# U.S. DOT/PHMSA - Agreement Modification

**Citation:** 0900006480e91fdb  
**Type / status:** rulemaking / current  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** Not stated

e U c r\^^^^r^^n* 1200 New Jersey Ave. S.E. .S. Department Washington, DC 20590 of Transportation Pipeline and Hazardous Materials Safety Administration April 30,2009 Mr. Walter Bennett ^ ^ Senior Vice President of Operations - 1 3 CD - i v- : ^ Boardwalk Pipeline Partners, LP 9 Greenway Plaza, Suite 2800 — I Houston, Texas 77046 r3 Dear Mr. Bennett: The enclosed Agreement... Page 2 Mr. Walter Bennett Boardwalk Pipeline Partners, LP steps to ensure the specified pipelines could be safely operated. Boardwalk is continuing its investigation, formulating a remediation fitness for purpose plan including the potential excavation and removal of certain anomalous pipe joints. We acknowledge...

## Document text

<<<PAGE 1>>>

e
U c r\^^^^r^^n* 1200 New Jersey Ave. S.E.
.S. Department Washington, DC 20590
of Transportation
Pipeline and Hazardous
Materials Safety
Administration April 30,2009
Mr. Walter Bennett ^ ^
Senior Vice President of Operations - 1 3
CD
- i v- : ^
Boardwalk Pipeline Partners, LP
9 Greenway Plaza, Suite 2800
— I
Houston, Texas 77046 r3
Dear Mr. Bennett:
The enclosed Agreement modifies the special permits the Pipeline and Hazardous Materials
Safety Administration (PHMSA) issued to Boardwalk Pipeline Partaers, LP and its subsidiaries,
Gulf Crossing Pipeline Company LLC, Gulf South Pipeline Company, LP, and Texas Gas
Transmission, LLC (collectively hereinafter, "Boardwalk") to operate certain pipelines at up to
80 percent SMYS in Class 1 locations provided that the conditions and safety requirements set
forth in each of the special permits were met. The request letters. Federal Register notices and
all other pertinent documents are available for review in Docket Nos. PHMSA- 2006-26533,
PHMSA- 2007-28994, PHMSA- 2008-0068, PHMSA- 2008-0067, and PHMSA- 2006-26533 in
the Federal Docket Management System (FDMS) located on the internet at
www.Regulations.gov. The Boardwalk pipelines that received special permits are located in
Louisiana, Texas, Mississippi, Arkansas, Oklahoma and Alabama and include: the 42-inch East
Texas to Mississippi Pipeline; the 42-inch Mississippi Loop Pipeline; the 42-inch South East
Pipeline; the 42-inch Gulf Crossing Pipeline; the 36-inch Fayetteville Lateral; and the 36-inch
Greerteville Lateral (collectively referred to as "Pipelines").
As you know, subsequent to the issuance of these special permits. Boardwalk reported to
PHMSA that certain anomalies had been discovered in the Pipelines. Specifically, some of the
X70 grade steel pipe used in constructing these pipelines appear to have exhibited low yield
strength below the minimum level allowed by American Petroleum Institute Specification 5L,
Specification for Line Pipe (API 5L). During the process of testing segments of the Mississippi
Loop project, a hydrostatic test failure occurred in which the root cause was determined to be a
switched plate inadvertently inserted into the plate rolling in the plate mill. As a result of the
hydrostatic test failure. Boardwalk, in cooperation with PHMSA, ran deformation tools in all of
the subject pipelines. Boardwalk has discovered anomalies in the Pipelines that appear not to be
directly related to the initial root cause findings for the Mississippi Loop failure.
After being informed of the.se issues by Boardwalk. PHMSA initiated an inquiry and took
immediate steps including field inspections and information collection. Through a number of
meetings and conference calls, PHMSA expressed its concerns and Boardwalk took immediate

<<<PAGE 2>>>

Page 2
Mr. Walter Bennett
Boardwalk Pipeline Partners, LP
steps to ensure the specified pipelines could be safely operated. Boardwalk is continuing its
investigation, formulating a remediation fitness for purpose plan including the potential
excavation and removal of certain anomalous pipe joints. We acknowledge Boardwalk's
cooperation and commitment to performing corrective actions in response to PHMSA's
concerns. The enclosed Agreement modifies the special permits by specifying interim pressure
limits and other remedial actions in order to conservatively address the potentially low yield
strength issues PHMSA has determined are necessary prior to implementing the alternative
MAOP and to prudently operate the Pipelines. The Agreement must be signed and returned to
PHMSA within 10 days of your receipt of this letter.
As the actions required under the Agreement are implemented, Boardwalk must review these
operating parameters with PHMSA and submit a 30-day notice of intent to implement the
alternative MAOP. Once PHMSA has determined that Boardwalk is in compliance with the
requirements of the special permit for each pipeline, including the requirements specified in the
enclosed Agreement, PHMSA will inform Boardwalk of approval to increase the operating
pressure of a line or line segment to a pressure corresponding to the validated stress level.
Thank you for your cooperation.
Sin<||rely,
Jeffrey D. Wiese
Associate Administrator for Pipeline Safety
Enclosure

<<<PAGE 3>>>

U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, DC 20590
SPECIAL PERMIT MODIFICATION AGREEMENT
This Agreement modifies the special permits the Pipeline and Hazardous Materials Safety
Administration (PHMSA) granted to Boardwalk Pipeline Partners, LP and its subsidiaries Gulf
Crossing Pipeline Company LLC, Gulf South Pipeline Company, LP, and Texas Gas
Transmission, LLC (collectively hereinafter, "Boardwalk") to operate certain pipelines located in
Louisiana, Texas, Mississippi, Arkansas, Oklahoma and Alabama at up to 80 percent SMYS in
Class 1 locations provided that numerous conditions and safety requirements were met. These
pipelines are defined as: 42-inch East Texas to Mississippi Pipeline, 42-inch Mississippi Loop
Pipeline, 42-inch South East Pipeline, 42-inch Gulf Crossing Pipeline, 36-inch Fayetteville
Lateral and 36-inch Greeneville Lateral (collectively referred to as "Pipelines").
Subsequent to the issuance of these special permits, the X70 grade steel pipe used in constructing
these pipelines appears to have exhibited low yield strength in field conditions and may be below
the minimum level allowed by American Petroleum Institute Specification 5L, Specification for
Line Pipe (API 5L). During the process of complying with the special permit for the Mississippi
Loop project, a hydrostatic test failure occurred in which the root cause was determined to be a
switched plate inadvertently inserted into the plate rolling in the plate mill. As a result of the
hydrostatic test failure. Boardwalk, in cooperation with PHMSA, ran deformation tools in all of
the subject pipelines and discovered additional potentially low yield strength anomalies in the
Pipelines. While not all of these additional anomalies may be directly related to the initial root
cause findings for the Mississippi Loop failure. Boardwalk is continuing its investigation, is
formulating a remediation and fitness for purpose plan including the potential excavation and
removal of certain of the anomalous pipe joints.
Based on the new information and changed circumstances surrounding the construction and
operation of the Pipelines that PHMSA became aware of after the special permits were initially
granted, PHMSA has determined that interim pressure limits and other remedial actions to
address the potential low yield strength issues are necessary as part of the implementation of the
special permit conditions to ensure the purpose of the conditions is met prior to implementing the
alternative MAOP and to ensure the pipelines can be safely operated.
Having agreed that modification of the special permits to include additional conditions is
necessary to address the potential low yield strength issue described above, Boardwalk agrees as
follows:
I. General Provisions
1. Boardwalk acknowledges that, as operator of the specified pipelines. Boardwalk and its
pipeline systems are subject to the jurisdiction of the pipeline safety laws, 49 U.S.C. 60101 et

<<<PAGE 4>>>

seq., and regulations and administrative orders issued thereunder. Boardwalk and PHMSA
hereby agree to the additional conditions set forth in this Agreement modifying the special
permits and each party waives its rights to contest the validity of this Agreement. Boardwalk
further waives any further procedural requirements it would otherwise have the opportunity to
avail itself of under 49 C.F.R. § 190.341(h) in connection with the special permit modifications
set forth in this Agreement, including any rights to administrative or judicial hearings or appeals.
2. Boardwalk agrees that the potential low yield strength issues described above exist and
agrees to address them by completing the actions specified in Section II of this Agreement
(Additional Special Permit Conditions) including any work plans and schedules which 'shall
automatically be incorporated into this Agreement, certain aspects of which are subject to ftirther
discussion and mutual agreement of PHMSA and Boardwalk. This Agreement shall apply to and
be binding upon Boardwalk, its officers, directors, and employees, and its successors, assigns, or
other entities or persons otherwise bound by law. Boardwalk agrees to provide a copy of this
Agreement and any incorporated work plans and schedules to all of its officers, employees, and
agents whose duties might reasonably include compliance with this agreement.
3. For all transfers of ownership or operating responsibility of the specified pipelines,
Boardwalk shall provide a copy of this Agreement to the prospective transferee at least 30 days
prior to such transfer and simultaneously provide written notice of the prospective transfer to
PHMSA.
4. Nothing in this Agreement affects or relieves Boardwalk of its responsibility to comply
with all applicable requirements of the pipeline safety laws, 49 U.S.C. § 60101 et seq., and
regulations and orders issued thereunder. Nothing in this Agreement alters PHMSA's right of
access, entry, inspection, and information gathering or PHMSA's authority to bring enforcement
actions against Boardwalk pursuant to the pipeline safety laws, 49 U.S.C. § 60101 et seq.,
regulations or orders issued thereunder, or any other provision of Federal or State law.
5. This Agreement does not waive or modify any other Federal, State, or local laws or
regulations applicable to Boardwalk's pipeline systems. Boardwalk is responsible for achieving
and maintaining compliance with all applicable Federal, State, and local laws, regulations and
permits.
6. This Agreement does not create rights in, or grant any cause of action to, any third party
not party to this Agreement. The U.S. Department of Transportation is not liable for any injuries
or damages to persons or property arising from acts or omissions of Boardwalk or its officers,
employees, or agents carrying out the work required by this Agreement. The U.S. Department of
Transportation, its officers, employees, agents, and representatives are not liable for any cause of
action arising from any acts or omissions of Boardwalk or its contractors in carrying out the
work required by this Agreement.
II. Additional Special Permit Conditions
East Texas to Mississippi, Southeast Expansion, Mississippi Loop, Gulf Crossing, Fayetteville
and Greenville Lateral Projects (Project(s))

<<<PAGE 5>>>

1. Boardwalk is approved to operate its pipeline systems or segment(s) per the "Interim
Operating Pressure" as defined in Table 1. Boardwalk must limit the operation of each
pipeline project segment at or below the "Interim Operating Pressure" until each such
pipeline segment has met the conditions contained within this Agreement. This pressure
restriction will remain in effect until written approval to increase the pressure is obtained
from the Director, Engineering and Emergency Support as set forth in Item 16.
"Project'''
East Texas to MS
(PHMSA- 2006-
26533)
East Texas to MS
(PHMSA- 2006-
26533)
East Texas to MS
(PHMSA- 2006-
26533)
East Texas to MS
(PHMSA- 2006-
26533)
Southeast Expansion
(PHMSA- 2007-
28994)
Mississippi Loop
(PHMSA- 2008-0068)
GulfCrossing
(PHMSA-2008-0068)
GulfCrossing
(PHMSA- 2008-0068)
GulfCrossing
(PHMSA-2008-0068)
GulfCrossing
(PHMSA- 2008-0068)
GulfCrossing
(PHMSA- 2008-0068)
Fayetteville
(PHMSA-2008-0067)
Fayetteville
(PHMSA- 2008-0067)
Greenville
(PHMSA-2008-0067)
East Texas to MS
(PHMSA-2006-
26533)
Table 1 - Listing
of Segments and Pressure Limitations
"Segmeni"
Carthage Junction CS to Hall
Summit
Hall Summit to Vixen CS
Vixen CS to Tallulah CS
Tallulah CS to Harrisville CS
Entire line (HarrisvilleCS 1 0
Transco 85)
Entire line
Sherman to Bennington^
Bennington to Paris
Paris to Mira
Mira to Sterlington
Sterlington to Tallulah
Grand View to Bald Knob
Bald Knob to Lula
Greenville to Kosciusko
36" Carthage Header
PHMSA Region
Southwest
Southwest
Southwest
Southwest/Southern
Southern
Southwest/Southern
Southwest
Southwest
Southwest
Southwest
Southwest
Southwest
Southwest/Southern
Southern
Southwest
Interim
Operating
Pressure
(Psig)
1.066
964
1.058
1,072
1065
1340
1340
1340
1032
1032
902
1050
810
1050
1204
Interim
Percent of
% SMYS
64%
58%
63%
57%
57%
72%
72%
72%
55%
55%
48%
72%
52%
72%
72%
72'%
SMYS
(psig)
1,200
1,200
1,200
1,340
1340
1340
1340
1340
1340
1340
1340
1050
1125
1050
1204
A '•'Project" is defined as a complete pipeline project and all of its segments.
^ A "Segment" is defined as a section of pipe between defined points, compressor stations or the entire pipeline.
^ The 72% SMYS used in the pressure calculations in Table fare based upon X70 (70,000 psi yield strength) pipe.
If through testing under this agreement it is determined that X70 is not the appropriate strength value to use the table
will be amended accordingly.
* The Mississippi Loop Pipeline and GulfCrossing Pipeline segments - Sherman to Bennington and Bennington to
Paris - do not have any expanded pipe in them based upon either removal of pipe or Deformation tool results.

<<<PAGE 6>>>

Actions that must be taken prior to increasing the pressure above the "Interim Operating
Pressure" up to 72% SMYS
2. Prior to being allowed to operate any pipeline segment up to 72% specified minimum yield
strength (SMYS) (as defined in Table 1) Boardwalk must evaluate that pipeline segment with
a high resolution deformation tool specifically for identifying potentially expanded pipe.
Once the pipeline deformation tool results from the Fayetteville and Greenville Lateral
Pipelines^ become available and are evaluated which is anticipated to occur during the
summer of 2009, Boardwalk may elect to submit an alternative plan for remediating the
Fayetteville and Greenville Lateral Pipelines. In such event, PHMSA will review and assess
such plan, including reviewing the "Proposed Interim Operating Pressures" identified above.
3. Unless otherwise agreed to in writing by PHMSA or as set forth herein. Boardwalk must cut
out all expanded pipe over API 5L tolerances on expansion, 0.25" or 0.60% of diameter for
42-inch pipe and 0.27-inch or 0.75% of diameter for 36-inch pipe. After cutting out the
expanded pipe in any given segment. Boardwalk may request to operate that segment up to
72 percent SMYS. Boardwalk must submit requests to modify this agreement or to increase
operating pressures in accordance with Item 16 below.
4. Boardwalk must submit a "Construction Plan" to the Director, Engineering and Emergency
Support with copies to the Directors, PHMSA Southern and Southwestern Regions. The plan
should contain any planned deformation tool runs and updated with the schedules for
removal of any identified expanded pipe. For purposes of this Agreement, a Construction
Plan shall mean the weekly reports that Boardwalk currently submits that outlines the work
anticipated to occur during the following week. Boardwalk is to submit these Construction
Plans each week.
5. The Construction Plan referenced in Item 4 must address the removal of the pipe joints
containing the three horizontal directional drill anomalies identified on the 42-inch East
Texas to Mississippi Pipeline^ that appear to have expansion of approximately 1.0% to 2.25
%, five horizontal directional drill (HDD) anomalies on the 42-inch Southeast Expansion
Pipeline^ that appear to have an expansion of approximately 1.0%, and one horizontal
directional drill anomaly on the Gulf Crossing Pipeline* that may have an expansion of
approximately 1.0%.
' The 36" Fayetteville Lateral deformation tool run is scheduled for May 28 on the 66 mile section from Grandview
to Bald Knob, AR. The 36" Greenville Lateral deformation tool run is scheduled for June 2 on the 97 mile section
from Greenville to Kosciusko, MS. The 36" Carthage Header (part of the East Texas to Mississippi Pipeline
Project) deformation tool run is scheduled for the week of May 4 for the entire 3 mile segment.
* The 42-inch East Texas to Mississippi Pipeline, Hall Summit to Vixen segment, has the following anomalies in
HDDs: a) Saline Bayou West - 2 anomalies, b) Saline Bayou East - 1 anomaly, c) Dugdemona Creek - 1 anomaly.
^ The 42-inch Southeast Expansion Pipeline has the following anomalies in HDDs: a) Campbell Creek - 1 anomaly,
b) Leaf River - I anomaly, c) West Tallahalla Creek - 1 anomaly, d) Tallahalla Creek - 1 anomaly, and e) County
Road 613-1 anomaly.
* The 42-inch GulfCrossing Pipeline, Mira to Sterlington segment, has the following anomaly in a HDD: a)
Dorcheat Bayou - 1 anomaly.

<<<PAGE 7>>>

6. If any pipe that has been identified as "Expanded" (as defined in Item 3) is not removed,
including any of the joints identified in Item 5, Boardwalk must submit to the Director,
Engineering and Emergency Support with copies to the Directors, PHMSA Southern and
Southwestern Regions, a technical justification why the expanded pipe can be operated safely
at the higher operating pressures.
Actions that must be taken prior to increasing the pressure above the 72% SMYS up to MAOP
Special Permit Conditions.
7. Boardwalk must continue with testing of pipe removed from the subject segments in order to
establish the serviceability up to 80% SMYS operating parameters. For each 42-inch and 36-
inch pipe steel supplier, rolling campaign, and slab source with an identified pipe expansion:
a) A minimum of 4 pipe joints must be tested showing no expansion after hydrotest';
b) A minimum of 4 pipe joints must be tested showing expansion between 0.6% of
diameter"' (0.75% of diameter for the 36" pipe) to 1.0% expansion after hydrotest;
c) A minimum of 4 pipe joints must be tested showing expansion between > 1.0 % to 2.0%
expansion hydrotest;
d) All pipe joints must be tested showing expansion greater than 2.0 % expansion after
hydrotest;
e) A minimum of 4 pipe joints must be tested that have not previously been hydrotested;
f) If less than 4 pipe joints exists for a category listed above, only those meeting criteria that
are removed will be tested.
g) The total test pipe joints for non-expanded pipe in Items 7 (a) and (e), must total at least
10% of the removed expanded pipe joints for each such category, i.e. pipe supplier,
rolling campaign and slab source.
A metallurgical examination must be conducted including mechanical (yield, tensile,
hardness, elongation, charpy impact and if necessary, drop weight tear test- DWTT),
chemical composition, and cross-sectional and grain size. Test coupons (transverse) must be
taken from 2 distant locations down the pipe joint for each metallurgical test item listed
above and opposite the pipe seam. This testing must include full destructive testing as set
forth in API 5L.
8. Boardwalk must continue to test pipe cut out from the pipeline segments as set forth above,
to determine a "Technical Fitness for Purpose Repair and Operating Plan". This "Technical
Fitness for Purpose Repair and Operating Plan" must be submitted to PHMSA within 180
days of operating each pipeline up to 72% SMYS. Until this plan is accepted, Boardwalk
must limit operation of each pipeline segment at a pressure of at or below 72% SMYS.
Boardwalk must submit requests to modify this Agreement or to increase operating pressures
in accordance with Item 16 below.
9. Boardwalk must incorporate Items 10, 11 and 12 below into their O & M Plan or
Construction Plan, as applicable, for each such segment.
' The hydrotest parameters are specified i n the Special Permit.
'" 0.6% equals 0.25" for 42" pipe.

<<<PAGE 8>>>

10. Boardwalk must run close interval surveys (CIS) and remediate the pipe in each segment in
accordance with 49 CFR Part 192 on a periodic basis not to exceed 45 months.
11. Boardwalk must run ILI Tools to evaluate for metal loss anomalies within 18 months of
removing expanded pipe from each pipeline Project or segment.
12. Boardwalk must evaluate^^ all metal loss anomalies found on these pipeline segments in
accordance with the following criteria until the Technical Fitness for Purpose Repair and
Operating Plan is implemented. All anomaly evaluations and repairs for the 72% SMYS
operations in the special permit segment, regardless of HCA status, must be performed, based
upon the following:
a) Anomaly Response Time: Immediately
• Any anomaly within a segment operating up to 72% SMYS with either: (1) a failure
pressure ratio (FPR) equal to or less than 1.25; (2) an anomaly depth equal to or
greater than 50% wall thickness loss.
• Any anomaly within a segment operating up to 60% SMYS with either: (1) an FPR
equal to or less than 1.40; (2) an anomaly depth equal to or greater than 50% wall
thickness loss.
• Any anomaly within a segment operating up to 50% SMYS with either: (1) an FPR
equal to or less than 1.5; (2) an anomaly depth equal to or greater than 50% wall
thickness loss.
b) Anomaly Response Time: Repair Within One Year
• Any anomaly within a segment operating at up to 72% SMYS with either: (I) an
FPR equal to or less than 1.39; (2) an anomaly depth equal to or greater than 40%
wall thickness loss.
• Any anomaly within a segment operating at up to 60% SMYS with either: (I) an
FPR equal to or less than 1.67; (2) an anomaly depth equal to or greater than 40%
wall thickness loss.
• Any anomaly within a segment operating at up 50% SMYS with either: (1) an FPR
equal to or less than 2.0; (2) an anomaly depth equal to or greater than 40% wall
thickness loss.
c) Anomaly Response Time: Monitored Conditions
• Anomalies not requiring immediate or one year repairs above must be reassessed
according to 49 CFR Part 192, Subpart O reassessment intervals.
• Each anomaly not repaired under the immediate repair requirements must have a
corrosion growth rate and ILI tool tolerance assigned per Boardwalk's Gas Integrity
Management Program (IMP) to determine the maximum re-inspection interval.
d) Anomaly Assessment Methods
• Boardwalk must confirm the remaining strength (R-STRENG) effective area
method, R-STRENG - 0.85dL, and ASME B31G assessment methods are valid for
the pipe diameter, wall, thickness, grade, operating pressure, operating stress level,
and operating temperature. Boardwalk must use the most conservative method until
" Evaluate means to review ILI data, excavate indication, evaluate (measure) actual anomaly and take appropriate
repair actions.

<<<PAGE 9>>>

confirmation of the proper method is made to the Director, Engineering and
Emergency Support with copies to the Directors, PHMSA Southern and
Southwestern Regions.
13. Boardwalk must complete the 36-inch Fayetteville Lateral Pipeline Project girth weld
inspection and remediation plan as outlined below prior to operating the applicable segments
above 72% SMYS as documented in Table 1.
Fayetteville Lateral Project Girth Weld Inspection and Remediation Protocol
Phase I - Program Development
1. Boardwalk must review the welding, weld repair and nondestructive testing
(NDT) procedures that were used for the repair of the girth weld that failed
during hydrostatic testing to ensure there are no technical problems with the
procedures.
2. Boardwalk must review the Fayetteville Lateral Project construction records
to identify, locate and catalog all girth weld repairs completed with the same
procedures used on the failed girth weld.
3. Boardwalk must review the Fayetteville Lateral Project specifications and
construction records regarding the actual placement of supports underneath
the pipe at tie-ins, over-bends, sag-bends, and other areas of high stress to
ensure that high stresses are not occurring on the Fayetteville Lateral Project
as a result of inadequate pipe support.
4. The girth weld inspection and remediation program must include the
nondestructive testing (NDT) and repair (if necessary) of girth welds along the
Fayetteville Lateral Project with special emphasis on those areas of the
pipeline subjected to the highest external loading. Boardwalk must identify,
investigate and where necessary remediate previously repaired girth welds
that meet the following criteria:
a) On any previously repaired girth weld where welding and/or NDT
procedures may not have been properly followed;
b) On any repaired girth welds in the vicinity of the failed girth weld with a
minimum re-inspection of three repaired girth welds upstream and three
downstream of the failed girth weld;
c) On any repaired girth welds in agricultural areas where heavy farm
equipment may add to overburden stresses;
d) On any repaired girth welds on the top and bottom of the pipe; and
e) On any repaired girth welds near over-bends or sag-bends.
5. Boardwalk must submit the findings of the "Fayetteville Lateral Project Girth
Weld Inspection and Remediation Protocol" Items 1, 2 and 3 above and the

<<<PAGE 10>>>

framework of the girth weld inspection and remediation program (Item 4) to
the Director, Engineering and Emergency Support with copies to the
Directors, PHMSA Southern and Southwestern Regions for review prior to
beginning any excavations.
Phase II - Program Implementation
1. Boardwalk must implement the program as described above.
2. If problems are discovered after the girth weld inspection and remediation
program is implemented. Boardwalk must also address each of the following,
as required:
(a) Repair girth welds on hilltops;
(b) Repair girth welds where hi-lo pipe alignment issues were not resolved by
shims;
(c) Repair girth welds at excessive depth locations;
(d) Repair girth welds in the downstream section of compressor stations; and
(e) Repair girth welds in other areas determined to be of high risk fi-om
excessive external forces such as bored crossings of highways/railroads and at
valve settings.
3. Boardwalk must submit all the findings and results of the girth weld inspection
and remediation program to the Director, Engineering and Emergency Support
with copies to the Directors, PHMSA Southern and Southwestern Regions for
review.
14. Should Boardwalk find, through the deformation tool evaluations and excavations of the
identified anomalies, or develop any additional information, whether through the
investigation or testing described otherwise herein, that may technically warrant a
modification of any of the provisions of this agreement. Boardwalk may notify the Director,
Engineering and Emergency Support with copies to the Directors, Southern and
Southwestern Regions of these findings and request approval of the proposed modifications.
15. Boardwalk is to submit quarteriy reports to the Director, Engineering and Emergency
Support with copies to the Directors, Southern and Southwestern Regions that: (1) include
available data and results of the testing and evaluations required by this Agreement; and (2)
describe the progress of the repairs and other remedial actions being undertaken. The first
quarterly report shall be due June 1, 2009.
16. The Director may allow the removal or modification of the pressure restriction set forth in
the Agreement upon a written request from Boardwalk demonstrating that the potentially low
yield strength risk has been abated and that restoring the affected pipeline, or portion thereof,
to its otherwise applicable MAOP is justified based on a reliable engineering analysis or
other mutually agreeable data, including industry publications or studies showdng that the
pressure increase is safe considering all known physical properties, and operating parameters
of the pipeline.

<<<PAGE 11>>>

III. Relationship to Original MAOP Special Permits
The additional conditions set forth in this Agreement are in addition to the conditions in the
original special permits and Boardwalk must comply with both the original special permit terms
and this Agreement. To the extent a term or condition in the original special permit and this
Agreement are in conflict, the condition in this Agreement is controlling.
IV. Review and Approval Process
All submissions required or allowed under this Agreement should be submitted electronically in
the absence of good cause to do otherwise. With respect to each submission that under this
Agreement requires the approval of the Director, Engineering and Emergency Support, the
Director may: (a) approve, in whole or in part, the submission, (b) approve the submission on
specified conditions, (c) disapprove, in whole or in part, the submission, or (d) any combination
of the foregoing. In the event of approval, approval in part, or approval with conditions,
Boardwalk will proceed to take all action required by the submission as approved by the
Director. In the event that the Director disapproves all or any portion of the submission, the
Director will provide Boardwalk with prompt written notice of the deficiencies and the specific
additional action needed to obtain approval. Boardwalk will correct all deficiencies within the
reasonable time specified by the Director and resubmit it for approval.
V. Enforcement
This Agreement is incorporated into the special permits issued by PHMSA for the specified
pipelines and is subject to all enforcement authorities available to PHMSA under 49 U.S.C. §
60101 et seq. and 49 C.F.R. Part 190, including administrative civil penalties under § 60122 of
up to $100,000 per violation for each day the violation continues, if PHMSA determines that
Boardwalk is not proceeding in accordance with terms of the agreement, determinations made by
the Regional Director, or if appealed, decisions of the Associate Administrator. Any work plans
and associated schedules shall be automatically incorporated into this Agreement and are
enforceable in the same manner. Notwithstanding anything herein. Boardwalk shall have all of
its legal rights to challenge, appeal or otherwise contest any proposed enforcement authority
asserted for alleged non-compliance with this Agreement.
VI. Modification
The terms of this Agreement may be modified by mutual agreement of the parties. Such
modifications shall be in writing and shall be signed by both parties.
VII. Termination
This Agreement shall terminate upon the completion of all terms set forth in Section II
(Additional Special Permit Conditions). Boardwalk may request written confirmation fi-om
PHMSA when this Agreement is terminated. To the extent ongoing monitoring is required,

<<<PAGE 12>>>

10
PHMSA may terminate this Agreement with respect to all other requirements with the exception
of such monitoring. Nothing in this Agreement prevents Boardwalk from completing any of the
obligations earlier than the deadlines provided for herein.
VIIL Ratification
The parties undersigned representatives certify that they are fully authorized to enter into the
terms and conditions of this Agreement and to execute and legally bind such party to this
document.
On behalf of Boardwalk, I hereby agree to all conditions and terms of this Agreement and agree
to implement this Agreement on the referenced pipeline projects and segments.
Walter Bennett
Senior Vice President of Operations
Boardwalk Pipeline Partners, LP
Date
I-OJZ
Jeffrey D. Wiese
Associate Administrator for Pipeline Safety
Date

## Provenance

- Official: Yes
- Source: <https://downloads.regulations.gov/PHMSA-2008-0067-0009/attachment_1.pdf>
- Source ID: `regulations-gov`
- SHA-256: `be3e15e66515de41af95f5f236b80fa77167c38771f67f5cbdfcc791e2322c8c`
- Retrieved: 2026-08-20T02:22:46.679Z
- Exported: 2026-08-22T22:04:20.764Z
- Document slug: `regulations-gov-attachment-0900006480e91fdb`

### Source metadata

```json
{
  "materialSubtype": "regulations_gov_agency_attachment",
  "parentDocumentId": "regulations-gov-document-phmsa-2008-0067-0009",
  "regulationsGovDocumentId": "PHMSA-2008-0067-0009",
  "docketId": "PHMSA-2008-0067",
  "attachmentId": "0900006480e91fdb",
  "format": "pdf",
  "authorshipClass": "agency_authored",
  "rightsClass": "federal_work",
  "ingestionDecision": "ingest",
  "decisionBasis": [
    "govAgencyType:Federal",
    "govAgency:PHMSA",
    "title:U.S. DOT/PHMSA - Agreement Modification"
  ],
  "summaryEligibility": "eligible",
  "jurisdiction": "US"
}
```