{"operation":"document","citation":"49 CFR 191.9","title":"Distribution system: Incident report.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":"2026-08-18","summary":"(a) Except as provided in paragraph (c) of this section, each operator of a distribution pipeline system shall submit Department of Transportation Form PHMSA F 7100.1 as soon as practicable but not more than 30 days after detection of an incident required to be reported under § 191.5.\n\n(b) When addi","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-191-9.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-191-9.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-191-9","source_url":"https://www.ecfr.gov/on/2026-08-18/title-49/section-191.9","body":"(a) Except as provided in paragraph (c) of this section, each operator of a distribution pipeline system shall submit Department of Transportation Form PHMSA F 7100.1 as soon as practicable but not more than 30 days after detection of an incident required to be reported under § 191.5.\n\n(b) When additional relevant information is obtained after the report is submitted under paragraph (a) of this section, the operator shall make supplementary reports as deemed necessary with a clear reference by date and subject to the original report.\n\n(c) Master meter operators are not required to submit an incident report as required by this section.\n\n[Amdt. 191-5, 49 FR 18960, May 3, 1984, as amended at 75 FR 72905, Nov. 26, 2010; Amdt. 191-37, 90 FR 40760, Aug. 21, 2025]","truncated":false,"body_characters":767}