{"operation":"document","citation":"49 CFR 178.245-7","title":"Report.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":null,"effective_on":"2005-10-01","summary":"(a) A copy of the manufacturer's data report required by Section VIII of the ASME Code (IBR, see § 171.7 of this subchapter) under which the tank is fabricated shall be furnished to the owner for each new tank.\n\n(b) [Reserved]\n\n[Amdt. 178-76, 48 FR 28102, June 20, 1983, as amended at 68 FR 75750, De","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-178-245-7.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-178-245-7.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-178-245-7","source_url":"https://www.govinfo.gov/app/details/CFR-2005-title49-vol2/CFR-2005-title49-vol2-sec178-245-7","body":"(a) A copy of the manufacturer's data report required by Section VIII of the ASME Code (IBR, see § 171.7 of this subchapter) under which the tank is fabricated shall be furnished to the owner for each new tank.\n\n(b) [Reserved]\n\n[Amdt. 178-76, 48 FR 28102, June 20, 1983, as amended at 68 FR 75750, Dec. 31, 2003]","truncated":false,"body_characters":312}