Preliminary Regulatory Analysis^ '•*' . -~\ i ' \ l v--._ "'^.\^ . O Notice of Proposed Rulemaking m Pipeline Safety: Pipeline and Liquefied Natural Gas Reporting Requirements [Docket No. PHMSA-08-0291] RIN2137-AE33 < February 20009 o o liJ 2.3.3. Option 3. Different Reporting Requirements for Small Operators PHMSA considered setting different requirements for large and small operators, basing the requirements on estimated differences in expected costs and benefits. PHMSA is aware that some regulations, rules, and Government policies place a...

## Document text

<<<PAGE 1>>>

Preliminary Regulatory Analysis^ '•*'
. -~\ i ' \ l v--._
"'^.\^ . O
Notice of Proposed Rulemaking
m
Pipeline Safety:
Pipeline and Liquefied Natural Gas Reporting
Requirements
[Docket No. PHMSA-08-0291]
RIN2137-AE33
<
February 20009
o
o
liJ

<<<PAGE 2>>>

ECONOMETRICA, INC.

<<<PAGE 3>>>

Table of Contents
Executive Summary iii
Introduction 1
1. Background 2
2. Regulatory Impact Analysis 3
2.1. Introduction 3
2.2. Identification of the Problem 3
2.3. Identificationof Available Alternative Approaches 5
2.3.1. Baseline: No Action 5
2.3.2. Option 2. Require Direct Data Submission to the NPMS 6
2.3.3. Option 3. Different Reporting Requirements for Small Operators 7
2.3.4. Option 4. Adopt Proposed NPRM Changes in Reporting Requirements 7
2.3.5. Linking Proposed Actions to Improved Pipeline Data Quality and Risk
Targeting 8
2.4. Baseline Data 10
2.4.1. Pipeline Information 10
2.4.2. Baseline Risk Trends 12
2.4.3. Electronic Filing Baseline 17
2.5 Costs of Complying with the Requirements of the Proposed Rule 19
2.5.1 Requirement One - Change the Scope of Part 191 to Reflect the Change to the
Definition of Gas Gathering Line in Part 192 20
2.5.2 Requirement Two - Change the Definition of "Incident" for Gas Pipelines and
LNG Facilities 21
2.5.3. Requirement Three - Require Operators of HL Pipelines to Report Pipeline
Information by State in the Annual Report for HL Pipelines 24
2.5.4. Requirement Four - Require LNG Operators to Submit Incident and
Annual Reports 26
2.5.5. Requirement Five - National Pipeline Operator Identification Registry 2.5.6. Requirement Six - Electronic Reporting and Filing of Required Reports 27
31
2.5.7. Requirement Seven - Merge Gas Transmission Gas Integrity Management
Semi-Annual Performance Measures Report with the Gas Transmission Operator
Report 32
2.5.8. Requirement Eight - Require a Safety-Related Condition Report 34
2.5.9 Requirement Nine - Modify HL Operator Telephonic Notification of Accident
Reporting Requirement 34
2.5.10. Total Costs Associated with the Proposed Rule 35
2.6. Benefits of the Proposed Rule 35
2.6.1. Average Number of Significant Pipeline Incidents 36
2.6.2. Calculated Annual Societal Costs Using a VSL of $5.8 Million 37
2.6.3. Comparison of the Costs and Benefits 38
Appendix A— Analyses Using VSLs of $3.2 and $8.4 Million 42
A.l. Significant Incidents in the Pipeline System 42
A.2. Comparison of the Costs and Benefits 42
Appendix B — Regulatory Flexibility Analysis 47
Initial Regulatory Flexibility Analysis 47

<<<PAGE 4>>>

Appendix C — Paperwork Reduction Act Analysis (44 U.S.C. 3501 et seq.) 54
C.l Paperwork Reduction 54
C.2 Burden Hours and Cost of PHMSA Proposed Rule to HL, NG Pipeline Operators
and LNG Facility Operators 55
Appendix D —PHMSA/OPS Environmental Checklist and Assessment 60
D.l Environmental Checklist 60
Project Description 60
D.2 Draft Environmental Assessment 65
D.2.1 Background Error! Bookmark not defined.
D.2.2. Market Segments Affected and Requirements of the Proposed Rule Error!
Bookmark not defined.
D.2.3 Alternatives Considered Error! Bookmark not defined.
D.2.4. Environmental Effects of the Proposed Rule..Error! Bookmark not defined.
n

<<<PAGE 5>>>

Executive Summary
The Pipeline and Hazardous Materials Safety Administration (PHMSA) has issued a
Notice of Proposed Rulemaking (NPRM) to improve the reliability and utility of data
collections fi"om hazardous liquid (HL) pipeline operators, natural gas (NG) pipeline
operators, and liquefied natural gas (LNG) facility operators. The rule proposes revisions
to the accident and operator annual reports that are intended to address recognized and
needed improvements to the data. These improvements will maximize the quality,
objectivity, utility, reliability, and integrity of the pipeline data. As part of PHMSA's
strategy to become more risk-based and data driven, these improvements will enhance
PHMSA's ability to: understand, measure, and assess the performance of operators;
integrate safety data to allow a more accurate assessment of risk; and simplify paperless
reporting by operators.
PHMSA proposes the following regulatory amendments and changes to the 49 CFR to
enhance general data and data management improvements for pipelines: (1) Modify the
scope of part 191 addressed in 49 CFR Section 191.1 to reflect the changes made in the
scope of part 192 to the definition of gas gathering lines; (2) Change the definition of an
"incident" to require an operator to report a fire not intentionally set by the operator, or
an explosion, and establish a volumetric basis for reporting unexpected or unintentional
gas loss; (3) Require operators of hazardous liquid pipelines to submit pipeline
information by State on the annual report for hazardous liquid pipelines; (4) Require
operators of Liquefied Natural Gas (LNG) facilities to submit incident and annual
reports; (5) Create and require participation in a National Pipeline Operator Registry; (6)
Require operators to report and file data electronically whenever possible; (7) Merge the
natural gas transmission integrity management (IM) Semi-Annual Performance
Measures Report with the annual reports; (8) Require operators to use a standard form in
submitting Safety-Related Condition Reports; and (9) Modify HL operator telephonic
notification of accidents.
These revisions will result in improvements not only to the data, but also to the analyses
PHMSA relies on to make critical safety-related decisions and allocate scarce agency
resources based on risk.
In this regulatory evaluation report, the benefits and costs of the proposed regulatory
changes are examined. Additionally, the report includes an environmental assessment
and addresses other mandatory analyses, including those required by the Regulatory
Flexibility Act and the Paperwork Reduction Act (PRA). The analyses find that the
proposed rule is not expected to adversely affect the economy or the environment.
Both the expected costs and projected benefits of the rule are estimated to be relatively
low, and the rule is likely to yield net benefits at very low levels of effectiveness. The
aggregate cost of the proposed rule to all pipeline operators is between $1.3 million and
$2.0 million. The present value of net benefits is estimated to range from about $62
million to $76 million. The rule is also considered to be cost effective if only one
111

<<<PAGE 6>>>

incident is avoided approximately every 19 months due to the rule. From an economic
perspective, these analyses demonstrate that the rule is in the public interest. This is
neither an economically significant regulatory action under Section 3(f)(1) of Executive
Order 12866 nor under the U.S. Department of Transportation's (DOT) regulatory
policies and procedures (44 FR 11034).
IV

<<<PAGE 7>>>

Introduction
The Pipeline and Hazardous Materials Safety Administration (PHMSA) has issued a
Notice of Proposed Rulemaking (NPRM) to improve the reliability and utility of data
collections from operators of hazardous liquid (HL) pipelines, natural gas (NG) pipelines,
and liquefied natural gas (LNG) pipelines. The revisions to the accident reports and
operator annual reports are intended to address needed improvements to the data and to
maximize the quality, objectivity, utility, reliability, and integrity of the pipeline data. As
part of PHMSA's strategy to become more risk-based and data driven, these
improvements will enhance PHMSA's ability to: Understand, measure, and assess the
performance of operators; integrate safety data to allow a more accurate assessment of
risk; and simplify paperless reporting by operators.
PHMSA's proposed rule is in response to various recommendations from the
Government Accountability Office (GAO), the U.S. Department of Transportation
Inspector General (DOTIG), the National Transportation Safety Board (NTSB), PHMSA
and DOT internal assessments, and industry petitions for improved data quality to
evaluate the safety performance of the pipeline industry and to aid regulatory decision
making. PHMSA proposes the following regulatory amendments and changes to the 49
CFR to enhance general data and data management improvements for pipelines:
1. Modify the scope of part 191 addressed in 49 CFR Section 191.1 to reflect the
changes made in the scope of part 192 to the definition of gas gathering lines.
2. Change the definition of an "incident" in 49 CFR Section 191.3 to require an
operator to report a fire not intentionally set by the operator, or an explosion, and
establish a volumetric basis for reporting unexpected or unintentional gas loss.
3. Require operators of hazardous liquid pipelines to submit pipeline information by
state on the annual report for hazardous liquid pipelines.
4. Require operators of Liquefied Natural Gas (LNG) facilities to submit incident
and annual reports.
5. Create and require participation in a National Pipeline Operator Registry.
6. Require operators to report and file data electronically whenever possible.
7. Merge the natural gas transmission integrity management (IM) Semi-Annual
Performance Measures Report with the annual reports.
8. Require operators to use a standard form in submitting Safety-Related Condition
Reports.
9. Modify hazardous liquid operator telephonic notification of accidents.

<<<PAGE 8>>>

These revisions will result in improvements not only to the data, but also to the analyses
PHMSA relies on to make critical safety-related decisions and allocate scarce agency
resources based on risk.
The proposed regulatory changes are authorized by statutory authority to carry out
pipeline safety duties under 49 U.S.C. 60101 et seq. (the pipeline safety laws), 49 U.S.C.
5101 et seq. (the hazardous material fransportation laws), and the Pipeline Inspection,
Protection, Enforcement and Safety Act of 2006 (PIPES) (Public Law No. 109-468).
Executive Order 12866 directs all Federal agencies to develop both preliminary and final
regulatory analyses if their proposed regulations are likely to be "significant regulatory
actions" that may have an annual impact on the economy of $100 million. The Order
also requires a determination as to whether a proposed rule could adversely affect the
economy or a section of the economy in terms of productivity and employment, the
environment, public health, safety, or State, local or tribal governments. In accordance
with the regulatory philosophy and principles provided in Sections 1 (a) and (b) and
Section 6(a)(3)(C) of Executive Order 12866, an economic analysis of the proposed
regulatory changes is required.
DOT does not consider this proposed rule to be a significant regulatory action under
section 3(f) of Executive Order 12866 (58 FR 51735; October 4, 1993). This NPRM is
also not significant under DOT's regulatory policies and procedures (44 FR 11034;
February 26, 1979). PHMSA prepared a Draft Regulatory Evaluation for this NPRM and
placed it in the public docket.
1. Background
The Natural Gas Pipeline Safety Act of 1968 and the Hazardous Liquid Pipeline Safety
Act of 1979 require the reporting of incidents on natural gas transmission and distribution
pipelines. These reporting requirements, as defined in 49 CFR Section 191.15, mandate
that operators report any incident that meets certain specific conditions. These
requirements were revised in 1984 and again in 2002. Additionally, in 2002, OPS issued
a rule that required hazardous liquid pipeline operators to file an annual report similar to
the annual report already required for natural gas transmission and distribution pipeline
operators.
More recently, PHMSA recognized the need to revise several components of the rules
relating to data reporting, including revisions to Section 191.3 and 195 subpart B (to
modify reporting requirements for operators of hazardous liquid pipelines); Section 191
references to LNG operators; to create a National Pipelines Owner/Operator Registry;
and to facilitate elecfronic data collection.
PHMSA is the nation's repository for pipeline data. These data are used by many entities
for various reasons, including planning purposes, safety-related research, critical public
safety information, and statistical analysis. This NPRM is intended to address recognized
needed improvements and enhance safety by ensuring that PHMSA has accurate safety

<<<PAGE 9>>>

data to manage and reduce risks associated with natural gas transmission and hazardous
liquid pipeline systems and LNG facilities.
2. Regulatory Impact Analysis
2.1. Introduction
Executive Order 12866 directs all Federal agencies to develop both preliminary and final
regulatory analyses if their regulations are likely to be "significant regulatory actions"
that may have an annual impact on the economy of $ 100 million or more. The Order also
requires a determination as to whether a rule could adversely affect the economy or a
section of the economy in terms of productivity and employment, the environment, public
health, safety, or state, local or tribal governments. This requirement applies to
rulemakings that rescind or modify existing rules as well as to those that establish new
requirements. Whereas regulatory analysis is used to anticipate and evaluate the likely
consequences of rules, cost-benefit analysis is a primary tool for such analysis. This tool
provides decision-makers with a clear indication of the most efficient alternative—that is,
the alternative that generates the largest net benefits to society (ignoring distributional
effects).
This regulatory analysis:
1. Identifies the target problem, including a statement of the need for the proposed
action.
2. Identifies available alternative approaches.
3. Defines the baseline.
4. Defines the scope and parameters of the analysis.
5. Defines and evaluates the costs and benefits of the proposed action and the main
alternatives identified by the analysis.
6. Compares the costs and benefits.
7. Interprets the cost and benefit results.
In accordance with the above directives, PHMSA has performed a preliminary evaluation
of the potential compliance costs of the proposed rule and feasible regulatory options and
identified those benefits that can be expressed in monetary terms.
2.2. Identification of the Problem
As the nation's repository for pipeline data, PHMSA is responsible for maintaining the
most comprehensive collection of accident and incident data for both infrastate and
interstate pipelines. PHMSA is subject to constant and continued interest and scrutiny by
various stakeholders for the reliability, utility, and applicability of pipeline data. PHMSA
is currently confronted with several data-related strategies to address shortcomings and
gaps in data collection. These gaps arise from changing industry and business practices.

<<<PAGE 10>>>

as well as changes in PHMSA's regulations and changes in PHMSA's own data-analysis
strategies and objectives.
There are several problem areas:
• Currently PHMSA's data cannot fully support regulatory oversight activities.
Some factors that contribute to this include:
1. Definitions of certain key terms in current reporting requirements do not
reflect the contribution of extraneous factors that could influence the
frequency of reported incidents (e.g., inflationary price increases have led to a
steep rise in the cost of various pipeline transported commodities, resulting in
a higher number of incident reports).
2. Lack of incident information on "near misses," such as explosions and fires
that do not cause serious damages or injuries, decreases the value of
vulnerability assessments in IM programs.
3. Lack of consistent causal information in the current incident databases due to
a non-systematic approach for data collection leads to data gaps. Operators
use varying methods to report incidents. For example, reports can be
submitted online and by fax, letter, and e-mail. In the absence of a systematic
approach to data collection, PHMSA is not able to validate or assess risks
posed by specific pipeline operators.
• LNG operators are exempt from annual and incident reporting requirements.
Quality and availability of data on LNG facilities are inadequate for monitoring
the safety performance of this critical portion of the infrastructure. The proposed
reporting requirement provides PHMSA with timely information needed for
facility risk evaluation and accurate user fee assessments.
• Annual reports do not support an efficient assessment of pipeline vulnerabilities.
Currently, HL operators do not report state-specific information in their annual
reports. The HL operators report mileage operated, pipeline characteristics, and
integrity management operation in the aggregate. Nationally aggregated
information on HL pipelines does not provide the level of detail or the State-
specific information necessary for PHMSA to understand, monitor, and assess
safety performance and risks posed by the pipelines. For example, the HL pipeline
annual reports show approximately 314 pipeline operators with a total of 165,000
miles of pipelines. Data from the National Pipeline Mapping System (NPMS),
which contains mileage by State, do not support these statistics (the latest NPMS
submission shows about 310 operators reporting a total of approximately 175,000
pipeline miles).
• There is no consistent method of registering pipeline owners and operators.
PHMSA needs to be able to maintain control over operator identification numbers
and the associated contact information. Currently, PHMSA cannot meaningfully
analyze and normalize data received from pipeline operators across different

<<<PAGE 11>>>

reporting requirements. Under the Pipeline Safety Improvement Act of 2002,
Congress requires operator identification information so that PHMSA can assess
operator compliance with the NPMS. With the information currently available,
PHMSA cannot fiilly determine which companies constitute the universe of
operators and whether or not "umbrella" companies had submitted data for other
related companies.
• Incident data reported to PHMSA are currentiy provided primarily through paper
filings. These paper reports are often incomplete and inconsistent, eind the forms
improperly filled out. If an operator enters data inconsistently on paper reports,
both the States and PHMSA are prevented from identifying system-wide
problems with respect to that operator, impeding optimal pipeline safety
oversight.
2.3. Identification of Available Alternative Approaches
PHMSA considered four alternatives to the proposed rule for implementing its data
collection requirements. After reviewing the four options, PHMSA selected the proposed
alternative which provides that the reporting requirements discussed earlier be applied to
all operators.
2.3.1. Baseline: No Action
Under this option, PHMSA would maintain existing requirements for reporting by taking
no action. However, PHMSA believes that this would not effectively support the
Agency's safety mission. Given the magnitude of the accident risks and economic losses
currentiy prevailing in the industry, as documented later in this report, a do-nothing
alternative is not an acceptable option. Taking no action would prolong the adverse
conditions currently prevailing in the industry, including:
• Inability to mitigate potential safety issues due to inadequate decision-making
capability, stemming from lack of needed information about the location of
hazardous liquid accidents and LNG facilities.
• Inability to address the safety due to the poor quality of data on natural gas
pipelines incident reports, and inadequate information on operators contained in
the annual reports and OPID.
• Inefficiencies in, and high costs of, processing and correcting error-prone paper-
based reports; inadequate information sent to the OPID; and failure to meet the
DOT strategic goals for E-Govemment.
By not taking action the Agency would be unresponsive, there would likely be no
reductions in the array of safety risks, and data collection inefficiencies and gaps
identified in the NPRM would continue to exist. Although taking no action would
eliminate additional compliance costs, there would be no reduction in the societal costs

<<<PAGE 12>>>

associated with the deaths, injuries, and property damages. This results in zero net
benefits. Thus, this alternative is the baseline for comparison with other alternatives.
2.3.2. Option 2. Require Direct Data Submission to the NPIVIS
The NPMS is created by PHMSA in cooperation with other Federal and State
governmental agencies and the pipeline industry. The NPMS consists of geospatial
attribute data related to natural gas fransmission and HL pipelines and LNG facilities
under PHMSA's jurisdiction. The NPMS is built and maintained using information
supplied by firms that operate pipeline and LNG facilities.
To date, pipeline facility data in the NPMS are submitted by pipeline operators on a
voluntary basis. Under Option 2, PHMSA would require all operators to adhere to
NPMS data standards for all submissions. Operators would be provided with access to
sample maps and submission checklists and information on data standards available for
online review and downloading.
This option would enable PHMSA to use the NPMS as a tool for decision support,
emergency response, inspection planning, community access, and regulatory compliance.
PHMSA will also be able to use the risk-based pipeline integrity management data
obtained from the NPMS for rulemaking. Through visualization, geospatial analysis, and
the integration of various databases, PHMSA will be able to use the NPMS to help ensure
the safe, reliable, and environmentally sound operation of the nation's pipeline
fransportation system.
This option was not selected for several reasons. To submit the proposed information via
the NPMS as opposed to other means, PHMSA would have to make modifications to the
existing geospatial technological architecture of the NPMS to accept the substantial data
elements that would have to be submitted if the NPMS were to generate the proposed
State totals. These modifications would be costly, and the costs are not currently
budgeted or planned for. To retrofit the NPMS into a format that could meet the
requirement, PHMSA would have to put in several years of planning and extensive work.
Additionally, we do not know the percentage of the hazardous liquid industry that
currently have geospatial data in a format that would enable such a submission. Many
small companies are not American Petroleum Institute (API) or Association of Oil Pipe
Lines (AOPL) members, and PHMSA would need to better understand the universe of
capabilities for such a consideration.

<<<PAGE 13>>>

2.3.3. Option 3. Different Reporting Requirements for
Small Operators
PHMSA considered setting different requirements for large and small operators, basing
the requirements on estimated differences in expected costs and benefits. PHMSA is
aware that some regulations, rules, and Government policies place a disproportionate
burden on small firms and enfrepreneurs. Consequently, to promote entrepreneurship.
Government agencies have sometimes granted small businesses special regulatory
treatment, such as exemptions from legislation or extended deadlines for compliance.
PHMSA judged that these considerations were not sufficient to recommend reporting
requirements based on business size. This option was not chosen because PHMSA
concluded that allowing disparate reporting would not meet its informational needs. The
Agency believes reporting must provide relevant information that is useful for the
decision-making needs of groups for whom the information is provided. PHMSA
determined, therefore, that allowing for firm size would dampen the regulation's
effectiveness and that special regulatory freatment would not, in fact, help small
businesses. PHMSA believes that although there may be a learning curve for small
entities, with practice and guidance—which PHMSA is willing to provide—small
operators will leam how to comply with the proposed reporting requirements.
2.3.4. Option 4. Adopt Proposed NPRM Changes in
Reporting Requirements
PHMSA has chosen Option 4, the proposed rule changes in this NPRM, as the most
reasonable of the four options, based on the OMB criteria for regulatory evaluation. This
option responds to various Government Accountability Office (GAO), DOT Inspector
General (DOT IG), and National Transportation Safety Board recommendations. This
option is PHMSA's preferred option and requires the following proposed changes:
1. Modify the scope of part 191 addressed in 49 CFR Section 191.1 to reflect
the changes made in the scope of part 192 to the definition of gas
gathering lines.
2. Change the definition of an "incident" in 49 CFR Section 191.3 to require
an operator to report a fire not intentionally set by the operator, or an
explosion, and establish a volumetric basis for reporting imexpected or
unintentional gas loss. This requirement will more accurately depict the
safety performance of gas pipelines over time.
3. Require operators of hazardous liquid pipelines to submit pipeline
information by state on the aimual report for hazardous liquid pipelines.
This data will allow PHMSA to improve its allocation of inspection and
other resources due to an improved understanding of the infrastructure it
regulates.
4. Require operators of Liquefied Natural Gas (LNG) facilities to submit
incident and annual reports. This data will provide valuable infrastructure

<<<PAGE 14>>>

information to PHMSA, and allow for a more thorough evaluation of the
safety performance of LNG facilities.
5. Create and require participation in a National Pipeline Operator Registry.
This data will provide PHMSA with timely updates on significant and
potential safety-impacting changes occurring under its purview, and help
PHMSA to better monitor and assess operator performance.
6. Require operators to report and file data electronically whenever possible.
The electronically submission of data will increase the accuracy and
quality of data collected which, in turn, will improve PHMSA's data
integration efforts. Electronic submission will also reduce the reporting
burden on operators.
7. Merge the natural gas transmission integrity management Semi-Annual
Performance Measures Report with the annual reports. This change will
significantly reduce the reporting burden on operators by changing the
current semi-annual requirement to an annual requirement.
8. Require operators to use a standard form in submitting Safety-Related
Condition Reports. This will ensure consistency of data submitted across
the pipeline industry.
9. Modify hazardous liquid operator telephonic notification of accidents to
require operators to have a procedure to calculate and provide a reasonable
initial estimate of released product and maintain a record of the procedure
used for reporting and to provide an additional telephonic report to the
National Response Center if significant new information becomes
available during the emergency response phase.
HL pipeline operators, NG transmission and distribution pipeline operators, and LNG
facilities are impacted by this proposed rule. PHMSA has determined that an Industrial
Engineer would be able to address the requirements under this proposed rule. Table 1
below summarizes the baseline data elements used in this analysis.
2.3.5. Linking Proposed Actions to Improved Pipeline Data Quality and Risk
Targeting
Given the anticipated outcomes outlined in this section, the proposed data reporting
requirements are justified. The proposed requirements presume an implicit linkage
between the elements of the proposed changes in data reporting requirements and the
following expected improvements.
2.3.5.1 Improved Efficiency of incident Anaiysis, More Effective Risl( Assessment
and Targeting
PHMSA and industry representatives believe that better risk management can both
improve safety outcomes and effectively allocate Agency resources cost effectively.
Improved reporting will expand the Agency's ability to analyze pipeline incidents, events
and the causes of potential pipeline incidents, as well as to examine both the likelihood

<<<PAGE 15>>>

and severity of potential pipeline incidents. To strengthen the linkage between risk
reduction and improved reporting requirements, PHMSA proposes to:
• Amend Section 191.3 definition of "incident" for natural gas pipeline operator
reports will improve the efficiency of data collection. New risk-based
information will enable PHMSA to focus more attention on high- to moderate-
impact incidents, as the number of reported minor and low-impact incidents will
be reduced.
•
•
Revise §195.49 (subpart B - Annual Reports) to require operators of hazardous
liquid pipelines to submit certain infrastructure and IM data by State. By
identifying the location of high-risk accidents, State inspectors can utilize safety
assessment tools and PHMSA can target mitigation measures.
Amend Sections 191 and 195 to require LNG operators to submit incident reports,
and HL pipeline operators to submit risk-based and location-specific annual
reports. This will improve PHMSA's capability to conduct risk-based assessment
of pipeline vulnerabilities and improve performance monitoring.
Require the semi-annual natural gas IM reports' incorporation into the annual
report. This will reduce compliance costs for interstate pipeline operators while
improving PHMSA ability to conduct risk-based vulnerability assessments.
2.3.5.2 improved Data Quality Leads to Accurate Data Reporting and Improved
Productivity of PHMSA and Pipeline Operators
The linkage between gains in accuracy, worker productivity, and improved reporting
requirements can be made in the following ways:
• Revising reporting requirements for HL, LNG, and NG transmission operators
that will improve data accuracy and consistency across reporting units and make it
possible to link the reports with the NPMS to enhance its function.
• Creating an OPID Registry that will improve the quality and accuracy of the data,
facilitate development of a more comprehensive inventory of operators, and
reduce data submission errors and inconsistencies.
•
Requiring operators to provide advance notice of new pipeline construction that
will similarly improve data quality and forecasting capability.
•
Requiring elecfronic submissions that will be more efficient, more accurate, and
cheaper.

<<<PAGE 16>>>

2.4. Baseline Data
2.4.1. Pipeline Information
The energy fransportation network of the United States consists of over 2 million
miles of pipelines. The network includes approximately:
• 170,000 miles of onshore and offshore HL pipeline;
• 295,220 miles of onshore and offshore NG Transmission pipelines;
• 1,900,000 miles of NG Distribution pipelines;
• LNG Plants connected to our natural gas transmission and distribution systems;
and
• Propane Distribution System pipelines.
The pipeline industry is extremely diverse. Pipeline systems vary in size and complexity.
These pipelines are operated by approximately 2,600 operators, large and small. PHMSA
believes an industrial engineer would best respond to the requirements of the proposed
rule.
Baseline Paratnetecs
No. of operators'
Pipeline mileage'^
Average hourly wage rate for an
engineer, based on BLS data
Average hourly wage rate for an
engineer based on industry
estimates
Table 1. Pipeline Information
HL
Pipelines
314
170,000
$40.39
$60.00
NatujRalGas
Transttiission
950
295,220
$37.21
$60.00
Natttral^iias ?
I»strlbtfc-c-. :... ,
1,262
1,900,000
$37.21
$60.00
fl::
77
NA
$37.21
$60.00
2.4.1.1. HL Pipelines
Gathering pipeline systems gather crude oil from production wells. Crude oil pipeline
systems transport crude oil from the gathering systems to refineries. Crude oil systems
can be tens to hundreds of miles in length and cross state and continental borders.
Pipeline systems transport refined products such as gasoline, kerosene, and many
industrial feedstock petrochemicals from refineries to the end user or to storage and
distribution terminals. Refined products pipelines can extend tens to thousands of miles
and cross state and continental borders. The pipe used in oil pipeline systems can range in
http://ops.dot.gov/stats/DT98.htm.
http://primis.phmsa.dot.gov/comm/PipeUneBasics.htm.
' BLS. May 2006 National Industry-Specific Occupational Employment and Wage Estimates. See
http://www.bls.gov/oes/current/naics3_486000.htm.
* Average hourly wage rate is based on conversations with a few pipeline industry representatives.
10

<<<PAGE 17>>>

size from 2 inches to 42 inches in diameter. Oil pipeline systems are owned and operated
by many different companies. The location, construction, and operation of these systems
are generally regulated by federal and state regulations.
2.4.1.2. Natural Gas Pipelines
Natural gas transmission pipeline systems transport natural gas thousands of miles across
many parts of the continental United States. Natural gas distribution pipeline systems can
be found in thousands of communities from coast to coast and distribute natural gas to
homes and businesses. The pipe used in natural gas pipeline systems can range in size
from 2 inches to 42 inches in diameter. Natural gas gathering and fransmission pipeline
systems are constructed from steel pipe. However, natural gas distribution systems can be
constructed from steel or plastic pipe. The use of modem plastic pipe for distribution
systems is becoming more and more prevalent today. Natural gas pipeline systems are
owned and operated by many different companies. The location, construction, and
operation of these systems are generally regulated by federal and state regulations.
2.4.1.3. LNG Facilities
LNG is the liquid form of natural gas - natural gas which has been cooled to the point
that it condenses to a liquid. Although LNG has been fransported safely in the U.S.,
security has been a concern of both Federal agencies and the industry. PHMSA prescribes
safety standards concerning the location, design, installation, construction, initial
inspection, and testing of new onshore and offshore LNG facilities. In cooperation with
the Interstate Natural Gas Association of America, OPS formed a task force to develop
and oversee industry-wide security standards "for critical onshore and offshore pipelines
and related facilities, as well as LNG facilities."' Technological improvements made
since the 1940s have made LNG facilities much safer. Serious risks remain, however,
because LNG is inherentiy volatile and is usually stored in large quantities.^ With the
endorsement of the OPS, in September 2002, the association's task force issued security
guidelines for natural gas infrastructure, including LNG facilities.^
Since September 11, 2001, the U.S. LNG industry and Federal agencies have put new
measures in place to both protect the LNG infrastructure and respond to potential terrorist
attacks. In 2004, the Federal Energy Regulatory Commission formed a new LNG
Engineering Branch within its Office of Energy Projects that is devoted to the safety and
security of LNG facilities. More recently, in May 2006, the Commission created a new
LNG Compliance Branch within its Office of Energy Projects to fiirther ensure the use of
^ Haener, William J., CMS Energy Corp. Testimony on behalf of the Interstate Natural Gas Association of
America (INGAA) before the House Transportation and Infrastructixre Subcommittee on Highways and
Transit. February 13, 2002: p. 4.
* Congressional Research Service (CRS) "Liquefied Natural Gas (LNG) Infrastructure Security:
Background and Issues for Congress," September 2003: p. 9.
' Interstate Natural Gas Association of America (INGAA), "Security Guidelines Natural Gas Industry
Transmission and Distribution," Washington, DC, September 6, 2002.
* CRS "Liquefied Natural Gas (LNG) Infrastructure Security: Background and Issues for Congress,"
September 2003: Executive Summary. Also see http://www.energv.ca.gov/lng/safetv.html. Liquefied
Natural Gas Safety.
11

<<<PAGE 18>>>

sound .:>w«iiJ engineering practices and appropriate safety and security measures during the
construction and operation of LNG facilities.^
2.4.2. Baseline Risk Trends
Over the years, OPS has partnered with industry to investigate the potential application of
risk management within the pipeline industry. Together they have concluded that risk
analysis and management requires suitable and sufficient data. However, the monitoring
of performance over time suggests that certain initial assumptions and data elements are
inadequate and need to be updated.
The information for LNG plants is mainly derived from outside sources. Table 2 below
contains a listing of LNG indents.
Table 2. The History of LNG Incidents in the U.S 10
'l°# ^te ^
• % - ; ^ ^ , : : " *
' • • %
•c^t • m . :
1944 East Ohio Gas
Cleveland,
LNG Tank
OH
128
deaths
LNG peak shaving facility. Tank failure
and no earthen berm. Vapor cloud formed
and filled the surrounding streets and
storm sewer system. Natural gas in the
vaporizing LNG pool ignited.
1969 LNG tank Portland,
OR
An explosion occurred in an LNG tank
under construction. No LNG had ever been
introduced into the tank. The cause of the
accident was attributed to the accidental
removal of blinds from natural gas
pipelines which were connected to the
tank. This led to the flow of natural gas
into the tank while it was being
constmcted.
1973 Texas Eastem
Transmission
LNG
Staten
Island, NY
40
deaths
Industrial incident unrelated to the
presence of LNG (incident). During
repairs, vapors associated with the
cleaning process apparently ignited the
mylar liner. Fire caused temperature in the
tank to rise, generating enough pressure to
dislodge a 6-inch thick concrete roof,
which then fell on the workers in the tank.
1974 Massachusetts Loading None Valve leakage. Deck fractures.
For additional information on LNG plants see Liquefied Natural Gas: An Overview of the LNG Industry
for Fire marshals and Emergency Responders.
http://primis.phmsa.dot.gov/comm/publications/LNG_for_Fire_Marshals_06-2005 .pdf?nocache= 1982
'* ^ University of Texas, Center for Energy and Economics "LNG Safety and Security," October 2003.
Table 4, p. 77. See
http://www.beg.utexas.edu/energvecon/lng/documents/CEE LNG Safetv and Securitv.pdf.
12

<<<PAGE 19>>>

.
• : j \ - . - -
:iac|i% # . • •
1979 Columbia Gas
LNG Terminal
Cove
Point,
MD,
1 death,
1 serious
injury
August
1987
Nevada Test
Site
Mercury,
NV
March
2005
WG utility District
Heights,
MD
An explosion occurred within an electrical
substation. LNG leaked through LNG
pump's electrical penetration seal,
vaporized, passed through 200 feet of
underground electrical conduit, and
entered the substation. Since natural gas
was never expected in this building, there
were no gas detectors installed in the
building. The normal arcing contacts of a
circuit breaker ignited the natural gas-air
mixture, resulting in an explosion causing
about $3 million in damages.
An accidental ignition of an LNG vapor
cloud occurred at the U.S. Department of
Energy Test Site during large-scale tests
involving LNG spills. The cloud was
accidentally ignited and damaged and
propelled polyurethane pipe insulation
outside the fence.
A Washington Gas company-sponsored
study released in July 2005 pointed to
subtle molecular differences in the
imported LNG the utility began using in
August 2003 as the cause of a house
explosion.
Worldwide, there have been approximately 10 serious accidents directiy attributed to
LNG facilities."
PHMSA's LNG responsibilities under 49 CFR 193 relate primarily to safety issues. The
Pipeline Branch of the TSA is responsible for pipeline security, for both land-based and
marine LNG facilities. The overlapping jurisdictions of TSA and OPS for monitoring
LNG safety and security have led to memoranda of agreement between the two agencies
to guide the security plans required by the facilities. The U.S. Coast Guard (USCG)
Program Office has estimated that it costs the Coast Guard between $40,000 and $50,000
to "shepherd" an LNG tanker through its delivery tour at an LNG terminal. Added to
these are the additional costs to State/local governments for police and fire department
support, at a total cost of approximately $80,000 per delivery (excluding costs incurred
by the terminal owner.) '^
Bureau of Mines, Report on the Investigation of the Fire at the Liquefaction, Storage, and Re-gasification
Plant of the East Ohio Gas Co., Cleveland, OH, October 20, 1944. Febmary, 1946. Quoted in CRS
Report for Congress, Liquefied Natural Gas (LNG) Infrastructure Security: Background and Issues for
Congress, September 9, 2003.
CRS Report to Congress, Liquefied Natural Gas (LNG) Infrastructure Security: Background and Issues
for Congress, September 9, 2003.
13

<<<PAGE 20>>>

A 2003 Congressional Research Service (CRS) Report to Congress has emphasized the
importance of risk-based information about LNG operations and the infrastructure
surrounding each facility and the need for information sharing and coordination among
the many international freaty organizations. Federal agencies, and State/local
governments. The CRC report concludes by emphasizing that efficiencies gained by
targeted risk-based information collection reduce costs to the Government. It went
fiirther stating: "costly 'blanket' investments in LNG security might be avoided if more
refined terror threat information were available to focus security spending on a narrower
11
set of infrastructure vulnerabilities."
While the risk of an LNG incident is low compared to that of other potential sources of
hazard, the consequences of a major LNG incident could be catasfrophic. This
consideration has raised community concerns in locations where new facilities have been
proposed. Part of the problem is that statistical probabilities for high-consequence
intentionally set LNG fires are not known.
A recent study sponsored by PHMSA attempted to quantify the risks associated with
large LNG fires. The study found that 49 CFR, Part 193 regulations have made
significant progress in ensuring that no LNG leaks/releases occur from material defects,
natural phenomena, and machinery attrition, and that if releases occur, sufficient
safeguards are in place to minimize the effects. However, the study reported, the
safeguards fail to address threats posed by an intentional release for harmfiil purposes.
To date, no data and frend information are available on the type/size of intentionally set
large fires, and magnitude of the damage, given the rare nature of the events. The study
concluded that to conduct a quantitative risk assessment on the individual and societal
risks associated with LNG accidents, more comprehensive incident reports and annual
reports are needed. These data will enable estimates of accident frequencies and
development of probabilistic risk scenarios, including:
• Size and volumes of storage tanks and transfer piping, dike details, pumping or flow
rates, and pipeline pressures in each type of piping.
•
Details of the surrounding community, including the topography, population density
and location of houses, industrial and commercial centers; location of sensitive
populations; distribution and sizes of buildings and emergency shelters.
•
Any systems or procedures available for mitigating the occurrence of or effect of
LNG fires.
Historical data on the modes of failures of components and systems used in LNG
facilities or ships or in the docks for unloading ships. ''*
13 Ibid.CRS-22.
'* Technology & Management Systems, Inc., "Spectrum of Fires in an LNG Facility: Assessments, Models
a Considerations in Risk Evaluation," Final Technical Report, submitted to U.S. DOT, PHMSA,
December 5, 2006.
14

<<<PAGE 21>>>

In summary, with the growing demand for LNG peak shaving and import facilities and
given the growing Government security concerns, the risks of high-consequence LNG
accidents are likely to continue. LNG accidents, though rare, are high-consequence
events for which more data need to be made available. Risks associated with LNG
accidents originate in three hazards: flammability, dispersion, and cryogenic temperature.
When LNG is spilled and its vapors come into contact with an ignition source, the spill
will develop into a pool fire and present a thermal radiation hazard. LNG facilities also
represent security risks as targets of terrorist attacks.
PHMSA defines a serious pipeline incident as an event involving a fatality or injury
requiring in-patient hospitalization. PHMSA also reports significant incidents, which
include all serious incidents as well as incidents with significant consequences beyond
injury and fatality. PHMSA defines Significant Incidents as those incidents reported by
pipeline operators when any of the following conditions are met:
1. fatality or injury requiring in-patient hospitalization
2. 3. $50,000 or more in total costs, measured in 1984 dollars
highly volatile liquid releases of 5 barrels or more or other liquid releases of 50
barrels or more
4. liquid releases resulting in an unintentional fire or explosion.
Overall assessment of the relative risks involved in each operation can be made by a
review of the PHMSA accident data, as displayed in the following figures and tables.
Serious Hazardous Liquid and Gas Transmission offshore incidents are combined with
their onshore counterparts in Table 3 and Figure 1. There have been no serious offshore
Hazardous Liquid incidents reported over the displayed time period and no serious
offshore Gas Transmission incidents since 1996.
15

<<<PAGE 22>>>

Table 3. Risk Based on Miles of Pipeline - All Pipelines (1988-2007)
Total Incidents
5,730
417
1,736
242.26
17.63
5-Year Annual
Average
(2003-2007)
304
17
53
12.85
0.72
10-Year
Annual
Average
287
18
64
12.13
0.76
(1998-2007)
20-Year
Annual
Average
287
21
87
(1988-2007)
12.13
0.89
Figure 1. Serious Incidents
National, All Pipeline Systems, Serious Incidents 1988-2007
20
10800
Source: PHMSA Significant incidents Files Feb 19. 2008
• All Types
• Hazardous Liquid @ Gas Transmission
© Gas Gathering
& Gas Distribution

<<<PAGE 23>>>

Figure 2. Average Incidents for Natural Gas and Hazardous Liquid Pipelines, 1988-
2007
Significant Pipeline Incidents (1988 - 2007)
• HL
• NG Trans,
a NG Dist
5 Year 10 Year
Average
20 Year
2.4.3. Electronic Filing Baseline
The following points guide the baseline assumptions about the private industry and
Government data processing costs in general, and the availability of Web-based report
filing capability in the pipeline industry in particular:
There are many advantages to filing electronically. Both business operators and
Government officials see electronic filing as fast, accurate, and easy to use.
Increased Data Availability. Pipeline industry data suggest that most pipelines are
establishments with ready access to e-filing. It is estimated that between 55 and 80
percent of the PHMSA Annual Reports are currently submitted electronically. Other
Federal agencies also require electronic filing.
Improved Data Accuracy. Many business operators and Government officials note that
the electronic filer is more apt to submit complete and accurate data. For example, when
the IRS estimated the error rate of electronic versus paper filing, the error rate for the
Expanding Electronic Tax Products for Businesses (EETPB) dropped between 9 and 23
percentage points.''
' ^ http://www.whitehouse.gov/omb/egov/c-7-6-eetpb.html.
17

<<<PAGE 24>>>

Reduced Costs to Government. According to Government reports there are monetary
benefits associated with electronic filing. For example:
1. The Expanding Electronic Tax Products for Businesses (EETPB) reduces cost. Over
5.5 million entities filed electronically, with savings ranging from between $1.49 and
$4.37 per return, accounting for over $10 million in savings in 2007.16
2. In Fiscal Year (FY) 2007, the IRS received nearly 4 million tax returns electronically
through Free File, representing a cost-savings to the Government of approximately
9.2 million over paper-based processing costs. The Free File program has generate
45.5 million in cost savings to the Government since its beginning in 2003.'
3. Introduction of the new electronic IRS filing methods has not only sped up the time
to refund the taxpayer, it has also greatly reduced the costs of processing a tax return
from $1.60 to $.02, saving millions of dollars each year. 8
4. E-Travel - The Treasury Department's participation in the E-Travel initiative
allowed the Department to save $402,000 in travel management fees in FY 2007.!9
5. The Virginia Employment Commission saved approximately $270,000 annually on
staff costs to process unemployment claims; their online claimants are saving over $2
million annually.?°
Reduced Costs to Businesses. Cost savings to the business community occur through
lower transaction/processing costs and improved labor productivity. For example:
1. The Department of Labor Employee Benefits Security Administration (EBSA)
estimates savings of $0.0167 per sheet of paper and $0.57 for postage per filing.?'
2. Estimated labor productivity gain in the Natural Gas Industry [North American
Industry Classification System (NAICS) 2212] for 2005, for instance, was 4.4
percent. E-commerce cost savings result from lower transaction costs and product
purchase prices. Cost savings from automated data collection and processing result
from reduced data entry and processing costs and lower labor input.?" Increased labor
productivity is the key element of the reduced costs to businesses from automation
and electronic transactions. The BLS statistics on labor productivity suggest
significant increases in labor productivity gains over the past decade, a trend that
16 The forms included in the initiative are used for filing or applying for Employment Tax, Corporate
http://www.whitehouse.gov/omb/egov/c-7-6-eetpb.html.
Income Tax, Employer Identification Number, and Wage Reporting. See
http://www.whitehouse.gov/omb/egov/documents/FY08_Benefits_Report.pdf.
18 http://www.ec3.org/Downloads/2003/RevMax.pdf.
20 http://www.ec3.org/Downloads/2003/RevMax.pdf
19 http://www.whitehouse.gov/omb/egov/documents/FY08_Benefits_Report.pdf.
21 Electronic Filing of Annual Reports. See
22
http://www.dol.gov/ebsa/regs/fedreg/proposed/2005017185.htm.
To illustrate, it has been estimated that transmission of business transaction documents by EDI reduces
costs by 10 to 50 percent of the transaction costs, depending on what costs are included. The Web-based
e-commerce cost savings are more complex and are still being estimated. For instance, compare
banking costs via the Internet (S0.01 per transaction) with traditional banking costs: banking vi
traditional ATM ($0.27), banking by phone ($0.52), and by branch banking ($1.07).
18

<<<PAGE 25>>>

reflects corrections to the previously reported low levels of improvements attributed
to electronic data entry 23
Client satisfaction. Businesses required to use electronic filings for their IRS forms
reported a 95 percent satisfaction with the process 24
2.5 Costs of Complying with the Requirements of the
Proposed Rule
The NPRM addresses eight requirement areas. Table 4 below indicates which pipeline
segment the proposed rule affects.
Table 4. Pipeline Segment Addressed by Each of the Eight Proposed Requirements
Proposed R^nlreimiitsi
HLOpsml^rs
N^OfertM^
1. Modify the scope of part 191
addressed in 49 CFR Section
191.1 to reflect the changes made
in the scope of part 192 to the
definition of gas gathering lines
2. Change the definition of an
"incident" in 49 CFR Section
191.3 to require an operator to
report a fire not intentionally set
by the operator, or an explosion,
and establish a volumetric basis
for reporting unexpected or
unintentional gas loss.
3. Require operators of hazardous
liquid pipelines to submit pipeline
information by state on the annual
report for hazardous liquid
pipelines.
4. Require operators of Liquefied
Natural Gas (LNG) facilities to
submit incident and annual
reports.
5. Create and require participation in
a National Pipeline Operator
Registry.
6. Require operators to report and file
No
Yes
Yes
Yes
No
?
Yes
No
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
^ ^ Bureau of Labor Statistics. See ftp://ftp.bls.gov/pub/special.requests/opt/dipts/ipr.airt.txt.
^ * E-Govemment initiatives. See http://www.whitehouse.gov/omb/egov/c-7-6-eetpb.html.
19

<<<PAGE 26>>>

Ihroposed Eeq«ir<^a[U!itfs
HLOi>eriit«ft^
, ; ' ^ ^ * ^ . ;
1 ^ ~ " ^
data electronically whenever
possible.
7. Merge the natural gas transmission
integrity management Semi-
Annual Performance Measures
Report with the annual reports.
8. Require operators to use a
standard fomi in submitting
Safety-Related Condition Reports
9. Modify hazardous liquid operator
telephonic notification of
accidents to require operators to
have a procedure to calculate and
provide a reasonable initial
estimate of released product and
maintain a record of the procedure
used for reporting and to provide
an additional telephonic report to
the National Response Center if
significant new information
becomes available during the
emergency response phase
No
Yes
No
Yes
Yes
Yes
Yes
No
No
Following is a fiill discussion of each of the eight requirements and the costs associated
with each of the requirements.
2.5.1 Requirement One - Change the Scope of Part 191 to Reflect the
Change to the Definition of Gas Gathering Line in Part 192
PHMSA inadvertently overlooked changing the scope of Part 191.1 when it published a
final rule adjusting the definition of gathering lines in the scope of Part 192.1. Section
191.1 will be changed to require operators of jurisdictional gathering lines to report
according to the new definition. This change will not impose costs on the operators of gas
gathering lines.
•il9l»tfitHMrt^^
20

<<<PAGE 27>>>

2.5.2 Requirement Two - Change the Definition of "Incident" for Gas
Pipelines and LNG Facilities
Currently operators of jurisdictional pipelines or hazardous material pipelines must report
incidents or accidents as required in Part 191 or Part 195, respectively. ^ 49 CFR § 191.3
states that "incident" means any of the following events:
(1) An event that involves a release of gas fi-om a pipeline; and
(2) A death, or personal injury necessitating in-patient hospitalization; or
(3) Estimated property damage, including cost of gas lost, of the operator or others,
or both, of $50,000 or more.
(4) An event that is significant, in the judgment of the operator, even though it did
not meet the criteria of paragraphs (1) or (2).
BLS reports fatal occupational injuries by industry and selected event or exposure. They
reported that fatalities fi-om fire averaged 174 per year from 2001 to 2006. Fatalities
increased 4 percent from 2005 to 2006.^^ When PHMSA compared its accident data on
death and injury, (with and without fire and explosion) death or injury increased by four
to five times if there was a fire or explosion.^^
By changing the definition of incident in §191.3 for NG fransmission and distribution,
pipelines will require the F-7100.2 (Incident Report) to be changed to report on:
• Fire intentionally set.
• Volimie measure for released gas of 3,000 MCF (million cubic feet) instead of the
cost of gas lost.
By adding fires intentionally set, explosions, and volume measures into the definition of a
reportable incident, it will:
• Allow PHMSA to get additional information on major outcomes that significantly
raise the risk of death of injury from a pipeline failure.
• Not only make the incident reporting requirement consistent with the reporting
requirement for HL pipelines, but will also improve data quality, accuracy, risk
targeting, and allow for more accurate analysis of threats posed by natural disasters.
• Tie releases to volume rather than value.
Forms are currently provided in Word, Microsoft Word, PDF, and compressed format.
This rule will most likely increase the number of reports, but the magnitude of the
increase is not known. The change in the reporting form will result in a marginal
^ ^ The general defmition of a jurisdictional pipeline is any gas installation that connects 10 or more gas
services on a common gas pipe, or three or more gas services at public locations (such as a shopping
center) on a common gas pipe, or coimection of two or more gas services on a common pipe that crosses
under a public roadway or right-of-way.
^ ^ http://www.bls.gov/news.release/cfoi.tO 1 .htm. Last Modified Date: August 09, 2007. Accessed: April 25,
2008.
^' Pipeline and Liquefied Natural Gas Reporting Requirements. Notice of Proposed Rulemaking, draft as of
March 28, 2008, p. 10.
21

<<<PAGE 28>>>

increase in time spent on meeting the paperwork requirements, as assessed in the PRA
report.
2.5.2.1. Costs to Operators of Changing Definition of "Incident" and Establishing a
Volumetric Basis for Unplanned Gas Loss
In estimating the costs incurred by NG operators from the proposed changes to §191.3,
PHMSA assumes:
• A total of 2,289 NG operators and LNG facility operators are impacted, consisting of
950 transmission operators, 1,262 distribution operators, and 77 LNG facility
operators.^^
• Reports are expected to increase from an annual average of 154 per year in a 10-year
period (1998 to 2007) to 462 in the first year, a net increase of 308 reports.
• Representative fiilly loaded average wage rates in the NG industry are between
$55.82 ($37.21*1.50) and $90.00 ($60.00*1.50) per hour.
• Based on previous years' trends, there will be an 11 percent increase (of 34 additional
reports, 308*.11) in successive years.
• NG and LNG operators will be required to spend 1 additional hour to complete
reports.
28 http://ops.dot.gov/stats/DT98.htm.
22

<<<PAGE 29>>>

Table 5. Estimated Cost Burden to NG and LNG Operators from Changes to $191.3
$191.3 Components No. of
I Wage Rates
Total No.
Total No. No. of
Cost to
Hours
(including 50,
of Natural
HOfING
Reports
Operators:
overhead
percent
Gas
Facility
1 hour
$55.82 to
Operators
Operators
First-year reporting
2,212
77
308
$17,000
not set intentionally
on explosions/fires
$90.00 per
hour
to
and released
$28,000
volume (NG
on explosions/fires
First-year reporting
Included
above
volumes for NG
distribution
pipelines.
Annual recurring
1 hour
$55.82 to
2,212
$2,000 to
reporting on
$90.00 per
$3,000
explosions/fires not
hour
set intentionally
and released
volume (NG
transmission).
Annual recurring
Included
reporting on
above
explosions/fires and
released volumes
for NG distribution
pipelines.
PHMSA estimates that the first-year costs to the 2,289 operators (950 NG transmission
operators, 1,262 distribution operators, and 77 LNG facility operators) will range
between $17,000 and $28,000 (308 * hourly wage rate). As illustrated in Table 5 above,
PHMSA estimates annual recurring cost would be between approximately $2,000 and
$3,000 for NG operators (34 * hourly wage rate).
The change in definition of an "incident" for NG pipelines in 49 CFR Part 191.3 to: (a)
Include fires not intentionally set and explosions as categories into the definition of
reportable incidents; and (b) establish a volumetric basis for unplanned gas loss for
reporting an incident, would result in added information collection burden. PHMSA
estimates the PRA burden for NG operators would increase by 308 hours the first year
and 34 hours each successive year.
23

<<<PAGE 30>>>

2.5.3. Requirement Three - Require Operators of HL Pipelines to
Report Pipeline Information by State in the Annual Report for HL
Pipelines
Currently HL pipeline operators submit incident and annual reports, but the annual
reports do not include State-specific (location) information. The information HL
operators provide on their annual reports is nationally aggregated. Current reporting
practices do not provide the level of detail or the State-specific information necessary for
PHMSA to understand, monitor, and assess safety performance and risks posed by the
pipelines.
There are inconsistencies between the HL operators' incident and annual reports. In
particular, the inconsistencies occur in several sections of part 195. Section 195.56 Part
B (Filing safety-related condition reports) requires HL release accidents to be reported
with information on "location condition." However, §195.49 (Annual Report rules)
requires HL operators to submit annual reports on each type of facility operated, but not
the location. This has resulted in multiple reports for each commodity fransported by the
operator, but no location-specific information from the operators. Because of this
information gap, incident data cannot be linked to the operators and their facilities.
Overall, the information gap has created a lack of clarity on infrastructure data by State.
The changes in Hazardous Liquid §195.B, Annual Report (Form F-7000-1) will require
HL operators to:
• Submit infrastructure and IM data for each state their pipeline traverses.
• Report by State instead of system type.
• Submit a separate report for each State the pipeline fraverses. Operators of interstate
pipelines must submit one report per State.
Alternatively, the form may require reporting by commodity type and include total State
mileage. These changes will allow reporting to be consistent across the other pipeline
systems and NPMS.
PHMSA will continue to collect annual report information in the current hard copy
format historically used until PHMSA has converted its technological platform that could
accept the submission via GIS tool, and until the Agency determines the entire industry
would be able to adhere to such a format.
24

<<<PAGE 31>>>

2.5.3.1. Costs to HL Operators of Reporting Annual Information by State
To estimate costs and burden hours to HL operators, PHMSA assumes:
• All 314 HL pipeline operators (intrastate and interstate) will have to submit state-
specific information on their annual reports.
• Approximately 40 percent of the pipeline operators or 126 pipeline operator
.40*314) are intrastate and 60 percent or 188 (.60*314) are interstate.?
• The 126 intrastate HL pipeline operators will have to file one annual report, while the
188 interstate HL pipeline operators must file multiple times based on the number of
different states they operate in for the designated System Type.
• Approximately 50 percent of the 188 interstate pipeline operators, or 94 operators
(.50*188) will file, on average, two annual reports for a total of 188 (94*2) reports.
• Approximately 30 percent of the 188 interstate operators, or 56 operators (.30*188)
will file, on average, five annual reports for a total of 283 (56*5).
•
Approximately 20 percent of the 188 interstate operators or 38 operators (.20*188)
will file, on average, 10 annual reports for a total of 377 reports.
•
Representative fully loaded average hourly wage rates for HL operators are between
$60.59 (40.39*1.50) and $90.00 ($60.00*1.50).
• HL operators will be required to spend 12 additional hours filing each State-specific
annual report.
Table 6. Estimated Costs to HL Operators
$195.49
Number of
Average Hourly
Total
Total Number
Costs per
Components
Hours per
Wage Rates
HL
Number of
of State-specifie
Year
Annual
(includes 50
Reports
Report
percent
Operators
12
overhead)
First-year
$60.59 to
314
979
$712,000 to
State-specific
$90.00 per hour
$1,057,000
annual report
Annual
12
specific costs
recurring State-
$60.59 to
314
979
$712,000 to
$90.00 per hour
$1,057,000
979 reports per year with state specific information included. PHMSA estimates that the
As illustrated in Table 6, PHMSA estimates that HL operators would file approximately
first-year costs to HL operators would range between approximately $712,000 (979
reports * $60.59 * 12 hours) and $1,057,000 (979 reports * $90.00 * 12 hours). PHMSA
estimates the recurring costs in successive years would be in the same magnitude each
year after the first year (i.e., year 2 to 10). PHMSA estimates that requiring HL operators
29 The estimate is based on an analysis of MPMS data, which shows that 40 percent operate in one state, 34
percent operate in two or more states and 25 percent of the operators that filings could not be matched in
PMS, but which PHMSA estimates could possibly operate in more than one state and therefore include:
25

<<<PAGE 32>>>

to submit state-specific annual reports will increase the reporting burden by 11,748 hours
(12 * 979) the first-year and each successive year. This may be an overestimation, since
operators that are required to file multiple reports may only need a fraction of this time to
complete the parts of the report required by 49 CFR Part 195 that pertain to information
on pipelines that fraverse State lines. PHMSA invites comments on this.
2.5.4. Requirement Four - Require LNG Operators to Submit Incident
and Annual Reports
PHMSA proposes to amend §191.15, §191.17, and §193.2011 to require LNG operators
to submit incident and annual reports consistent with the current reporting requirements
for gas and HL pipeline operators. Currently, 49 CFR §193.2011 requires LNG operators
to report leaks and spills under Part 191, but the incident reporting in §191.15 and the
aimual reporting in §191.17 exclude LNG facilities.
2.5.4.1 Cost to LNG Operators of Submitting Annual and Incident Report
PHMSA assimies:
• A total of 77 operators will be impacted.
• Representative fiilly loaded average hourly wage rates for the LNG industry are
between $55.82 ($37.21*1.50) and $90.00 ($60.00*1.50).
• LNG operators will need to spend 12 additional hours to complete annual reports.
• Considering that between 1944 and 2004, three major LNG accidents occurred, with
some 130 fatalities and injuries (not including those resulting from the Staten Island
construction-related accident), PHMSA estimates that at most there may be one
incident reported per year over the next 10 years.
• It will take 1 hour to prepare the incident report.
26

<<<PAGE 33>>>

Table 7. Estimated Costs to LNG Operators
§191.15, §191,17, and
No. of
Total LNG
L$193.2011 Components
Hours
Wage Rates
No. of
including 50
Operators
Reports
Costs per
Year
percent overhead)
First-year additional
12
$55.82 to $90.00
77
77
$52,000 to
information on annual
hours
per hour
$83,000
reports
First-year incident
1 hour
$55.82 to $90.00
77
1
$56.00 to
reports
per hour
$90.00
Total First-year Costs
$52,056 to
$83,090
Annual recurring
12
$55.82 to $90.00
77
77
$52,000 to
additional information
hours
per hour
$83,000
on annual reports
Annual recurring
1 hour
$55.82 to $90.00
77
1
$56.00 to
incident reports
per hour
$90.00
Total Recurring Costs
$52,056 to
$83,090
PHMSA estimates that the first-year costs to the 77 LNG operators would range between
approximately $52,000 and $83,000 (77*hourly wage rate*number of hours). PHMSA
estimates the recurring costs in successive years would be in the same magnitude each
year. (See Table 7.) Both the first-year and annual recurring cost totals include
opportunity costs. PHMSA estimates that requiring LNG operators to submit annual
reports and incident reports will increase the reporting burden by 13 hours the first-year
and each successive year.
2.5.5. Requirement Five - National Pipeline Operator Identification
Registry
Under $191.3 and §195.2 operators are required to submit reports using the Operator
Identification Number (OPID) assigned by PHMSA. PHMSA is proposing to create a
National Pipeline Operator Identification Registry with unique Operator Identification
Number (OPID) for reporting requirements. The implementation and use of the National
OPID Registry will enable PHMSA to consolidate information on pipeline operators and
identify the interrelationship between pipeline owners and operators. Currently, there is
no single source to connect owners to contract operators, parent companies, sister
companies, and subsidiary corporate entities. The National OPID Registry will allow
PHMSA to link its disparate database applications and new integrated technology
systems under development. A uniform registry would also improve the accuracy of
PHMSA performance monitoring and reduce the costs of compliance oversight.
PHMSA will require an "operator" of a regulated pipeline or facility, as defined in
§191.3, to submit all reports using the OPID assigned to the operator. An operator will
also be required to notify PHMSA at least 30 days in advance of certain profile or other
27

<<<PAGE 34>>>

changes to their facilities which could impact public safety. These include any of the
following:
• A change in the operating entity responsible for operating an existing pipeline,
pipeline segment, or facility.
• A change in the operating entity responsible for managing or administering a safety
program (such as an IM or Corrosion Protection Program) covering an existing
pipeline, pipeline segment, or facility.
• The acquisition or divestiture of 50 or more miles of an existing pipeline or pipeline
segment.
• The rehabilitation or replacement of pipe or other system modifications to upgrade or
update an existing pipeline, pipeline segment, or facility costing $5 million or more.
• The construction of 10 or more miles of a new hazardous liquid or gas transmission
pipeline facility, or other construction project costing $5 million or more.
• The construction of a new LNG facility, or the sale or purchase of an existing LNG
facility.
This reporting requirement will provide an integrated national pipeline inventory of
operator contact and facility information; ensure PHMSA's communication to and
representations of the regulated entities are complete and accurate; enable PHMSA to
distribute up-to-date pipeline information; provide accurate and up-to-date compilation of
operating entities and facilities that is critical to PHMSA's pipeline safety mission; and
provide critical information to various oversight entities, including Congress, GAO, the
DOT IG, NTSB, and other safety partners.
Currently the NPMS does not have adequate data to fiilly illustrate which companies
constitute the imiverse of operators and whether or not there is a single "umbrella"
company that submits data for other related entities.^^ This requirement will improve
PHMSA's capability to comply with the 2004 Congressional requirements for enhancing
operator compliance with the NPMS and reduce maintenance costs.
^° One example of inconsistency in the current OPID data is the number of entities in the Dunn &
Bradstreet (D&B) database of pipeline owners and operators. The database contains some 2,558 records
on pipeline entities - corporate or branch facilities - including operation type, employment, and DOT
Operator ID. After deleting between 400 and 600 fields with zero employees, 1,905 records remain for
entries that provided corporate-level employees (ranging between I and 42,000) and 2,123 records
remained for entries that provided information on the number of employees at the facility. However,
the questionable quality of the D&B database is evident when a review of the facility standard industrial
classification (SIC) codes (field: "SIC 1 Description, Columns FQ) reveals entries for an array of non-
pipeline facilities. Included in the non-pipeline entries are: a Methodist church, a volunteer fire
department, a gasoline service station, a mayor's office, a trucking company, a bus transportation
facility, and a city & town manager's office.
28

<<<PAGE 35>>>

2.5.5.1. Costs to Operators for Complying with the National OPID Registry
Requirements
PHMSA assumes:
• All pipeline operators will be required to use the National Operator ID (OPID)
Registry when reporting. PHMSA estimates that 15 percent of the HL pipelines and
23 percent of the NG operators will be impacted." In addition, PHMSA estimates
the approximatoly 9 new LNG facility operators will begin operations each year over
• The representative fully loaded average hourly wage rate for the HL industry is
between $60.59 ($40.39*1.50) and $90.00 ($60.00*1.50); the representative fully
loaded average hourly wage rate for the NG industry is between $55.82
($37.21*1.50) and $90.00 ($60.00*1.50).
• Operators will need an estimated additional 10 minutes for entering registration
information for the first year, and 5 minutes in future years.33
• Operators will need an additional hour to submit advance notice of pipeline profile or
other changes.
31 This estimate is based on the number of operators who reported more pipe miles installed during the
32 This estimate is based on an LNG global growth rate of 50 percent in 4 years. This translates to
2000-2009 period, compared to previous annual filings.
approximately 13 percent per year. See http://www.upstreamonline.com/live/article150318.ece. Another
estimate is based on the industry tripling in the next 20 years. This translates to approximately 12
economist.com/default.asp?page=14&PubID=46&ISS=8648&SID=325632.
percent per year. See http://www.petroleum-
33 This paperwork compliance burden information is based on the experience of the Federal Motor Carrier
Safety Administration (FMCSA) in conducting registration of trucking carriers who have a DOT
identification number in the FMCSA Trucking Registry. The Agency found it took trucking carriers 7
Source: Vivian Oliver, FMCSA, in a telephone interview with Adam Klauber, the Volpe Center, June
minutes to enter required data in the Registry for the first time and 5 minutes for subsequent years.
28, 2007.
29

<<<PAGE 36>>>

Table 8. Estimated Costs to HL and NG Operators
$191.3, and
Time
Hourly
| Total
Number
Components
$195.2
Average
Operators
of
HIL
Cost to
NG*
Cost to
Cost to
ING
Wage
Impacted
Reports Operators
Operators
Operators
Rates (50
percent
First-year
10
overhead).
minutes
$55.82 to
$90.00 for
47 HL,
275
$476 to
National
219 NG,
$707
$5,000 to
$86 to
OPID
NG/LNG
9 LNG
$8,000
$139
registry
submissions
operators;
$60.59 to
facility
$90.00 for
operators
HL
1 hour
operators
First-year
$55.82 to
47 HL,
275
$2,854 to
$28,399
$516 to
rofile o
ther
$90.00 for
NG/LNG | 9 LNG
219 NG,
$4,239
to
$832
changes
$45,788
operators;
facility
$60.59 to
$90.00 for
operators
HL
Total first-
operators
$3,329 to
$4,946
$33,132
$602 to
year costs
to
$970
$53,240 C
Annual
5
$55.82 to
47 HL,
275
$238 to
$2,410 to
$43 to
recurring
minutes
$90.00 for 219 NG,
$353
$3,858
$69
cost of
OPID
operators; facility
NG/LNG 9 LNG
registry
S60.59o
submissions
$90.00 for
operators
HL
Annual
1 hour
operators
$55.82 to
47 HL,
275
$2,854 to
$28,000
$516 to
recurring
$4,239
to
5832
profile or
other
$47,000
changes
$90.00 for
$60.59 to operators
HL
operators
Total annual
$3,092 to
S31,324
$559 to
recurring
$4,592/
$50,505
to.
S875
costs.
30

<<<PAGE 37>>>

Under this requirement, PHMSA estimates that the first-year costs to the HL and gas
transmission operators expected to report would range between approximately $37,000
and $59,000 (number of operators * hourly wage rate * time). (See Table 8.) PHMSA
estimates the recurring costs in successive years would be slightly lower because
operators are expected to be more familiar with the filing procedures in successive years.
The recurring annual costs would range approximately between $32,000 and $51,000
(number of operators * hourly wage rate * time).
PHMSA estimates that requiring HL operators, NG operators, and LNG facility operators
to abide by the National OPID Registry requirements will increase the reporting burden
by 1 hour and 10 minutes the first-year and 1 hour and 5 minutes each successive year.
2.5.6. Requirement Six - Electronic Reporting and Filing of Required
Reports
PHMSA is proposing to modify Sections 191.7 and 195.58 to require electronic reporting
and updating of operator data in PHMSA databases. Mandatory electronic filing is
wholly consistent with the E-Govemment Act of 2002 (Public Law No: 107-347) and the
Government Paperwork Elimination Act of 1998 (Public Law No: 105-277)
requirements. The proposed electronic data collection and filing requirement is also
consistent with Section 9 (B) of the PIPES Act, which requires annual reporting to the
Secretary of DOT.
PHMSA expects that electronic reporting will improve processing and accuracy of the
data submitted while reducing the paperwork burden. Placing required data fields within
the reports will require pipeline operators to submit complete and accurate information.
Any electronic reporting requirement will be a fimction of the ability of the regulated
operators to report data electronically to PHMSA. Currently between 55 and 80 percent
of the operators submit reporting data electronically. PHMSA has provided electronic
reporting as a method of filing since 2002.
Given the size and technological capacity of HL and NG pipeline operators, PHMSA
believes they have the capacity to report data electronically. If an operator lacks capacity,
PHMSA proposes the operator notify PHMSA and request an alternative method of
reporting to comply with this requirement. For those not able to report electronically,
PHMSA will arrange for the operator to use paper forms and file by mail or facsimile.
To the extent that the industry and the operators have the capacity to report electronically,
this requirement imposes no additional regulatory burden and represents a reasonable
attempt at enhancing efficiency and accuracy.
PHMSA provides access to information on the Business.gov website about compliance
regulations and how to file incident reports. Business.gov currently provides access to.
31

<<<PAGE 38>>>

and instructions for, the following five PHMSA forms and other electronic reports for
pipeline operators:
• Form 7000-1 Accident Report - Hazardous Liquid Pipeline Systems
• Form 7000-1.1 Annual Report for Calendar Year 20xx Hazardous Liquid or Carbon
Dioxide System
• Form 7100-1. Incident Report - Gas Distribution System
• Form 7100-1.1 Annual Report for Calendar Year 20xx Gas Distribution System
• Form 7100-2 Incident Report - Gas Transmission and Gathering Systems
• Safety Related Condition reports
• LNG Incident Report
• LNG Annual Report
PHMSA estimates approximately 2,700 operators will be impacted. The ruling makes no
size exception, but PHMSA will follow the waiver approach to allow flexibility for small
businesses lacking electronic report filing capability.
2.5.7. Requirement Seven - Merge Gas Transmission Gas Integrity
Management Semi-Annual Performance Measures Report with the
Gas Transmission Operator Report
Currently gas transmission pipeline operators submit IM performance semi-annually
(§192.945 and §192.951). PHMSA is proposing to revise §192.951 to specify that
operators submit the required performance measures through the annual report required
in §191.15. Operators must submit a separate report for each State the pipeline traverses.
Thus, operators of interstate pipelines must submit one report for each State-specific
pipeline. This change will increase the number annual reports that interstate pipeline
operators must file but reduce the reporting burden to industry because they no longer
have to file semi-annual IM reports. These changes will enhance PHMSA's ability to
monitor the pipeline.
Currently, PHMSA requires gas pipeline operators to prepare and submit semi-annual IM
reports and annual reports 49 CFR § 192.945 and § 192.951). This proposed reporting
change would eliminate the semi-annual reports. Operators would then incorporate semi-
annual report information into a single IM annual report. Moving from semi-annual
reporting to annual reporting would facilitate reporting by State for transmission
operators.
PHMSA estimates that there may be some additional reporting costs and additional
paperwork burdens to operators by changing these requirements. The change eliminates
the semi-annual report, thereby decreasing the amount of paperwork and the time to
process that paperwork, but also may increase the cost and paperwork burden for
operators with interstate pipeline, since they would have to file a state-specific annual
report for the interstate pipelines. State-specific reporting allows PHMSA to identify the
location of the inspection, repair, leaks, failure, and incidents in HCAs.
32

<<<PAGE 39>>>

By eliminating the semi-annual report and replacing it with the annual report, some
savings accrue to operators. By requiring some operators to file multiple annual reports,
some operators will accrue additional costs. PHMSA does not expect that cost increases
and savings will cancel each other out. This is based on the following factors:
• PHMSA assumes that 50 percent of the 950 NG operators, or 475 pipeline operators,
have interstate pipelines and will need to file multiple annual reports, whereas the
other 50 percent, or 475 pipeline operators, are intrastate operators and will need to
file one annual report (rather than a report semi-annually). PHMSA assumes
intrastate operators' costs will decrease by 50 percent, since they no longer have to
report semi-annually because they will be filing one instead of two reports annually.
• The 475 interstate operators will file multiple annual reports, one for each state in
which they operate, under our assumptions. The calculations below are subject to
rounding.
1. Approximately 50 percent of the 475 operators or 238 will file two reports for a total
of 475 reports. Their costs will remain the same because they are filing two reports
annually; the same number of reports they filed in previous years when they filed
semi-annually.
2. Thirty percent of the 475 operators or approximately 143 will file five reports, for a
total of 713 reports. They will file approximately 427 [713 - (2*143)] additional
reports annually.
3. Approximately 20 percent of the 475 operators or 95 will file 10 reports for a total of
950 reports. They will file approximately 760 [950 - (2*95)] additional reports
annually.
• Operators will spend 12 hours completing the required annual report. PHMSA
assumes that operators took 12 hours to file each of their semi-annual reports in past
years.
• Representative fully loaded average hourly wage rates for gas operators are between
$55.82 ($37.21*1.50) and $90.00 ($60.00*1.50).
Recurring costs are expected to be at the same level as the first-year costs.
33

<<<PAGE 40>>>

Table 9. Estimated Costs to Gas Transmission Operators
$195.49
Number of
Average Hourly
-Total
‚Total Number of
Costs per
Components
Hours per
Report
Wage Rates
Number of
(includes 50
State-specific
Year
Operators
•Reports
percent
Affected
First-year
12
overhead)
$55.82 to
950
713
$477,596
State-specific
$90.00 per hour
annual report
$770,040
Annual
12
$55.82 to
950
713
recurring State-
$477,596
$90.00 per hour
specific costs
$770,040
PHMSA estimates that a total of 950 NG transmission pipeline operators will be affected.
they will file 2,613 reports annually. Operators will now file an additional 713 reports
Previously operators filed an estimated 1,900 reports semi-annually (2 * 950) and now
(2,613 - 1,900) annually. PHMSA estimates that the cost incurred will range from
$477,596 (713*12*$55.82) to $770,040 (713*12*$90.00) annually.
2.5.8. Requirement Eight - Require a Safety-Related Condition Report
Currently HL or NG pipeline operators report the existence of a safety-related condition
(SRC) within 5 working days (but not later than 10 working days) by facsimile (49 CFR
§191.25). PHMSA is proposing to amend § 191.25 to require operators to submit a
standardized SRC form electronically.
This requirement will: Ensure that PHMSA obtains all the pertinent information it needs
o pertorm its assessments and satety analyses; ensure that operators report all the
required data, and to do so consistently across the regulated community; reduce the dat
management burden on PHMSA; and reduce the reporting burden on operators.
No additional costs to operators will result from this requirement.
2.5.9 Requirement Nine - Modify HL Operator Telephonic Notification
of Accident Reporting Requirement
This is in response to the NTSB recommendation to modify 49 CFR § 195.52 of the
and provide a reasonable initial estimate of released product in the telephonic report to
hazardous liquid regulations to require pipeline operators to have a procedure to calculate
the National Response Center (NTSB Safety Recommendation P-07-07). This also
responds to the NTSB recommendation to modify the hazardous liquid telephonic notice
regulation section to require pipeline operators to provide an additional telephonic report
to the National Response Center, if significant new information becomes available during
the emergency response phase of a reported event (NTSB Safety Recommendation P-07-
34

<<<PAGE 41>>>

08). PHMSA estimates that there would be no appreciable additional costs to operators
from this requirement.
2.5.10. Total Costs Associated with the Proposed Rule
The table below summarizes the costs to operators from the changes proposed.
Additional information on costs by pipeline segment is included in Appendix A, Table A-
Table 10. Summary of Costs to Pipeline Operators (S Thousand)
Costs
L operators Noral
LNG Facility
_ Operators.
Operators:
Total Cost a 1
Low
High
Low
High
Low
High
Low High
First year
$716
S1,063
$528
$851
$52
$84
$1.296 $1,997
Annual
$715
$1,062
$511
$823
$52
$84
$1,278 $1,969
recurring
2.6. Benefits of the Proposed Rule
Implementing the proposed rule will enhance PHMSA's ability to:
• Understand, measure, and assess the performance of individual operators and
industry as a whole.
• Integrate pipeline safety data in a way that will allow a more thorough, rigorous, and
comprehensive understanding and assessment of risk.
• Expand and simplify existing electronic reporting by operators.
• Improve the data and analyses PHMSA relies on to make critical, safety-related
decisions.
• Facilitate PHMSA's allocation of inspection and other resources based on a more
accurate accounting of risk.
Also, if the rule is effective there will be fewer incidents and accidents, resulting in fewer
associated deaths, injuries, and property damage. The societal costs of those deaths,
injuries, and property damage will also be reduced.
35

<<<PAGE 42>>>

2.6.1. Average Number of Significant Pipeline Incidents
PHMSA uses specific criteria to identify which incidents are significant fi-om a pipeline
safety viewpoint. PHMSA defines Significant Incidents as those incidents reported by
pipeline operators when any of the following conditions are met:
• Fatality or injury requiring in-patient hospitalization.
• $50,000 or more in total costs, measured in 1984 dollars.
• Highly volatile liquid releases of five barrels or more or other liquid releases of 50
barrels or more.
• Liquid releases resulting in an unintentional fire or explosion.
Over the past 10 years, pipeline operators have reported, on average, approximately 287
significant incidents per year. HL operators have reported 125, including 64 gas
transmission pipeline significant incidents, 90 gas distribution pipeline significant
incidents, and eight gathering lines significant incidents per year. One major LNG
incident in 1979 has been associated with LNG facilities in the U.S.^' There are far more
abnormal events or near misses that occur on pipelines than those that are reported. Some
events involve off-normal conditions for which controllers or automated safety systems
intercede to prevent serious consequences, or the events do not progress to the point of
needing controller or safety-system involvement. Some near misses, but not all, are
documented by pipeline operators. PHMSA surmised there are probably also a number of
low-order events or near misses that occur but go unobserved.
On average, over the past 10 years, 19 fatalities, 64 injuries, and approximately $245
million in annual damages were associated with pipelines. This includes two fatalities,
eight injuries, and approximately $91.3 million in property damage for HL pipelines
systems; three fatalities, seven injuries, and $55.1 million in damages for gas
transmission pipeline systems; and 14 fatalities, 49 injuries, and $75.6 million in property
damage for gas distribution pipeline systems.''^ In addition, the 1979 LNG facility
accident adds one fatality, one injury, and $3 million dollars to the total. The following
table summarizes the number of deaths, injuries, and property damages for the pipelines
and LNG facilities.
^' ^ PHMSA Stakeholder Communications. See Significant Incidents,
http://primis.phmsa.dot.gov/comm/reports/safetv/SigPSr.html. Accessed in April 2008.
' ' Se http://www.beg.utexas.edii/energvecon/lng/documents/CEE LNG Safetv and Securitv.pdf. p.79.
^ * Approximately 94% of the Property Damage for Gas Distribution Incidents in 2005 was caused by
flooding in New Orleans. The amount of property damage represents lost gas and operator property
damage, but does not include flood damage to public and private property.
36

<<<PAGE 43>>>

Table 11. Average (1998-2007) Annual HL and NG Fatalities, Injuries, and
Property Damage
Pipeline System
Fatalities
Injuries
Property Damage (S Millions)
HL
8
91
NG transmission
3
7
55
NG distribution
LNG (1979)
=-
49
76
1
3
Total
20
65
248
The benefit of preventing a fatality can be measured by the Value of Statistical Life
nidentified person. On February 5, 2008, the Department issued a memorandun
/SL), defined as the value that society would place on the prevention of death for or
"Treatment of the Economic Value of a Statistical Life in the Departmental Analyses,"
directing DOT analysts to use $5.8 million as the best estimate for the economic value of
preventing a human fatality. However the Department also requested that a
supplementary analysis be conducted using values of $3.2 million and $8.4 million for
each life saved. The analyses for the latter can be found in Appendix A of this document.
In all three cases, we will use $238,000 as the average cost of an injury requiring
hospitalization.?
2.6.2. Calculated Annual Societal Costs Using a VSL of $5.8 Million
Given a VSL of $5.8 million and the cost per injury at $238,000, total annual societal
costs of pipeline incidents are approximately $356 million (20 * $5.8 million + 65 *
$238,000 + $225 million). This figure represents the potential benefits of remedial
actions. That is, if there were a set of actions that could eliminate all the deaths, injuries,
and property damages associated with pipeline incidents, it would be in the public interest
to pursue those remedial actions, if they were to cost less than $356 million per year.
Table 12 summarizes the societal costs for all pipeline systems, as well as the societal
costs for HL, total NG pipelines, including transmission and distribution pipeline
systems, and LNG facilities using a value of statistical life of $5.8 million.
Table 12. Annual Societal Costs (Potential Benefits) of the Proposed Rule
3 About half of the pipeline incident injuries requiring hospitalization are burns. A Consumer Product
the average total costs associated with a thermal burn injury that results in hospitalization were $200,479
Safety Commission report on Injury Costs, "Revised Injury Cost Model," December 2000, reports that
(1995 $) compared to $149,142 (1995 $) average total costs for all injuries that resulted in
hospitalization. The latter figure overestimates somewhat the costs on non-burn injuries because it
average cost of burn injuries and $202,909 for all injuries. Since about half the injuries are burns, w
includes burn injuries. Using the BLS inflator to revise for 2007 dollars, results in $272,754 for the
37

<<<PAGE 44>>>

Using a VSL of
$5.8 Million
($ Million)
Total Annual Societal Costs — All Pipeline Incidents
356
Annual Societal Costs of HL
105
Annual Societal Costs of NG Distribution
168
Annual Societal Costs NG Transmission
74
Annual Societal Costs of all NG
243
Annual Societal Costs of LNG
9
The actual benefits of the proposed rule will depend on how effective the rule is in
eliminating deaths, injuries, and property damage. For example, if the proposed rule were
deemed to be 1 percent effective, annual benefits would be approximately $3.6 million
($356 million * 0.01). Similarly if the proposed rule were 5 percent effective, annual
benefits would be approximately $17.8 million ($356 million * 0.05). Since most
requirements (with the exception of the National OPID Registry) in the proposed rule
apply to some, but not all pipeline systems, annual benefits will differ depending on the
pipeline system.
2.6.3. Comparison of the Costs and Benefits
One approach to evaluating regulation is to compare the projected benefits expected to
result from the action to the estimated cost of complying with the action. This analysis
compares the present value of costs to the present value of benefits as described below.
In a previous section, the costs were presented as a total of first-year, or initial, costs that
occur once and as costs that will be incurred every year.
The first-year costs range approximately from a low of $1.3 million to a high of $2.0
million. The stream of recurring annual costs ranges from a low of $1.3 million to a high
of $2.0 million. Discounting the initial and recurring costs over 10 years at 3 percent and
7 percent (only the first year includes the initial costs) yields a range of present values of
cost from $12.1 million to $18.7 million at 3 percent, and $10.2 million to $15.7 million
at 7 percent. Thus, the range of the present value of compliance costs is from a low of
approximately $10.2 million to a high of $18.7 million. Table 13 summarizes these costs.
Appendix A contains the costs by requirement area for each of the pipelines affected.
38 Does not add up due to rounding
38

<<<PAGE 45>>>

Table 13. Present Value (over 10 Years) of Compliance Costs for All Pipelines
($ Million)
Low Costs
High Costs:
First Year Costs
1.296
1.997
Recurring Costs
1.278
1.969
Total Costs
2.574(1% year only)
3.966 (1 year only)
Discounted at 3 percent
12.160
18.735
Discounted at Z percent
(10.187
15.696
2.6.3.1 Benefits of Reduced Societal Costs Using a Value of Statistical Life of $5.8
Million
The benefits of reduced societal costs will be spread over the range of years for which the
remedial action (the proposed rule) is carried out by the affected firms and enforced by
the Agency. For a low estimate of benefits, the analysis assumes that 1 percent of
societal costs are avoided each year owing to improvements in data collection. For a high
estimate, the analysis assumes that 5 percent of the societal costs are reduced each year
due to data collection improvements.
Using a VSL of $5.8 million, annual benefits for HL pipeline systems would be
approximately between $1.1 million ($105 million * 0.01) and $5.2 million ($105 million
* 0.05); NG pipeline systems would be approximately between $2.4 million ($243
million * 0.01) and $12.2 million ($243 million * 0.05); and benefits for LNG facilities
would be approximately between $90,000 (S9 million * 0.01) and $450,000 ($9 million *
0.05). For all systems the annual benefits would be approximately between $3.6 million
($356 million * 0.01) and $17.8 million ($356 million * 0.05) million. Table 14
summarizes the benefit streams with a value of statistical life of $5.8 million.
Table 14. Annual Benefit Stream Using a VSL of $5.8 Million
Societal Costs
Benefits Stream
Benefits Stream
Pipeline Segments
(Smillion)
(1 percent reduction
(5 percent reduction
in incidents
in incidents-
$ million)
S million)
HL
105
1.1
5.2
NG
243
2.4
12.1
LNG
9
All Systems
356
0.09
0.45
3.6
17.8
2.6.3.2 Present Value of Benefits (over 10 Years) Using a VSL of $5.8 Million
PHMSA estimates a high and low range of the present value of benefits and discounts the
benefits over a 10 year period by 3 and 7 percent, respectively. The range of present
value for all pipeline systems is from a low of $25 million (low level of benefits
discounted at 7 percent) to a high of $152 million (high level of benefits discounted at 3
percent). See Table 15 below.
39

<<<PAGE 46>>>

Table 15. Present Value of Benefits (over 10 Years) Using a VSL of $5.8 Million
Pipeline
1 Present Value of Benefits
Present Value of Benefits
Segment
(discounted at 3 percent - S
(discounted at 7 percent -S
million)
million)
Low
High
Low
High
HL
9
45
7
37
NG
103
17
85
LNG
4
.6
3
All Systems
30
152
25
125
2.6.3.3 Comparison of Present Value of Benefits and Present Value of Costs
From Table 14, the benefits resulting from the proposed rule are estimated to be between
$3.6 million and $17.8 million per year. The aggregate cost of the proposed rule to all
pipeline operators is between $1.3 million and $2.0 million (Table 10), an average of less
than $800 per operator. Table 16 gives the present values for these estimated benefits
and costs over 10 years at 3 percent and 7 percent discount rates. Low net benefits are
the difference between the low benefits and high cost and high net benefits are the
difference between high benefits and low cost.
TABLE 16. Present Values of Benefits, Costs, and Net Benefits of the Proposed
Rule Calculated Over 10 Years
($ million)
Discount Räte
Benefits
Costs.
Net Benefits
3%
Low
High
Low
High
Low
High
152
12
19
12
140
7%
25
125
16
9
115
As can be seen from Table 16, the estimated present value of net benefits of the proposed
rule is positive at each discount rate. At the 3 percent discount rate there appears to be
proximately between $12 million and $140 million in net benefits over the 10-ye
eriod and at 7 percent approximately between $9 million and $115 million over 1
years. (Note - Low net benefits equal low benefits minus high costs at each discount rate,
and high net benefits equal high benefits minus low costs at each discount rate.)
The average of the present value of net benefits at a 3 percent discount rate is
approximately $76 million ([$12 million + $140 million]/2) and approximately $62
million ([$9million + $115 million]/2) at 7 percent. The analysis concludes that the
present value of net benefits ranges from about $62 million to $76 million.
Another way to evaluate the proposed rule is to ask how effective the reporting
requirements need to be in reducing societal costs associated with pipeline incidents to
40

<<<PAGE 47>>>

cover the costs of the rule. Even at the highest level of costs, about $19 million present
value over 10 years, the rule only needs to reduce societal costs by about one percent
($19 million /$3,041 million, which is the present value of societal costs, $356.47
million, over a 10-year period discounted at 3 percent, or $19 million/$2,504 million
present value of societal costs at 7 percent) to be cost effective.
A third approach to the proposed rule is to assume the highest total annual cost estimate
to all pipeline operators, approximately $2 million (from Table 10), is accurate. Since the
average cost of an incident is roughly $1,240,056 ($356 million annual societal costs /
287 incidents), if the rule leads to only one fewer incident approximately every 19
months ($2 million/ [$1,240,056/12]) then it will be cost effective.
All of the above analyses of costs and benefits suggest that the rule is in the public
interest.
41

<<<PAGE 48>>>

Appendix A— Analyses Using VSLs of $3.2 and
$8.4 Million
A.1. Significant Incidents in the Pipeline System
Table A.l below shows the annual HL and NG fatalities, injuries, and property damage
associated with significant incidents averaged over the 10-year period fi-om 1998 though
2007. The table also reflects the lone incident reported in 1979 from an LNG accident.
Table A-1. Average (1998-2007) Annual HL and NG FataUties, Injuries, and
Property Damage
. Pip^Iipe Sptian.. % '^| :-j|
, J , - HL
NG transmission
NG distribution
LNG
Total
2
3
14
1
20
• • • • ' . - • J . . 8
7
49
1
65
" • ' * ^ -
-:• W ^ir W ^ . : - U /
91.3
55.1
75.6
3
225
A.2. Comparison of the Costs and Benefits
One approach to evaluating regulation is to compare the projected benefits expected to
result firom the action to the estimated cost of complying with the action. This analysis
compares the present value of costs to the present value of benefits as described below.
Table A.2 shows the range of annual and recurring costs discounted over 10 years by
requirement area and pipeline segment.
42

<<<PAGE 49>>>

Table A.2. Present Value (over 10 Years) of Compliance Costs by Requirement Area
Flrtit-
Y w r
Require-
mentArea ,
Changing
the
definition of
incident
Reporting
State-
specific
Infonnation
Submitting
LNG
Reports
National
OPID
Registry
NG Annual
Reports
$
Tftous.
17 to
28
712 to
1,057
52 to
83
37 to
59
478 to
770
Co«ts
Thous.
2 to 3
712 to
1,057
52 to 83
35 to 56
478 to
770
Ms-
ocwnt
_
HLLmv
3%
7%
3%
7%
3%
7%
3%
7%
3%
7%
wmnm
6,764,767
5,666,211
29.608
24,829
4,537,676
3,800,786
m ,
10,042,638
8,411,776
43,973
36,875
7,316,209
6,128,102
NO tow
, m
33,565
29,935
299,635
251,228
52,775
47,239
483,039
404,995
<* >
Negligible
Negligible
494,588
414,270
329,243
276,057
Negligible
Negligible
789,444
661,244
527,012
441,870
Table A.3 shows the total first-year and recurring costs by pipeline segment.
Table A.3. Summary of Costs to Pipeline Operators ($ Thousand)
43

<<<PAGE 50>>>

Table A.4. Present Value (over 10 years) of Compliance Costs by Pipeline Segment
Discounted at
Discounted Costs
3 percent
Discounted at 7 percent
($ Million)
($ Million)
HL Low
6.8
5.7
HL High
10.0
8.4
NG Low
4.8
4.1
NG High
7.9
6.6
LNG Low
.8
LNG High
1.3
1.1
All Segments Low
12.1
10.2
All Segments High
18.7
15.7
Table A.5 summarizes the societal costs for all pipeline systems, as well as the societal
costs for HL, NG (including NG transmission and distribution pipeline systems), and
LNG facilities using VSLs of $3.2 million and $8.4 million, respectively.
Table A.5. Annual Societal Costs (Potential Benefits) of the Proposed Rule Using
VSLs of $3.2 and $8.4 Million
Pipeline Segment
VSL.Or 532 Million
VSL of S8.4 Million
(S Millions)
(8 Millions)
All Pipeline Segments
304
408
HL
100
110
NG Distribution
132
205
NG Transmission
66
82
All NG Pipelines
198
287
LNG
6
12
Given a VSL of $3.2 million and the cost per injury at $238,000, total annual societal
costs of pipeline incidents are approximately $304 million (20 * $3.2 million + 65 *
$238,000 + $225 million). Given a VSL of $8.4 total annual costs of pipeline incidents
are approximately $408 million. These figures represent the potential benefits of remedial
44

<<<PAGE 51>>>

actions. If there is a set of actions that could eliminate all the deaths, injuries, and
property damages associated with pipeline incidents at a cost of less than $304 or $408
million per year respectively, it would be in the public interest to pursue those remedial
actions.
The actual benefits of the proposed rule will depend on how effective the rule is in
benefits of the proposed rule using VSLs of $3.2 and $8.4 million, given the level of
eliminating deaths, injuries, and property damages. Tables A-6 and A-7 present the
effectiveness, herein assumed to be 1 percent and 5 percent, respectively. Numbers may
not add up due to rounding.
Table A.6. Annual Benefits ($ millions) of Reduced Societal Costs Using a VSL of
$3.2 Million
Pipeline System
At 1 percent Effective
At 5 percent Effective
HL
1
5
NG
2
10
LNG
0.064
0.322
All Systems
3
15
Table A.7. Annual Benefits ($ millions) of Reduced Societal Costs Using a VSL of
$8.4 Million
Pipeline System + *
At 1 percent Effective
At 5 percent Effective
LNG
0.116
0.582
All Systems
4
20
Since most requirements (with the exception of the National OPID Registry) in the
proposed rule apply to some, but not all pipeline systems, annual benefits will differ
depending on the pipeline system.
45

<<<PAGE 52>>>

Table A.8. Present Value of Benefits (over 10 years) Using a VSL of $3.2 Million
Incidents
Cut by 1
Incidents Cut by
Low Benefits
High Benefits
Pipeline
Percent ($
5 Percent ($
Discounted at 3 and
Discounted at 3 and 7,
Segment
Million)
Million) -
7 Percent (S Million)
Percent ($ Million)
HL
1
NG
2
5u
8
42
35
17
14
LNG
.062
0.322
0.549
0.452
3
All
Systems
3
15
26
21
130
107
Table A.9. Present Value of Benefits (over 10 years) Using a VSL of $8.4 Million
Incidents
Cut by 1
Incidents Cut by
Pipeline
Percent (S
5 Percent (S
Low Benefits
High Benefits
Discounted at 3 and
Discounted at 3 and 7
Segment
Million)
Million)
7 Percent (S Million).
Percent (S Million)
HL
47
39
NG
3
14
24
20
122
LNG
0.116
0.582
0.993
0.817
4
All
Systems
4
20
35
29
174
143
The present values of benefits in Tables A.8 and A.9 are higher than the present value of
costs of the rule at the corresponding discount rates (see Table 16 in the report).
46

<<<PAGE 53>>>

Appendix B — Regulatory Flexibility Analysis
Regulatory Flexibility Act (P.L. 96-354)
DEPARTMENT OF TRANSPORTATION
Pipeline and Hazardous Materials Safety Administration
49 CFR Parts 192
[Docket ID PHMSA-08-0291]
RIN2137-AE33
Pipeline Safety: Pipeline and Natural Gas Reporting Requirements
Action: Notice of Proposed Rule Making
Initial Regulatory Flexibility Analysis
The Regulatory Flexibility Act of 1980, as amended, requires Federal agencies to conduct
a separate analysis of the economic impact of rules on small entities. The Regulatory
Flexibility Act requires that Federal agencies take small entities' concerns into account
when developing, writing, publicizing, promulgating, and enforcing regulations. To this
end, the Act requires that agencies detail how they have met these concerns, by including
a Regulatory Flexibility Analysis (RFA). An initial UFA, which accompanies a NPRM,
must include the following five elements:
1) A description of the reasons why action by the Agency is being considered;
2) A succinct statement of the objectives of, and legal basis for, the proposed rule;
3) A description of and, where feasible, an estimate of the number of small entities to
which the proposed rule would apply;
4) A description of the proposed reporting, recordkeeping, and other compliance
requirements of the proposed rule, including an estimate of the classes of small
entities that would be subject to the requirements and the type of professional
skills necessary for preparing the report or record; and
5) Identification, to the extent practicable, of all Federal rules which may duplicate,
overlap, or conflict with the proposed rule.
A discussion of these requirements follows.
47

<<<PAGE 54>>>

1. A description of the reasons why action by the agency is being considered.
PHMSA recognized the need to revise several components of the rules relating to data
reporting, including those relating to Section 191.3 and 195 subpart B (to modify
reporting requirements for operators of hazardous liquid pipelines); to Section 191
references to LNG operators; to creating a National Pipelines Owner/Operator
Registry; and to facilitating electronic data collection.
As the nation's repository for pipeline data, PHMSA's data are used by many entities
for many reasons, including planning purposes, safety-related research, public critical-
safety information, and statistical analysis. The NPRM is intended to address
recognized needed improvements and enhance safety by ensuring that PHMSA has
accurate safety data to manage and reduce risks associated with natural gas
transmission and hazardous liquid pipeline systems and LNG facilities.
The modifications noted in the proposed rule will affect hazardous liquid and gas
pipelines (distribution and transmission), and liquefied natural gas (LNG) facility
operators.
2. A succinct statement of the objectives of and legal basis for, the proposed rule.
The Natural Gas Pipeline Safety Act of 1968 and the Hazardous Liquid Pipeline
Safety Act of 1979 require the reporting of incidents on natural gas transmission and
distribution pipelines. These reporting requirements, as defined in 49 CFR Section
191.15, mandate that operators report any incident that meets certain specific
conditions.
PHMSA proposes the following regulatory amendments and changes to the 49 CFR to
enhance general data and data management improvements for pipelines: (1) Modify
the scope of part 191 addressed in 49 CFR Section 191.1, to reflect the changes made
in the scope of part 192 of the changes to the definition of gas gathering lines; (2)
Change the definition of an "incident" to require an operator to report a fire not
intentionally set by the operator, or an explosion, and establish a volumetric basis for
reporting unexpected or unintentional gas loss; (3) Require operators of hazardous
liquid pipelines to submit pipeline information by state on the annual report for
hazardous liquid pipelines; (4) Require operators of Liquefied Natural Gas (LNG)
facilities to submit incident and annual reports; (5) Create and require participation in
a National Pipeline Operator Registry; (6) Require operators to report and file data
electronically whenever possible; (7) Merge the natural gas transmission IM Semi-
Annual Performance Measures Report with the annual reports; (8) Require operators
to use a standard form in submitting Safety-Related Condition Reports; and (9)
Require additional telephonic notification of accidents.
48

<<<PAGE 55>>>

These revisions will result in improvements not only to the data but also to the
analyses PHMSA relies on to make critical safety-related decisions and to more
properly allocate scarce agency resources based on risk.
3. A description of and, where feasible, an estimate of the number of small entities to
which the proposed rule would apply.
The Small Business Administration criteria for defining a small entity in the hazardous
liquid pipeline industry is 1,500 employees, as specified in the North American
Industry Classification System (NAICS) codes. The NAICS codes relevant to
hazardous liquid pipelines are code 486110, Pipeline Transportation of Crude Oil; and
code 486910, Pipeline Transportation of Refined Petroleum Products. PHMSA does
not collect information on number of employees or revenues for pipeline operators.
Such a collection would require OMB approval. Nevertheless, PHMSA continues to
seek information about the number of small pipeline operators to more fully determine
impact on small entities, that is, the companies with less than 1,500 employees,
including employees of parent corporations.
PHMSA has reviewed the data it collects from the hazardous liquid (HL) pipeline
industry and has estimated there are probably 10 to 20 small entities in this industry.
Several of the operators do not transport petroleum products, but rather transport
carbon dioxide, ammonia, or chlorine and may not be indirect competition with large
pipeline operators. Other small operators remain competitive, as they have developed
niche markets and may serve only a small number of customers.
For the Natural Gas Transmission pipeline industry (NAICS 486210), the size
standard for a small business is $6.5 million in annual revenues. The size standard for
Natural Gas Distribution is 500 employees. PHMSA estimates that about 480 of the
gas transmission and gathering firms have less than $6.5 million in revenues and about
1,000 gas distribution firms have fewer than 500 employees. PHMSA assumes that no
more than 61 percent will be affected by the proposed rule.
Information on the market structure of the LNG Industry is scarce; however the
Energy Information Administration indicates that the LNG Industry is expanding to
the point that the LNG operators are at full capacity, facing increasing demand. In
addition, they report costs are decreasing in the LNG industry. ^ The estimated
reporting cost to LNG facilities operators is very low, and thus, PHMSA assumes that
LNG facilities operators will not be adversely affected by the requirements in the
proposed rule.
39 http://www.eia.doe.gov/oiaf/analysispaper/global/lngindustry.html.
49

<<<PAGE 56>>>

4. A description of the proposed reporting, recordkeeping, and other compliance
requirements of the proposed rule, including an estimate of the classes of small
entities which would be subject to the requirements and the type of professional skills
necessary for preparation of the report or record.
The proposed rule contains the following information collection requirements.
PHMSA assumes that an engineer would be responsible for collecting and providing
the information required under the proposed rule. Engineers in the oil and gas
ransportation industry earn on average fully loaded hourly wage rate of betwee
55.82 ($37.21*1.50 overhead) and $90.00 ($60.00*1.50 overhead).*
1. PHMSA is proposing to change the definition of an "incident" for Natural Gas
pipelines and LNG facilities (49 CFR Part 191.3): (a) to include fires not
intentionally set and explosions as categories into the definition of reportable
incidents; and (b) to establish a volumetric basis for unplanned gas loss for
reporting an incident.
There is an added information collection burden on NG and LNG operators resulting
from this increased reporting requirement. Reports are expected to increase by 308 the
first year and by 34 reports in subsequent years. PHMSA estimates that approximately
1,349 (0.61* 2,212) NG operators could be considered small and 9 LNG operators.
Based on PHMSA's estimated cost to 2,212 NG operators and 77 LNG operators of
between $17,000 and $28,000, (about $7.42 to $12.79 per operator) the total first-year
cost to the 2,189 small operators will range between $10,546 and $17,370 (about the
same average cost per firm as for all operators). Based on PHMSA's estimate of
annual recurring cost of between approximately $2,000 and $3,000 for NG operators,
the annual recurring costs to all small firms combined would be between $1,241 and
$1,861.
2. PHMSA is proposing to require HL operators to submit state-specific annual
reports.
Based on PHMSA's estimates of first-year costs to the 188 interstate HL operators of
between approximately $712,000 and $1,057,000 (about $3,787 to $5,622 per firm),
operators)and $84,335. PHMSA estimates the recurring costs in successive years
would be in the same magnitude each year (year 2 to 10).
3. PHMSA is requiring LNG operators to submit additional information on their
annual reports and submit incident reports.
40 The lower range is from BLS and the upper range is an industry estimate.
50

<<<PAGE 57>>>

PHMSA estimates that the first-year costs to the 77 LNG operators would range
between approximately $52,000 and $83,000.^*' PHMSA estimates the recurring costs
in successive years would be in the same magnitude each year. Although there is
scarce information about the LNG industry market structure, based on Energy
Information Administration data, PHMSA assumes that only a small fi-action of the
LNG operators are small, and that the cost to small operators may be negligible. It
would be approximately between $675 and $1,078 per LNG operator.
4. PHMSA is proposing to require HL operators, NG operators, and LNG facility
operators to use the National Pipeline Operator Identification registry to submit all
reports. In addition PHMSA is requiring operators to notify PHMSA at least 30
days in advance of certain profile and other changes in their facilities. Changes
that require reporting include the following:
• A change in the operating entity responsible for operating an existing pipeline,
pipeline segment, or facility.
• A change in the operating entity responsible for managing or administering a
safety program (such as an Integrity Management or Corrosion Protection
Program) covering an existing pipeline, pipeline segment, or facility.
• The acquisition or divestiture of 50 or more miles of an existing pipeline or
pipeline segment.
• The rehabilitation or replacement of pipe or other system modifications to upgrade
or update an existing pipeline, pipeline segment, or facility costing $5 million or
more.
• The construction of 10 or more miles of a new hazardous liquid or gas
transmission pipeline facility, or other construction project costing $5 million or
more.
• The construction of a new LNG facility, or the sale or purchase of an existing
LNG facility.
The following assumptions were made to calculate the increased burden on operators:
• All pipeline operators will be required to use the National OPID Registry when
reporting. PHMSA estimates that 15 percent of the HL pipeline operators and 23
percent of the NG operators will be impacted. This translates to 47 HL operators
We use different average hourly wage rates for the low range based on information from BLS. For the low
range, we use an average wage rate (including overhead) for an engineer in the HL industry of $60.59, and
in the NG industry the wage rate is $55.82. For the high range we use an industry determined wage rate of
$90.00 per hour.
51

<<<PAGE 58>>>

and 509 NG transmission operators."^^ In addition, approximately nine LNG
facility operators will be impacted.''^
• Operators will need an estimated additional 10 minutes for entering registration
information for the first year and 5 minutes in future years.'*'*
• Operators will need 1 additional hour for submitting advance notice of new
pipeline construction.
PHMSA estimates that only a small percentage of operators will be affected,
approximately 565. Based on PHMSA's estimate of first-year costs for all operators
ranging between $37,000 and $59,000 (about $65.49 to $104.42 per operator), PHMSA
estimates that the first-year costs to small operators would range between approximately
$8,524 and $13,642. Recurring costs in successive years would be between $8,046 and
$12,872.
5. PHMSA is proposing to require NG operators to submit performance measures
through the annual report required in § 191.15.
Operators must submit a separate report for each State the pipeline traverses. Thus,
operators of interstate pipelines must submit one report per State. This change will
increase the number of annual reports that interstate pipeline operators must file but
reduce the reporting burden to industry because they no longer have to file semi-annual
IM reports. By eliminating the semi-annual report and replacing it with the annual report,
some savings accrue to operators. By requiring some operators to file multiple annual
reports, some operators will accrue additional costs. PHMSA does not expect that cost
increases and savings will cancel each other out. This is based on the following factors:
PHMSA estimates that few, if any, small operators will be affected since small
transmission operators' pipelines rarely cross State lines. PHMSA estimates that fewer
than (or at least 10) small operators may be affected. Their aggregate cost is
approximately between $2,161 and $3,481 (about $216 to $348 per firm) the first year and
in the same range in successive years.
This estimate is based on the number of operators who reported more pipe miles installed during 2000 to
2009, compared to previous annual PHMSA filings.
* ^ This estimate is based on an LNG global growth rate of 50 percent in 4 years. This translates to
approximately 13 percent per year. See http://www.upstreamonline.coni/live/articlel50318.ece. Another
estimate is based on the industry tripling in the next 20 years. This translates to approximately a 12
percent per year.
Seehttp://www.petroleum-economist.com/defauh.asp?page=14&PubID=46&ISS=8648&SID=325632.
^ This paperwork compliance burden information is based on the experience of the Federal Motor Carrier
Safety Administration (FMCSA) in conducting registration of trucking carriers who have a DOT
identification number in the FMCSA Trucking Registry. The agency found that it took trucking carriers 7
minutes to enter required data in the Registry for the first time and 5 minutes for subsequent years.
Source: Vivian Oliver, FMCSA, in a telephone interview with Adam Klauber, the Volpe Center, June 28,
2007.
52

<<<PAGE 59>>>

6. PHMSA is modifying HL operator telephonic notification of accident reporting
requirement if significant information becomes available during the emergency.
PHMSA does not foresee any undue impact to small operators resulting from this
requirement.
The table below summarizes the average cost to small operators by pipeline sector.
Average
Average
Average
Average
Cost to HL
Cost to HL
Cost to NG
Cost to NG
Average
Cost to
Average
Cost to
LNG
LNG
Operators -
Low
Operators -
High
Locrators-
Operators -
Operators -
High
Low
- High
Operators
First
Year
$3,805
Recurring
$3,804
$5,649
$239
$385
$691
$5,647
$231
$349
$1,103
$683
$1,091
5. An identification, to the extent practicable, of all Federal rules that may duplicate,
overlap, or conflict with the proposed rule.
No Federal rules would duplicate, overlap, or conflict with the proposed rule.
PHMSA prepared a Regulatory Impact Analysis (RIA). A copy of the RIA was placed in
the Docket (Document No. PHMSA-08-0291).

<<<PAGE 60>>>

Appendix C — Paperwork Reduction Act Analysis (44
U.S.C. 3501 et seq.)
DEPARTMENT OF TRANSPORTATION
Pipeline and Hazardous Materials Safety Administration
49 CFR Parts 191,192, 193 and 195
[Docket No. PHMSA-08-0291]
Rin2137-AE33
Action Name: Pipeline Safety: Pipeline and Liquefied Natural Gas Reporting
Requirements
Agency: Pipeline and Hazardous Materials Safety Administration (PHMSA),
Department of Transportation (DOT)
Category: Notice of Proposed Rulemaking
C.l Paperwork Reduction
This NPRM proposes additional information collection requirements. Those requirements
will affect natural gas (NG) and hazardous liquid (HL) pipeUne operators and liquefied
natural gas (LNG) facility operators. HL operators will submit separate annual reports for
each state the pipeline traverses and they will provide a telephonic report if significant
information becomes available during an emergency response.. LNG operators will be
required to submit annual and incident reports. NG Transmission operators will submit IM
performance measures through the annual reports. NG, HL and LNG operators will
participate in a National Pipeline Identification Registry and will use a standard form in
submitting safety related condition reports.
As required by the Paperwork Reduction Act of 1995 (44 U.S.C. 3507(d)), PHMSA will
present a separate paperwork analysis to the Office of Management and Budget for
review. A copy of the analysis will be placed in the docket.
The proposed rule contains information collection requirements.
PHMSA is proposing to revise the Pipeline Safety Regulations to improve the reliability
and utility of data collections fi-om operators of NG pipelines, HL pipelines, and LNG
pipeline facilities. These revisions will enhance PHMSA's ability to: Understand,
measure, and assess the performance of individual operators and industry as a whole;
integrate pipeline safety data in a way that will allow a more thorough, rigorous, and
comprehensive understanding and assessment of risk; and expand and simplify existing
electronic reporting by operators. These revisions will result in improvements to both the
54

<<<PAGE 61>>>

data and the analyses PHMSA relies on to make critical, safety-related decisions, and they
will facilitate PHMSA's allocation of inspection and other resources based on a more
accurate accounting of risk
C.2 Burden Hours and Cost of PHMSA Proposed Rule to HL, NG
Pipeline Operators and LNG Facility Operators
categories into the definition of reportable incidents; and (b) to establish a volumetric
basis for unplanned gas loss for reporting an incident.
There is added information collection burden on LNG and NG operators resulting from
this increased reporting requirement. Reports are expected to increase from 154 to 308
the first year and then increase by 34 reports each successive year.
The following assumptions were made to calculate the information collection burden for
the preparation of reports:
• A total of 2,289 NG operators and LNG facility operators are impacted, consisting
of 950 transmission operators, 1,262 distribution operators, and 77 LNG facility
operators.*S
Reports are expected to increase from an annual average of 154 per year in a 10-
year period (1998 to 2007) to 462 in the first year, a net increase of 308 reports.
• Representative wage rates in the NG industry are between $55.82 and $90.00 per
hour.
• Based on previous years' trends, there will be an 11 percent increase (of 34
additional reports, 308*.11) in successive years.
• LNG and NG operators will be required to spend 1 additional hour to complete
reports.
PHMSA estimates that the first-year costs to the 2,289 operators (950 NG transmission
operators, 1,262 distribution operators, and 77 LNG facility operators) will range between
$17,000 and $28,000 (308 * burdened, average hourly wage rate of $55.00 and $90.00).
PHMSA estimates annual recurring cost would be between approximately $2,000 and
$3,000 for NG operators (34 * burdened, average hourly wage rate of $55.82 and $90.00).
The change in definition of an "incident" for NG pipelines in 49 CFR Part 191.3 to: (a)
include fires not intentionally set and explosions as categories into the definition of
reportable incidents; and (b) establish a volumetric basis for unplanned gas loss for
reporting an incident which would result in added information collection burden. PHMSA
45 http://ops.dot.gov/stats/DT98.htm.
55

<<<PAGE 62>>>

estimates the PRA burden for NG operators would increase by 308 hours the first-year
and 34 hours each successive year.
2. PHMSA is proposing to require HL operators to submit State-specific annual reports.
To estimate costs and burden hours to HL operators, PHMSA assumes:
• All 314 HL pipeline operators (intrastate and interstate) will have to submit state-
specific information on their annual reports.
• Approximately 40 percent of the pipeline operators or 126 pipeline operators
(.40*314) are intrastate and 60 percent or 188 (.60*314) are interstate. 46
• The 126 intrastate HL pipeline operators will have to file one annual report, while
the 188 interstate HL pipeline operators must file multiple times as needed for the
designated System Type for each State in which pipeline facilities exist.
• Approximately 50 percent of the 188 interstate pipeline operators, or 94 operators
(.50*188) will file, on average, two annual reports for a total of 188 (94*2) reports.
• Approximately 30 percent of the 188 interstate operators or 56 operators (30*188)
will file, on average, five annual reports for a total of 283 (56*5).
• Approximately 20 percent of the 188 interstate operators or 38 operators (20*188)
will file, on average, 10 annual reports for a total of 377 reports.
• Representative fully loaded average hourly wage rates for HL operators are
between $60.59 (40.39*1.50) and $90.00 ($60.00*1.50).
• HL operators will be required to spend 12 additional hours filing each State-
specific annual report.
PHMSA estimates that HL operators will file approximately 979 reports per year with
state specific information included. PHMSA estimates that the first-year costs to HL
reports will increase the reporting burden by 11,748 hours (12 * 979) the first-year and
each successive year. This may be an overestimation, since operators that are required to
file multiple reports may only need a fraction of this time to complete the parts of the
report required by 49 CFR Part 195 that pertain to information on pipelines that traverse
State lines. PHMSA invites comments on this.
3. PHMSA is requiring LNG operators to submit additional information on their annual
reports and submit incident reports. The following assumptions were made to estimate the
burden on LNG operators:
46 The estimate is based on an analysis of MPMS data, which shows that 40 percent operate in one state, 34

<<<PAGE 63>>>

• A total of 77 operators are expected to prepare annual reports.'*'
• Average hourly wage rates are between $55.82 and $90.00.
• Between 1944 and 2004, three major LNG accidents occurred with some 130
fatalities and injuries (not including those resulting from the Staten Island
construction-related accident), so PHMSA estimates that at most there may be no
more than one incident reported per year overall.
• LNG operators will need to spend 13 additional hours to complete both reports.
PHMSA estimates that the first-year costs to the 77 LNG operators would range between
approximately $52,000 and $83,000 (77 * houriy wage rate * number of hours). PHMSA
estimates the recurring costs in successive years would be in the same magnitude each
year. Both the first-year and annual recurring cost totals include opportunity costs.
PHMSA estimates that requiring LNG operators to submit incident and annual reports will
increase the reporting burden by 13 hours the first year and each successive year.
PHMSA is proposing to require HL, NG, and LNG operators to use the National Pipeline
Operator Identification registry to submit all reports. In addition PHMSA is requiring
operators to notify PHMSA at least 30 days in advance of certain profile and other
changes in their facilities. Changes include the following:
• A change in the operating entity responsible for operating an existing pipeline,
pipeline segment, or facility.
• A change in the operating entity responsible for managing or administering a
safety program (such as an Integrity Management or Corrosion Protection
Program) covering an existing pipeline, pipeline segment, or facility.
• The acquisition or divestiture of 50 or more miles of an existing pipeline or
pipeline segment.
• The rehabilitation or replacement of pipe or other system modifications to upgrade
or update an existing pipeline, pipeline segment, or facility costing $5 million or
more.
• The construction of 10 or more miles of a new hazardous liquid or gas
transmission pipeline facility, or other construction project costing $5 million or
more.
• The construction of a new LNG facility or the sale or purchase of an existing LNG
facility.
The following assumptions were made to calculate the increased burden on operators:
• All pipeline operators will be required to use the National OPID Registry when
reporting. PHMSA estimates that 15 percent of the HL pipeline operators and 23
percent of the NG operators will be impacted. This translates to 47 HL operators
''''http://ops.dot.gov/stats/DT98.htm.
57

<<<PAGE 64>>>

and 509 NG transmission operators.'** In addition, approximately nine LNG
facility operators will be impacted.'*^
• Operators will need an estimated additional 10 minutes for entering registration
information for the first year, and 5 minutes in fiiture years.'°
• Operators will need an additional hour for submitting advance notice of new
pipeline construction.
PHMSA estimates that the first-year costs to the operators that are expected to report
under this requirement would range between approximately $37,000 and $59,000 (number
of operators * hourly wage rate * time). Because operators are expected to be more
familiar with the filling procedures in successive years, PHMSA estimates the recurring
costs in successive years would be slightly lower. The recurring annual costs would range
approximately between $32,000 and $51,000 (number of operators * hourly wage rate *
time).
PHMSA estimates that requiring HL, NG, and LNG operators to abide by the National
OPID Registry requirements will increase the reporting burden by 1 hour and 10 minutes
the first-year and 1 hour and 5 minutes each successive year.
5. PHMSA is proposing to require NG operators to submit performance measures through
the annual report required in §191.15. Operators must submit a separate report for each
State the pipeline traverses. Thus, operators of interstate pipelines must submit one report
per State. This change will increase the number of annual reports that interstate pipeline
operators must file but reduce the reporting burden to industry because they no longer
have to file semi-annual IM reports.
By eliminating the semi-annual report and replacing it with the annual report, some
savings accrue to operators. By requiring some operators to file multiple annual reports,
some operators will accrue additional costs. PHMSA does not expect that cost increases
and savings will cancel each other out. This is based on the following factors:
• PHMSA assumes that 50 percent of the 950 NG operators, or 475 pipeline
operators, have interstate pipelines and will need to file multiple annual reports.
"* * This estimate is based on the number of operators who reported more pipe miles installed during 2000 to
2009, compared to previous annual PHMSA filings.
'^ This estimate is based on an LNG global growth rate of 50 percent in 4 years. This translates to
approximately 13 percent per year. See http://www.upstreamonline.com/live/articlel50318.ece. Another
estimate is based on the industry tripling in the next 20 years. This translates to approximately 12 percent
per year. See http://www.petroleum-
economist.com/default.asp?page=14&PubID=46&ISS=8648&SlD=325632.
'" This paperwork compliance burden information is based on the experience of the Federal Motor Carrier
Safety Administration (FMCSA) in conducting registration of carriers who have a DOT identification
number in the FMCSA Trucking Registry. The agency found that it took trucking carriers 7 minutes to
enter required data in the Registry for the fu-st time and 5 minutes for subsequent years. Source: Vivian
Oliver, FMCSA, in a telephone interview with Adam Klauber, the Volpe Center, June 28, 2007.
58

<<<PAGE 65>>>

whereas the other 50 percent, or 475 pipeline operators, are intrastate operators
and will need to file one annual report (rather than a report semi-annually).
PHMSA assumes intrastate operators' costs will decrease by 50 percent, since they
will be filling one annual report instead of two semi-annual reports annually.
The 475 interstate operators will file multiple annual reports, one for each state in
which they operate. The calculations below are subject to rounding under our
assumptions.
1. Approximately 50 percent of the 475 operators or 238 will file two reports
filing two reports annually; the same number of reports they filed in previous
for a total of 475 reports. Their costs will remain the same because they are
years when they filed semi-annually.
2. Thirty percent of the 475 operators or approximately 143 will file five
reports, for a total of 713 reports. They will file approximately 427 [713-
(2*143)] additional reports annually.
3. Approximately 20 percent of the 475 operators or 95 will file 10 reports for
a total of 950 reports. They will file approximately 760 [950 - (2*95)]
additional reports annually.
• Operators will spend 12 hours completing the required annual report. PHMSA
assumes that operators took 12 hours to file each of their semi-annual reports in
past years.
• Representative fully loaded average hourly wage rates for gas operators are
between $55.82 ($37.21*1.50) and $90.00 ($60.00*1.50).
Recurring costs are expected to be at the same level as the first-year costs.
PHMSA estimates that a total of 950 NG transmission pipeline operators will be affected.
Previously operators filed an estimated 1,900 (2 * 950) reports semi-annually and now
they will file 2,613 (475 + 950 + 713 + 475) reports annually. Operators will now file an
additional 713 reports (2,613 - 1,900) annually. PHMSA estimates that the cost incurred
will range from $477,596 (713*12*$55.82) to $770,040 (713*12*$90.00) annually.

<<<PAGE 66>>>

Appendix D —PHIVISA/OPS Environmental Checklist and
Assessment
DEPARTMENT OF TRANSPORTATION
Pipeline and Hazardous Materials Safety Administration
49 CFR Parts 191, 192, 193, and 195
[Docket No. PHMSA-08-0291]
RIN2137-AE33
Action Name: Pipeline Safety: Pipeline and Liquefied Natural Gas Reporting
Requirements
Location: Nationwide
Description: The Notice of Proposed Rulemaking seeks to revise the Pipeline Safety
Regulations to improve the reliability and utility of data collections from
operators of natural gas pipelines, hazardous liquid pipelines, and
liquefied natural gas (LNG) facilities.
Category: Proposed Rulemaking
D.1 Environmental Checklist
Project Description
In response to various Government Accountability Office (GAO), the U.S. Department of
Transportation Inspector General (DOTIG), the National Transportation Safety Board
(NTSB) recommendations, PHMSA and DOT intemal assessments, and industry petitions
for improved data quality to evaluate the safety performance of the pipeline industry and
to aid regulatory decision-making, PHMSA proposes the following regulatory
amendments and changes to the 49 CFR to enhance general data and data management
improvements for pipelines:
1. Modify the scope of part 191 addressed in 49 CFR Section 191.1, to reflect the changes
made in the scope of part 192 of the changes to the definition of gas gathering lines.
2. Change the definition of an "incident" in 49 CFR Section 191.3 to require an operator
to report a fire not intentionally set by the operator, or an explosion, and establish a
volumetric basis for reporting unexpected or unintentional gas loss.
3. Require operators of hazardous liquid pipelines to submit pipeline information by state
on the annual report for hazardous liquid pipelines.
60

<<<PAGE 67>>>

4. Require operators of Liquefied Natural Gas (LNG) facilities to submit incident and
annual reports.
5. Create and require participation in a National Pipeline Operator Registry.
6. Require operators to report and file data elecfronically whenever possible.
7. Merge the natural gas transmission IM Semi-Annual Performance Measures Report
with the annual reports.
8. Require operators to use a standard form in submitting Safety-Related Condition
Reports.
9. Require additional telephonic notification of accidents.
These revisions will result in both improvements not only to the data but also the analyses
PHMSA relies on to make critical safety-related decisions and more properly allocate
scarce agency resources based on risk.
The proposed regulatory changes are authorized by PHMSA's statutory authority to carry
out pipeline safety duties under 49 U.S.C. 60101 et seq. (the pipeline safety laws), 49
U.S.C. 5101 et seq. (the hazardous material transportation laws), and the Pipeline
Inspection, Protection, Enforcement and Safety Act of 2006 (PIPES) (Public Law No. 109-
468).
Activity Year: 2008 Forward
Piii-t L Checidkt Analysis:
1. 2. Is there greater size or scope than generally experienced for a
particular category of action?
Is the proposed action located near a site that involves a unique
characteristic of the geographic area, such as a historic or cuhural
resource, park land, wetland, wild and scenic river, ecologically
critical area, or property requiring special consideration under 49
U.S.C. 303(c)?
YES NO
3. Is there likelihood that the proposed action would be highly
controversial on environmental grounds?
X
61
bAtA
X
%

<<<PAGE 68>>>

:^a|tI.dhecW^Ai|apls^^.-.^^^^^^ YES NO' pATA
4. 5. Is there a potential for effects on the human environment that are
highly uncertain or involve unique or unknown risks?
Will the action cause effects on the human or natural environment that
may be precedent setting?
X
X
6. Are the action's impacts likely to create cumulatively significant
impacts when considered along with other past, present, and
reasonably foreseeable future actions?
X
7. 8. 9. 10. 11. Is the proposed action likely to have an impact on a district, site,
highway, structure, or object that is listed on or eligible for listing on
the National Register of Historic Places, or to cause the loss or
destruction of a significant scientific, cultural, or historic resource?
Will the proposed action have a significant effect on species or habitats
protected by the Endangered Species Act or other statute?
Is there a likelihood that the proposed action would be inconsistent
with or cause a violation of any Federal, State, local, or tribal law or
requirement imposed for the protection of the environment?
Is the action likely to have an impact that may be both beneficial and
adverse? A significant impact may exist even if it is believed that, on
balance, the effect will be beneficial such as likelihood that air
emissions exceed de minimis levels or otherwise that a formal Clean
Air Act conformity determination is required?
Are there reportable releases of hazardous or toxic substances as
specified in 40 CFR Part 302, Designation, Reportable Quantities, and
Notification in the vicinity of the proposed action?
12. Are there reportable releases of petroleum, oils, and lubricants,
application of pesticides and herbicides, or where the proposed action
results in the requirement to develop or amend a Spill Prevention,
Control, or Countermeasures Plan?
13. Does the proposed action have the potential to degrade already poor
environmental conditions? Does the initiation of degrading influence
activity, or affect areas not already significantly modified from their
natural condition?
X
X
X
X
X
X
X
62

<<<PAGE 69>>>

Part I. Checklist Analysis:
xm NO
NEED
OATA
14. Does the proposed action have the potential to impact minority and/or
low-income populations?
X
Other environmental considerations not included on checklist.
X
Part 11. Comments or Additional Information Related to Part I:
The following space is provided to discuss the "yes" responses to the above categories
(identify by corresponding number), or to provide any supplemental information.
X None
Part III. Conclusions:
1. This proposed action is a Categorical Exclusion (CE) and it requires no further
environmental review [ ]
Comments:
2. This proposed action is a CE, but it is recommended for fiirther review under one or
more of the environmental authorities noted below (list). [ ]
Comments:
3. An EA is recommended for this proposed action. [X]
Comments: The Draft Environmental Assessment follows this section.
63

<<<PAGE 70>>>

4. An EIS is recommended for this proposed action. Comments:
[ ]
5. A SEIS is recommended for this proposed action. Comments:
[ ]
6. A FEIS is recommended for this proposed action. [ ]
Comments:
Date Preparer/Environmental Project Manager Title/Position
Date Environmental Reviewer Title/Position
64

<<<PAGE 71>>>

D.2 Environmental Assessment
Background
The National Environmental Policy Act, 42 USC §§ 4321 - 4375, requires tiiat federal
agencies analyze proposed actions to determine whether the action will have a significant
impact on the human environment. The Council on Environmental Quality (CEQ)
regulations order federal agencies to conduct an environmental review considering: (1)
the need for the proposed action; (2) alternatives to the proposed action; (3) probable
environmental impacts of the proposed action and alternatives; and (4) the agencies and
persons consulted during the consideration process. 40 C.F.R. § 1508.9(b). . PHMSA
has recognized the need to revise several requirements in the Pipeline Safety Regulations
relating to data reporting. We developed this assessment to determine the effects of this
notice of proposed rulemaking on the environment and whether a more comprehensive
environmental impact statement may be required.
Purpose of Action
The Nation's pipelines are a transportation system that enables the safe movement of
energy products to industry and consumers. The Pipeline and Hazardous Materials Safety
Administration (PHMSA) is the Federal safety authority for the Nation's natural gas and
hazardous liquid pipelines. PHMSA is the Federal agency charged with the safe and
secure movement of almost one million daily shipments of hazardous materials by all
modes of transportation. The Agency also oversees the Nation's pipeline infrastructure,
which accounts for 64 percent of the energy commodities consumed in the United States.
The Natural Gas Pipeline Safety Act of 1968 and the Hazardous Liquid Pipeline Safety
Act of 1979 require the reporting of incidents on gas transmission and distribution piping.
These reporting requirements, as defined in 49 CFR Section 191.15, mandate that
operators report any incident that meets certain specific conditions. These requirements
were revised in 1984 and again in 2002. Additionally, in 2002, OPS issued a rule that
required hazardous liquid pipeline operators to file an annual report similar to the annual
report already required for natural gas transmission and distribution pipeline operators.
More recently, PHMSA has recognized the need to revise several rules components
relating to data reporting, including those relating to Section 191.3 and 195 subpart B (to
modify reporting requirements for operators of hazardous liquid pipelines). Section 191
references to liquefied natural gas (LNG) operators, to create a National Pipelines
Owner/Operator Registry, and to facilitate electronic data collection. PHMSA proposes
to revise the Federal pipeline safety regulations to address human factors and other
components of control room management. The proposed rules would require operators of
hazardous liquid (HL) pipelines, natural gas (NG) pipelines, and LNG facilities to amend
65

<<<PAGE 72>>>

their existing operations and maintenance procedures, operator qualification (OQ)
programs, and emergency plans to incorporate lessons learned from PHMSA and National
Transportation Safety Board (NTSB) studies of pipeline control rooms and pipeline
controllers.
The modifications noted in the proposed rule will affect HL and NG pipelines
(distribution and transmission), including LNG facilities.
In response to various Government Accountability Office (GAO), the U.S. Department of
Transportation Inspector General (DOTIG), the National Transportation Safety Board
(NTSB) recommendations, PHMSA and DOT intemal assessments, and industry petitions
for improved data quality to evaluate the safety performance of the pipeline industry and
to aid regulatory decision making, these revisions will result in both improvements to the
data and analyses PHMSA relies on to make critical safety-related decisions and better
allocate scarce agency resources based on risk.
The proposed regulatory changes are authorized by PHMSA's statutory authority to carry
out pipeline safety duties under 49 U.S.C. 60101 et seq. (the pipeline safety laws), 49
U.S.C. 5101 et seq. (the hazardous material fransportation laws), and the Pipeline
Inspection, Protection, Enforcement and Safety Act of 2006 (PIPES) (Public Law No. 109-
468).
Description of Action
HL, NG, and LNG pipelines are affected by this proposed rule. PHMSA proposes the
following regulatory amendments and changes to the 49 CFR to enhance general data and
data management improvements for pipelines:
1. Modify the scope of part 191 addressed in 49 CFR Section 191.1 to reflect
the changes made in the scope of part 192 of the changes to the definition of
gas gathering lines.
2. Change the definition of an "incident" in 49 CFR Section 191.3 to require an
operator to report a fire not intentionally set by the operator, or an explosion,
and establish a volumetric basis for reporting unexpected or unintentional gas
loss.
3. Require operators of hazardous liquid pipelines to submit pipeline
information by state on the annual report for hazardous liquid pipelines.
4. Require operators of Liquefied Natural Gas (LNG) facilities to submit
incident and annual reports.
5. Create and require participation in a National Pipeline Operator Registry.
6. Require operators to report and file data elecfronically whenever possible.
7. Merge the natural gas transmission IM Semi-Annual Performance Measures
Report with the annual reports.
66

<<<PAGE 73>>>

8. Require operators to use a standard form in submitting Safety-Related
Condition Reports.
9. Require additional telephonic notification of accidents.
Alternatives Considered
PHMSA considered three alternatives to its data collection requirements. After reviewing
the three options, PHMSA selected the proposed alternative. Option 3, given the following
considerations:
Option 1. No Action
Under this option, PHMSA would continue with the existing requirements for reporting.
PHMSA believes that taking no action would not effectively support the agency's safety
mission. Given the magnitude of the accident risks and economic losses currently
prevailing in the industry, as documented in Section 6.2 of this report, a do-nothing
alternative is not an acceptable option. Taking no action would prolong the adverse
conditions currently prevailing in the industry, including:
• Inability to mitigate the potential safety hazards arising from inadequate decision
making capability, given the lack of needed information about the location of
hazardous liquid accidents and LNG facilities.
• Inability to address the safety risks arising from poor quality of data on natural gas
pipelines incident reports, and inadequate information on operators contained in
the annual reports and OPID.
• Inefficiencies in, and high costs of, processing and correcting error-prone paper-
based reports, inadequate information provided the OPID, and failure to meet the
DOT strategic goals for E-Govemment.
This Option is deemed unacceptable, given the array of safety risks and data collection
inefficiencies and gaps identified in this NPRM.
Option 2. Require Direct Data Submission to the NPMS
The NPMS is created by PHMSA in cooperation with other Federal and State
governmental agencies and the pipeline industry. It consists of geospatial attribute data
related to the natural gas transmission and HL pipelines and LNG facilities under
PHMSA's jurisdiction. The NPMS is built and maintained using information supplied by
firms that operate pipeline and LNG facilities.
67

<<<PAGE 74>>>

To date, pipeline facility data in the NPMS are submitted by pipeline operators on a
voluntary basis. Under Option 2, PHMSA will require all operators to adhere to NPMS
data standards for all submissions that they provide. Operators will be provided with
access to sample maps and submission check-lists, and information on data standards
available for online review and downloading.
This option will enable PHMSA to use the NPMS as a tool for decision support,
emergency response, inspection planning, community access, and regulatory compliance.
PHMSA will also be able to use the risk-based pipeline IM data obtained from the NPMS
for mlemaking. Through visualization, geospatial analysis, and the integration of various
databases, PHMSA will be able to use the NPMS to help ensure the safe, reliable, and
environmentally sound operation of the nation's pipeline transportation system.
This option is not selected as the preferred alternative, partly because the compliance cost
to the industry is not known and expected to be excessively high.
Option 3. Different Reporting Requirements for Small Operators
PHMSA considered setting different requirements for large and small operators, basing
the requirements on estimated differences in expected costs and benefits. PHMSA is
aware that some regulations, rules, and government policies place a disproportionate
burden on small firms and entrepreneurs. PHMSA is aware that to promote
entrepreneurship, Govemment agencies have sometimes let small businesses receive
special regulatory treatment, such as exemptions from legislation or extended deadlines
for compliance.
These considerations were not sufficient to recommend different reporting requirements
based on business size. This option was not chosen because PHMSA concluded that
allowing disparate reporting would not meet its informational needs. PHMSA believes
reporting must provide relevant information that is useful for the decision-making needs
of those groups for whom the information is provided. PHMSA determined that not
allowing for size differences ensures integrity of the data, while allowing for firm size can
dampen the regulation's effectiveness or its primary purpose, and special regulatory
freatment may not, in fact, help small businesses. Also PHMSA believes that although
there may be a leaming curve for small entities, with practice and guidance—which
PHMSA is willing to provide— small operators will leam how to comply with the
proposed reporting requirements.^'
'' Although there is not comprehensive research on the effect of regulation on small businesses, this
assumption is not without foundation. A RAND study reports that small firms that were initially adversely
impacted by the reporting requirements of Sarbanes-Oxley Act (SOX - a Federal law that tightened
financial reporting requirements for publicly owned companies). Although more frnns, particularly
smaller ones, left the public market after enactment, they note that exits may not have been due to SOX;
other market forces may have precipitated that exit. There is also evidence that the impact was deemed
68

<<<PAGE 75>>>

option 4. Adopt Proposed NPRM Cfianges in Reporting Requirements
PHMSA has chosen Option 4, the proposed mle changes in this NPRM, as the most
reasonable of the three options, based on the OMB criteria for regulatory evaluation. This
option responds to various Govemment Accountability Office (GAO), DOT Inspector
General (DOT IG), and National Transportation Safety Board
Environmental Consequences
If complied with, almost all of the requirements will lead to better identification of
adverse impacts on the physical environment. PHMSA is currently confronted with
several data-related gaps. These gaps arise from the poor quality of reported incident data,
lack of consistent and risk-based information in annual reports, lack of data on LNG
facilities, inconsistencies in operator registry and reporting formats, and errors and
inefficiencies in paper filings. In general, systematic data collection will:
• Enhance PHMSA's ability to analyze, synthesize, and utilize the submitted data to
support regulatory oversight activities.
• Further PHMSA's safety mission by providing data essential to identify high-risk
areas and allocate resources in proportion to risk.
• Help PHMSA with its regulatory oversight and enforcement of compliance with
pipeline inspections.
Conclusion and Finding of No Significant Impact (FONSI)
The provisions of this NPRM build in and improve current regulatory requirements
related to identification of adverse impacts on the environment. Specifically, this NPRM
proposes to (1) modify the scope of part 191 addressed in 49 CFR Section 191.1 to reflect
the changes made in the scope of part 192 to the definition of gas gathering lines; 2)
Change the definition of an "incident" in 49 CFR Section 191.3 to require an operator to
report an explosion or fire not intentionally set by the operator. The proposal also
establishes a volumetric basis for reporting unexpected or unintentional gas loss. These
reporting changes will more accurately depict the safety performance of gas pipelines over
time: 3) Require operators of hazardous liquid pipelines to submit pipeline information
by state on the annual report for hazardous liquid pipelines. This data will allow PHMSA
to improve its allocation of inspection and other resources through a better understanding
of the infrastructure it regulates; 4) Require operators of Liquefied Natural Gas (LNG)
facilities to submit incident and annual reports. This data will provide valuable
negligible after 5 quarters of reporting. See http://rand.org/pubs/research briefs/RB9295/indexl .html and
http://rand.org/pubs/research_briefs/RB9298/indexl.html
69

<<<PAGE 76>>>

infrastmcture information to PHMSA, and allow for a more thorough evaluation of the
safety performance of LNG facilities; 5) Create and require participation in a National
Pipeline and LNG Operator Registry. This data will provide PHMSA with timely updates
on significant and potential safety-impacting changes occurring under its purview, and
help PHMSA to better monitor and assess operator performance; 6) Require operators to
report and file data electronically whenever possible. The elecfronic submission of data
will increase the accuracy and quality of data collected which, in tum, will improve
PHMSA's data integration efforts. Elecfronic submission will also reduce the reporting
burden on operators; 7) Merge the natural gas transmission integrity management Semi-
Annual Performance Measures Report with the annual reports. Revise the leak cause
categories listed in the annual report to include those nine categories listed in ASME
B31.8S. This change will significantly reduce the reporting burden on operators by
changing the current semi-annual requirement. 8) Require operators to use a standard form
in submitting Safety-Related Condition Reports. This will ensure consistency of data
submitted across the pipeline industry; 9) Modify hazardous liquid operator telephonic
notification of accidents to require operators to have and maintain a procedure to calculate
and report a reasonable initial estimate of released product and to provide an additional
telephonic report to the National Response Center if significant new information becomes
available during the emergency response phase. The net environmental impact of this rale
will be positive. Therefore, we believe there are no significant environmental impacts
associated with this final rale.
List of Agencies and Persons Consulted
Roger Littie, PHMSA, DOT
John Gale, PHMSA, DOT
Warren Pranella, Econometric
70

## Provenance

- Official: Yes
- Source: <https://downloads.regulations.gov/PHMSA-2009-0203-0006/attachment_1.pdf>
- Source ID: `regulations-gov`
- SHA-256: `bfa830336f7eadcb3d18d0b4ed1283be9eed289ff0150e0e91a40bae79416c05`
- Retrieved: 2026-08-20T02:22:46.679Z
- Exported: 2026-08-25T18:01:59.798Z
- Document slug: `regulations-gov-attachment-0900006480e913c7`

### Source metadata

```json
{
  "materialSubtype": "regulations_gov_agency_attachment",
  "parentDocumentId": "regulations-gov-document-phmsa-2009-0203-0006",
  "regulationsGovDocumentId": "PHMSA-2009-0203-0006",
  "docketId": "PHMSA-2009-0203",
  "attachmentId": "0900006480e913c7",
  "format": "pdf",
  "authorshipClass": "agency_authored",
  "rightsClass": "federal_work",
  "ingestionDecision": "ingest",
  "decisionBasis": [
    "organization:U.S. DOT/PHMSA",
    "title:U.S. DOT/PHMSA - Draft Regulatory Evaluation - NPRM: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements (One Rule)"
  ],
  "summaryEligibility": "eligible",
  "jurisdiction": "US"
}
```