# Routing shipments, Division 1.1 or 1.2 (explosive) materials.

- **operation:** document
- **citation:** 49 CFR 174.105
- **title:** Routing shipments, Division 1.1 or 1.2 (explosive) materials.
- **source type:** regulation
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** 2026-08-18
- **summary:** Before a shipment of Division 1.1 or 1.2 (explosive) materials destined to a point beyond the lines of the initial carrier is accepted from the shipper, the initial carrier shall ascertain that the shipment can go forward by the route designated. To avoid delays en route, the initial carrier must be
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/49-cfr-174-105.json
- **markdown:** https://regulus.evalyn.ai/document/49-cfr-174-105.md
- **app url:** https://regulus.evalyn.ai/document/49-cfr-174-105
- **source url:** https://www.ecfr.gov/on/2026-08-18/title-49/section-174.105
**body:**

Before a shipment of Division 1.1 or 1.2 (explosive) materials destined to a point beyond the lines of the initial carrier is accepted from the shipper, the initial carrier shall ascertain that the shipment can go forward by the route designated. To avoid delays en route, the initial carrier must be in possession of full rate information before forwarding the shipment.

[Amdt. 174-26, 41 FR 16092, Apr. 15, 1976, as amended by Amdt. 174-68, 55 FR 52682, Dec. 21, 1990; 66 FR 45383, Aug. 28, 2001]
- **truncated:** false
- **body characters:** 499
