# Qualifications for acceptance as a certifying entity.

- **operation:** document
- **citation:** 33 CFR 154.2010
- **title:** Qualifications for acceptance as a certifying entity.
- **source type:** regulation
- **agency:** United States Coast Guard
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** 2026-08-18
- **summary:** To qualify for acceptance as a vapor control system (VCS) certifying entity, the entity must demonstrate to the satisfaction of the Commandant that it possesses the following minimum qualifications:

(a) The ability to review and evaluate design drawings and failure analyses for compliance to this s
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/33-cfr-154-2010.json
- **markdown:** https://regulus.evalyn.ai/document/33-cfr-154-2010.md
- **app url:** https://regulus.evalyn.ai/document/33-cfr-154-2010
- **source url:** https://www.ecfr.gov/on/2026-08-18/title-33/section-154.2010
**body:**

To qualify for acceptance as a vapor control system (VCS) certifying entity, the entity must demonstrate to the satisfaction of the Commandant that it possesses the following minimum qualifications:

(a) The ability to review and evaluate design drawings and failure analyses for compliance to this subpart;

(b) The knowledge of the applicable regulations of this subpart, including the standards incorporated by reference;

(c) The ability to monitor and evaluate test procedures and results for compliance with the operational requirements of this subpart;

(d) The ability to perform inspections and observe tests of bulk liquid cargo-handling systems;

(e) The applicant must not be controlled by an owner or operator of a vessel or facility engaged in controlling vapor emissions;

(f) The applicant must not be dependent upon Coast Guard acceptance under this section to remain in business; and

(g) The person in charge of VCS certification must be a licensed professional engineer in a U.S. State or territory. A person in charge of VCS certification who is not a licensed professional engineer on August 15, 2013 must obtain that license from a U.S. State or territory by August 15, 2014.

[USCG-1999-5150, 78 FR 42618, July 16, 2013, as amended by 80 FR 7540, Feb. 11, 2015]
- **truncated:** false
- **body characters:** 1285
