{"operation":"document","citation":"49 CFR 176.190","title":"Departure of vessel.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":"2026-08-18","summary":"When loading of Class 1 (explosive) materials is completed, the vessel must depart from the port area as soon as is reasonably practicable.","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-176-190.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-176-190.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-176-190","source_url":"https://www.ecfr.gov/on/2026-08-18/title-49/section-176.190","body":"When loading of Class 1 (explosive) materials is completed, the vessel must depart from the port area as soon as is reasonably practicable.","truncated":false,"body_characters":139}