{"operation":"document","citation":"49 CFR 192.305","title":"Inspection: General.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":"2026-08-18","summary":"Link to an amendment published at 80 FR 12779, Mar. 11, 2015.\n\nThis amendment was delayed indefinitely at 80 FR 58633, Sept. 30, 2015.\n\nEach transmission line or main must be inspected to ensure that it is constructed in accordance with this part.","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-192-305.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-192-305.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-192-305","source_url":"https://www.ecfr.gov/on/2026-08-18/title-49/section-192.305","body":"Link to an amendment published at 80 FR 12779, Mar. 11, 2015.\n\nThis amendment was delayed indefinitely at 80 FR 58633, Sept. 30, 2015.\n\nEach transmission line or main must be inspected to ensure that it is constructed in accordance with this part.","truncated":false,"body_characters":247}