{"operation":"document","citation":"49 CFR 192.307","title":"Inspection of materials.","source_type":"regulation","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":"2026-08-18","summary":"Each length of pipe and each other component must be visually inspected at the site of installation to ensure that it has not sustained any visually determinable damage that could impair its serviceability.","machine_formats":{"json":"https://regulus.evalyn.ai/document/49-cfr-192-307.json","markdown":"https://regulus.evalyn.ai/document/49-cfr-192-307.md"},"app_url":"https://regulus.evalyn.ai/document/49-cfr-192-307","source_url":"https://www.ecfr.gov/on/2026-08-18/title-49/section-192.307","body":"Each length of pipe and each other component must be visually inspected at the site of installation to ensure that it has not sustained any visually determinable damage that could impair its serviceability.","truncated":false,"body_characters":206}