# Permit for Divisions 1.1 and 1.2 (explosive) materials.

- **operation:** document
- **citation:** 49 CFR 176.100
- **title:** Permit for Divisions 1.1 and 1.2 (explosive) materials.
- **source type:** regulation
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** 2026-08-18
- **summary:** Before Divisions 1.1 and 1.2 (explosive) materials may be discharged from, loaded on, handled or restowed on board a vessel at any place in the United States, the carrier must obtain a permit from the COTP in accordance with the procedures in 33 CFR 126.19. Exceptions to this permit requirement may 
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/49-cfr-176-100.json
- **markdown:** https://regulus.evalyn.ai/document/49-cfr-176-100.md
- **app url:** https://regulus.evalyn.ai/document/49-cfr-176-100
- **source url:** https://www.ecfr.gov/on/2026-08-18/title-49/section-176.100
**body:**

Before Divisions 1.1 and 1.2 (explosive) materials may be discharged from, loaded on, handled or restowed on board a vessel at any place in the United States, the carrier must obtain a permit from the COTP in accordance with the procedures in 33 CFR 126.19. Exceptions to this permit requirement may be authorized by the COTP.

[Amdt. 176-30, 55 FR 52696, Dec. 21, 1990, as amended by Amdt. 176-34, 58 FR 51533, Oct. 1, 1993; 66 FR 45385, Aug. 28, 2001]
- **truncated:** false
- **body characters:** 453
