{"operation":"document","citation":"49 CFR 178.33a-4","title":"a-4 Duties of inspector.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":"2026-08-18","summary":"(a) To inspect material and completed containers and witness tests, and to reject defective materials or containers.\n\n(b) [Reserved]\n\n[Order 71, 31 FR 9074, July 1, 1966. Redesignated at 32 FR 5606, Apr. 5, 1967]","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-178-33a-4.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-178-33a-4.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-178-33a-4","source_url":"https://www.ecfr.gov/on/2026-08-18/title-49/section-178.33a-4","body":"(a) To inspect material and completed containers and witness tests, and to reject defective materials or containers.\n\n(b) [Reserved]\n\n[Order 71, 31 FR 9074, July 1, 1966. Redesignated at 32 FR 5606, Apr. 5, 1967]","truncated":false,"body_characters":212}