{"operation":"document","citation":"49 CFR 107.101","title":"Purpose and scope.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":"2026-08-18","summary":"This subpart prescribes procedures for the issuance, modification and termination of special permits from requirements of this subchapter, subchapter C of this chapter, or regulations issued under chapter 51 of 49 U.S.C.","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-107-101.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-107-101.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-107-101","source_url":"https://www.ecfr.gov/on/2026-08-18/title-49/section-107.101","body":"This subpart prescribes procedures for the issuance, modification and termination of special permits from requirements of this subchapter, subchapter C of this chapter, or regulations issued under chapter 51 of 49 U.S.C.","truncated":false,"body_characters":220}