{"operation":"document","citation":"49 CFR 176.100","title":"Permit for Divisions 1.1 and 1.2 (explosive) materials.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":"2026-08-18","summary":"Before Divisions 1.1 and 1.2 (explosive) materials may be discharged from, loaded on, handled or restowed on board a vessel at any place in the United States, the carrier must obtain a permit from the COTP in accordance with the procedures in 33 CFR 126.19. Exceptions to this permit requirement may ","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-176-100.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-176-100.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-176-100","source_url":"https://www.ecfr.gov/on/2026-08-18/title-49/section-176.100","body":"Before Divisions 1.1 and 1.2 (explosive) materials may be discharged from, loaded on, handled or restowed on board a vessel at any place in the United States, the carrier must obtain a permit from the COTP in accordance with the procedures in 33 CFR 126.19. Exceptions to this permit requirement may be authorized by the COTP.\n\n[Amdt. 176-30, 55 FR 52696, Dec. 21, 1990, as amended by Amdt. 176-34, 58 FR 51533, Oct. 1, 1993; 66 FR 45385, Aug. 28, 2001]","truncated":false,"body_characters":453}