# Cathodic protection test station location.

**Citation:** WAC 480-75-340  
**Type / status:** regulation / current  
**Agency:** Washington Utilities and Transportation Commission  
**Effective:** 2008-06-30  
**Published:** Not stated

Pipeline companies must ensure that each cathodically protected pipeline has test stations and other electrical measurement contact points that are located at pipe casings and at locations sufficient to facilitate cathodic protection testing.

## Document text

Pipeline companies must ensure that each cathodically protected pipeline has test stations and other electrical measurement contact points that are located at pipe casings and at locations sufficient to facilitate cathodic protection testing.

## Provenance

- Official: Yes
- Source: <https://app.leg.wa.gov/WAC/default.aspx?cite=480-75-340>
- Source ID: `wa-wac`
- SHA-256: `c2f6a6f7e97a6a3054d5f43f92a31211db51b1e7dbde600ac719a4bd0909bba3`
- Retrieved: 2026-08-11T02:02:35.370Z
- Exported: 2026-08-23T16:19:29.589Z
- Document slug: `wac-480-75-340`

### Source metadata

```json
{
  "jurisdiction": "US-WA",
  "chapter": "480-75",
  "section": "480-75-340",
  "sourceNote": "[Statutory Authority: RCW 80.01.040, 80.04.060, 81.88.040. WSR 08-12-045 (Docket PL-070974, General Order R-548), § 480-75-340, filed 5/30/08, effective 6/30/08. Statutory Authority: RCW 80.01.040 and 80.04.160. WSR 02-18-032 (Docket No. TO-000712, General Order No. R-500), § 480-75-340, filed 8/26/02, effective 9/26/02.]",
  "officialPdfUrl": "https://app.leg.wa.gov/WAC/default.aspx?cite=480-75-340&pdf=true",
  "filingHistoryUrl": "https://app.leg.wa.gov/wac/registerfiling.aspx?cite=480-75-340",
  "pipelineScope": "hazardous-liquid",
  "region": "WA"
}
```
