- **summary:** If PHMSA conducts a facility design and/or construction safety review or inspection in connection with a proposal to construct, expand, or operate a gas, hazardous liquid or carbon dioxide pipeline facility, or a liquefied natural gas facility that meets the applicability requirements in § 190.403, 
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/49-cfr-190-401.json
- **markdown:** https://regulus.evalyn.ai/document/49-cfr-190-401.md
- **app url:** https://regulus.evalyn.ai/document/49-cfr-190-401
- **source url:** https://www.ecfr.gov/on/2026-08-18/title-49/section-190.401
**body:**

If PHMSA conducts a facility design and/or construction safety review or inspection in connection with a proposal to construct, expand, or operate a gas, hazardous liquid or carbon dioxide pipeline facility, or a liquefied natural gas facility that meets the applicability requirements in § 190.403, PHMSA may require the applicant proposing the project to pay the costs incurred by PHMSA relating to such review, including the cost of design and construction safety reviews or inspections.
- **truncated:** false
- **body characters:** 490