{"operation":"document","citation":"49 CFR 178.318-3","title":"-3 Marking.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":"2026-08-18","summary":"Each container must be marked as prescribed in § 178.2(b).\n\n[Amdt. 178-40, 41 FR 38181, Sept. 9, 1976, as amended at 66 FR 45185, Aug. 28, 2001]","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-178-318-3.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-178-318-3.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-178-318-3","source_url":"https://www.ecfr.gov/on/2026-08-18/title-49/section-178.318-3","body":"Each container must be marked as prescribed in § 178.2(b).\n\n[Amdt. 178-40, 41 FR 38181, Sept. 9, 1976, as amended at 66 FR 45185, Aug. 28, 2001]","truncated":false,"body_characters":144}