# -11 Loading and unloading valves.

- **operation:** document
- **citation:** 49 CFR 179.500-11
- **title:** -11 Loading and unloading valves.
- **source type:** regulation
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** 2026-08-18
- **summary:** (a) Loading and unloading valve or valves shall be mounted on the cover or threaded into the marked end of tank. These valves shall be of approved type, made of metal not subject to rapid deterioration by lading or in service, and shall withstand without leakage a pressure equal to the marked test p
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/49-cfr-179-500-11.json
- **markdown:** https://regulus.evalyn.ai/document/49-cfr-179-500-11.md
- **app url:** https://regulus.evalyn.ai/document/49-cfr-179-500-11
- **source url:** https://www.ecfr.gov/on/2026-08-18/title-49/section-179.500-11
**body:**

(a) Loading and unloading valve or valves shall be mounted on the cover or threaded into the marked end of tank. These valves shall be of approved type, made of metal not subject to rapid deterioration by lading or in service, and shall withstand without leakage a pressure equal to the marked test pressure of tank. Provision shall be made for closing service outlet of valves.

(b) [Reserved]
- **truncated:** false
- **body characters:** 394
