# Preparation of specimens for testing.

- **operation:** document
- **citation:** 49 CFR 173.462
- **title:** Preparation of specimens for testing.
- **source type:** regulation
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** 2026-08-18
- **summary:** (a) Each specimen (i.e., sample, prototype or scale model) must be examined before testing to identify and record faults or damage, including:

(1) Divergence from the specifications or drawings;

(2) Defects in construction;

(3) Corrosion or other deterioration; and

(4) Distortion of features.

(
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/49-cfr-173-462.json
- **markdown:** https://regulus.evalyn.ai/document/49-cfr-173-462.md
- **app url:** https://regulus.evalyn.ai/document/49-cfr-173-462
- **source url:** https://www.ecfr.gov/on/2026-08-18/title-49/section-173.462
**body:**

(a) Each specimen (i.e., sample, prototype or scale model) must be examined before testing to identify and record faults or damage, including:

(1) Divergence from the specifications or drawings;

(2) Defects in construction;

(3) Corrosion or other deterioration; and

(4) Distortion of features.

(b) Any deviation found under paragraph (a) of this section from the specified design must be corrected or appropriately taken into account in the subsequent evaluation.

(c) The containment system of the packaging must be clearly specified.

(d) The external features of the specimen must be clearly identified so that reference may be made to any part of it.
- **truncated:** false
- **body characters:** 659
