{"operation":"document","citation":"49 CFR 173.214","title":"Packagings which require approval by the Associate Administrator.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":"2026-08-18","summary":"When § 172.101 of this subchapter specifies that a hazardous material be packaged under this section, packagings and method of shipment must be approved by the Associate Administrator prior to the first shipment.\n\n[Amdt. 173-224, 55 FR 52643, Dec. 21, 1990, as amended at 66 FR 45379, Aug. 28, 2001]","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-173-214.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-173-214.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-173-214","source_url":"https://www.ecfr.gov/on/2026-08-18/title-49/section-173.214","body":"When § 172.101 of this subchapter specifies that a hazardous material be packaged under this section, packagings and method of shipment must be approved by the Associate Administrator prior to the first shipment.\n\n[Amdt. 173-224, 55 FR 52643, Dec. 21, 1990, as amended at 66 FR 45379, Aug. 28, 2001]","truncated":false,"body_characters":299}