the
remediation of the defect. These conditions are categorized as either immediate, 60-day, or 180-
day repair conditions.
This proposed rule would allow more flexibility (i) in the reassessments for hazardous liquid
pipelines by adding an eight-month window to the five-year timeframe for operators to complete
the reassessment; and (ii) by allowing the use of another acceptable method for calculating
reduced operating pressure (when the specified formula is not applicable, or results in a
calculated pressure higher than the operating pressure).
In addition, another proposed revision would require both hazardous liquid and natural gas
operators to notify OPS whenever they reduce pipeline pressure to mitigate a defect and to
provide OPS with the reason for the pressure reduction. With the data collected from such
notifications, OPS seeks to evaluate the scope and scale of repair issues to develop an accurate
baseline for future program development. OPS would also assess the reasons for delay in
scheduling assessments and evaluate the effect of permitting restrictions on delaying
assessments.
Rational for Regulatory Assessment
All proposed and final Federal regulations must undergo economic analysis. Executive Order
12866 directs all Federal agencies to develop both preliminary and final regulatory analyses if
their proposed regulations are likely to be “significant regulatory actions” that may have an
annual impact on the economy of $100 million. The Order also requires a determination as to
whether a proposed rule could adversely affect the economy or a section of the economy in terms
of productivity and employment, the environment, public health, safety, or State, local or tribal
3

<<<PAGE 4>>>

governments. In accordance with the regulatory philosophy and principles provided in Sections
1(a) and (b) and Section 6(a)(3)(C) of Executive Order 12866, an economic analysis of the
proposed regulatory changes must be conducted. Furthermore, the Regulatory Flexibility Act of
1980, as amended, requires Federal agencies to conduct a separate analysis of the economic
impact of proposed rules on small entities, and the Unfunded Mandates Act also requires
economic impact analysis.
In accordance with the above directives, OPS has performed a preliminary evaluation of the
potential compliance costs of the proposed rule and feasible regulatory options, and identified
those benefits that can be expressed in monetary terms. To the extent possible, this is based on
available data and information from a range of pertinent sources. OPS estimates that the impact
of implementing the rule would be less than $100 million annually, and expects that the rule
would not adversely affect the economy or a section of the economy in terms of productivity and
employment, the environment, public health, safety, or State, local or tribal governments.
PHMSA has also determined, as required by the Regulatory Flexibility Act, that the proposed
rule would not have a significant economic impact on a substantial number of small entities in
the United States. Additionally, it was determined that the rule would not impose annual
expenditures of $120.7 million or more on State, local, or tribal governments or the private
sector, and thus would not require an Unfunded Mandates Act analysis.
Alternatives Considered
The goal of this rulemaking is to facilitate the continuous assessment and remediation of the
Nation’s pipeline infrastructure through added flexibility without adversely affecting the safety
of the pipeline system. In developing the NPRM, the following two alternatives were
considered:
1. Do nothing.
4

<<<PAGE 5>>>

2. Adopt the recommendations in the API petition with some modifications and expand
the requirement for notification of pressure reduction to enhance data collection and
evaluation of the IMP.
For the purpose of the regulatory impact analysis, the cost-benefit analysis of option 2 is
evaluated here. Also note that OPS is also seeking the submittal of engineering analyses and
technical data to evaluate the scope and scale of the repair issues. Consequently, the cost-benefit
analysis does not make any assumption on the frequency and scope of the repair issues but is
based on the available data from the Integrity Management Program already in place.
Economic Analysis
In the proposed rule for Modifications and Clarifications to the Pipeline Integrity Management
Program, PHMSA is proposing to amend Parts 192 and 195 in 49 CFR as follows:
• Section 195.452(j)(3):
Change length of intervals for continually assessing the integrity of hazardous liquid
pipelines from five-years (60 months) to five-year intervals that are not to exceed 68
months.
• Section 195.452(h)(4):
Add flexibility in scheduling repairs to hazardous liquid pipelines. For immediate repairs,
OPS proposes to allow hazardous liquid pipeline operators to use another acceptable
method for calculating a reduced operating pressure when the formula in 451.7 of
ASME/ANSI B31.4 (ibr, see §195.3) is not applicable.
• Sections 192.933 and 195.452(h):
Change notification of pressure requirements for gas transmission operators (192.933)
and hazardous liquid pipeline operators (195.452). Currently, an operator must notify
OPS when it cannot meet scheduled repairs or when it cannot provide safety though a
5

<<<PAGE 6>>>

temporary pressure reduction. Operators would now need to notify each time pressure is
reduced and report the reason for the reduction.
PHMSA has previously established the IMP, requiring hazardous liquid and gas transmission
pipelines to regularly schedule the evaluation of pipeline integrity and to repair discovered
defects. The proposed changes would add flexibility to scheduling assessments for hazardous
liquid pipelines, but would not impact the number of entities subject to the existing regulatory
requirements nor impact the number of assessments to be conducted. The frequency of
notification of reduced pressure would increase under the proposed rule changes.
Quantity and Characteristics of Entities Affected by the Proposed Rule
The proposed changes to Section 195.452 would affect all hazardous liquid pipeline operators.
Proposed changes to Section 192.933 would affect all gas transmission operators.
Table 1. Numbers of Pipelines by Type1
Estimated
Pipeline Type
Number of Operators
Hazardous liquid transmission pipelines 263
Natural gas transmission pipelines (includes
gathering lines)
903
TOTAL 1,166
Note that the proposed rule would also impact intrastate operators that are currently affected by
the IMP.
1 Source: PHMSA Hazardous Liquid Annual Reports and Gas Transmission Annual Reports as of 10/2005.
6

<<<PAGE 7>>>

Natural gas transmission pipelines are those lines that connect gas production sources with gas
consumers. Hazardous liquid pipelines are those that deliver hazardous liquids, as defined by
federal pipeline safety regulations, from production or processing facilities to terminals and final
consumers. A total of 1,166 entities would be affected by the proposed rule2
.
Both gas transmission and hazardous liquid pipeline operators are generally large firms.
Therefore, no small entities are affected by the proposed regulatory changes.
Regulatory Impact
All proposed changes to the IMP are cost-effective. The proposed changes to 49 CFR 195.452
would create benefits through added flexibility for liquid pipeline operators without raising the
costs of compliance with reassessment and remediation regulation. The operators would conduct
the same number of inspections and repairs as under existing regulations.
The proposed change to notification requirements would increase the frequency of notification
and thus raise the costs of compliance for both liquid and gas transmission operators. However,
OPS believes that the benefits of the collected data would offset these costs. The data would be
used to better address industry concerns over delays to assessments and repairs caused by
permitting restrictions, to identify other reasons for delays and ways to expedite repairs and to
understand whether prolonged pressure reductions have potential impact on the Nation’s energy
supply.
Estimated Costs of Changes to Reassessment Interval
The primary impact of changes to the reassessment interval is to provide hazardous liquid
operators with extra flexibility in meeting regulatory requirements for continuous evaluation and
repairs of pipelines. These changes are expected to have no effect on costs. The estimated 200
2 Additionally, the proposed rule would affect some intrastate operators that operate HCA miles under IMP program.7

<<<PAGE 8>>>

hazardous liquid pipeline operators would still be required to make the same total number of
inspections and repairs.
Costs may decline slightly for those operators that extend the evaluation interval beyond the
previously required five years, as the costs of excavation would be borne up to the proposed
eight months further into the future. Allowing the reassessment to be completed at an interval no
longer than 68 months should not compromise pipeline safety.
Estimated Costs of Changes to Notification Requirements of Pressure Reduction
The costs of compliance with proposed changes to notification requirements would increase for
both hazardous liquid pipeline and natural gas transmission operators. Without the proposed
change, operators notify OPS only when they cannot meet the schedule for evaluation or
remediation and cannot provide safety through a temporary reduction in pressure. They must also
submit reasons for pressure reductions lasting longer than 365 days. With the proposed rule,
operators would notify OPS every time that pressure is reduced and report the reasons for the
reduction. They would still notify OPS of reductions lasting longer than 365 days. The frequency
of notification would thus increase.
Based on the database on hazardous liquid IMP that includes about 263 operators,3
since May 2002 OPS has received 74 notifications as of May 2005. Among the 74, 36 requests
were due to an operator’s inability to meet repair schedules or reduce pressure; 22 were to use
“other technology”; 13 were to request longer time schedule; and 3 were for other reasons. The
following figure depicts the notification by type of request.
3 The figure is based on inspection conducted over past 3 years. Number of operators include intrastate operators as
well.
8

<<<PAGE 9>>>

Figure 1: Notifications by Type
(Based on the Hazardous Liquid IMP database as of May 2005)
40
35
30
25
20
15
10
5
0
Schedule Technology Interval Other
OPS assumes that an engineering manager, with a fully loaded cost of $64.75 per hour,4 would
take 30 minutes to complete each notification.5 The estimated cost per notification is $32.38.
However, based on the currently available information from the hazardous liquid pipeline IMP
database, the 74 notification requests were submitted by 26 operators over a period of 3 years.
There are 263 Hazardous Liquid operators that filed the 2004 Annual Report,6 and the total
number of anomalies within an HCA Segment meeting the definition of immediate repair
conditions were 1,230 while 644 anomalies were met the 60-day condition and 3,690 anomalies
were met the 180-day condition7. Since this NPRM proposes a notification is required whenever
an operator has to reduce pressure to make a repair. This would include immediate repairs
(required reduction) or any other repairs where an operator chooses to reduce pressure.
4 Based on the 2004 U.S. Department of Labor’s Bureau of Labor Statistics National Industry-Specific Occupational
Employment and Wage Estimates. The median hourly wage of an engineering manager (for NAICS 486000 –
pipeline transportation) is estimated to be $47.96. With an estimated fringe benefit of 35%, the fully loaded coast of
an engineering manager in the pipeline industry is $64.75 per hour.
5 The estimated time includes time to fill up the form as well as some time to collect data, reviews, and approval.
6 As of 10/2005, 263 operators submitted annual reports to OPS. This is the first hazardous liquid annual report
submitted to OPS, therefore the data are preliminary and may change in future.
7 per Part J Item 2 of the Annual Report.
9

<<<PAGE 10>>>

Therefore, this regulatory impact assessment assumes that 263 hazardous liquid operators would
submit about 1,500 notifications per year or about 6 notifications per operator per year and the
same will be true for gas transmission operators.8 Assuming each notification costs $32.38 to
prepare and submit, the estimated total notification cost to the operator is $194.25 annually and
the total cost to the industry (263 hazardous liquid and 903 gas transmission operators times
$194.25) is $226,495 per year.
Through this NPRM, OPS is seeking information on the frequency of the repairs. Based on the
information developed, OPS would develop the total cost of compliance for the industry.
Estimated Benefits of Changes to Reassessment Interval and Repair Schedules
Based on the information on frequency and scope of the repairs, OPS would quantify or
monetize the benefits of the proposed changes to the reassessment interval for hazardous liquid
pipeline operators in future. However, the benefits to the industry would be positive. The added
flexibility would better allow the operators to meet established regulatory requirements in more
cost-effective ways. Operators would be better able to plan around adverse weather and other
unforeseen circumstances that may delay assessment and in turn, repairs. The added flexibility
would thus help the industry to avoid unscheduled delays.
Estimated Benefits of Changes to Notification Requirements for Pressure Reduction
Currently, OPS does not have the information needed to quantify or monetize the benefits of the
proposed changes to the notification requirements for pressure reductions. The benefits would
result from data collected from the notifications. The data would be used to study the causes of
delays in pipeline assessment and repairs, especially the effect of permitting restrictions on the
delays. Such analyses can lead to further improvements in the pipeline IMP and the addressing of
8 This is a rough estimate – 1,500/263 ≈ 6 based on only 1 year worth of data.
10

<<<PAGE 11>>>

the causes of delays. The data would also be used to study the effect of prolonged pressure
reductions on the Nation’s energy supply.
Benefits and Costs Assessment
The proposed changes to add flexibility to the scheduling of continuous assessment would create
ongoing benefits and have no cost effects. These modifications would thus create positive net
benefits. The changes to notification requirement for pressure reduction would create additional
ongoing costs as well as benefits. The benefits are expected to offset the costs. Together, these
proposed modifications to the IMP for hazardous liquid and gas transmission pipelines are
expected to create positive net benefits.
Regulatory Flexibility Analysis
The Regulatory Flexibility Act (5 U.S.C. 601 et seq.) requires an agency to review regulations to
assess their impact on small entities unless the agency determines that a rule is not expected to
have a significant impact on a substantial number of small entities. Most hazardous liquid
pipeline operators and the natural gas transmission operators do not meet the Small Business
Administration’s definition of small business, which is either $6.0 in revenue (for natural gas
pipelines – NAICS 486210) or 1,500 employee size (for crude oil and refines petroleum product
pipelines – NAICS 486110 and 486910)9. The notification cost per operator is about $194.25
annually, i.e., less than 0.003% of the gross revenue of $6 million per operator. Therefore, the
requirements in this NPRM do not have a significant impact on pipeline operators, including
small entities.
9 http://ecfr.gpoaccess.gov/cgi/t/text/text-
idx?c=ecfr&sid=eeb26803b82759a11a87d80990f9b044&rgn=div5&view=text&node=13:1.0.1.1.14&idno=13#13:1
.0.1.1.14.1.231.2
11

<<<PAGE 12>>>

12

## Provenance

- Official: Yes
- Source: <https://downloads.regulations.gov/PHMSA-RSPA-2000-7666-0364/attachment_1.pdf>
- Source ID: `regulations-gov`
- SHA-256: `bf78a0fe093e0688861508db033988118f8b4b2ba8131ce8d8b326a58fab3bac`
- Retrieved: 2026-08-20T02:22:46.679Z
- Exported: 2026-08-22T15:45:14.245Z
- Document slug: `regulations-gov-attachment-0900006480e8a885`

### Source metadata

```json
{
  "materialSubtype": "regulations_gov_agency_attachment",
  "parentDocumentId": "regulations-gov-document-phmsa-rspa-2000-7666-0364",
  "regulationsGovDocumentId": "PHMSA-RSPA-2000-7666-0364",
  "docketId": "PHMSA-RSPA-2000-7666",
  "attachmentId": "0900006480e8a885",
  "format": "pdf",
  "authorshipClass": "agency_authored",
  "rightsClass": "federal_work",
  "ingestionDecision": "ingest",
  "decisionBasis": [
    "organization:U.S. DOT/PHMSA",
    "title:U.S. DOT/PHMSA - Regulatory Assessment: IMP Modifications"
  ],
  "summaryEligibility": "eligible",
  "jurisdiction": "US"
}
```